Search NASA⌕ Search

SEARCH · Search NASA

Results for “V&V process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Ares I-X Range Safety Simulation Verification and Analysis IV and V

NASA s ARES I-X vehicle launched on a suborbital test flight from the Eastern Range in Florida on October 28, 2009. NASA generated a Range Safety (RS) flight data package to meet the RS trajectory data requirements defined in the Air Force Space Command Manual 91-710. Some products included in the flight data package were a nominal ascent trajectory, ascent flight envelope trajectories, and malfunction turn trajectories. These data are used by the Air Force s 45th Space Wing (45SW) to ensure Eastern Range public safety and to make flight termination decisions on launch day. Due to the criticality of the RS data in regards to public safety and mission success, an independent validation and verification (IV&V) effort was undertaken to accompany the data generation analyses to ensure utmost data quality and correct adherence to requirements. Multiple NASA centers and contractor organizations were assigned specific products to IV&V. The data generation and IV&V work was coordinated through the Launch Constellation Range Safety Panel s Trajectory Working Group, which included members from the prime and IV&V organizations as well as the 45SW. As a result of the IV&V efforts, the RS product package was delivered with confidence that two independent organizations using separate simulation software generated data to meet the range requirements and yielded similar results. This document captures ARES I-X RS product IV&V analysis, including the methodology used to verify inputs, simulation, and output data for an RS product. Additionally a discussion of lessons learned is presented to capture advantages and disadvantages to the IV&V processes used.

Tarpley, Ashley↗

Ares I-X Range Safety Simulation and Analysis IV and V

NASA s Ares I-X vehicle launched on a suborbital test flight from the Eastern Range in Florida on October 28, 2009. NASA generated a Range Safety (RS) product data package to meet the RS trajectory data requirements defined in the Air Force Space Command Manual (AFSPCMAN) 91-710. Some products included were a nominal ascent trajectory, ascent flight envelopes, and malfunction turn data. These products are used by the Air Force s 45th Space Wing (45SW) to ensure public safety and to make flight termination decisions on launch day. Due to the criticality of the RS data, an independent validation and verification (IV&V) effort was undertaken to accompany the data generation analyses to ensure utmost data quality and correct adherence to requirements. As a result of the IV&V efforts, the RS product package was delivered with confidence that two independent organizations using separate simulation software generated data to meet the range requirements and yielded similar results. This document captures the Ares I-X RS product IV&V analysis, including the methodology used to verify inputs, simulation, and output data for certain RS products. Additionally a discussion of lessons learned is presented to capture advantages and disadvantages to the IV&V processes used.

Merry, Carl M.↗

Observatory Improvements for SOFIA

The Stratospheric Observatory for Infrared Astronomy (SOFIA) is a joint project between NASA and Deutsches Zentrum fuer Luft- und Raumfahrt (DLR), the German Space Agency. SOFIA is based in a Boeing 747 SP and flown in the stratosphere to observe infrared wavelengths unobservable from the ground. In 2007 Dryden Flight Research Center (DFRC) inherited and began work on improving the plane and its telescope. The improvements continue today with upgrading the plane and improving the telescope. The Observatory Verification and Validation (V&V) process is to ensure that the observatory is where the program says it is. The Telescope Status Display (TSD) will provide any information from the on board network to monitors that will display the requested information. In order to assess risks to the program, one must work through the various threats associate with that risk. Once all the risks are closed the program can work towards improving the observatory.

Peralta, Robert A.↗

FPGA Verification Accelerator (FVAX)

Is Verification Acceleration Possible? - Increasing the visibility of the internal nodes of the FPGA results in much faster debug time - Forcing internal signals directly allows a problem condition to be setup very quickly center dot Is this all? - No, this is part of a comprehensive effort to improve the JPL FPGA design and V&V process.

