Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

SOFIA Science Instruments: Commissioning, Upgrades and Future Opportunities

The Stratospheric Observatory for Infrared Astronomy (SOFIA) is the world's largest airborne observatory, featuring a 2.5 meter telescope housed in the aft section of a Boeing 747sp aircraft. SOFIA's current instrument suite includes: FORCAST (Faint Object InfraRed CAmera for the SOFIA Telescope), a 5-40 μm dual band imager/grism spectrometer developed at Cornell University; HIPO (High-speed Imaging Photometer for Occultations), a 0.3-1.1 micron imager built by Lowell Observatory; FLITECAM (First Light Infrared Test Experiment CAMera), a 1-5 micron wide-field imager/grism spectrometer developed at UCLA; FIFI-LS (Far-Infrared Field-Imaging Line Spectrometer), a 42-210 micron IFU grating spectrograph completed by University Stuttgart; and EXES (Echelon-Cross- Echelle Spectrograph), a 5-28 micron high-resolution spectrometer being completed by UC Davis and NASA Ames. A second generation instrument, HAWC+ (Highresolution Airborne Wideband Camera), is a 50-240 micron imager being upgraded at JPL to add polarimetry and new detectors developed at GSFC. SOFIA will continually update its instrument suite with new instrumentation, technology demonstration experiments and upgrades to the existing instrument suite. This paper details instrument capabilities and status as well as plans for future instrumentation, including the call for proposals for 3rd generation SOFIA science instruments.

FLITECAM↗

Recent Upgrades for the NASA Ames Vertical Gun Range

Recent upgrades to the performance capabilities of the NASA Ames Vertical Gun Range(AVGR) are presented. Upgrades include: the successful implementation of a fast-acting, gun gases suppression valve to minimize target contamination and perturbations to both the target and ejecta; powder gun and light-gas gun operational parameter adjustments to provide clean, low speed test conditions; a liquid nitrogen-based system and methodology for chilling targets and/or other impact chamber situated equipment; and imaging system capabilities enhancements to enable observing 50 micrometer particles traveling at 2 km/s. Many of these performance improvements were motivated by AVGR customer requirements for very clean shot conditions at speeds below 1.9 km/s and to provide testing in support of proposed NASA missions to Enceladus and 16-Psyche.

AVGR↗

NASA's Orbital Debris Optical Program: ES-MCAT Updated and Upgraded

The 1.3m ES-MCAT telescope (or MCAT for short) now has a proven capability for observing objects from Low- Earth Orbit (LEO) out to Geosynchronous (GEO) orbit, and the ability to run all systems autonomously. A GEO survey, the initial focus for MCAT, will commence in late 2019 to map out the current state of the GEO population as input for the ORbital Debris Engineering Model (ORDEM 4.x). This survey will statistically sample the GEO belt (0 to ~15 deg orbital inclinations) to detect both known and unknown targets. If a break-up occurs, additional surveys of the break-up field can be followed for discovery and investigations of daughter debris fragments from the parent satellite. Discovery can be accomplished by tracking orbits near to and including the parent object’s orbit. Targeted observations of debris can be taken with a suite of broadband filters for characterizing individual objects by ratetracking their known or calculated orbital elements (Two-Line Element sets, TLEs). Several modifications and upgrades have been made to the instrumentation and systems originally installed in 2015 and are reported here. In 2018, MCAT’s primary mirror was recoated with a high-end protected, enhanced silver by the ZeCoat Corporation. The CCD chip was replaced in the Spectral Instruments camera with a broad-band antireflective coated chip. The automated weather systems have been modified from the original system, removing some weather sensors and installing replacements that are better suited to Ascension’s weather and environment. A new 2.5-m ObservaDome replaced the Astrohaven dome on the nearby tower platform that will house an auxiliary 0.4-meter telescope. Finally, in 2019, the Observatory Control System was upgraded to 2.0 which includes additional flexibility for automating data collection and reduction. With these updates completed, MCAT is now well on track to reach Full Operational Capability (FOC) in 2019 for its survey, rate-track, and TLE tracking capabilities.

