An intelligent planning and scheduling system for the HST servicing missions

A new, intelligent planning and scheduling system has been delivered to NASA-Goddard Space Flight Center (GSFC) to provide support for the up-coming Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART is written in C and runs on a UNlX-based workstation (IBM RS/6000) under Motif. SM/PART effectively automates the complex task of building or rebuilding integrated timelines and command plans which are required by HST Servicing Mission personnel at their consoles during the missions. SM/PART is able to quickly build or rebuild timelines based on information stored in a Knowledge Base (KB) by using an Artificial Intelligence (AI) tool called the Planning And Resource Reasoning (PARR) shell. After a timeline has been built in the batch mode, it can be displayed and edited in an interactive mode with help from the PARR shell. Finally a detailed command plan is generated. The capability to quickly build or rebuild timelines and command plans provides an additional safety factor for the HST, Shuttle and Crew.

Johnson, Jay↗

Visualizing Time-Varying Phenomena In Numerical Simulations Of Unsteady Flows

Streamlines, contour lines, vector plots, and volume slices (cutting planes) are commonly used for flow visualization. These techniques are sometimes referred to as instantaneous flow visualization techniques because calculations are based on an instant of the flowfield in time. Although instantaneous flow visualization techniques are effective for depicting phenomena in steady flows,they sometimes do not adequately depict time-varying phenomena in unsteady flows. Streaklines and timelines are effective visualization techniques for depicting vortex shedding, vortex breakdown, and shock waves in unsteady flows. These techniques are examples of time-dependent flow visualization techniques, which are based on many instants of the flowfields in time. This paper describes the algorithms for computing streaklines and timelines. Using numerically simulated unsteady flows, streaklines and timelines are compared with streamlines, contour lines, and vector plots. It is shown that streaklines and timelines reveal vortex shedding and vortex breakdown more clearly than instantaneous flow visualization techniques.

Lane, David A.↗

The Cassini Solstice Mission: Streamlining Operations by Sequencing with PIEs

The Cassini Solstice Mission (CSM) is the second extended mission phase of the highly successful Cassini/Huygens mission to Saturn. Conducted at a much-reduced funding level, operations for the CSM have been streamlined and simplified significantly. Integration of the science timeline, which involves allocating observation time in a balanced manner to each of the five different science disciplines (with representatives from the twelve different science instruments), has long been a labor-intensive endeavor. Lessons learned from the prime mission (2004-2008) and first extended mission (Equinox mission, 2008-2010) were utilized to design a new process involving PIEs (Pre-Integrated Events) to ensure the highest priority observations for each discipline could be accomplished despite reduced work force and overall simplification of processes. Discipline-level PIE lists were managed by the Science Planning team and graphically mapped to aid timeline deconfliction meetings prior to assigning discrete segments of time to the various disciplines. Periapse segments are generally discipline-focused, with the exception of a handful of PIEs. In addition to all PIEs being documented in a spreadsheet, allocated out-of-discipline PIEs were entered into the Cassini Information Management System (CIMS) well in advance of timeline integration. The disciplines were then free to work the rest of the timeline internally, without the need for frequent interaction, debate, and negotiation with representatives from other disciplines. As a result, the number of integration meetings has been cut back extensively, freeing up workforce. The sequence implementation process was streamlined as well, combining two previous processes (and teams) into one. The new Sequence Implementation Process (SIP) schedules 22 weeks to build each 10-week-long sequence, and only 3 sequence processes overlap. This differs significantly from prime mission during which 5-week-long sequences were built in 24 weeks, with 6 overlapping processes.

Vandermey, Nancy↗

Integrated Mecical Model (IMM) 4.0 Verification and Validation (VV) Testing (HRP IWS 2016)

Timeline, partial treatment, and alternate medications were added to the IMM to improve the fidelity of this model to enhance decision support capabilities. Using standard design reference missions, IMM VV testing compared outputs from the current operational IMM (v3) with those from the model with added functionalities (v4). These new capabilities were examined in a comparative, stepwise approach as follows: a) comparison of the current operational IMM v3 with the enhanced functionality of timeline alone (IMM 4.T), b) comparison of IMM 4.T with the timeline and partial treatment (IMM 4.TPT), and c) comparison of IMM 4.TPT with timeline, partial treatment and alternative medication (IMM 4.0).

risk assessment↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Within the next few decades, humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant two-way communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) performing an EVA and an Earth-based mission control. Next-generation operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the on-planet extravehicular crewmember(s), and intermediate mission support from intravehicular crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. For this purpose, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automating the tracking and projection of consumables usage over an EVA timeline, providing real-time probabilistic safety assessments of an EVA timeline given consumables constraints, and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the intravehicular crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g. training bias.