Oh, Jane↗

A Survey of ISS and Visiting Vehicle Returned Surfaces for Environmental Characterization and Computer Model Development

The Orbital Debris Engineering Model (ORDEM) developed by the NASA Orbital Debris Program Office (ODPO) is a data-driven model — extensive radar, optical, laboratory, and in situ measurement data sets have been used to build the model since its earliest versions. A salient aspect of professional software development is the verification and validation (V&V) process. Verification answers the question “Is the model built correctly?” while validation addresses the question “Did we build the correct model?” Less extensive, reserved, or independent data sets serve the validation requirement. Due to the dynamic nature of the orbital debris environment, it is critical to use contemporaneous data sources that represent the current environment to support ORDEM development and validation. ORDEM has utilized in situ data collected from Space Shuttle and Hubble Space Telescope surface inspections, now over a decade old. This historical dataset is fundamental for providing baseline in situ measurement data for sizes between 10 to 300 microns, but new data sources are being evaluated using returned surfaces from or near the International Space Station (ISS). This paper reviews a general microscopic survey of ISS soft goods, the Pressurized Mating Adapter 2 (PMA-2) blanket, and a limited-scope feasibility study conducted on the Space Exploration Technologies Corporation (SpaceX) Dragon capsule’s Thermal Protection System (TPS) material. The PMA-2 blanket, exposed to the space environment between 09 July 2013 and 25 February 2015, is an approximately 3.7 m2-area blanket composed of a betacloth outer layer and multiple ballistic fabric inner layers. The SpaceX Cargo Dragon capsule regularly visited the ISS from 2012 through 2020 and potentially provides a timely and well-characterized source of data for modeling purposes. The capsule’s lateral surfaces use SpaceX Proprietary Ablative Material (SPAM) TPS material, a syntactic foam, for thermal management during all mission phases. Seven SPAM extracted samples have been analyzed to date. This paper will provide an overview of the characterization completed for impact features by size, depth, impactor diameter, and the impactor residues chemical analyses, allowing a differentiation between micrometeoroids and orbital debris and a categorization by mass density and density class. Impactor diameter is estimated using damage equations generated from ground-based hypervelocity impact testing. The orbital debris impactors are compared to the current ORDEM 3.2 model of the environment at ISS altitudes. We briefly discuss the meteoroid impactors, including constituents and mass densities, in the general context of current models.

Phillip Anz-meador↗

A Survey of ISS and Visiting Vehicle Returned Surfaces for Environmental Characterization and Computer Model Development

The Orbital Debris Engineering Model (ORDEM) developed by the NASA Orbital Debris Program Office (ODPO) is a data-driven model — extensive radar, optical, laboratory, and in situ measurement data sets have been used to build the model since its earliest versions. A salient aspect of professional software development is the verification and validation (V&V) process. Verification answers the question “Is the model built correctly?” while validation addresses the question “Did we build the correct model?” Less extensive, reserved, or independent data sets serve the validation requirement. Due to the dynamic nature of the orbital debris environment, it is critical to use contemporaneous data sources that represent the current environment to support ORDEM development and validation. ORDEM has utilized in situ data collected from Space Shuttle and Hubble Space Telescope surface inspections, now over a decade old. This historical dataset is fundamental for providing baseline in situ measurement data for sizes between 10 to 300 microns, but new data sources are being evaluated using returned surfaces from or near the International Space Station (ISS). This paper reviews a general microscopic survey of ISS soft goods, the Pressurized Mating Adapter 2 (PMA-2) blanket, and a limited-scope feasibility study conducted on the Space Exploration Technologies Corporation (SpaceX) Dragon capsule’s Thermal Protection System (TPS) material. The PMA-2 blanket, exposed to the space environment between 09 July 2013 and 25 February 2015, is an approximately 3.7 m2-area blanket composed of a betacloth outer layer and multiple ballistic fabric inner layers. The SpaceX Cargo Dragon capsule regularly visited the ISS from 2012 through 2020 and potentially provides a timely and well-characterized source of data for modeling purposes. The capsule’s lateral surfaces use SpaceX Proprietary Ablative Material (SPAM) TPS material, a syntactic foam, for thermal management during all mission phases. Seven SPAM extracted samples have been analyzed to date. This paper will provide an overview of the characterization completed for impact features by size, depth, impactor diameter, and the impactor residues chemical analyses, allowing a differentiation between micrometeoroids and orbital debris and a categorization by mass density and density class. Impactor diameter is estimated using damage equations generated from ground-based hypervelocity impact testing. The orbital debris impactors are compared to the current ORDEM 3.2 model of the environment at ISS altitudes. We briefly discuss the meteoroid impactors, including constituents and mass densities, in the general context of current models.

