Search NASA⌕ Search

SEARCH · Search NASA

Results for “Support activities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

An Overview of the Process for Pre-Launch Checkout and Transition Activities in Support of the International Space Station (ISS) Payload Operations Integration Center

The objective of this paper is to provide future ISS scientists and/or engineers with an overview of the coordination process for the preparation and implementation of the pre-launch checkout and transition activities as observed from the Marshall Control Flight Center (MSFC) Payload Operations Integration Center perspective. This includes 4 major phases: (1) Verification and validation of the new command and telemetry databases that are needed for new payload experiments and new onboard formats; (2) Integration testing of the new ground control software and hardware; (3) Final internal and external pre-launch checkouts with cadre and experiment teams; (4) Performance of the actual synchronized transition between MSFC, Johnson Space Center (JSC), and ISS onboard configuration to new onboard software, ground software, and databases.

Digesu, Sam↗

Overview of Liner Activities in Support of the International Forum for Aviation Research

This paper provides an overview of liner research being conducted by members of the International Forum for Aviation Research (IFAR). The IFAR consists of representatives from a number of national research labs and is established to enable information exchange on aviation research activities. NASA has provided three challenges that explore different aspects of acoustic liner research, and will compile the results from each of the partners into a common database when the challenges are completed. The goal of the first challenge is to compare experimental methods applied at different national labs for acoustic liner evaluation, and to compare impedance eduction methodologies for uniform liners. The second challenge is to evaluate the ability of 3D propagation codes to predict the effects of spanwise variable-impedance liners on the acoustic pressure field. The third challenge is to explore different approaches to simultaneously educe the impedances for each zone of a three-zone liner. Each challenge is intended to be conducted as a blind test. Thus, only representative results achieved by the NASA Liner Physics Team for each of the three challenges are presented herein. When the results from all participants are available, the compiled results are intended to be provided in future reports.

Jones, Michael G.↗

Progress Report on PICA Activities in Support of New Frontiers Missions

Phenolic Impregnated Carbon Ablator (PICA) is a TPS material that has been used in a number of previous flight missions (Stardust, MSL) and is planned for a number of future missions (OSIRIS-Rex and Mars 2020) so it has substantial flight heritage, is applicable to a wide range of missions, and is often baselined as the TPS in future NASA proposal activities. As is common with a number of TPS materials, PICA faces a supply chain issue with the rayon precursor from which the carbon fibers used in the PICA preform are derived. PICA uses a non-woven form of the rayon, which once carbonized, is used in the low-density carbon FiberForm (carbon tile) preform utilized in PICA. Current PICA uses a NASA-qualified non-domestic rayon supplier (Sniace), however the qualified supplier is no longer manufacturing the rayon materials. This activity will address PICA sustainability, by initially carbonizing the remaining stockpile of Sniace rayon precursor. A additional FiberForm manufacturing task from alternate rayon sources is also in progress.

thermal protection↗

Safety & Mission Assurance (SMA) Activities in Support of Artemis I and Plans for Artemis II

The Artemis I mission in 2022 accomplished humanity’s first venture beyond Low-Earth Orbit (LEO) with a human-rated spacecraft in over fifty years. Artemis comprises several key Program elements – Multi-Purpose Crew Vehicle (MPCV) Orion Crew Module, Service Module, Launch Abort System; the Space Launch System (SLS) and the Exploration Ground System (EGS). Much of our human spaceflight experience with crewed lunar missions is captured in historical program documents, but first-hand knowledge is limited to a few spaceflight veterans. Missions to LEO have offered the opportunity of direct, near-instantaneous communications and assistance, and the ability to return to Earth within a matter of hours in case of emergency. Outward-bound missions do not have these features and will require a more autonomous and reliable spacecraft. The assessment of compliance with applicable safety requirements and adequacy of hazard controls and verifications is the responsibility of the MPCV Safety and Engineering Review Panel (MSERP), along with a Joint [NASA/ESA] Safety and Engineering Review Panel (JSERP) for the review of the European Service Module (ESM). The MSERP has two features that are relatively unique amongst NASA safety panels. First, NASA Engineering was added as a Panel co-chair, which enhanced the Engineering organization’s engagement and level of understanding of hazard analysis methodology and results. The MSERP has representation from each office, including Flight Operations Directorate (FOD) and Health and Medical Technical Authority, supporting the Orion Program in addition to the Engineering and Safety Technical Authority co-chairs. Second, the JSERP has a second set of co-chairs from ESA Engineering and ESA Product Assurance and Safety organizations, which recognizes the international arrangement as one of partnership. This paper will focus on SMA processes, activities, and plans for the Orion element and explore unique challenges associated with Artemis II as we approach the flight of the first crewed Orion vehicle.

