Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Exploring the influence of transition metals on f-element bonding

The United States aims to triple its nuclear energy production by 2050, which will result in increased uranium usage and spent nuclear fuel generation. This highlights the need for a comprehensive understanding of actinide coordination chemistry, which is crucial for the extraction, processing, purification, and fabrication of uranium-based fuels. Moreover, it is vital for the reprocessing or safe disposal of nuclear waste and effective remediation efforts. Achieving this successfully requires an in-depth understanding of f-electron behavior, as “the role of 5f electrons in bond formation remains a fundamental topic in actinide chemistry”. Introducing a second metal into the system can increase structural dimensionality and diversify structural architecture. Heterometallic systems can also alter material properties, such as magnetic and spectroscopic characteristics, luminescence, and actinide mobility. Additionally, secondary transition metals, even when present only in the second coordination sphere and not directly coordinated, can influence the electron density at the actinyl metal center. In this study, uranium heterometallic single crystals were synthesized by incorporating transition metals such as iron(III), iron(II), nickel(II), manganese(II), copper(I), and cobalt(II). The crystals were formed using 2,6-pyridine dicarboxylic acid and other structurally similar ligands with varying functional groups. The synthesized crystals were analyzed using an extensive array of analytical and computational characterization techniques, including single crystal X-ray diffraction, Raman and infrared spectroscopy, and density functional theory calculations.

37 - INORGANIC, ORGANIC, PHYSICAL AND ANALYTICAL C↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 128: Best Practices in Project Communications

This panel focused on a sustainable, holistic and integrated approach to structure nuclear waste management, disposal and remediation decisions. This panel had participation from internal and external stakeholders and demonstrate use of tools and techniques to effectively communicate factors that inform decisions. The desired outcome was to effectively communicate how risk is evaluated at complex sites, highlight holistic site level approaches that are protective of human health and the environment, and incorporate policy and technical concerns related to achieving alternative end points. This discussion included existing decision-making tools in conjunction with case studies. Panelists with presentations: Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos National Laboratory (David Nickless); Best Practice In Project Communications (Alan Paulley); Stakeholder and Public Engagement (Mark Lesinski); Stakeholder Engaged Structured Decision Making (Kelly Black)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Control Specialists Technical Review Team Report

1. Modeling of Drum 68660 and the WCS Drums: A calibrated model of Los Alamos National Laboratory (LANL) Drum 68660 indicates that pressurization of the drum by restriction of drum venting could have led to the thermal runaway reaction at the Waste Isolation Pilot Plant (WIPP) in 2014, supporting the hypothesis that the contents of the drum were not fundamentally different from the overall remediated nitrate salt (RNS) waste stream. 2. Nitric Acid Reactions and Aging of the Waste: The stability of the WCS RNS waste with respect to autocatalytic thermal runaway due to nitric acid chemistry should increase over time as the nitric acid is depleted from chemical reactions in the drum. However, this cannot be confirmed because of the lack of long-term experimental data on the impact of aging on the reactivity of RNS waste. The calibrated model indicates that the waste drums retain most of their reactive components, metal nitrate salts and sWheat Scoop ® , even after eight years. 3. Pressure Effects and Runaway Reactions: The calibrated model indicates that if the drums and standard waste boxes (SWBs) are not allowed to pressurize during transport or storage and they are stored at historical WIPP repository temperatures, then an autocatalytic thermal runaway event is not expected to occur. Since the cause of Drum 68660 pressurization is not known, decision makers are not able to tailor mitigating strategies to the initiating event. Consequently, mitigating strategies must consider all feasible internal and external events that could lead to the pressurization of the drums. 4. Temperature Effects and Runaway Reactions: Temperature also has a strong influence on the stability of the waste. The calibrated model indicates that cooling the drums or SWBs can reduce the possibility of autocatalytic thermal runaway reactions. Simulations suggest that for a drum with a plugged vent, the probability of thermal runaway may be reduced or eliminated if wastes are maintained at or below 43 °F through active cooling measures from the initiation of transport until emplacement at WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Decade of Innovative Approaches to Treating and Dispositioning Radioactive Waste at the Savannah River Site - 20620