Mars↗

Crew Autonomy Through Self-Scheduling: Operational Characterization

NASA’s future long-duration exploration missions (LDEMs) will encounter increasing communication transmission delays as they move farther from Earth-based ground stations. This necessitates a new approach, as crews can no longer rely on real-time support from ground planners and must self-schedule their own operational timelines effectively and efficiently. To enable this transition, our team has developed Playbook, a mission planning and scheduling tool. Our research focuses on quantifying scheduling performance using Playbook to inform the design and development of future features to streamline timeline creation. We also aim to propose standards and guidelines for autonomous crews in LDEMs. In the past year, we have focused on further validating and quantifying the effects of countermeasure aids on self-scheduling performance. There are two software aids in Playbook (self-scheduling platform): Suggested Fixes, which propose an edit to resolve violations within a timeline, and No-Go Zones, which highlight where activities should not be scheduled on a timeline. We have made significant progress in HERA Campaign 7 (C7) data collection, increasing the number of days crew must self-schedule from 4 to 8. As a result, almost 20% of the mission is self-scheduled by the analog astronauts. We have also started data collection on a controlled lab experiment designed to quantify performance effects due to the countermeasures. We expect to present the preliminary results from both efforts. Finally, we have conducted an exploratory analysis of NASA’s HERA Campaign 6 (C6), investigating the mission-level impacts of self-scheduling. We derived basic patterns and descriptive statistics to better characterize crew autonomy through self-scheduling. We also assessed if there are any individual indicators of preference for self-scheduling, such as experience or predilection for autonomy. Preliminary analysis indicates that the HERA C6 crew self-scheduled one out of four flexible activities, indicating unprompted adoption of self-scheduling as a concept of operation for crew autonomy.

analog↗

Asset - An application in mission automation for science planning

Recent advances in computer technology were used to great advantage in planning science observation sequences for the Voyager 2 encounter with Uranus in 1986. Despite a loss of experienced personnel, a challenging schedule, workforce limitations, and the complex nature of the Uranus encounter itself, the resultant science observation timelines were the most highly optimized of the five Voyager encounters with the outer planets. In part, this was due to the development of a microcomputer-based system, called ASSET (Automated Science Sequence Encounter Timelines generator), which was used to design those science observation timelines. This paper details the development of that system. ASSET demonstrates several features essential to the design of the first expert systems for science planning which will be applied for future missions.

Finnerty, D. F.↗

A general software reliability process simulation technique

The structure and rationale of the generalized software reliability process, together with the design and implementation of a computer program that simulates this process are described. Given assumed parameters of a particular project, the users of this program are able to generate simulated status timelines of work products, numbers of injected anomalies, and the progress of testing, fault isolation, repair, validation, and retest. Such timelines are useful in comparison with actual timeline data, for validating the project input parameters, and for providing data for researchers in reliability prediction modeling.

Tausworthe, Robert C.↗

NASA/Mir Phase 1: A Lesson Learned in Long Duration Mission Planning and Operations

The NASA/Mir Phase I Program is a precursor to the assembly and operations of the International Space Station (ISS). The Phase I Program covers a four-year period and encompasses over ten shuttle flights to the Mir, culminating with the flight of STS-91 in June 1998. The Mir-Orbiting Station (Mir-OS) provides an excellent environment, both onboard and on the ground, for learning and studying the characteristics associated with crew-tended operations on long duration missions. By the end of the Phase I program, NASA astronauts will have accumulated over two years of continuous operations experience working and living onboard the Mir-OS. Ground controllers, working in Russia and at remote sites in the United States, will have gained valuable experience in the generation, maintenance, and coordination of the information and products required to support the long duration crew members onboard the Mir-OS. The experience gained by the crew and ground support personnel in the area of long duration mission operations has resulted in a number of factors that need to be considered in the definition and implementation of the processes and products for the ISS. While there are many areas in which experience has been gained, this paper focuses on the lessons learned regarding the level of detail and flexibility of crew timelines. Provided in this paper is an overview of the characteristics associated with long duration mission timeline development and execution, a summary of applicable lessons learned identified and documented through participation in the NASA/Mir Phase I Program, a detailed discussion of "Gross Timelines" as implementation which addresses the lessons learned. Also discussed are the challenges that must be overcome in getting the ISS program to recognize, evaluate, and learn from the crew and ground controller experience gained through participation in the NASA/Mir Phase I Program.

Hagopian, Jeff↗

Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

Jaap, John↗

An Enabling Technology for New Planning and Scheduling Paradigms

The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Enabling a New Planning and Scheduling Paradigm

The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.↗

Full Mission Astronaut Radiation Exposure Assessments for Long Duration Lunar Surface Missions

