Aircraft electric motor with integrated cooling system

Aircraft electric motors include a motor unit having a rotor and a stator. The stator includes a plurality of windings and cooling channels arranged to provide cooling thereto. A drive unit is configured to drive operation of the motor unit. A cooling system includes a working fluid arranged within a cooling fluid flow path, wherein the cooling fluid flow path includes a liquid cooling path configured to direct flow of the working fluid through, at least, the cooling channels of the motor unit and a vapor cooling path configured to direct flow of the working fluid through the drive unit and a separator arranged upstream of each of the liquid cooling path and the vapor cooling path and configured to direct a liquid portion of the working fluid into the liquid cooling path and configured to direct a vapor portion of the working fluid into the vapor cooling path.

Alahyari, Abbas A.↗

Binary Power Plant CO2 Life Cycle Emissions Including Isobutane Fugitive Emission

Geothermal energy production has one of the lowest life cycle CO2 emission factors (~ 15 g-CO2/kWh) for plants producing electricity (Hondo, 2005). This life cycle factor includes indirect emissions from plant construction as well as ongoing operations such as additional well drilling and equipment replacement. Not included in this calculation are direct emissions from geothermal power production. Geothermal flash plants emit CO2 at rates related to the reservoir concentration. Binary plants report “near zero” emissions of high global warming potential gases because of their closed loop system design. Binary plants use working fluids to drive the turbine generators and leakage of these working fluids have not yet been quantified. To assess the working fluid emissions from geothermal power production using an Organic Rankine Cycle, reported isobutane emissions were accessed for 3 California binary plants from the Great Basin Unified and Imperial County Air Pollution Control Districts as well as the California Air Resource Board. Each binary plant used in this study has been operating for more than 25 years. From the data, two types of isobutane emissions were accounted for over a 15 month period: ‘normal’ equipment leakage and equipment breakdown emissions. This preliminary analysis of working fluid emissions from these plants suggest that if a binary plant has equipment failures, the majority of the isobutane releases can be due to these events. The results indicate that a well maintained binary plant releases approximately 0.13 g-Isobutane/kWh where as a plant with equipment failures releases approximately 6 g-Isobutane/kWh. Assuming a greenhouse warming potential of 3 for isobutane, these emission values become 0.4 and 18 g-CO2e/kWh (where CO2e is the CO2 equivalent effect). The direct operation isobutane leakage for a well maintained binary plant does not significant increase the life cycle CO2 emission factor whereas a plant with significant equipment issues can effectively double the life cycle CO2 emissions. This limited data set suggests that when direct CO2e fugitive emission are add to the indirect CO2 emissions, the total CO2 emissions from binary power plants are equivalent or less than nuclear, as well as other renewables power production such as wind and solar.

15 GEOTHERMAL ENERGY↗

Transport Properties of He-N{sub 2} Binary Gas Mixtures for CBC Space Applications

In order to reduce the size and mass of the single-shaft turbo-machines, with little impact on the size of the heat transfer components in the CBC loop, He-Xe binary mixture with a molecular weight of 40 g/mole has been the working fluid of choice in space nuclear reactor power systems with Close Brayton Cycle (CBC) for energy conversion. This working fluid is also a suitable coolant for the fission reactors heat source designed with fast neutron energy spectra. For space nuclear reactors with thermal neutron energy spectra, however, the high capture neutron cross-section of Xe will reduce the beginning-of-life excess reactivity of the reactor, decreasing its effective operation lifetime. In addition, the neutron activation of Xe in the reactor will introduce a radioactivity source term in the CBC loop. Alternative working fluids with no activation concerns and comparable performance are N{sub 2} and the binary mixtures of He-N{sub 2}. This paper calculates the transport properties of these working fluids and compares their values to those of noble gas binary mixtures at the temperatures and pressures expected in CBC space reactor power system applications. Also investigated is the impact of using these working fluids on the pressure losses, heat transfer coefficient, and the aerodynamic loading of the blades in the CBC turbo-machines.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Closed cycle heat engine

Heat engines employing fluid bearing assemblies hermetically sealed with a closed flowpath for a working fluid are generally disclosed. For example, the heat engine includes a rotating drivetrain and a fluid bearing assembly. The rotating drivetrain includes a compressor section, an expander section, and a heat exchanger. The compressor section and expander section together define at least in part a closed flowpath for the flow of a working fluid. The heat exchanger is thermally coupled to the closed flowpath for adding heat to the working fluid. The fluid bearing assembly is configured to utilize the working fluid to support the rotating drivetrain. Further, the fluid bearing assembly is hermetically sealed with the closed flowpath.