Paul J. Collier↗

Control Activity in Support of NASA Turbine Based Combined Cycle (TBCC) Research

Control research for a Turbine Based Combined Cycle (TBCC) propulsion system is the current focus of the Hypersonic Guidance, Navigation, and Control (GN&C) discipline team. The ongoing work at the NASA Glenn Research Center (GRC) supports the Hypersonic GN&C effort in developing tools to aid the design of control algorithms to manage a TBCC airbreathing propulsion system during a critical operating period. The critical operating period being addressed in this paper is the span when the propulsion system transitions from one cycle to another, referred to as mode transition. One such tool, that is a basic need for control system design activities, is computational models (hereto forth referred to as models) of the propulsion system. The models of interest for designing and testing controllers are Control Development Models (CDMs) and Control Validation Models (CVMs). CDMs and CVMs are needed for each of the following propulsion system elements: inlet, turbine engine, ram/scram dual-mode combustor, and nozzle. This paper presents an overall architecture for a TBCC propulsion system model that includes all of the propulsion system elements. Efforts are under way, focusing on one of the propulsion system elements, to develop CDMs and CVMs for a TBCC propulsion system inlet. The TBCC inlet aerodynamic design being modeled is that of the Combined-Cycle Engine (CCE) Testbed. The CCE Testbed is a large-scale model of an aerodynamic design that was verified in a small-scale screening experiment. The modeling approach includes employing existing state-of-the-art simulation codes, developing new dynamic simulations, and performing system identification experiments on the hardware in the NASA GRC 10 by10-Foot Supersonic Wind Tunnel. The developed CDMs and CVMs will be available for control studies prior to hardware buildup. The system identification experiments on the CCE Testbed will characterize the necessary dynamics to be represented in CDMs for control design. These system identification models will also be the reference models to validate the CDM and CVM models. Validated models will give value to the tools used to develop the models.

Stueber, Thomas J.↗

Lessons Learned: Mechanical Component and Tribology Activities in Support of Return to Flight

The February 2003 loss of the Space Shuttle Columbia resulted in NASA Management revisiting every critical system onboard this very complex, reusable space vehicle in a an effort to Return to Flight. Many months after the disaster, contact between NASA Johnson Space Center and NASA Glenn Research Center evolved into an in-depth assessment of the actuator drive systems for the Rudder Speed Brake and Body Flap Systems. The actuators are CRIT 1-1 systems that classifies them as failure of any of the actuators could result in loss of crew and vehicle. Upon further evaluation of these actuator systems and the resulting issues uncovered, several research activities were initiated, conducted, and reported to the NASA Space Shuttle Program Management. The papers contained in this document are the contributions of many researchers from NASA Glenn Research Center and Marshall Space Flight Center as part of a Lessons Learned on mechanical actuation systems as used in space applications. Many of the findings contained in this document were used as a basis to safely Return to Flight for the remaining Space Shuttle Fleet until their retirement.

Tribology↗

Space Shuttle Orbiter ECLSS.

The Orbiter Environmental Control and Life Support System (ECLSS) provides the functions of atmosphere revitalization, crew life support, active thermal conditioning, and airlock support for EVA and docking activities. The ECLSS must satisfy the requirements of orbital missions with four to ten crewmembers and mission duration of a few hours to 30 days and the requirements associated with an atmospheric horizontal flight test program and ferry flight missions. The ECLSS development plan utilizes an ECLSS ground test article and thermal/vacuum testing to support the first horizontal flight test at the end of 1976. The ground testing and horizontal flight test program certify the Orbiter ECLSS for the first orbital flight in early 1978.

