Search NASA⌕ Search

SEARCH · Search NASA

Results for “action plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Implementation of a robotic flexible assembly system

As part of the Intelligent Task Automation program, a team developed enabling technologies for programmable, sensory controlled manipulation in unstructured environments. These technologies include 2-D/3-D vision sensing and understanding, force sensing and high speed force control, 2.5-D vision alignment and control, and multiple processor architectures. The subsequent design of a flexible, programmable, sensor controlled robotic assembly system for small electromechanical devices is described using these technologies and ongoing implementation and integration efforts. Using vision, the system picks parts dumped randomly in a tray. Using vision and force control, it performs high speed part mating, in-process monitoring/verification of expected results and autonomous recovery from some errors. It is programmed off line with semiautomatic action planning.

Benton, Ronald C.↗

An architecture for heuristic control of real-time processes

Abstract Process management combines complementary approaches of heuristic reasoning and analytical process control. Management of a continuous process requires monitoring the environment and the controlled system, assessing the ongoing situation, developing and revising planned actions, and controlling the execution of the actions. For knowledge-intensive domains, process management entails the potentially time-stressed cooperation among a variety of expert systems. By redesigning a blackboard control architecture in an object-oriented framework, researchers obtain an approach to process management that considerably extends blackboard control mechanisms and overcomes limitations of blackboard systems.

Raulefs, P.↗

Technology development on evolutionary space station

The topics covered are presented in view graph form and include a space research and technology (R&T) mission statement and a NASA action plan. With respect to an integrated technology plan for the civil space program, the following topics are also covered: (1) an R&T strategy; (2) a NASA technology maturation strategy; (3) an Office of Space Flight (OSF) technology requirements evaluation; (4) an external technology perspectives summary; (5) a work breakdown structure; (6) critical user requirements/ strategic plan element categorization; (7) technology flight experiments; (8) proposed station paylods by thrust; and (9) an integrated traffic model

Ambrus, Judith H.↗

Management as the enabling technology for space exploration

This paper addresses the dilemma which NASA faces in starting a major new initiative within the constraints of the current national budget. It addressed the fact that unlike previous NASA programs, the major mission constraints come from management factors as opposed to technologies. An action plan is presented, along with some results from early management simplification processes.

Mandell, Humboldt C., Jr.↗

ROBOSIM: An intelligent simulator for robotic systems

The purpose of this paper is to present an update of an intelligent robotics simulator package, ROBOSIM, first introduced at Technology 2000 in 1990. ROBOSIM is used for three-dimensional geometrical modeling of robot manipulators and various objects in their workspace, and for the simulation of action sequences performed by the manipulators. Geometric modeling of robot manipulators has an expanding area of interest because it can aid the design and usage of robots in a number of ways, including: design and testing of manipulators, robot action planning, on-line control of robot manipulators, telerobotic user interface, and training and education. NASA developed ROBOSIM between 1985-88 to facilitate the development of robotics, and used the package to develop robotics for welding, coating, and space operations. ROBOSIM has been further developed for academic use by its co-developer Vanderbilt University, and has been in both classroom and laboratory environments for teaching complex robotic concepts. Plans are being formulated to make ROBOSIM available to all U.S. engineering/engineering technology schools (over three hundred total with an estimated 10,000+ users per year).

Fernandez, Kenneth R.↗

The 1992 town meetings: Toward a shared vision

With the goal of developing a shared vision for the future of NASA, the U.S. civil aeronautics and space agency conducted a series of town meetings across the country in Nov. and Dec. 1992. Specifically, NASA sought comment on the Agency's new vision statement and mission values, which were developed by the Agency's employees in an effort to redefine NASA's priorities and purpose for the 1990's and beyond. In practice, the meetings constituted a sort of nationwide brainstorming session on how to make aeronautics and space research more relevant to people's daily lives. Primary findings, NASA's action plan, town meeting proceedings, and conclusions are described.

Source record↗

Workshop on the Thermophysical Properties of Molten Materials

The role of accurate thermophysical property data in the process design and modeling of solidification processes was the subject of a workshop held on 22-23 Oct. 1992 in Cleveland, Ohio. The workshop was divided into three sequential sessions dealing with (1) industrial needs and priorities for thermophysical data, (2) experimental capabilities for measuring the necessary data, and (3) theoretical capabilities for predicting the necessary data. In addition, a 2-hour panel discussion of the salient issues was featured as well as a 2-hour caucus that assessed priorities and identified action plans.

Source record↗

Technical Assessment of the National Full Scale Aerodynamic Complex Fan Blades Repair

This report describes the principal activities of a technical review team formed to address National Full Scale Aerodynamic Complex (NFAC) blade repair problems. In particular, the problem of lack of good adhesive bonding of the composite overwrap to the Hyduliginum wood blade material was studied extensively. Description of action plans and technical elements of the plans are provided. Results of experiments designed to optimize the bonding process and bonding strengths obtained on a full scale blade using a two-step cure process with adhesive primers are presented. Consensus recommendations developed by the review team in conjunction with the NASA Ames Fan Blade Repair Project Team are provided along with lessons learned on this program. Implementation of recommendations resulted in achieving good adhesive bonds between the composite materials and wooden blades, thereby providing assurance that the repaired fan blades will meet or exceed operational life requirements.

