Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Unreliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

System Study: High-Pressure Core Spray 1998–2018

This report presents an unreliability evaluation of the high-pressure core spray (HPCS) at eight U.S. commercial boiling water reactors. Demand, run hours, and failure data from 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPCS results.

99 GENERAL AND MISCELLANEOUS↗

A New Remote Communications Link to Reduce Residential PV Solar Costs

Monitoring of PV/DER site production is expensive to install and unreliable. Among third party systems providers, lost communications links are a growing concern. Nearly 20% of links are failing, provisioning is complex, recovery is expensive, production data is lost, and access is fragmented. FleetLink is a new concept in DER system communications, purpose built for lowering the cost of maintaining active contact with residential end user sites and ensuring that production data is reliably available to third party systems providers. Systems providers require accurate, secure system monitoring and reporting of production data and system faults while driving down overall costs to compete effectively. This plug and play, independently operating communications solution lowers the cost of fleet contact from typically .08 dollars-$.12/W down to .02 dollars -.03/W including installation and maintenance expenses. FleetLink establishes a breakthrough in simplicity that facilitates rapid expansion of residential solar by reducing initial capital outlay and lowering installation labor time and skill levels. The solution also facilitates higher DER installation growth rates by driving down maintenance costs and eliminating communications trouble calls. This is accomplished by the FleetLink’s unique network technology that enables dynamic network configuration for fast changes, and active, self-healing DER site contact for uptime assurance. Using an open source network framework with proprietary, application specific enhancements, FleetLink independently manages connectivity, security, recovery, grid control communications, and fleet expansion while presenting a compliant SunSpec interface to the third party operations centers. The net system cost savings of at least .05 dollars/W supports the SunShot cost goals and the flexibility and scalability of the solution accelerates the velocity and ubiquitous adoption of solar.

14 SOLAR ENERGY↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998–2012

This report presents an enhanced performance evaluation of motor-driven valves (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2012 for the component reliability as reported in the Equipment Performance and Information Exchange (EPIX). The MDP failure modes considered for standby systems are failure to start, failure to run less than or equal to 1 hour, and failure to run more than 1 hour; for normally running systems, the failure modes considered are failure to start and failure to run. An 8 hr unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. One statistically significant increasing trend was identified in the MDP results for standby MDP run hours per reactor critical year. Statistically significant decreasing trends were identified for unreliability (for standby and normally running systems) frequency of failure-to-start events for standby systems and failure probability for standby systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Target diagnostic control system implementation for the National Ignition Facility (invited)

The extreme physics of targets shocked by NIF's 192-beam laser is observed by a diverse suite of diagnostics. Many diagnostics are being developed by collaborators at other sites, but ad hoc controls could lead to unreliable and costly operations. A diagnostic control system (DCS) framework for both hardware and software facilitates development and eases integration. Each complex diagnostic typically uses an ensemble of electronic instruments attached to sensors, digitizers, cameras, and other devices. In the DCS architecture each instrument is interfaced to a low-cost WINDOWS XP processor and JAVA application. Each instrument is aggregated with others as needed in the supervisory system to form an integrated diagnostic. The JAVA framework provides data management, control services, and operator graphical user interface generation. DCS instruments are reusable by replication with reconfiguration for specific diagnostics in extensible markup language. Advantages include minimal application code, easy testing, and high reliability. Collaborators save costs by assembling diagnostics with existing DCS instruments. This talk discusses target diagnostic instrumentation used on NIF and presents the DCS architecture and framework.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Selecting Observation Platforms for Optimized Anomaly Detectability under Unreliable Partial Observations

Diagnosers for keeping track on the occurrences of special events in the framework of unreliable partially observed discrete-event dynamical systems were developed in previous work. This paper considers observation platforms consisting of sensors that provide partial and unreliable observations and of diagnosers that analyze them. Diagnosers in observation platforms typically perform better as sensors providing the observations become more costly or increase in number. This paper proposes a methodology for finding an observation platform that achieves an optimal balance between cost and performance, while satisfying given observability requirements and constraints. Since this problem is generally computational hard in the framework considered, an observation platform optimization algorithm is utilized that uses two greedy heuristics, one myopic and another based on projected performances. These heuristics are sequentially executed in order to find best observation platforms. The developed algorithm is then applied to an observation platform optimization problem for a multi-unit-operation system. Results show that improved observation platforms can be found that may significantly reduce the observation platform cost but still yield acceptable performance for correctly inferring the occurrences of special events.