Risk to astronauts due to ionizing radiation exposure is a primary concern for missions beyond Low Earth Orbit (LEO) and will drive mission architecture requirements, mission timelines, and operational practices. Both galactic cosmic ray (GCR) and solar particle event (SPE) environments pose a risk to astronauts for missions beyond LEO. The GCR environment, which is made up of protons and heavier ions covering a broad energy spectrum, is ever present but varies in intensity with the solar cycle, while SPEs are sporadic events, consisting primarily of protons moving outward through the solar system from the sun. The GCR environment is more penetrating and is more difficult to shield than SPE environments, but lacks the intensity to induce acute effects. Large SPEs are rare, but they could result in a lethal dose, if adequate shielding is not provided. For short missions, radiation risk is dominated by the possibility of a large SPE. Longer missions also require planning for large SPEs; adequate shielding must be provided and operational constraints must allow astronauts to move quickly to shielded locations. The dominant risk for longer missions, however, is GCR exposure, which accumulates over time and can lead to late effects such as cancer. SPE exposure, even low level SPE exposure received in heavily shielded locations, will increase this risk. In addition to GCR and SPE environments, the lunar neutron albedo resulting mainly from the interaction of GCRs with regolith will also contribute to astronaut risk. Full mission exposure assessments were performed for proposed long duration lunar surface mission scenarios. In order to accomplish these assessments, radiation shielding models were developed for a proposed lunar habitat and rover. End-to-End mission exposure assessments were performed by first calculating exposure rates for locations in the habitat, rover, and during extra-vehicular activities (EVA). Subsequently, total mission exposures were evaluated for proposed timelines. A number of computational tools and mathematical models, which have been incorporated into NASA's On-Line Tool for the Assessment of Radiation In Space (OLTARIS), were used for this study. These tools include GCR and SPE environment models, human body models, and the HZETRN space radiation transport code, which is used to calculate the transport of the charged particles and neutrons through shielding materials and human tissue. Mission exposure results, assessed in terms of effective dose, are presented for proposed timelines and recommendations are made for improved astronaut shielding and safer operational practice.

Adamczyk, Anne M.↗

Full Mission Astronaut Radiation Exposure Assessments for Long Duration Lunar Surface Missions

Risk to astronauts due to ionizing radiation exposure is a primary concern for missions beyond Low Earth Orbit (LEO) and will drive mission architecture requirements, mission timelines, and operational practices. For short missions, radiation risk is dominated by the possibility of a large Solar Particle Event (SPE). Longer duration missions have both SPE and Galactic Cosmic Ray (GCR) risks. SPE exposure can contribute significantly toward cancer induction in combination with GCR. As mission duration increases, mitigation strategies must address the combined risks from SPE and GCR exposure. In this paper, full mission exposure assessments were performed for the proposed long duration lunar surface mission scenarios. In order to accomplish these assessments, previously developed radiation shielding models for a proposed lunar habitat and rover were utilized. End-to-End mission exposure assessments were performed by first calculating exposure rates for locations in the habitat, rover, and during Extra-Vehicular Activities (EVA). Subsequently, total mission exposures were evaluated for the proposed timelines. Mission exposure results, assessed in terms of effective dose, are presented for the proposed timelines and recommendations are made for improved astronaut shielding and safer operational practices.

Adamczyk, Anne↗

Gas Chromatograph Method Optimization Trade Study for RESOLVE: 20-meter Column v. 8-meter Column

RESOLVE is the payload on a Class D mission, Resource Prospector, which will prospect for water and other volatile resources at a lunar pole. The RESOLVE payload's primary scientific purpose includes determining the presence of water on the moon in the lunar regolith. In order to detect the water, a gas chromatograph (GC) will be used in conjunction with a mass spectrometer (MS). The goal of the experiment was to compare two GC column lengths and recommend which would be best for RESOLVE's purposes. Throughout the experiment, an Inficon Fusion GC and an Inficon Micro GC 3000 were used. The Fusion had a 20m long column with 0.25mm internal diameter (Id). The Micro GC 3000 had an 8m long column with a 0.32mm Id. By varying the column temperature and column pressure while holding all other parameters constant, the ideal conditions for testing with each column length in their individual instrument configurations were determined. The criteria used for determining the optimal method parameters included (in no particular order) (1) quickest run time, (2) peak sharpness, and (3) peak separation. After testing numerous combinations of temperature and pressure, the parameters for each column length that resulted in the most optimal data given my three criteria were selected. The ideal temperature and pressure for the 20m column were 95 C and 50psig. At this temperature and pressure, the peaks were separated and the retention times were shorter compared to other combinations. The Inficon Micro GC 3000 operated better at lower temperature mainly due to the shorter 8m column. The optimal column temperature and pressure were 70 C and 30psig. The Inficon Micro GC 3000 8m column had worse separation than the Inficon Fusion 20m column, but was able to separate water within a shorter run time. Therefore, the most significant tradeoff between the two column lengths was peak separation of the sample versus run time. After performing several tests, it was concluded that better detection via good peak separation with a longer run time is a better asset than moderate peak separation with a shorter run time. Even given that RESOLVE is highly interested in water and that mission timeline is of significant importance given the short seven-to-ten-day mission timeline, worse detection with an 8m column may lead to overlooking other substances existing on the moon that could advance planetary science. Thus, I recommend the 20m column. However, if mission timeline and water separation are deemed the highest priority, the 8m column should be selected due to its ability to separate water within a shorter run time than the 20m column.

Column↗