Development of Hydrocarbon Membrane for Automotive Fuel Cell Applications

The purpose of this project was to have Sandia National Laboratories (SNL) develop and ship membrane materials to Automotive Fuel Cell Cooperation Corporation (AFCC) to test under their industrial conditions. The results of this project was a close partnership with SNL and an established OEM. This project also gave the SNL material exposure to other large OEM such as Ford, Daimler and Gore. Also, it gave the SNL team confidence that the materials are being developed meet performance metrics required by industry. For the industry partner, this project expanded their view on what type of membrane materials could be used for their end application.

33 ADVANCED PROPULSION SYSTEMS↗

GM Light Duty Fuel Cell Electric Vehicle Validation Data

General Motors LLC (GM) completed a multi-phase project with the Department of Energy to validate light-duty fuel cell electric vehicle (FCEV) performance and durability using dynamometer fuel cell system and real-world vehicle performance data. This project began with GM’s Gen 0 Fuel Cell Fleet vehicles with Technology Insertion operating strategies and materials, and extended to GM’s Gen 1 and early Gen 2 commercial-design intent Fuel Cell stacks and Fuel Cell Systems. The intent of this project was to understand how fuel cell materials, system architectures, and operating strategies impact fuel cell stack durability under fully dynamic operating conditions such as those seen in a light duty vehicle application. More than 87,000 hours of system run time were accumulated under this project simulating several vehicle lifetimes under aggressive driver usage conditions. Lessons learned from this demonstration project have helped expedite the development of a commercially viable, zero-petroleum, zero-emission, Fuel Cell propulsion system. Durability test results have enabled a substantial reduction in the precious metal content in the Fuel Cell Stack with each successive generation of stack design. Stack lifetimes between the first and current design iterations have increased nearly tenfold, while the overall precious metal content has been reduced by approximately 85%. The Gen 2 system power density (kW/gPt) is over five times that of the Gen 0 system. In addition, run time voltage degradation as a function of total platinum was reduced by more than an order of magnitude between the first and last phase of this project. GM is proceeding with a low volume production program aided by the results of the durability testing performed under this cooperative agreement.

08 HYDROGEN↗

Cooperative Adaptive Cruise Control (CACC) in Controlled and Real-World Environments: Testing and Results

The transportation industry annually travels more than 6 times as many miles as passenger vehicles. The fuel cost associated with this represents 38% of the total marginal operating cost for this industry. As a result, industry’s interest in applications of autonomy have grown. One application of this technology is Cooperative Adaptive Cruise Control (CACC) using Dedicated Short-Range Communications (DSRC). Auburn University outfitted four class 8 vehicles, two Peterbilt 579’s and two M915’s, with a basic hardware suite, and software library to enable level 1 autonomy. These algorithms were tested in controlled environments, such as the American Center for Mobility (ACM), and on public roads, such as highway 280 in Alabama, and Interstates 275/696 in Michigan. This paper reviews the results of these real-world tests and discusses the anomalies and failures that occurred during testing.

42 ENGINEERING↗

Thermal Analysis and Test Program to Evaluate Passenger Compartment Thermal Load Reduction and Improve: Cooperative Research and Development Final Report, CRADA number CRD-07-00231

This activity supported a GM and NREL collaborative exploration of strategies to minimize and alleviate the temperature rise in the passenger compartment of an automobile during prolonged exposure to solar radiation in hot climates. It developed and exercised math-based models to simulate the air flow and thermal environment in the passenger compartment in order to compare the effectiveness ofthe strategies. This activity also assessed the strategies using vehicle tests.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

KJRR-FAI Hydraulic Flow Testing Input Package

The INL, in cooperation with the KAERI via Cooperative Research And Development Agreement (CRADA), undertook an effort in the latter half of calendar year 2013 to produce a conceptual design for the KJRR-FAI campaign. The outcomes of this effort are documented in further detail elsewhere [5]. The KJRR-FAI was designed to be cooled by the ATR’s Primary Coolant System (PCS) with no provision for in-pile measurement or control of the hydraulic conditions in the irradiation assembly. The irradiation assembly was designed to achieve the target hydraulic conditions via engineered hydraulic losses in a throttling orifice at the outlet of the irradiation vehicle.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Test of a 250 kVA Battery-Inverter System Micro-Grid: Cooperative Research and Development Final Report, CRADA Number CRD-11-460

Portland General Electric (PGE) is installing a 5-megawatt (MW) lithium-ion-based battery-inverter system (BIS) in Salem, Oregon, as part of the Pacific Northwest Smart Grid Demonstration Project. NREL will assist PGE in testing a 250-kilovolt-ampere (kVA) portion of the BIS in order to verify correct operation and minimize risk to subsequent demonstrations. In this project NREL will providetechnical support for the 250-kVA test and will work with PGE to write a test plan and evaluate the system in the lab before deployment in the field.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Low-Power, Load-Balancing Whole Home Electrification Solution: Cooperative Research and Development (Final Report)

