Search NASA⌕ Search

SEARCH · Search NASA

Results for “VIRTUALIZATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Still Virtual After All These Years: Recent Developments in the Virtual Solar Observatory

While continuing to add access to data from new missions, including Hinode and STEREO, the Virtual Solar Observatory is also being enhanced as a research tool by the addition of new features such as the unified representation of catalogs and event lists (to allow joined searches in two or more catalogs) and workable representation and manipulation of large numbers of search results (as are expected from the Solar Dynamics Observatory database). Working with our RHESSI colleagues, we have also been able to improve the performance of IDL-callable vso_search and vso_get functions, to the point that use of those routines is a practical alternative to reproducing large subsets of mission data on one's own LAN.

Gurman, Joseph B.↗

AlphaBuilding ResCommunity: A multi-agent virtual testbed for community-level load coordination

Training and validating algorithms in a simulation testbed can accelerate research and applications of optimal control of residential loads to improve energy flexibility and grid resilience. We developed an open-source simulation environment, AlphaBuilding ResCommunity, that can be used to train and validate algorithms to control a single thermostatically controlled load (TCL) or coordinate a group of TCLs. We used reduced-order models to simulate the thermodynamics of TCLs, and the parameter values were determined from the connected smart thermostat data of real households. The environment was built upon the standardized OpenAI Gym interface. Ancillary functions, such as retrieving the parameters and weather forecasts, are provided to facilitate control strategies that require predictive information. Compared with existing efforts, AlphaBuilding ResCommunity has three advantages: (1) more realistic model settings because the parameter values are identified from actual household operating data, and modelling and measurement uncertainty are considered; (2) passive thermal storage control; and (3) ease of use due to a simple software dependency and standardized interface. We demonstrated the applications of the environment by implementing a Kalman Filter and Model Predictive Control on a single TCL and a Priority-Stack-Based Control and Alternating Direction Method of Multipliers to coordinate multiple TCLs for load tracking.

Wang, Z↗

APOLLO: a facility-scale differentiable virtual accelerator at Fermilab FAST/IOTA

As the design complexity of modern accelerators grows, there is more interest in using advanced simulations that have fast execution time or yield additional insights like gradients. The FAST/IOTA facility has been working on implementing and experimentally validating an end-to-end digital twin that is both fast and gradient-aware, allowing for rapid prototyping of new software and experiments with minimal beam time costs. Our framework integrates physics and ML codes for linac and ring simulation through a set of generic interfaces between surrogate and physics-based sections. To reproduce device inputs and outputs, system state is exposed as a deterministic event loop in a specialized discrete event simulator architecture. Because Fermilab is undergoing control system transition, several APIs were implemented as final user interfaces - a fully asynchronous EPICS soft IOC, a gRPC-based Data Pool Manager (DPM), and legacy ACNET protocols. We discuss implementation details as well as challenges handling live data assimilation and future plans to extend modelling to main complex proton accelerators like PIPII and Booster.

Kuklev, Nikita [Fermilab]↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