Ertas, Bugra Han↗

Two-Stage, Integrated, Geothermal-CO2 Storage Reservoirs: An Approach for Sustainable Energy Production, CO 2 -Sequestration Security, and Reduced Environmental Risk

We introduce a hybrid two-stage energy-recovery approach to sequester CO 2 and produce geothermal energy at low environmental risk and low cost by integrating geothermal production with CO 2 capture and sequestration (CCS) in saline, sedimentary formations. Our approach combines the benefits of the approach proposed by Buscheck et al. (2011b), which uses brine as the working fluid, with those of the approach first suggested by Brown (2000) and analyzed by Pruess (2006), using CO 2 as the working fluid, and then extended to saline-formation CCS by Randolph and Saar (2011a). During stage one of our hybrid approach, formation brine, which is extracted to provide pressure relief for CO 2 injection, is the working fluid for energy recovery. Produced brine is applied to a consumptive beneficial use: feedstock for fresh water production through desalination, saline cooling water, or make-up water to be injected into a neighboring reservoir operation, such as in Enhanced Geothermal Systems (EGS), where there is often a shortage of a working fluid. For stage one, it is important to find economically feasible disposition options to reduce the volume of brine requiring reinjection in the integrated geothermal-CCS reservoir (Buscheck et al. 2012a). During stage two, which begins as CO 2 reaches the production wells; coproduced brine and CO 2 are the working fluids. We present preliminary reservoir engineering analyses of this approach, using a simple conceptual model of a homogeneous, permeable CO 2 storage formation/geothermal reservoir, bounded by relatively impermeable sealing units. We assess both the CO 2 sequestration capacity and geothermal energy production potential as a function of well spacing between CO 2 injectors and brine/CO 2 producers for various well patterns and for a range of subsurface conditions.

02 PETROLEUM↗

Final Report: Modifications and Optimization of the Organic Rankine Cycle to Improve the Recovery of Waste Heat

This research and development (R&D) project exemplifies a shared public private commitment to advance the development of energy efficient industrial technologies that will reduce the U.S. dependence upon foreign oil, provide energy savings and reduce greenhouse gas emissions. The purpose of this project was to develop and demonstrate a Direct Evaporator for the Organic Rankine Cycle (ORC) for the conversion of waste heat from gas turbine exhaust to electricity. In conventional ORCs, the heat from the exhaust stream is transferred indirectly to a hydrocarbon based working fluid by means of an intermediate thermal oil loop. The Direct Evaporator accomplishes preheating, evaporation and superheating of the working fluid by a heat exchanger placed within the exhaust gas stream. Direct Evaporation is simpler and up to 15% less expensive than conventional ORCs, since the secondary oil loop and associated equipment can be eliminated. However, in the past, Direct Evaporation has been avoided due to technical challenges imposed by decomposition and flammability of the working fluid. The purpose of this project was to retire key risks and overcome the technical barriers to implementing an ORC with Direct Evaporation. R&D was conducted through a partnership between the Idaho National Laboratory (INL) and General Electric (GE) Global Research Center (GRC). The project consisted of four research tasks: (1) Detailed Design & Modeling of the ORC Direct Evaporator, (2) Design and Construction of Partial Prototype Direct Evaporator Test Facility, (3) Working Fluid Decomposition Chemical Analyses, and (4) Prototype Evaluation. Issues pertinent to the selection of an ORC working fluid, along with thermodynamic and design considerations of the direct evaporator, were identified. The FMEA (Failure modes and effects analysis) and HAZOP (Hazards and operability analysis) safety studies performed to mitigate risks are described, followed by a discussion of the flammability analysis of the direct evaporator. A testbed was constructed and the prototype demonstrated at the GE GRC Niskayuna facility.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluation of CO 2 -Fluid-Rock Interaction in Enhanced Geothermal Systems: Field-Scale Geochemical Simulations

