Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerator test facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Harnessing Ultra-Intense Long-Wave Infrared Lasers: New Frontiers in Fundamental and Applied Research

This review explores two main topics: the state-of-the-art and emerging capabilities of high-peak-power, ultrafast (picosecond and femtosecond) long-wave infrared (LWIR) laser technology based on CO2 gas laser amplifiers, and the current and advanced scientific applications of this laser class. The discussion is grounded in expertise gained at the Accelerator Test Facility (ATF) of Brookhaven National Laboratory (BNL), a leading center for ultrafast, high-power CO2 laser development and a National User Facility with a strong track record in high-intensity physics experiments. We begin by reviewing the status of 9–10 μm CO2 laser technology and its applications, before exploring potential breakthroughs, including the realization of 100 terawatt femtosecond pulses. These advancements will drive ongoing research in electron and ion acceleration in plasma, along with applications in secondary radiation sources and atmospheric energy transport. Throughout the review, we highlight how wavelength scaling of physical effects enhances the capabilities of ultra-intense lasers in the LWIR spectrum, expanding the frontiers of both fundamental and applied science.

43 PARTICLE ACCELERATORS↗

Fabrication and testing of the transition section between modules of a wakefield accelerator

The fabrication process is presented for a typical transition section located between each cylindrical corrugated waveguide structure comprising the wakefield accelerator module. The transition section includes couplers for extracting the 180 GHz TM 01 accelerating mode and separate couplers for extracting the 190 GHz HE 11 dipole mode, both modes induced by the electron bunch traversing the cylindrical corrugated waveguide structure. Extraction of the high-power accelerating mode reduces the heat load due to the subterahertz wave power dissipation within the corrugated accelerating structure. Extraction of the low-power dipole mode serves the purpose of detecting the electron bunch transverse oscillations within the wakefield accelerator and identifying the onset of beam breakup instability. Comprehensive testing of the fully functional transition section with an electron beam was done at the Accelerator Test Facility in Brookhaven National Laboratory which verified the functionality of the transition section. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Facility for Advanced Accelerator Experimental Tests (FACET) at SLAC and its Radiological Considerations

Facility for Advanced Accelerator Experimental Tests (FACET) in SLAC will be used to study plasma wakefield acceleration. FLUKA Monte Carlo code was used to design a maze wall to separate FACET project and LCLS project to allow persons working in FACET side during LCLS operation. Also FLUKA Monte Carlo code was used to design the shielding for FACET dump to get optimum design for shielding both prompt and residual doses, as well as reducing environmental impact. FACET will be an experimental facility that provides short, intense pulses of electrons and positrons to excite plasma wakefields and study a variety of critical issues associated with plasma wakefield acceleration [1]. This paper describes the FACET beam parameters, the lay-out and its radiological issues.

43 PARTICLE ACCELERATORS↗

Investigation of Thermal Acoustic Effects on SRF Cavities within CM1 at Fermilab

Two TESLA-style 8-cavity cryomodules have been operated at Fermilab Accelerator Science and Technology (FAST), formerly the Superconducting Radio Frequency (SRF) Accelerator Test Facility. Operational instabilities were revealed during Radio Frequency (RF) power studies. These observations were complemented by the characterization of thermal acoustic effects on cavity microphonics manifested by apparent noisy boiling of helium involving vapor bubble and liquid vibration. The thermal acoustic measurements also consider pressure and temperature spikes which drive the phenomenon at low and high frequencies.

43 PARTICLE ACCELERATORS↗

ATF2 Summary and Status

The Accelerator Test Facility (ATF) [1] at KEK was originally constructed as a Damping Ring (DR) demonstration facility for the next generation of electron linear colliders. It consists of a 1.3 GeV s-band linac and a 136m circumference damping ring which can routinely generate 1.6 nC electron bunches with very small vertical emittances (<10pm.rad). Completed in December of 2008, a new extraction line and final focus optics was built, this is referred to as ATF2 [2]. The location of ATF in-relation to the KEK site can be seen in Figure 1. ATF is a general-purpose facility for accelerator physics related R and D activities, with approximately 50% of the available beam time currently devoted to the ATF2 program. The ATF2 extraction line (EXT) and final focus system (FFS) extends about 90 meters from the DR extraction point, a sketch of this system can be seen in figure 2, along with the location of key instrumentation. The primary purpose of the ATF2 beam line is to demonstrate a new style of magnetic focusing optics intended for use at future linear colliders, such as ILC or CLIC based on a local chromaticity correction scheme. The primary goal of the collaboration is to demonstrate the ability of this optics to focus an electron beam of similar emittance to the ILC using a FFS of the same design chromaticity. A comparison of some of the ATF2 design parameters with those of the ILC and CLIC are shown in table 1. With the 1.3 GeV beam energy of ATF2, the target spot size to prove the operability of this optics for ILC is 37nm. This is referred to as 'Goal 1'. In addition, Goal 1 requires the demonstration of stable operations with such a beam size at the Interaction Point (IP). 'Goal 2' is to demonstrate nm-level stability with respect to the IP beam monitors, such as is required for stable beam collisions at ILC or CLIC. A further goal is to attempt to increase the chromaticity of the final focus optics, reducing the IP beta functions to a level where the system more closely resembles the CLIC FFS, and also for some of the newly proposed ILC parameters. It is anticipated that the difficulty of successfully tuning the FFS to deliver design IP beam spot sizes scales with the chromaticity of the system. The design of the achromatic focusing system involves fine cancelation of first, second and third order aberrations at the IP. One needs more accurate cancelation the tighter one attempts to focus the beam, also including more higher order terms. By gradually pushing the system to smaller IP beta functions and higher chromaticity we hope to learn what the limits of such a design are when applied practically. This will give confidence in the design philosophy behind future high-luminosity colliders and in the simulations used to predict their behaviour.