Phillip Anz-Meador↗

Development of a systematic approach for safety assessment of PLD based equipment of I and C systems - 354

Nuclear power plants (NPPs) increasingly apply digital equipment for instrumentation and control (I and C) systems. During the life cycle of NPPs the operators, designers and manufactures are facing the need to replace or upgrade obsolete equipment or to implement new digital I and C systems. A relatively new challenge in this area is the deployment of programmable logic devices (PLDs) for the equipment of I and C systems. Regulatory approval for safety and safety related I and C systems demands confirmation of evidence that design as well as verification and validation (V and V) processes have ensured that the application of new equipment will fulfil safety and reliability requirements and its intended design function. The objective of the recent research project of GRS is developing a systematic approach for the assessment of PLD-based equipment in safety and safety-related I and C systems regarding the fulfilment of regulatory requirements and identification of undesired failure effects. A generic approach for the safety-oriented assessment of PLD-based equipment has been developed, based on the principles of a Plan-Do-Check-Act (PDCA) cycle. The approach comprises planning of the assessment, predefined analysis steps and methodologies, as well as required input information, criteria for decision making process, the tasks concerning identification of improvement potential and determining documentation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A design for a V&V and UQ discovery process.

There is currently sparse literature on how to implement systematic and comprehensive processes for modern V&V/UQ (VU) within large computational simulation projects. Important design requirements have been identified in order to construct a viable 'system' of processes. Significant processes that are needed include discovery, accumulation, and assessment. A preliminary design is presented for a VU Discovery process that accounts for an important subset of the requirements. The design uses a hierarchical approach to set context and a series of place-holders that identify the evidence and artifacts that need to be created in order to tell the VU story and to perform assessments. The hierarchy incorporates VU elements from a Predictive Capability Maturity Model and uses questionnaires to define critical issues in VU. The place-holders organize VU data within a central repository that serves as the official VU record of the project. A review process ensures that those who will contribute to the record have agreed to provide the evidence identified by the Discovery process. VU expertise is an essential part of this process and ensures that the roadmap provided by the Discovery process is adequate. Both the requirements and the design were developed to support the Nuclear Energy Advanced Modeling and Simulation Waste project, which is developing a set of advanced codes for simulating the performance of nuclear waste storage sites. The Waste project served as an example to keep the design of the VU Discovery process grounded in practicalities. However, the system is represented abstractly so that it can be applied to other M&S projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ballistic Mercury orbiter mission via Venus and Mercury gravity assists

It is shown that it is possible to deliver a payload of 600 to 2000 kg to a 300-km circular orbit at Mercury using presently available NASA Space Transportation Systems and a single-stage bipropellant chemical rocket. This superior payload performance is attained by swingbys of Venus, plus (more importantly), the use of the reverse Delta-V/EGA process. In contrast to the Delta-V/EGA process (used to boost the launch energy by returning to earth for a gravity assist), the reverse Delta-V/EGA process reduces the Mercury approach energy each time a spacecraft makes a near-resonant return to Mercury for a gravity assist and reduces the orbit-capture Delta-V requirement. The mission sequences for such high-performance missions are described, and example mission opportunities for the years 1990 to 2010 are presented.

Yen, C.-W. L.↗

Adenoviral protein V promotes a process of viral assembly through nucleophosmin 1

Adenoviral infection induces nucleoplasmic redistribution of a nucleolar nucleophosmin 1/NPM1/B23.1. NPM1 is preferentially localized in the nucleoli of normal cells, whereas it is also present at the nuclear matrix in cancer cells. However, the biological roles of NPM1 during infection are unknown. Here, by analyzing a pV-deletion mutant, Ad5-dV/TSB, we demonstrate that pV promotes the NPM1 translocation from the nucleoli to the nucleoplasm in normal cells, and the NPM1 translocation is correlated with adenoviral replication. Lack of pV causes a dramatic reduction of adenoviral replication in normal cells, but not cancer cells, and Ad5-dV/TSB was defective in viral assembly in normal cells. NPM1 knockdown inhibits adenoviral replication, suggesting an involvement of NPM1 in adenoviral biology. Further, we show that NPM1 interacts with empty adenovirus particles which are an intermediate during virion maturation by immunoelectron microscopy. Collectively, these data implicate that pV participates in a process of viral assembly through NPM1.

