Universal Utility Data Exchange (UUDEX) Phase 4 Test Plan
This report Provides a test plan for the Phase 4 UUDEX demonstration.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This report Provides a test plan for the Phase 4 UUDEX demonstration.
Subsystem development and qualification test plan for Apollo applications program combined mission payload integration
Pioneer Venus system test plans and trade studies which were first published as Study Tasks (References 1 through 5) are reviewed. The plan and trade studies are presented in a condensed form. Greater detail may be found in the referenced study tasks if desired. All significant conclusions and plan outlines of the original studies are, presented.
A preliminary assessment of vibroacoustic test plan optimization for free flyer STS payloads is presented and the effects on alternate test plans for Spacelab sortie payloads number of missions are also examined. The component vibration failure probability and the number of components in the housekeeping subassemblies are provided. Decision models are used to evaluate the cost effectiveness of seven alternate test plans using protoflight hardware.
The Sibling Pin test campaign is a Department of Energy (DOE) research activity within the Spent Fuel and Waste Science and Technology (SFWST) program that is tasked with characterization of high burnup (HBU) fuel in support of the High Burnup Spent Fuel Data Project. Of the 25 fuel rods in the Sibling Pin inventory, approximately 9 rod lengths have been consumed during the first phase (Phase I) of the test campaign leaving approximately 16 rod lengths for the second phase (Phase II) of testing. This plan outlines the Phase II testing and the motivations for performing these tests. Priorities for Phase II testing are based on previously identified knowledge gaps, lessons-learned from Phase I work, the original objectives of the High Burnup Spent Fuel Data Project and the Sibling Pin test campaign, and input from external stakeholders. The priorities for Phase II testing are to obtain data to characterize the effects of annealing on cladding mechanical properties and fuel rod performance, to quantify the creep behavior of cladding materials and fuel rods and the effects of creep deformations on the performance of cladding and fuel rods, and to gather data to support the final closure of the hydride reorientation and radial hydride induced embrittlement gap for HBU fuel rods.
The objective of this test plan is to describe research to determine the gaseous by-products of the adsorption of CH 3 I on hydrogen reduced silver exchanged mordenite (AgZ). An initial test plan was developed in FY 2012 to discern the chemical reactions that occur when organic iodides interact with the other components in a prototypical off-gas in the presence of silver-loaded zeolite, AgZ. CH 3 I is used as a surrogate for organic iodides that could be present in the gas streams, although follow-on tests include potentially using other organic iodides as well. This test plan was updated to reflect test results obtained during FY 2013 to FY 2015 and was further adjusted based on additional information from the relevant literature obtained since 2012. Four main questions are listed that need to be answered to verify earlier test results that indicate that CH 3 I and I 2 are present in the effluent from a column containing AgZ.
The Plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.
The plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.
Earlier encouraging test results of a contextual classifier that combines spatial and spectral information employing a general statistical approach are expanded. The earlier results were of limited meaning because they were produced from small (50-by-50 pixel) data sets. An implementation of the contextual classifier on NASA Goddard's Massively Parallel Processor (MPP) is presented; for the first time the MPP makes feasible the testing of the classifier on large data sets (a 12-hour test on a VAX-11/780 minicomputer now takes 5 minutes on the MPP). The MPP is a Single-Instruction, Multiple Data Stream computer, consisting of 16,384 bit serial microprocessors connected in a 128-by-128 mesh array with each element having data transfer connections with its four nearest neighbors so that the MPP is capable of billions of operations per second. Preliminary results are given (with more expected for the conference) and plans are mentioned for extended testing of the contextual classifier on Thematic Mapper data sets.
The test plan defines the tests to be conducted, identifies and describes all test items, and states the objectives of all tests required to verify that the performance and design goals of the Contract End Item Specification, 7232-0009, have been met and that flight hardware is acceptable. Additionally, environmental conditions, testing time or cycles, allowable maintenance, logging requirements, manner of analysis and utilization of test results, disposition of test specimens, retest requirements, location of tests, facilities and support requirements, and the time phasing of the tests are presented.
The purpose of this flight test plan is to describe procedures for conducting FIM operations with the FIM Avionics Systems installed in two test aircraft.
Preproduction test program for measuring electromagnetic interference and susceptability of high level multicoder
Explore the source record for details and available documents.
Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.
Ground and flight test plans for defining operational capability of ammonia and hydrogen resistojet control system for Manned Orbital Research Laboratory
Observatory integration and test plan and launch operations plan for Earth Resources Technology Satellite
The following report serves as a formal introduction to the water-based Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne. Since 2005, this US Department of Energy (DOE) sponsored program has conducted large scale experimental testing to generate high-quality and traceable validation data for guiding design decisions of the Reactor Cavity Cooling System (RCCS) concept for advanced reactor designs. The most recent facility iteration, and focus of this report, is the operation of a 1/2 scale model of a water-RCCS concept. Several features of the NSTF prototype align with the conceptual design that has been publicly released for the AREVA 625 MWt SC-HTGR. The design of the NSTF also retains all aspects common to a fundamental boiling water thermosiphon, and thus is well poised to provide necessary experimental data to advance basic understanding of natural circulation phenomena and contribute to computer code validation. Overall, the NSTF program operates to support the DOE vision of aiding US vendors in design choices of future reactor concepts, advancing the maturity of codes for licensing, and ultimately developing safe and reliable reactor technologies. In this report, the top-level program objectives, testing requirements, and unique considerations for the water cooled test assembly are discussed, and presented in sufficient depth to support defining the program’s overall scope and purpose. A discussion of the proposed 6-year testing program is then introduced, which outlines the specific strategy and testing plan for facility operations. The proposed testing plan has been developed to meet the toplevel objective of conducting high-quality test operations that span across a broad range of single- and two-phase operating conditions. Details of characterization, baseline test cases, accident scenario, and parametric variations are provided, including discussions of later-stage test cases that examine the influence of geometric variations and off-normal configurations. The facility design follows, including as-built dimensions and specifications of the various mechanical and liquid systems, design choices for the test section, water storage tank, and network piping. Specifications of the instrumentation suite are then presented, along with specific information on performance windows, measurement uncertainties, and installation locations. Finally, descriptions of the control systems and heat removal networks are provided, which have been engineered to support precise quantification of energy balances and facilitate well-controlled test operations.
This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.