This year marks the 70. anniversary of the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. SRS also continues to have a role in critical defense-related activities and the reprocessing of used reactor fuel. The SRS encompasses 803 square kilometers (310 square miles) in parts of Aiken, Barnwell, and Allendale counties. The Liquid Waste Mission starts with the safe receipt and storage of radioactive liquid waste in the waste tanks, which principally includes Cold War legacy waste, but also waste from support of National Aeronautics Space Administration missions, medical isotope production, and research activities. This 133,000 cubic meters (m{sup 3}) (35 million gallons [Mgal]) of high-level radioactive waste (HLW) is currently held in 43 large underground waste tanks. The capacity of each of these tanks range from 2,800 m{sup 3} to 5,000 m{sup 3} (0.75 to 1.33 Mgal) and were placed in operation between 1954 and 1986. In July 2009, the DOE awarded a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor selected was Savannah River Remediation LLC1 (SRR), which is responsible for receipt, storage, retrieval and treatment of all HLW, disposal of the decontaminated low-activity waste fraction, as well as operationally closing cleaned HLW tanks. Since July 2009, SRR has successfully grouted and operationally closed six large underground tanks, poured 1,476 canisters of vitrified HLW (a stable glass waste form), treated approximately 34,200 m{sup 3} (9.0 Mgal) of HLW, and dispositioned over 41,200 m{sup 3} (10.9 Mgal) of decontaminated salt solution as low-level waste (LLW) into the Saltstone Disposal Units (SDUs) being constructed by SRR on site. The innovative work performed by SRR in the LLW portion of its mission has earned it the Richard S. Hodes Award. The work conducted by SRR is the same work championed by the late Richard S. Hodes, a respected physician, statesmen, and Chairman of the Southeast Compact Commission for Low-Level Radioactive Waste Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scoping Thermal Response Calculations of RNS Waste During Transport to and Disposal at the WIPP

Sandia National Laboratories (SNL) was contracted by the United States Department of Energy Environmental Management (DOE-EM), Los Alamos Field Office to perform mechanical and thermal scoping calculations as part of a study seeking to understand the ignitability risk of the Remediated Nitrate Salts (RNS) waste drums during transportation from the Waste Control Specialists (WCS) facility to Waste Isolation Pilot Plant (WIPP) and permanent disposal of the waste at WIPP. The scoping thermal simulations described in this report pertain to thermal calculations performed with a packaging system consisting of one Standard Waste Box (SWB) loaded with drums placed inside a Standard Large Box 2 (SLB2). During transportation, the SLB2 is inside Transuranic Package Transporter Model III (TRUPACT-III), which provides the third layer of the packaging. Once at the WIPP, it is assumed the SLB2 is extracted from the TRUPACT-III and maintained above ground, and then subsequently placed underground for permanent disposal. In these proposed configurations, the space between the SLB2 and the SWB is always filled by a layer of insulation consisting of air-filled glass microbubbles except for the bottom which rests directly on the SLB2. The thermal scoping calculations described in this report specifically address whether the introduction of external heat inputs, combined with the contributions from the internally generated radiolytic decay heat and chemical reactions, lead to an unstable thermal state during the time of its movement and placement in the permanent disposal location. The external heat inputs are of two forms: 1) ambient thermal irradiation (e.g., solar and ambient storage/disposal temperatures) and 2) accident-induced fire. Three scoping calculation scenarios were derived as representative, conservative scenarios: 1A) TRUPACT-III transient transportation, 1B) SLB2 48-hour outdoor storage with solar radiation, and 2) fully-engulfing fire during SLB2 handling or emplacement following a steady-state analysis in a 38 °C environment. All the simulated scenarios are conservative relative to the operational conditions expected for handling the waste package during transportation and placement in the WIPP underground disposal unit. The predictions obtained from simulating the three exposure scenarios revealed that adding the SLB2 and the air-filled glass microbubbles to the transport and storage/disposal configurations provides additional thermal protection of the drums beyond what the SWB provides alone, both during long-term above ground insolation and underground during a fire accident. Under the current transportation/storage/disposal concepts, the degree of protection provided by the packaging concept is sufficient to prevent the waste from being ignitable. The simulation results demonstrate that there is adequate margin to safely transport and place the RNS waste from WCS to the WIPP under the current operational concept.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: An Overview - 20106