97 MATHEMATICS AND COMPUTING↗

Component Repair Times Obtained from MSPI Data

Information concerning times to repair or restore equipment to service given a failure is valuable to probabilistic risk assessments (PRAs). Examples of such uses in modern PRAs include estimation of the probability of failing to restore a failed component within a specified time period (typically tied to recovering a mitigating system before core damage occurs at nuclear power plants) and the determination of mission times for support system initiating event (SSIE) fault tree models. Information on equipment repair or restoration times applicable to PRA modeling is limited and dated for U.S. commercial nuclear power plants. However, the Mitigating Systems Performance Index (MSPI) program covering all U.S. commercial nuclear power plants provides up-to-date information on restoration times for a limited set of component types. This paper describes the MSPI program data available and analyzes the data to obtain median and mean component restoration times as well as non-restoration cumulative probability curves. The MSPI program provides guidance for monitoring both planned and unplanned outages of trains of selected mitigating systems deemed important to safety. For systems included within the MSPI program, plants monitor both train UA and component unreliability (UR) against baseline values. If the combined system UA and UR increases sufficiently above established baseline results (converted to an estimated change in core damage frequency or CDF), a “white” (or worse) indicator is generated for that system. That in turn results in increased oversight by the US Nuclear Regulatory Commission (NRC) and can impact a plant’s insurance rating. Therefore, there is pressure to return MSPI program components to service as soon as possible after a failure occurs. Three sets of unplanned outages might be used to determine the component repair durations desired in this article: all unplanned outages for the train type that includes the component of interest, only unplanned outages associated with failures of the component of interest, and only unplanned outages associated with PRA failures of the component of interest. The paper will describe how component repair times can be generated from each set and which approach is most applicable. Repair time information will be summarized for MSPI pumps and diesel generators using data over 2003 – 2007. Also, trend information over 2003 – 2012 will be presented to indicate whether the 2003 – 2007 repair time information is still considered applicable. For certain types of pumps, mean repair times are significantly higher than the typically assumed 24 h duration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Systematic Evaluation of Backdoor Data Poisoning Attacks on Image Classifiers

Backdoor data poisoning attacks have recently been demonstrated in computer vision research as a potential safety risk for machine learning (ML) systems. Traditional data poisoning attacks manipulate training data to induce unreliability of an ML model, whereas backdoor data poisoning attacks maintain system performance unless the MLmodel is presented with an input containing an embedded“trigger” that provides a predetermined response advantageous to the adversary. Our work builds upon prior back-door data-poisoning research for ML image classifiers and systematically assesses different experimental conditions including types of trigger patterns, persistence of trigger patterns during retraining, poisoning strategies, architectures (ResNet-50, NasNet, NasNet-Mobile), datasets (Flowers, CIFAR-10), and potential defensive regularization techniques (Contrastive Loss, Logit Squeezing, Manifold Mixup,Soft-Nearest-Neighbors Loss). Experiments yield four key findings. First, the success rate of backdoor poisoning at-tacks varies widely, depending on several factors, including model architecture, trigger pattern and regularization technique. Second, we find that poisoned models are hard to detect through performance inspection alone. Third, regularization typically reduces backdoor success rate, although it can have no effect or even slightly increase it, depending on the form of regularization. Finally, backdoors inserted through data poisoning can be rendered ineffective after just a few epochs of additional training on a small set of clean data without affecting the model’s performance.

Truong, Loc T.↗

Performance and scalability evaluation of the Ceph parallel file system. In: PDSW '13 Proceedings of the 8th Parallel Data Storage Workshop

Ceph is an emerging open-source parallel distributed file and storage system. By design, Ceph leverages unreliable commodity storage and network hardware, and provides reliability and fault-tolerance via controlled object placement and data replication. This paper presents our file and block I/O performance and scalability evaluation of Ceph for scientific high-performance computing (HPC) environments. Our work makes two unique contributions. First, our evaluation is performed under a realistic setup for a large-scale capability HPC environment using a commercial high-end storage system. Second, our path of investigation, tuning efforts, and findings made direct contributions to Ceph's development and improved code quality, scalability, and performance. These changes should benefit both Ceph and the HPC community at large.

Wang, Feiyi↗

Capacity and Coulombic Efficiency Measurements Underestimate the Rate of SEI Growth in Silicon Anodes

Capacity measurements and related quantities are the first layer of information acquired during testing of Li-ion cells. It is generally considered that elevated values of coulombic efficiency and capacity retention are absolute indicators of the existence of a stable solid electrolyte interphase (SEI). Here, we challenge this notion by analyzing how the effect of side reactions on cell capacity depends on the choice of electrodes. More specifically, we demonstrate that the extent of measurable capacity fade due to SEI growth is modulated by the shape of the voltage profile of the cathode and anode at the end of charge and discharge half-cycles. This shape-dependency creates a mismatch between SEI growth and cell capacity loss, which is relatively small for graphite anodes but sizable for silicon-containing electrodes. We illustrate this point by showing that, at the same coulombic efficiency and capacity retention, cells containing silicon-based materials could actually exhibit rates of SEI growth that are as much as ≥ 40% higher than graphite cells. The main implication of this behavior is that, for certain systems, capacity measurements may be an unreliable source of information about the extent of reactions at the SEI, allowing other consequences of these side reactions (such as electrolyte depletion) to proceed unchecked while the cell appears to be stable.