Recent studies suggest that using supercritical CO 2 (scCO 2 ) instead of water as a heat transmission fluid in Enhanced Geothermal Systems (EGS) may improve energy extraction. While CO 2 -fluid-rock interactions at “typical” temperatures and pressures of subsurface reservoirs are fairly well known, such understanding for the elevated conditions of EGS is relatively unresolved. Geochemical impacts of CO 2 as a working fluid (“CO 2 -EGS”) compared to those for water as a working fluid (H 2 O-EGS) are needed. The primary objectives of this study are (1) constraining geochemical processes associated with CO 2 -fluid-rock interactions under the high pressures and temperatures of a typical CO 2 -EGS site and (2) comparing geochemical impacts of CO 2 -EGS to geochemical impacts of H 2 O-EGS. The St. John’s Dome CO 2 -EGS research site in Arizona was adopted as a case study. A 3D model of the site was developed. Net heat extraction and mass flow production rates for CO 2 -EGS were larger compared to H 2 O-EGS, suggesting that using scCO 2 as a working fluid may enhance EGS heat extraction. More aqueous CO 2 accumulates within upper- and lower-lying layers than in the injection/production layers, reducing pH values and leading to increased dissolution and precipitation of minerals in those upper and lower layers. Dissolution of oligoclase for water as a working fluid shows smaller magnitude in rates and different distributions in profile than those for scCO 2 as a working fluid. It indicates that geochemical processes of scCO 2 -rock interaction have significant effects on mineral dissolution and precipitation in magnitudes and distributions.

58 GEOSCIENCES↗

Waste heat recovery lube oil management

A waste heat recovery system comprising a thermal circuit. The thermal circuit includes a boiler and an expander fluidly coupled to the boiler. The thermal circuit further includes a power transfer system integrated to the expander. The power transfer system is configured to receive mechanical energy from the expander. The thermal circuit further includes an ejector fluidly coupled to the boiler and to the power transfer system. The ejector is configured to receive a motive flow of working fluid from the boiler. The ejector is further configured to receive a suction flow of working fluid from the power transfer system. The ejector is further configured to combine the motive flow of working fluid and the suction flow of working fluid.

Ernst, Timothy C.↗

Challenges in structural analysis for deformed nuclear reactivity assessments.

Launch safety calculations for past space reactor concepts have usually been limited to immersion of the reactor in water and/or sand, using nominal system geometries or in some cases simplified compaction scenarios. Deformation of the reactor core by impact during the accident sequence typically has not been considered because of the complexity of the calculation. Recent advances in codes and computing power have made such calculations feasible. The accuracy of such calculations depends primarily on the underlying structural analysis. Even though explicit structural dynamics is a mature field, nuclear reactors present significant challenges to obtain accurate deformation predictions. The presence of a working fluid is one of the primary contributors to challenges in these predictions. The fluid-structure interaction cannot be neglected because the fluid surrounds the nuclear fuel which is the most important region in the analysis. A detailed model of a small eighty-five pin reactor was built with the working fluid modeled as smoothed particle hydrodynamic (SPH) elements. Filling the complex volume covered by the working fluid with SPH elements required development of an algorithm which eliminates overlaps between hexahedral and SPH elements. The results with and without the working fluid were found to be considerably different with respect to reactivity predictions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Terry Turbopump Expanded Operating Band Modeling and Full-Scale Test Development Efforts in FY19 (Progress Report)

The Terry Turbine Expanded Operating Band Project is currently conducting testing at Texas A&M University, and the resulting data has been incorporated into MELCOR models of the Terry turbines used in nuclear power plants. These improved models have produced improvements in the Fukushima Daiichi Unit 2 simulations while providing new insights into the behavior of the plant. The development of future experimental test efforts is ongoing. Development of and refinements to the plans for full-scale steam and steam-water turbine ingestion testing has been performed. These full-scale steam-based tests will complement the testing occurring at Texas A&M University, and will resolve the remaining questions regarding scale or working fluid. Planning work has also begun for future testing intended to explore the uncontrolled RCIC self-regulation theorized to have occurred in Fukushima Daiichi Unit 2.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Influence of Reservoir Convection on Heat Extraction with Closed-Loop Geothermal Systems