The UK government is committed to nuclear energy having an important role in delivering a secure, low-carbon and affordable energy future. Projections indicate that between now and 2035, ∼14 GW of new nuclear generating capacity may be built. Successful delivery of this strategy recognises the need for research and development, skills development and international collaboration as key enablers. One key area is the decommissioning and clean-up of all civil nuclear licensed sites and the implementation of geological disposal of highly active wastes, with a central component being a joined-up approach to nuclear R and D across government, industry and academia which benefits the UK economy and ensures the security of supply. Essential to public acceptance of this strategy remains a demonstrable ability to safely manage and dispose of waste, with acceptance directly linked to having scientifically robust routes for its safe clean-up and disposal. There therefore remains an ongoing need for further research in the areas of decommissioning, immobilisation and management of nuclear waste, and there is significant government and stakeholder support for such research. Given the needs of both new nuclear power generation and legacy wastes, there is a requirement to develop innovative approaches to waste management and decommissioning. Following on from earlier, highly successful projects supported by UK Research and Innovation's Energy Programme, the work of the TRANSCEND (Transformative Science and Engineering for Nuclear Decommissioning) consortium is part of the response to these needs, providing support to a strong and internationally leading group of researchers in this key technology area. The consortium is a collaboration between 11 universities, supported by 8 key industry partners, with a total funding of UK Pounds 9.5 M from the UK Engineering and Physical Research Council, the universities and key project partners. The research being carried out is multidisciplinary and covers both fundamental and applied topics, with 40 research projects clustered in four technical themes: integrated waste management; site decommissioning and remediation; spent fuels; and nuclear materials. Key aims of the consortium are to extend and further develop a relevant academic skill base in the UK associated with the needs of nuclear waste management and decommissioning, to train the next generation of UK researchers, equipping them with skills and experiences relevant to nuclear waste management and decommissioning issues, and to carry out cutting-edge research that has the potential to provide new and innovative pathways to better management of both legacy and future nuclear wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improved precision in As speciation analysis with HERFD-XANES at the As K -edge: the case of As speciation in mine waste

High-energy-resolution fluorescence-detected (HERFD) X-ray absorption near-edge spectroscopy (XANES) is a spectroscopic method that allows for increased spectral feature resolution, and greater selectivity to decrease complex matrix effects compared with conventional XANES. XANES is an ideal tool for speciation of elements in solid-phase environmental samples. Accurate speciation of As in mine waste materials is important for understanding the mobility and toxicity of As in near-surface environments. In this study, linear combination fitting (LCF) was performed on synthetic spectra generated from mixtures of eight measured reference compounds for both HERFD-XANES and transmission-detected XANES to evaluate the improvement in quantitative speciation with HERFD-XANES spectra. The reference compounds arsenolite (As 2 O 3 ), orpiment (As 2 S 3 ), getchellite (AsSbS 3 ), arsenopyrite (FeAsS), kaňkite (FeAsO 4 ·3.5H 2 O), scorodite (FeAsO 4 ·2H 2 O), sodium arsenate (Na 3 AsO 4 ), and realgar (As 4 S 4 ) were selected for their importance in mine waste systems. Statistical methods of principal component analysis and target transformation were employed to determine whether HERFD improves identification of the components in a dataset of mixtures of reference compounds. LCF was performed on HERFD- and total fluorescence yield (TFY)-XANES spectra collected from mine waste samples. Arsenopyrite, arsenolite, orpiment, and sodium arsenate were more accurately identified in the synthetic HERFD-XANES spectra compared with the transmission-XANES spectra. In mine waste samples containing arsenopyrite and either scorodite or kaňkite, LCF with HERFD-XANES measurements resulted in fits with smaller R -factors than concurrently collected TFY measurements. The improved accuracy of HERFD-XANES analysis may provide enhanced delineation of As phases controlling biogeochemical reactions in mine wastes, contaminated soils, and remediation systems.

58 GEOSCIENCES↗

Role of uncertainties in protecting ecological resources during remediation and restoration

Cleanup of contaminated waste sites is a National priority to protect human health and the environment, while restoring land to productive uses. While there are uncertainties with under standing risk to individuals from exposure, the aim of this study was to focus on uncertainties and complexities for ecological systems, complicated by hundreds of species occupying any remediation site which participate in multiple-interacting food webs. The ability to better predict the effectiveness of remediation in fostering future ecosystems might facilitate remedy selection and improve strategic environmental management. This investigation examined (1) uncertainties in ecosystem processes, (2) uncertainties in exposure from contamination before remediation, and (3) uncertainties during remediation. Two Department of Energy sites Hanford Site and Savannah River Site were used as case studies to illustrate how the uncertainties affect eco-receptors. Several types of ecological, physical, and human dimension uncertainties are defined. Ecological uncertainties include temporal, spatial, individual, developmental, and exogenous types. Physical uncertainties are weather-related, watershed variations, slope/aspect, soil/sediment structure and form, unforeseen events, and temporal patterns. Human dimension uncertainties include current land use, future land use, extractive and non-extractive recreation. The effects of remedial strategies varied between the two sites because Hanford is a primarily arid shrub-steppe ecotype, while Savannah River is a wet forest ecotype. Defining the associated ecological sensitivities and uncertainties and providing examples might help policy-makers, managers, planners, and contractors to be aware of issues to consider throughout planning, remediation, and restoration. Adding ecological uncertainty analysis to risk evaluations and remediation planning is analogous to using safety factors in human health risk assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 132: Risk-Informed Approach for Decision Making in WM, D and D and SNF Management: Reasonable Assurance for Safety