Lederer, S. M.↗

9- by 15-Foot Low-Speed Wind Tunnel Acoustic Upgrade Part 2: Improvement Comparison

This report describes an acoustic improvement project carried out in the NASA Glenn Research Center (GRC) 9- by 15-Foot Low Speed Wind Tunnel (9x15 LSWT) and the effect on the acoustic measurement capabilities of the facility. The improvement project began in June 2017 and ended in March 2019, with some work stoppages in between. The main purpose of the project was to reduce the background noise of the facility to enable better signal-to-noise ratio measurements of quiet aircraft propulsion concepts. The term background noise refers to the noise measured inside the facility without a model installed. This report discusses the details of the project, the motivation for the upgrade and the history of the facility background noise levels that motivated the upgrade. This report is one of a two-volume set documenting the 9x15 LSWT acoustic improvement. The companion report[1] documents the “supporting studies” that were conducted as part of the improvement project, but do not relate explicitly to the 9x15 LSWT. The present report is focused specifically on studies conducted by NASA regarding the 9x15 LSWT and thus may be less broadly applicable to other facilities or projects.

Wind Tunnel↗

Upgrading the 14x22 Data Acquisition System (DAS)

The 14-by 22-Foot Subsonic Tunnel recently completed development and installation of a new Data Acquisition System for use in the tunnel and in the Rotor Test Cell (RTC). Planning and development of this new system has been ongoing for several years, and installation was performed over this past year. This effort also required an upgrade of the facility infrastructure to support the upgraded power and cooling requirements. This presentation summarizes the new data acquisition system, improved capabilities, challenges of installation, and proposed future enhancements to the system.

wind tunnel↗

NASA’s Deep Space Network (DSN) Lunar Exploration Upgrades (DLEU)

In the near future, the National Aeronautics and Space Administration (NASA) will returnhumansto the moon beginning the next era of human exploration. NASA’s Space Communications and Navigation (SCaN) program will play a vital role in establishing communications and navigation support to realize the ambitious goals of the Artemis program. SCaN’s overall lunar communications support plan will be covered in a separate 2023 SpaceOps paper: “NASA’s Communications and Navigation Architecture Plans to Support the Return to the Moon and a Sustainable Lunar Presence.” The four-point plan,as it currently stands, includes lunar relay services, a dedicated set of new ground stations, international partner contributions,and supportthrough the Deep Space Network (DSN)and associated upgrades. This paper will have a more granular focus on the DSN and NASA’s plans to upgrade and expand the network to be better suited for human spaceflight on and around the lunar surface. NASA’s Deep Space Network (DSN) will be a critical communications component for the upcoming lunar activities. There will be multiple spacecraft, using different bands, and some of those spacecraft will be transmitting and receiving using multiple bands, requiring DSN support of S-band (2 GHz), X-band (7 GHz up, 8 GHz down), and K-band (22.5 GHz up, 26 GHz down). Since there may be more than one spacecraft in the beamwidth of the DSN antennas, the DSN support will require an extension of the DSN’s capability to support multiple spacecraft using one antenna, expanding it to provide two simultaneous uplinks in the different bands at each antenna. Achieving this requires using new techniques for manufacturing the frequency selective surfaces, called dichroics, which steer the different frequency beams from and to the appropriate transmitting and receiving equipment, along with the addition of a new K-band uplink system. Additionally, due to the relative closeness of the moon from Earth (as opposed to the planetary missionsthe DSN supports daily), significantly higher data rates on both uplink and downlinkare requiredare possible and desirable by the lunar missions, specifically up to 20 Mbps on the uplink and 150 Mbps on the downlink, both using Low Density Parity Check (LDPC) error correcting codes. And, again due to the relative closeness of the moon, there is a need for low latency data delivery of the high rate downlink telemetry which requires a change in the current DSN paradigm of delivering higher rate data with higher latency.