Testing was conducted at the Systems Performance Laboratory in NREL’s Energy Systems Integration Facility to test the performance of 120V wall-mounted heat pumps, 120V heat pump water heaters (HPWH), Electric Vehicle Supply Equipment (EVSE), and other plug-in loads, using NeoCharge Smart Splitters and whole home energy software as appropriate. Four different simulated occupancy scenarios were used to evaluate the package of technology and controls.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

International Energy Agency Ocean Energy Systems Task 10 Wave Energy Converter Modeling Verification and Validation: Preprint

This is the first joint reference paper for the Ocean Energy Systems (OES) Task 10 Wave Energy Converter modeling verification and validation group. The group is established under the OES Energy Technology Network program under the International Energy Agency. OES was founded in 2001 and Task 10 was proposed by Bob Thresher (National Renewable Energy Laboratory) in 2015 and approved by the OES Executive Committee EXCO in 2016. The kickoff workshop took place in September 2016, wherein the initial baseline task was defined. Experience from similar offshore wind validation/verification projects (OC3-OC5 conducted within the International Energy Agency Wind Task 30) [1], [2] showed that a simple test case would help the initial cooperation to present results in a comparable way. A heaving sphere was chosen as the first test case. The team of project participants simulated different numerical experiments, such as heave decay tests and regular and irregular wave cases. The simulation results are presented and discussed in this paper.

16 TIDAL AND WAVE POWER↗

Achievements in testing of the MGA and FRAM isotopic software codes under the DOE/NNSA-IRSN cooperation of gamma-ray isotopic measurement systems

DOE/NNSA and IRSN collaborated on a study of gamma-ray instruments and analysis methods used to perform isotopic measurements of special nuclear materials. The two agencies agreed to collaborate on the project in response to inconsistencies that were found in the various versions of software and hardware used to determine the isotopic abundances of uranium and plutonium. IRSN used software developed internally to test the MGA and FRAM isotopic analysis codes for criteria used to stop data acquisition. The stop-criterion test revealed several unusual behaviors in both the MGA and FRAM software codes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

First Results of the SRF Wafer Test Cavity for the Characterization of Superconductors

The wafer test cavity was designed as a short sample test system that could create a reproducible environment for the testing of superconducting materials above the Bardeen-Cooper- Schrieffer limit of niobium. The results of the sapphire test cavity showed that the dielectric was too lossy, and thus, the original design had to be altered to make operation feasible with current hardware and achieve ~200 mT. The new design was fabricated at Thomas Jefferson National Accelerator Facility and was cryogenically tested. After four tests, the cavity was able to produce a 6.6-mT field with a Q of 3.96 * 108. Although lower than anticipated, in comparison to other TE01 cavities, this result is quite encouraging. Multipacting and coupling were limitations, but current work is pursuing the elimination of these complications. This document will expound upon the new design, mathematical simulations, testing of the cavity, complications, results, and future work.

Pogue, Nathaniel J.↗

NREL Energy Performance Testing of Asetek's RackCDU System on a Single Rack of Twin Blade Servers: Cooperative Research and Development Final Report, CRADA Number CRD-13-518

The project will entail Asetek retrofitting 1 - 2 compute racks of servers at the National Renewable Energy Laboratory (NREL) to test and validate RackCDU's cooling performance and long-term reliability. The project will also entail measuring and reporting energy savings under a real workload by comparing total power input to the system vs. total heat removed by liquid and air. Direct measurements will be made to compare and contrast energy consumption and performance both before and after RackCDU installation. The scope of this project is strictly demonstration and feedback on the system. No development work will be performed under this CRADA.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced LWR Fuel Testing Capabilities in the ORNL High Flux Isotope Reactor

A new test capability for the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) is being developed that will allow testing of advanced nuclear fuels and cladding materials under prototypic light-water reactor (LWR) operating conditions in less time than it takes in other research reactors. This paper will describe the HFIR testing capabilities, the new advanced fuel/cladding testing facilities, and the initial cooperative irradiation experiments currently planned to start in late 2008.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Biodiesel Performance with Modern Engines. Cooperative Research and Development Final Report, CRADA Number CRD-05-153

NREL and the National Biodiesel Board (NBB) will work cooperatively to assess the effects of biodiesel blends on the performance of modern diesel engines and emissions control systems meeting increasingly strict emissions standards. This work will include research to understand the impact of biodiesel blends on the operation and durability of particle filters and NOx control sorbents/catalysts, to quantify the effect on emission control systems performance, and to understand effects on engine component durability. Work to assess the impact of biodiesel blends on real world fleet operations will be performed. Also, research to develop appropriate ASTM standards for biodiesel quality and stability will be conducted. The cooperative project will involve engine testing and fleet evaluation studies at NREL using biodiesel from a variety of sources. In addition, NREL will work with NBB to set up an Industrial Steering Committee to design the scope for the various projects and to provide technical oversight to these projects. NREL and NBB will cooperatively communicate the study results to as broad an audience as possible.