Stoll, O. T.↗

Sandia Laboratories in-house activities in support of solar thermal large power applications

The development of thermal energy storage subsystems for solar thermal large power applications is described. The emphasis is on characterizing the behavior of molten nitrate salts with regard to thermal decomposition, environmental interactions, and corrosion. Electrochemical techniques to determine the ionic species in the melt and for use in real time studies of corrosion are also briefly discussed.

Mar, R. W.↗

Central station applications planning activities and supporting studies

The application of photovoltaic technology in central station (utility) power generation plants is considered. A program of data collection and analysis designed to provide additional information about the subset of the utility market that was identified as the initial target for photovoltaic penetration, the oil-dependent utilities (especially muncipals) of the U.S. Sunbelt, is described along with a series of interviews designed to ascertain utility industry opinions about the National Photovoltaic Program as it relates to central station applications.

Leonard, S. L.↗

Design and implementation of a Windows NT network to support CNC activities

The Manufacturing, Materials, & Processes Technology Division is undergoing dramatic changes to bring it's manufacturing practices current with today's technological revolution. The Division is developing Computer Automated Design and Computer Automated Manufacturing (CAD/CAM) abilities. The development of resource tracking is underway in the form of an accounting software package called Infisy. These two efforts will bring the division into the 1980's in relationship to manufacturing processes. Computer Integrated Manufacturing (CIM) is the final phase of change to be implemented. This document is a qualitative study and application of a CIM application capable of finishing the changes necessary to bring the manufacturing practices into the 1990's. The documentation provided in this qualitative research effort includes discovery of the current status of manufacturing in the Manufacturing, Materials, & Processes Technology Division including the software, hardware, network and mode of operation. The proposed direction of research included a network design, computers to be used, software to be used, machine to computer connections, estimate a timeline for implementation, and a cost estimate. Recommendation for the division's improvement include action to be taken, software to utilize, and computer configurations.

Shearrow, C. A.↗

To Support Research Activities Under the NASA Experimental Program to Stimulate Competitive Research

The Alabama NASA EPSCoR Program is a collaborative venture of The Alabama Space Grant Consortium, The Alabama EPSCoR, and faculty and staff at 10 Alabama colleges and universities as well as the Alabama School of Math and Science in Mobile. There are two Research Clusters which include infrastructure-building and outreach elements embedded in their research activities. Each of the two Research Clusters is in an area of clear and demonstrable relevance to NASA's mission, to components of other Alabama EPSCoR projects, and to the State of Alabama's economic development. This Final Report summarizes and reports upon those additional activities occurring after the first report was submitted in March 2000 (included here as Appendix C). Since the nature of the activities and the manner in which they relate to one another differ by cluster, these clusters function independently and are summarized in parallel in this report. They do share a common administration by the Alabama Space Grant Consortium (ASGC) and by this means, good ideas from each group were communicated to the other, as appropriate. During the past year these research teams, involving 15 scientists, 16 graduate students, 16 undergraduates, and 7 high school students involving 10 Alabama universities had 14 peer reviewed scientific journal articles published, 21 others reviewed for publication or published in proceedings, gave 7 formal presentations and numerous informal presentations to well over 3000 people, received 3 patents and were awarded 14 research proposals for more than $213K dollars in additional research related to these investigations. Each cluster's activities are described and an Appendix summarizes these achievements.