Moon↗

ECS Artemis II Upgrades

The National Aeronautics and Space Administration (NASA) actively works to further the expectations of space exploration and research. NASA has been able to develop innovative technology and methods that has allowed for continued discovery and innovation. NASA is in the midst of work for the Artemis mission, which is to return to the moon in an effort to prepare for future Mars exploration. After the successful launch of Artemis I last November, our sights have shifted to Artemis II, which is set to launch next year and bring humans into the lunar orbit for the first time in over fifty years. Artemis II will be the first crewed mission for the program and will represent another step forward in our mission to advance our knowledge of the universe around us. From there, the Artemis program will move onto building a permanent site on the moon that will allow us to eventually reach Mars. During my time at NASA, I was able to work with the NE-XF Branch, also known as the Environmental and Life Support Systems Branch. I specifically worked with the Environmental Control Systems (ECS) team. During my time here, construction on the system in the Vehicle Assembly Building (VAB) and at Launchpad 39B have been progressing at full force. ECS is used to provide processed and purged air at specific temperatures, pressures, and humidity’s to fulfill requirements necessary to support Orion and the SLS. While the Pad has been undergoing upgrades from the original Artemis I configuration, the VAB has a completely new ECS very similar to it. While both systems have been undergoing upgrades, we have been able to transition into testing the systems as we prepare for stacking in the VAB early next year. My role has allowed me to learn about how the systems work and function through walkdowns and visits out to both the Pad and the VAB. I’ve been able to see firsthand how the system operates and have learned how the system affects the vehicle. I’ve been able to shadow my mentor, my coworkers, and COMET operators to oversee the construction efforts of the system along with the testing of the software and the system itself. I even was able to aid in testing at the console myself at Pad 39B. Additionally, I am also revising and reviewing displays for Artemis IV that will be used to remotely control parts of the system. Eventually these displays will be used to support the future of Artemis.

Monique Toon↗

Upgrading and extended testing of the MSC integrated water and waste management hardware

The results are presented of upgrading and testing an integrated water and waste management system, which uses the compression distillation, reverse osmosis, adsorption filtration and ion-exchange processes to recover potable water from urine, flush water and used wash water. Also included is the development of techniques for extending the useful biological life of biological filters, activated carbon filters and ion-exchange resins to at least 30 days, and presterilizing ion-exchange resins so that sterile water can be recovered from waste water. A wide variety of reverse osmosos materials, surfactants and germicides were experimentally evaluated to determine the best combination for a wash water subsystem. Full-scale module tests with real wash water demonstrated that surface fouling is a major problem.

Bambenek, R. A.↗

Lewis Research Center support of Chrysler upgraded engine program

Running of the upgraded engine has indicated that, although the engine is mechanically sound, it is deficient in power. Recent modifications and corrective action have improved this. Testing of the engine is being done in the test cell. This simulates an automobile installation. Located in the inlet flow ducts are two turbine flow meters to measure engine air flow.

Warren, E. L.↗

Upgrading the free flying rendezvous and docking simulator and the orbital servicer system

Recommendations are made for upgrading two teleoperator/robotics test and simulation systems based upon a review of latest technology advances in the involved disciplines. A second generation Free Flying Mobility Unit is recommended which adds a sixth degree of freedom and incorporates other improvements which greatly expand the center's capability to perform evaluation tests and demonstrations of advanced systems concepts for rendezvous and docking in support of the Teleoperator Maneuvering System (TMS) Program. The Orbital Servicer System provides the capability for testing and demonstrating concepts for on orbit servicing of compatibly designed satellites/payloads. The TMS is to be the transporting vehicle for the servicer. The manipulator arm of the Orbital service System is presently computer controlled in the trajectory portion of the module transfer operation. The ultimate objective is to fully automte its operation requiring additional capabilities in sensors, artificial intelligence, image analysis, communications, computer programming, pattern recognition, kinematics, and manipulator design. It is recommended that the Electronics and Control Laboratory move to acquire the basic competencies in robotics necessary to achieve full automation.