30 DIRECT ENERGY CONVERSION↗

Supported Molecular Catalysts: Synthesis, In-Situ Characterization and Performance

The objectives of our work are: (i) to create solid catalysts with active sites that can function in a cooperative manner to enhance reactivity and selectivity, and (ii) to prepare solid catalysts that can perform multiple reactions in a network that in some cases would not be possible in solution due to the incompatibilities of the various catalytic entities (for example an acid and a base). We carried out extensive reactions to test the nature of the cooperative effect caused by thiol/sulfonic acid interactions. The acid/thiol combination provided an example where the two organic groups should be positioned as close to one another as possible. We also studied a system where this is not possible (acid-base). We investigated simultaneously incorporating acid and base groups into the same material. For the case of acid and bases, there is an optimal separation distance (too close allows for neutralization while too far eliminates any cooperative behavior).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems

This document is the final technical report for Cooperative Agreement DE-FC26-04NT41992, 'Pilot Testing of Mercury Oxidation Catalysts for Upstream of Wet FGD Systems,' which was conducted over the time-period January 1, 2004 through December 31, 2010. The objective of this project has been to demonstrate at pilot scale the use of solid catalysts and/or fixed-structure mercury sorbents to promote the removal of total mercury and oxidation of elemental mercury in flue gas from coal combustion, followed by wet flue gas desulfurization (FGD) to remove the oxidized mercury at high efficiency. The project was co-funded by the U.S. DOE National Energy Technology Laboratory (DOE-NETL), EPRI, Great River Energy (GRE), TXU Energy (now called Luminant), Southern Company, Salt River Project (SRP) and Duke Energy. URS Group was the prime contractor. The mercury control process under development uses fixed-structure sorbents and/or catalysts to promote the removal of total mercury and/or oxidation of elemental mercury in the flue gas from coal-fired power plants that have wet lime or limestone FGD systems. Oxidized mercury not adsorbed is removed in the wet FGD absorbers and leaves with the byproducts from the FGD system. The project has tested candidate materials at pilot scale and in a commercial form, to provide engineering data for future full-scale designs. Pilot-scale catalytic oxidation tests have been completed for periods of approximately 14 to19 months at three sites, with an additional round of pilot-scale fixed-structure sorbent tests being conducted at one of those sites. Additionally, pilot-scale wet FGD tests have been conducted downstream of mercury oxidation catalysts at a total of four sites. The sites include the two of three sites from this project and two sites where catalytic oxidation pilot testing was conducted as part of a previous DOE-NETL project. Pilot-scale wet FGD tests were also conducted at a fifth site, but with no catalyst or fixed-structure mercury sorbent upstream. This final report presents and discusses detailed results from all of these efforts, and makes a number of conclusions about what was learned through these efforts.

01 COAL, LIGNITE, AND PEAT↗

Field Testing of a Wet FGD Additive for Enhanced Mercury Control

This document is the final report for DOE-NETL Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project has been to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project was intended to demonstrate whether such additives can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project involved pilot- and full-scale tests of the additives in wet FGD absorbers. The tests were intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power provided the Texas lignite/PRB co-fired test site for pilot FGD tests and project cost sharing. Southern Company provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested, and project cost sharing. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation provided the TMT-15 additive, and the Nalco Company provided the Nalco 8034 additive. Both companies also supplied technical support to the test program as in-kind cost sharing. The project was conducted in six tasks. Of the six tasks, Task 1 involved project planning and Task 6 involved management and reporting. The other four tasks involved field testing on FGD systems, either at pilot or full scale. These four tasks included: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests were completed in 2005 and the full-scale test using high-sulfur coal was completed in 2006; only the TMT-15 additive was tested in these efforts. The Task 5 full-scale additive tests conducted at Southern Company's Plant Yates Unit 1 were completed in 2007, and both the TMT-15 and Nalco 8034 additives were tested.

01 COAL, LIGNITE, AND PEAT↗

Advanced Fuel/Cladding Testing Capabilities in the ORNL High Flux Isotope Reactor

The ability to test advanced fuels and cladding materials under reactor operating conditions in the United States is limited. The Oak Ridge National Laboratory (ORNL) High Flux Isotope Reactor (HFIR) and the newly expanded post-irradiation examination (PIE) capability at the ORNL Irradiated Fuels Examination Laboratory provide unique support for this type of advanced fuel/cladding development effort. The wide breadth of ORNL's fuels and materials research divisions provides all the necessary fuel development capabilities in one location. At ORNL, facilities are available from test fuel fabrication, to irradiation in HFIR under either thermal or fast reactor conditions, to a complete suite of PIEs, and to final product disposal. There are very few locations in the world where this full range of capabilities exists. New testing capabilities at HFIR have been developed that allow testing of advanced nuclear fuels and cladding materials under prototypic operating conditions (i.e., for both fast-spectrum conditions and light-water-reactor conditions). This paper will describe the HFIR testing capabilities, the new advanced fuel/cladding testing facilities, and the initial cooperative irradiation experiment that begins this year.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