25 ENERGY STORAGE↗

The Impact of Stochastic Perturbations in Physics Variables for Predicting Surface Solar Irradiance

We present a probabilistic framework tailored for solar energy applications referred to as the Weather Research and Forecasting-Solar ensemble prediction system (WRF-Solar EPS). WRF-Solar EPS has been developed by introducing stochastic perturbations into the most relevant physical variables for solar irradiance predictions. In this study, we comprehensively discuss the impact of the stochastic perturbations of WRF-Solar EPS on solar irradiance forecasting compared to a deterministic WRF-Solar prediction (WRF-Solar DET), a stochastic ensemble using the stochastic kinetic energy backscatter scheme (SKEBS), and a WRF-Solar multi-physics ensemble (WRF-Solar PHYS). The performances of the four forecasts are evaluated using irradiance retrievals from the National Solar Radiation Database (NSRDB) over the contiguous United States. We focus on the predictability of the day-ahead solar irradiance forecasts during the year of 2018. The results show that the ensemble forecasts improve the quality of the forecasts, compared to the deterministic prediction system, by accounting for the uncertainty derived by the ensemble members. However, the three ensemble systems are under-dispersive, producing unreliable and overconfident forecasts due to a lack of calibration. In particular, WRF-Solar EPS produces less optically thick clouds than the other forecasts, which explains the larger positive bias in WRF-Solar EPS (31.7 W/m 2 ) than in the other models (22.7–23.6 W/m 2 ). This study confirms that the WRF-Solar EPS reduced the forecast error by 7.5% in terms of the mean absolute error (MAE) compared to WRF-Solar DET, and provides in-depth comparisons of forecast abilities with the conventional scientific probabilistic approaches (i.e., SKEBS and a multi-physics ensemble). Guidelines for improving the performance of WRF-Solar EPS in the future are provided.

14 SOLAR ENERGY↗

Threat Agnostic Virulence Assessment of Pathogens

Virulence assessment of new, emerging, and engineered pathogens is critical to mounting an appropriate response to a biothreat agent. The capacity of the pathogen to colonize human and harm tissues must be characterized to understand pathogenicity pathways and optimize diagnosis and treatment of resulting disease. Respiratory pathogens are of interest because they can have high transmissibility rates, as observed with the SARS-CoV-2 virus, the causative agent of Covid-19. Current technologies are insufficient to assess threats due to their reliance on systems with only one cell type and on sequencing the pathogen. However, it is known that sequence is not an accurate predictor of function, and sequencing can be unreliable for newly emerged or engineered pathogens. An ideal system would consist of relevant epithelial cell types and an assay sensitive enough to detect changes in host responses that do not rely on DNA sequencing. We chose a system consisting of host lung epithelial cells that can be used to assess the virulence of unknown respiratory pathogens. We interrogated pathogens using this model and assess features of pathogenicity. Our objective is to leverage PNNLs strengths in tissue engineering and proteomics capabilities to build a multiple reaction monitoring (MRM) or parallel reaction monitoring (PRM) liquid chromatography-tandem mass spectrometry assay for human host cell proteins whose abundance is influenced by infection. These responses can were then assessed for relative virulence using pathogen agnostic signatures. When confronted with a pathogen, cells activate dedicated signaling pathways, typically through phosphorylation of regulatory proteins and downstream activation of host cell networks.

59 BASIC BIOLOGICAL SCIENCES↗

Enhanced Component Performance Study: Turbine Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period: The following decreasing trends were identified for TDPs for the most recent 10 year period: • Standby TDP FTR>1H failure rate • Normally running TDP FTR failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of start demands (demands per reactor year) • Standby TDP frequency of FTR=1H hours (hours per reactor year) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands • Normally running TDP frequency of run hours • Normally running TDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998-2024

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10-year period: The following decreasing trends were identified for TDPs for the most recent 10-year period: • Standby TDP FTR>1H failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands (demands per reactor year) • Normally running TDP frequency of run hours (hours per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP frequency of start demands (demands per reactor year) • Standby MDP frequency of FTR≤1H hours (hours per reactor year) • Standby MDP frequency of FTR>1H hours • Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP FTR≤1H failure probability • Normally running MDP FTR failure rate • Standby MDP unavailability • Normally running MDP total unreliability (8-hour mission) • Standby MDP frequency of FTR≤1H events (failures per reactor year) • Normally running MDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP frequency of start demands (demands per reactor year), (2) Standby MDP frequency of FTR=1H hours (hours per reactor year), (3) Standby MDP frequency of FTR>1H hours, and (4) Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP FTR=1H failure probability, (2) Normally running MDP FTR failure rate, (3) Standby MDP unavailability, (4) Standby MDP total unreliability (8-hour mission), and (5) Normally running MDP total unreliability (8-hour mission).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Motor Driven Pumps 1998-2024

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