Over the past few years, advancements in closed-loop geothermal systems (CLGS), also called advanced geothermal systems (AGS), have sparked a renewed interest in these types of designs. CLGS have certain advantages over traditional and enhanced geothermal systems (EGS), including not requiring in-situ reservoir permeability, conservation of the circulating fluid, and allowing for different fluids, including working fluids directly driving a turbine at the surface. CLGS may be attractive in environments where water resources are limited, rock contaminants must be avoided, and stimulation treatments are not available (e.g., due to regulatory or technical reasons). Despite these advantages, CLGS have some challenges, including limited surface area for heat transfer and requiring long wellbores and laterals to obtain multi-MW output in conduction-only reservoirs. CLGS have been investigated in conduction-only systems. In this paper, we explore the impact of both forced and natural convection on the levels of heat extraction with a CLGS deployed in a hot wet rock reservoir. We bound potential benefits of convection by investigating liquid reservoirs over a range of natural and forced convective coefficients. Additionally, we investigate the effects of permeability, porosity, and geothermal temperature gradient in the reservoir on CLGS outputs. Reservoir simulations indicate that reservoir permeabilities of at least ~100 mD are required for natural convection to increase the heat output with respect to a conduction-only scenario. The impact increases with increasing reservoir temperature. When subject to a forced convection flow field, Darcy velocities of at least 10-7 m/s are required to obtain an increase in heat output.

advanced geothermal systems↗

A Modelica Implementation of an Organic Rankine Cycle

Organic Rankine cycle (ORC) systems generate power from low-grade heat sources, such as geothermal sources and industrial waste heat. A key feature is that a working fluid is selected to match the temperature of the source. With the vast pool of candidate working fluids comes the challenge of developing a large number of robust thermodynamic media models. We implemented a subcritical ORC model in Modelica that uses working fluid data records and interpolation schemes in lieu of thermodynamic medium evaluation for energy recovery estimation. This is a component model that can be integrated into a larger energy system model. It does not require detailed thermodynamic, heat transfer, or machine analysis. Our ORC model fills a gap where working fluids are ready to choose or easy to add, and at the same time can be integrated into an energy system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of Brayton Cycles Utilizing Supercritical Carbon Dioxide

This white paper documents a detailed and extensive Brayton cycle analysis that was performed to better understand at a fundamental level the dependence of the Brayton cycle performance on operating conditions, working fluid, supercritical fluid properties, and some cycle non-idealities. This work was performed to better understand the factors controlling Brayton cycle performance and optimal operating conditions, particularly for cycles utilizing supercritical CO 2 (sCO 2 ) as the working fluid. The focus of this study is on cycle performance, particularly efficiency. No cost estimates were performed. However, as a single indirect measure of cycle cost, some sensitivity analyses on specific power (net output divided by working fluid mass flow rate) were included.

42 ENGINEERING↗

High Performance Heat Pipe Power Transient Testing at SPHERE Facility

Microreactors are being researched, designed, and built at Idaho National Laboratory (INL). Microreactors are small reactors defined at less than 20MW of power. These reactor concepts are also being looked at throughout industry for various applications. An important aspect of these reactor designs is economic feasibility i.e. lower overnight capital cost. The driving factors for implementing microreactors are quick setup and takedown, minimal operators, and the ability to manufacture them readily and to fit in mid-sized containers for transport. A specific area of research to aid in successful integration of these factors within the designs is passive heat removal of the core’s thermal power. Interest in heat pipes to achieve this passive heat removal has been shown across multiple industry partners. Because of this interest, INL has developed a test facility to facilitate experimental tests for sodium filled heat pipes. INL has developed the Single Primary Heat Extraction and Removal Emulator (SPHERE) facility to run experiments on high performance, sodium filled heat pipes. As mentioned above, heat pipes are passive heat transfer devices. Radially, heat pipes are broken up into an outer wall, a small annular gap, a wick structure, and a centerline gap. They function by utilizing latent heat transfer. Heat pipes are traditionally separated into three regions, an evaporator (heat input), an adiabatic region, and finally a condenser region (heat removal). As heat is being applied to the evaporator, the working fluid undergoes a phase change to a vapor. This phase change causes a differential pressure across the axial length of the pipe driving flow down the center gap of the heat pipe. The vapor flows down past the adiabatic region to the condenser where the heat is removed. This heat removal forces the working fluid to phase change back to a liquid. The wick structure is then utilized to drive the flow back towards the evaporator by capillary forces. This backflow is aided by the annular gap. Because this heat transfer mechanism functions with latent heat transfer, the heat pipe is close to isothermal down the axial length. Heat pipes can operate under a wide range of working fluids. Considerations for these working fluids are primarily driven by operating temperatures amongst other important factors based around overall performance. Sodium filled heat pipes operate from 450°C up to 900°C. This temperature range works well for the current microreactor designs. In conjunction with this experimental capability, INL has developed a modeling software to simulate heat pipe physics within reactor cores. This modeling software is called Sockeye and functions under the established INL Multiphysics Object Oriented Simulation Environment (MOOSE). SPHERE also supports Sockeye development by providing the modeling team with experimental data on an array of setups and operating parameters to support validation efforts. A power transient experiment was performed utilizing the SPHERE facility to continue to aid with Sockeye development. The testing followed a proposed test plan to ramp up and down the temperature of the heat pipe. Sockeye models steady state heat pipe operation with high accuracy, the data provided by the power transient testing aims to assist with the validation efforts and further enhance transient modeling capability of the tool [2].