43 PARTICLE ACCELERATORS↗

Resonant Excitation of Plasma Wakefields

We describe characteristics of the bunch train and plasma source used in a resonant plasma wakefield experiment at the Brookhaven National Laboratory Accelerator Test Facility. The bunch train has the proper correlated spread to unambiguously observe the expected energy gain by the witness bunch at resonance. The plasma density in the capillary discharge is sufficiently high to reach the resonance with the typical bunch train spacing of this experiment. It is also uniform over more than 3/4 of the 2 cm-long capillary.

43 PARTICLE ACCELERATORS↗

Cavity Beam Position Monitor System for ATF2

The Accelerator Test Facility 2 (ATF2) in KEK, Japan, is a prototype scaled demonstrator system for the final focus required for a future high energy lepton linear collider. The ATF2 beam-line is instrumented with a total of 38 C and S band resonant cavity beam position monitors (CBPM) with associated mixer electronics and digitizers. The current status of the BPM system is described, with a focus on operational techniques and performance.

43 PARTICLE ACCELERATORS↗

Beam Physics of Integrable Optics Test Accelerator at Fermilab

Fermilab's Integrable Optics Test Accelerator (IOTA) is an electron storage ring designed for testing advanced accelerator physics concepts, including implementation of nonlinear integrable beam optics and experiments on optical stochastic cooling. The machine is currently under construction at the Advanced Superconducting Test Accelerator facility. In this report we present the goals and the current status of the project, and describe the details of machine design. In particular, we concentrate on numerical simulations setting the requirements on the design and supporting the choice of machine parameters.

43 PARTICLE ACCELERATORS↗

High resolution BPMS with integrated gain correction system

High resolution beam position monitors (BPM) are an essential tool to achieve and reproduce a low vertical beam emittance at the KEK Accelerator Test Facility (ATF) damping ring. The ATF damping ring (DR) BPMs are currently upgraded with new high resolution read-out electronics. Based on analog and digital down-conversion techniques, the upgrade includes an automatic gain calibration system to correct for slow drift effects and ensure high reproducible beam position readings. The concept and its technical realization, as well as preliminary results of beam studies are presented.

43 PARTICLE ACCELERATORS↗

Integrated system modeling analysis of a cryogenic multi-cell deflecting-mode cavity resonator

A deflecting mode cavity is the integral element for six-dimensional phase-space beam control in bunch compressors and emittance transformers at high energy beam test facilities. RF performance of a high-Q device is, however, highly sensitive to operational conditions, in particular in a cryo-cooling environment. Using analytic calculations and RF simulations, we examined cavity parameters and deflecting characteristics of TM{sub 110,π} mode of a 5 cell resonator in a liquid nitrogen cryostat, which has long been used at the Fermilab A0 Photoinjector (A0PI). The sensitivity analysis indicated that the cavity could lose 30%–40% of deflecting force due to defective input power coupling accompanying non-uniform field distribution across the cells with 40 ∼ 50 MeV electron beam and 70–80 kW klystron power. Vacuum-cryomodules of the 5 cell cavity are planned to be installed at the Fermilab Advanced Superconducting Test Accelerator facility. Comprehensive modeling analysis integrated with multi-physics simulation tools showed that RF loading of 1 ms can cause a ∼5 K maximum temperature increase, corresponding to a ∼4.3 μm/ms deformation and a 1.32 MHz/K maximum frequency shift. The integrated system modeling analysis will improve design process of a high-Q cavity with more accurate prediction of cryogenic RF performance under a high power pulse operation.