Eastman, R. M.↗

Test results of the Chrysler upgraded automotive gas turbine engine: Initial design

The upgraded engine as built to the original design was deficient in power and had excessive specific fuel consumption. A high instrumented version of the engine was tested to identify the sources of the engine problems. Analysis of the data shows the major problems to be low compressor and power turbine efficiency and excessive interstage duct losses. In addition, high HC and CO emission were measured at idle, and high NOx emissions at high energy speeds.

Horvath, D.↗

NOCA upgrade

The network operations control area (NOCA) of the space flight operations facility (SFOF) is being upgraded in both hardware and software capabilities to provide the visibility and operability necessary for the operations control function to be performed within the present technological environment of the tracking network. The hardware implementation currently in progress is addressed. It provides a standard operating console with increased display capacity and improved ergonomics as a replacement for the existing, outmoded, circular consoles original to the SFOF.

Gould, G. D.↗

Cold-air performance of compressor-drive turbine of Department of Energy upgraded automobile gas turbine engine. 2: Stage performance

The aerodynamic performance of the compressor-drive turbine of the DOE upgraded gas turbine engine was determined in low temperature air. The as-received cast rotor blading had a significantly thicker profile than design and a fairly rough surface finish. Because of these blading imperfections a series of stage tests with modified rotors were made. These included the as-cast rotor, a reduced-roughness rotor, and a rotor with blades thinned to near design. Significant performance changes were measured. Tests were also made to determine the effect of Reynolds number on the turbine performance. Comparisons are made between this turbine and the compressor-drive turbine of the DOE baseline gas turbine engine.

Roelke, R. J.↗

Fuel quality/processing study. Volume 3: Fuel upgrading studies

The methods used to calculate the refinery selling prices for the turbine fuels of low quality are described. Detailed descriptions and economics of the upgrading schemes are included. These descriptions include flow diagrams showing the interconnection between processes and the stream flows involved. Each scheme is in a complete, integrated, stand alone facility. Except for the purchase of electricity and water, each scheme provides its own fuel and manufactures, when appropriate, its own hydrogen.

Jones, G. E., Jr.↗

Single crystal growth of upgraded metallurgical silicon by HEM for photovoltaic applications

Commercially available metallurgical grade (MG) silicon has high B and P content which is not reduced significantly by directional solidification. By choosing high purity raw materials for an experimental Submerged Electrode Arc Furnace, most of the impurities are reduced to 10 ppmw. Directional solidification of upgraded metallurgical grade (UMG) silicon by the Heat Exchanger Method (HEM) has produced 16 cm x 16 cm cross section ingots with nearly single crystal structure. The main problem encountered during directional solidification was SiC impurities dispersed through the structure. Solar cells fabricated from UMG silicon that was directionally solidified twice by HEM have shown up to 12.33% (am1) conversion efficiency.

Khattak, C. P.↗

MINIVER upgrade for the AVID system. Volume 1: LANMIN user's manual

The successful design of thermal protection systems for vehicles operating in atmosphere and near space environments requires accurate analyses of heating rate and temperature histories encountered along a trajectory. For preliminary design calculations, however, the requirement for accuracy must be tempered by the need for speed and versatility in computational tools used to determine thermal environments and structural thermal response. The MINIVER program has been found to provide the proper balance between versatility, speed and accuracy for an aerothermal prediction tool. The advancement in computer aided design concepts at Langley Research Center (LaRC) in the past few years has made it desirable to incorporate the MINIVER program into the LaRC Advanced Vehicle Integrated Design, AVID, system. In order to effectively incorporate MINIVER into the AVID system, several changes to MINIVER were made. The thermal conduction options in MINIVER were removed and a new Explicit Interactive Thermal Structures (EXITS) code was developed. Many upgrades to the MINIVER code were made and a new Langley version of MINIVER called LANMIN was created. The theoretical methods and subroutine functions used in LANMIN are described.

Engel, C. D.↗