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experimental study of single-phase pressure drop and heat transfer in a micro-fin tube

The single-phase pressure drop and heat transfer in a micro-fin tube were measured using oil and water as the working fluids. The Prandtl number varied from 3.2 to 220 and the Reynolds number ranged from 2500 to 90,000. The results show that there is a critical Reynolds number, Re{sub cr}, for heat transfer enhancement. For Re<Re{sub cr}, the heat transfer in the micro-fin tube is the same as that in a smooth tube, but for Reynolds numbers higher than Re{sub cr}, the heat transfer in the micro-fin tube is gradually enhanced compared with a smooth tube. It reaches more than twice that in a smooth tube for Reynolds numbers greater than 30,000 with water as the working fluid. The Nusselt number is proportional to Pr {sup 0.56} in the enhanced region and is proportional to Pr {sup 0.3} in the non-enhanced region. For the high Prandtl number working fluid (oil, 80< Pr <220), the critical Reynolds number for heat transfer enhancement is about 6000, while for the low Prandtl number working fluid (water, 3.2< Pr <5.8), the critical Reynolds number for heat transfer enhancement is about 10,000. The friction factors in the micro-fin tube are almost the same as for a smooth tube for Reynolds numbers below 10,000. For Reynolds numbers higher than 30,000, the friction factor is about 40-50% higher than for a smooth tube. (author)

42 ENGINEERING↗

Near-isothermal-isobaric compressed gas energy storage

In this paper, the effectiveness of storing energy by compressing and expanding a condensable gas is evaluated. A high efficiency energy storage system, which stores energy by compressing/expanding gas (air) using a liquid (water) piston has been recently introduced and extensively studied. With the use of the liquid piston, the inefficient gas turbomachines used in conventional gas compression/expansion systems are replaced with high efficiency hydraulic machines. Utilizing heat transfer techniques and replacing the non-condensable air with a condensable gas (i.e. CO 2 , synthetic refrigerants, hydrocarbon refrigerants, etc.) have been proposed as methods to improve energy density and roundtrip efficiency of such systems, leading to near isothermal and near isobaric charge/discharge processes. In order to investigate the effectiveness of the proposed concept, a miniature lab-scale experimental setup was designed and built to investigate the compression/expansion characteristics and energy storage efficiency of a system utilizing R134a as the energy storage (primary) working fluid, and mineral refrigerant oil as the liquid piston (secondary) working fluid. Several tests are carried out to quantify energy storage efficiency and energy density. It is found that improving heat transfer rates from/into the storage fluid results in increased efficiency and energy density. A heat-transfer enhancement strategy to achieve near isothermal, isobaric expansion and compression is proposed and investigated experimentally. Some results are generalized and presented in non-dimensional form which can be applied to describe and/or design scaled-up systems. Lastly, a potential working fluid for a scaled-up system is discussed.

25 ENERGY STORAGE↗

Investigation of Solar Cooling Cogeneration Plant

The deficiency in the energy for the space cooling is overcome by solar energy. Still the input energy is minimized by integrating both power and cooling cycle in common platform, such as working fluid, component and working parameters. The aqua-ammonia is used in both power cycle and vapor cooling cycle. The generator is common for cycles for the production of ammonia vapor. The analyses are made to find out the operational parameters for the cooling cogeneration cycle with solar as source. The analyses are done for the proposed cycle with various atmosphere temperatures. At absorber concentration of 0.42 and turbine inlet concentration of 0.90, with solar collector exit temperature of 155°C and atmosphere temperature of 30°C the generated power and cooling are 21.88 and 215.79 kW, respectively. The power and cooling output range can alter by varying turbine inlet concentration and temperature.