Gregory, John C.↗

Auxiliary Propulsion Activities in Support of NASA's Exploration Initiative

The Space Launch Initiative (SLI) procurement mechanism NRA8-30 initiated the Auxiliary Propulsion System/Main Propulsion System (APS/MPS) Project in 2001 to address technology gaps and development risks for non-toxic and cryogenic propellants for auxiliary propulsion applications. These applications include reaction control and orbital maneuvering engines, and storage, pressure control, and transfer technologies associated with on-orbit maintenance of cryogens. The project has successfully evolved over several years in response to changing requirements for re-usable launch vehicle technologies, general launch technology improvements, and, most recently, exploration technologies. Lessons learned based on actual hardware performance have also played a part in the project evolution to focus now on those technologies deemed specifically relevant to the Exploration Initiative. Formal relevance reviews held in the spring of 2004 resulted in authority for continuation of the Auxiliary Propulsion Project through Fiscal Year 2005 (FY05), and provided for a direct reporting path to the Exploration Systems Mission Directorate. The tasks determined to be relevant under the project were: continuation of the development, fabrication, and delivery of three 870 lbf thrust prototype LOX/ethanol reaction control engines; the fabrication, assembly, engine integration and testing of the Auxiliary Propulsion Test Bed at White Sands Test Facility; and the completion of FY04 cryogenic fluid management component and subsystem development tasks (mass gauging, pressure control, and liquid acquisition elements). This paper presents an overview of those tasks, their scope, expectations, and results to-date as carried forward into the Exploration Initiative.

Best, Philip J.↗

Comparison of V-4 and V-5 Exercise/Oxygen Prebreathe Protocols to Support Extravehicular Activity in Microgravity

The Prebreathe Reduction Program (PRP) used exercise during oxygen prebreathe to reduce necessary prebreathe time prior to depressurizing to work in a 4.3 psi suit during extravehicular activity (EVA). Initial testing produced a two-hour protocol incorporating ergometry exercise and a 30 min cycle of depress/repress to 10.2 psi where subjects breathed 26.5% oxygen/balance nitrogen (Phase II - 10 min at 75% peak oxygen consumption [VO2 peak] followed by 40 min intermittent light exercise [ILE] [approx. 5.8 mL-per kilogram- per minute], then 50 min of rest). The Phase II protocol (0/45 DCS) was approved for operations and has been used on 40 EVAs, providing significant time savings compared to the standard 4 h resting oxygen prebreathe. The Phase V effort focused on performing all light in-suit exercise. Two oxygen prebreathe protocols were tested sequentially: V-4) 160 min prebreathe with 150 min of continuous ILE. The entire protocol was completed at 14.7 psi. All exercise involved upper body effort. Exercise continued until decompression. V-5) 160 min prebreathe with 140 min of ILE - first 40 min at 14.7 psi, then 30 min at 10.2 psi (breathing 26.5% oxygen) after a 20 min depress, simulating a suit donning period. Subjects were then repressed to 14.7 psi and performed another 50 min of lower body ILE, followed by 50 min rest before decompression. The V-4 protocol was rejected with 3 DCS/6 person-exposures. Initial V-5 testing has produced 0 DCS/11 person-exposures (ongoing trials). The difference in DCS rate was significant (Fisher Exact p=0.029). The observations of DCS were significantly lower in early V-5 trials than in V-4 trials. Additional studies are required to evaluate the relative contribution of the variables in exercise distribution, the 10.2 psi depress/repress component, pre-decompression rest, or possible variation in total oxygen consumption.

Pollock, N. W.↗

Software Development Standard Processes (SDSP)

A JPL-created set of standard processes is to be used throughout the lifecycle of software development. These SDSPs cover a range of activities, from management and engineering activities, to assurance and support activities. These processes must be applied to software tasks per a prescribed set of procedures. JPL s Software Quality Improvement Project is currently working at the behest of the JPL Software Process Owner to ensure that all applicable software tasks follow these procedures. The SDSPs are captured as a set of 22 standards in JPL s software process domain. They were developed in-house at JPL by a number of Subject Matter Experts (SMEs) residing primarily within the Engineering and Science Directorate, but also from the Business Operations Directorate and Safety and Mission Success Directorate. These practices include not only currently performed best practices, but also JPL-desired future practices in key thrust areas like software architecting and software reuse analysis. Additionally, these SDSPs conform to many standards and requirements to which JPL projects are beholden.

Lavin, Milton L.↗