60 APPLIED LIFE SCIENCES↗

Ballistic Mercury orbiter mission via Venus and Mercury gravity assists

This paper shows that it is possible to deliver a payload of 600 to 2000 kg to a 300-km circular orbit at Mercury, using the presently available NASA STS and a single-stage bipropellant chemical rocket. This superior payload performance is attained by swingbys of Venus, plus more importantly, the use of the reverse Delta-V/EGA process. In contrast to the familiar Delta-V/EGA process used to boost the launch energy by returning to earth for a gravity assist, the reverse process reduces the Mercury approach energy each time a spacecraft makes a near-resonant return to Mercury for a gravity assist and reduces the orbit-capture Delta-V requirement. The mission sequences for such high-performance missions are described, and example mission opportunities for the years 1990 to 2010 are presented.

Yen, Chen-Wan Liu↗

Characterization of the Fe-Co-1.5V soft ferromagnetic alloy processed by Laser Engineered Net Shaping (LENS)

Processing of the low workability Fe-Co-1.5V (Hiperco® equivalent) alloy is demonstrated using the Laser Engineered Net Shaping (LENS) metals additive manufacturing technique. As an innovative and highly localized solidification process, LENS is shown to overcome workability issues that arise during conventional thermomechanical processing, enabling the production of bulk, near net-shape forms of the Fe-Co alloy. Bulk LENS structures appeared to be ductile with no significant macroscopic defects. Atomic ordering was evaluated and significantly reduced in as-built LENS specimens relative to an annealed condition, tailorable through selection of processing parameters. Fine equiaxed grain structures were observed in as-built specimens following solidification, which then evolved toward a highly heterogeneous bimodal grain structure after annealing. The microstructure evolution in Fe-Co is discussed in the context of classical solidification theory and selective grain boundary pinning processes. In conclusion, magnetic properties were also assessed and shown to fall within the extremes of conventionally processed Hiperco® alloys.

36 MATERIALS SCIENCE↗

The Role of Independent V&V in Upstream Software Development Processes

This paper describes the role of Verification and Validation (V&V) during the requirements and high level design processes, and in particular the role of Independent V&V (IV&V). The job of IV&V during these phases is to ensure that the requirements are complete, consistent and valid, and to ensure that the high level design meets the requirements. This contrasts with the role of Quality Assurance (QA), which ensures that appropriate standards and process models are defined and applied. This paper describes the current state of practice for IV&V, concentrating on the process model used in NASA projects. We describe a case study, showing the processes by which problem reporting and tracking takes place, and how IV&V feeds into decision making by the development team. We then describe the problems faced in implementing IV&V. We conclude that despite a well defined process model, and tools to support it, IV&V is still beset by communication and coordination problems.

Easterbrook, Steve↗

ASME V\&V challenge problem: Surrogate-based V&V

The process of verification and validation can be resource intensive. From the computational model perspective, the resource demand typically arises from long simulation run times on multiple cores coupled with the need to characterize and propagate uncertainties. In addition, predictive computations performed for safety and reliability analyses have similar resource requirements. For this reason, there is a tradeoff between the time required to complete the requisite studies and the fidelity or accuracy of the results that can be obtained. At a high level, our approach is cast within a validation hierarchy that provides a framework in which we perform sensitivity analysis, model calibration, model validation, and prediction. The evidence gathered as part of these activities is mapped into the Predictive Capability Maturity Model to assess credibility of the model used for the reliability predictions. With regard to specific technical aspects of our analysis, we employ surrogate-based methods, primarily based on polynomial chaos expansions and Gaussian processes, for model calibration, sensitivity analysis, and uncertainty quantification in order to reduce the number of simulations that must be done. The goal is to tip the tradeoff balance to improving accuracy without increasing the computational demands.

42 ENGINEERING↗