Mr. Larry Camper organized a panel of experts to discuss approaches to better make risk-informed decisions in waste management, decommissioning, and the management of Spent Nuclear Fuel (SNF). The audience heard the perspectives from four panelists that addressed issues ranging from the technical basis used to make risk-informed decisions to for developing cleanup criteria and promulgating regulations and safety standards both domestically and abroad. A summary of each of the presentations given by the panelists is provided herein. This WMS BOD featured panel focused on the Risk-Informed Approach for Decision Making in WM, D and D and SNF Management and the Reasonable Assurance for Safety. The panelists addressed and discussed with the audience different approaches used for decision-making, summarizing ongoing probabilistic vs. deterministic approaches, including IAEA graded approach, and discussed policies/approaches to achieve reasonable assurance for safety rather than using absolute assurance. Panelists with presentations: Risk-Informed Decision Making - More than a Motto? (Paul Black); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid); Risk-Informed Decision-Making and Illustrative National Academies Studies (Charles Ferguson); IAEA's Revised Safety Guidance on Remediation (Michelle Roberts); NDA Radioactive Waste Strategy - A Risk Informed Approach (James McKinney)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Incorporation of Pump-and-Treat Data in the New Tracking Restoration and Closure (TRAC)Web-Based Mapping Tool - 20339

Groundwater pump-and-treat (P and T) systems are a common remediation strategy for sites with contaminated groundwater within the U.S. Department of Energy (DOE) Office of Environmental Management (EM). Currently, there are six DOE-EM sites with active P and T systems, but integrated information on individual systems is only primarily available in separate annual reports. To provide a broad view of both current and historical P and T operations, data has been collected on all of the P and T systems. This summary information not only includes capital and average annual costs, but also identifies contaminants treated and forecasted P and T closure dates. Principal contaminants of concern treated with P and T systems include trichloroethylene, chromium (VI), strontium-90, technetium-99, and uranium. DOE-EM is continuing to create a web-based mapping tool that compiles information on groundwater contaminants, remediation strategies and, current data related to plumes and cleanup progress within all DOE-EM sites. The information collected on P and T systems will be added to the TRAC (Tracking Restoration and Closure) tool using interactive maps to quickly access and share information. This information sharing supports the transition from active to passive remediation methods and long-term monitoring approaches. TRAC can ensure that managers, stakeholders, regulators, and contractors remain up to date on cleanup progress for all sites within the complex. The information on P and T systems expands the use of TRAC and can assist in project monitoring and budget planning and support potential shifts in management plans based on plume data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Carbon Mineralization of Sulfate Wastes Containing Pb: Synchrotron Pb M3-Edge XANES Analysis of Simultaneous Heavy Metal and Carbon Sequestration

Sulfate wastes are produced in large quantities and contain toxic heavy metals such as lead (Pb), posing environmental risks. Because of favorable solubility differences, these wastes can be repurposed for engineered carbon dioxide (CO 2 ) sequestration. Understanding the fate and mobility of heavy metals during this process is important. This study focuses on Pb and the effect of zinc (Zn) on Pb in carbon mineralization. Synthesized gypsum was treated with a carbonate-rich solution at pH 11.5 to convert the sulfates to carbonates. Aqueous solutions and mineral solids were analyzed. Synchrotron-based micro-X-ray fluorescence and a novel application of Pb M3-edge X-ray absorption near-edge structure provided detailed insights into Pb distribution and mineral forms. Results showed significant reductions in aqueous Pb and Zn concentrations, indicating effective metal sequestration. Carbon mineralization transformed Pb from soluble anglesite (PbSO 4 ) into insoluble cerussite (PbCO 3 ) and hydrocerussite (Pb 3 (CO 3 ) 2 (OH) 2 ). Pb primarily precipitated onto calcium carbonate surfaces through surface-mediated precipitation reactions. While the presence of Zn modified crystallization dynamics, it did not impede Pb sequestration and potentially enhanced surface reactivity, facilitating greater Pb immobilization. These findings highlight carbon mineralization as a sustainable approach to immobilize toxic metals in sulfate wastes while advancing CO 2 sequestration efforts.

54 ENVIRONMENTAL SCIENCES↗