43 PARTICLE ACCELERATORS↗

Hard X-ray inverse Compton scattering at photon energy of 87.5 keV

Abstract Production of hard X-ray via inverse Compton scattering at photon energies below 100 keV range aimed at potential applications in medicine and material research is reported. Experiments have been performed at the Brookhaven National Laboratory, Accelerator Test Facility, employing the counter collision of a 70 MeV, 0.3 nC electron beam with a near infra-red Nd: YAG laser (1064 nm wavelength) pulse containing ~ 100 mJ in a single shot basis. The radiation distribution of the scattered photon beam is assessed to be sufficiently quasi monochromatic to produce clear contrast from the Au K - edge at 80.7 keV.

43 PARTICLE ACCELERATORS↗

High resolution upgrade of the ATF damping ring BPM system

A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished in its first stage, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital downconversion techniques, digital signal processing, and also tests a new automatic gain error correction schema. The technical concept and realization, as well as preliminary results of beam studies are presented.

43 PARTICLE ACCELERATORS↗

9.3 Microns: Toward a Next-Generation CO2 Laser for Particle Accelerators

We present realistic theoretical predictions of the performance of the next-generation long-wave infrared (LWIR) laser for advanced particle acceleration research at the Accelerator Test Facility (ATF) of Brookhaven National Laboratory. Two upgrades are planned for the present ATF CO2 laser, which currently produces up to 5 TW peak power in 2 ps pulses at 9.2 μm. For the first upgrade, the deployment of a ten-millijoule solid-state seed laser at 9.3 μm will reduce the pulse duration 4 times, to 500 fs, and increase the peak power to 15 TW. The second upgrade will be the implementation of the postcompression of this pulse. This will reduce the pulse duration to three optical cycles (100 fs) and increase the usable peak power to 25 TW.

43 PARTICLE ACCELERATORS↗

X-ray phase-contrast imaging with an Inverse Compton Scattering source

Single-shot in-line phase-contrast imaging with the Inverse Compton Scattering X-ray source available at ATF (Accelerator Test Facility) at Brookhaven National Laboratory is experimentally demonstrated. Phase-contrast images of polymer wires are obtained with a single X-ray pulse whose time length is about 1 picosecond. The edge-enhancement effect is clearly visible in the images and simulations show a quantitative agreement with experimental data. A phase-retrieval step in the image processing leads to a accurate estimation of the projected thickness of our samples. Finally, a single-shot image of a wasp is presented as an example of a biological sample.

07 ISOTOPE AND RADIATION SOURCES↗

Simulation Studies On The Vertical Emittance Growth At The Existing ATF Extraction Beamline

Significant beam intensity-dependence of the vertical emittance growth was experimentally observed at the Accelerator Test Facility (ATF) at KEK extraction beamline. This paper presents the simulations of possible vertical emittance growth sources, particularly in the extraction channel, where the magnets are shared by both the ATF extraction beamline and its damping ring. The vertical emittance growth is observed in the simulations by changing the beam orbit in the extraction channel, even with all optics corrections. The possible reasons for the experimentally observed dependence of the vertical emittance growth on the beam intensity are also discussed. An experiment to measure the emittance versus beam orbit at the existing ATF extraction beamline is on-going led by the European colleagues.

43 PARTICLE ACCELERATORS↗

Specifications of the octupole magnets required for the ATF2 ultra-low ß* lattice

The Accelerator Test Facility 2 (ATF2) aims to test the novel chromaticity correction for higher chromaticity lattices as the one of CLIC. To this end the ATF2 ultra-low ß* lattice is designed to vertically focus the beam at the focal point or usually referred to as interaction point (IP), down to 23 nm. However when the measured multipole components of the ATF2 magnets are considered in the simulations, the evaluated spot sizes at the IP are well above the design value. The designed spot size is effectively recovered by inserting a pair of octupole magnets. In this note we address the technical specifications required for these octupole magnets.

43 PARTICLE ACCELERATORS↗

Status of the ATF Damping Ring BPM Upgrade Project

A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

43 PARTICLE ACCELERATORS↗

Short wavelength limits of current shot noise suppression

Shot noise in electron beam was assumed to be one of the features beyond control of accelerator physics. Current results attained in experiments at Accelerator Test Facility in Brookhaven and Linac Coherent Light Source in Stanford suggest that the control of the shot noise in electron beam (and therefore of spontaneous radiation and Self Amplified Spontaneous Emission of Free Electron Lasers) is feasible at least in the visible range of the spectrum. Here, we present a general linear formulation for collective micro-dynamics of e-beam noise and its control. Specifically, we compare two schemes for current noise suppression: a quarter plasma wavelength drift section and a combined drift/dispersive (transverse magnetic field) section. We examine and compare their limits of applicability at short wavelengths via considerations of electron phase-spread and the related Landau damping effect.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