Young, Clarence P., Jr.↗

Columbia Accident Investigation Board Report. Volume Five

Volume V of the Report contains appendices that were not cited in VolumeI. These consist of documents produced by NASA and other organizations, which were provided to the Columbia Accident Investigation Board in support of its inquiry into the February 1, 2003 destruction of the Space Shuttle Columbia The contents include:. Appendix G.1 Requirements and Procedures for Certification of Flight Readiness; Appendix G.2 Appendix R, Space Shuttle Program Contingency Action Plan; Appendix G.3 CAIB Charter, with Revisions; Appendix G.4 Group 1 Matrix Brief on Maintenance, Material, and Management; Appendix G.5 Vehicle Data Mapping(VDM) Team Final Report, Jun 13, 2003; Appendix G.6 SRB Working Group Presentation to CAIB; Appendix G. 7 Starfire Team Final Report, Jun 3, 2003; Appendix G.8 Using the Data and Observations from Flight STS-107, Executive Summary; Appendix G.9 Contracts, Incentives, and Safety/Technical Excellence; Appendix G.10 Detailed Summaries: Rogers Commission Report, ASAP Report, SIAT Report; Appendix G.11 Foam Application and Production Chart; Appendix G.12 Crew Survivability Report; and Appendix G.12 Aero/Aerothermal/ Thermal/Structures Team FinalReport, August 6, 2003.

CAIB (COLUMBIA ACCIDENT INVESTIGATION BOARD)↗

Technology Assessment for the Future Aeronautical Communications System

To address emerging saturation in the VHF aeronautical bands allocated internationally for air traffic management communications, the International Civil Aviation Organization (ICAO) has requested development of a common global solution through its Aeronautical Communications Panel (ACP). In response, the Federal Aviation Administration (FAA) and Eurocontrol initiated a joint study, with the support of NASA and U.S. and European contractors, to provide major findings on alternatives and recommendations to the ICAO ACP Working Group C (WG-C). Under an FAA/Eurocontrol cooperative research and development agreement, ACP WG-C Action Plan 17 (AP-17), commonly referred to as the Future Communications Study (FCS), NASA Glenn Research Center is responsible for the investigation of potential communications technologies that support the long-term mobile communication operational concepts of the FCS. This report documents the results of the first phase of the technology assessment and recommendations referred to in the Technology Pre-Screening Task 3.1 of AP-17. The prescreening identifies potential technologies that are under development in the industry and provides an initial assessment against a harmonized set of evaluation criteria that address high level capabilities, projected maturity for the time frame for usage in aviation, and potential applicability to aviation. A wide variety of candidate technologies were evaluated from several communications service categories including: cellular telephony; IEEE-802.xx standards; public safety radio; satellite and over-the-horizon communications; custom narrowband VHF; custom wideband; and military communications.

Budinger, James M.↗

Additional Technologies and Investigations for Provision of Future Aeronautical Communications

The following NASA Contractor Report documents the in-depth studies on select technologies that could support long-term aeronautical mobile communications operating concepts. This work was performed during the third and final phase of NASA s Technology Assessment for the Federal Aviation Administration (FAA)/EUROCONTROL Future Communications Study (FCS) under a multiyear NASA contract. It includes the associated findings of ITT Corporation and NASA Glenn Research Center to the FAA as of the end of May 2007. The activities documented in this report focus on three final technology candidates identified by the United States, and were completed before sufficient information about two additional technology candidates proposed by EUROCONTROL was made available. A separate report to be published by NASA/CR-2008-215144, entitled Final Report on Technology Investigations for Provision of Future Aeronautical Communications will include an assessment of all five final candidate technologies considered by the U.S. agencies (FAA and NASA) and EUROCONTROL. It will also provide an overview of the entire technology assessment process, including final recommendations. All three phases of this work were performed in compliance with the Terms of Reference for the Action Plan number 17 (AP-17) cooperative research agreement among EUROCONTROL, FAA, and NASA along with the general guidance of the FAA and EUROCONTROL available throughout this study.

Gilbert, Tricia↗

Possible Deficiencies in Predicting Transonic Aerodynamics on the X-43A

The initial X-43A flight test, June 2, 2001, resulted in a mishap and loss of the vehicle. A mishap investigation board (MIB) report and findings, including the established root cause, were publicly released on July, 23, 2003. The X-43A Flight 1 Hyper-X Launch Vehicle (HXLV) failed because the vehicle control system design was deficient for the trajectory flown due to inaccurate analytical models (Pegasus heritage and HXLV specific), which overestimated the (control) system margin ? X-43A Mishap Investigation Report, Vol. I. ? included as Reference 1. Several specific errors were noted, 1) HXLV aerodynamics ? failure to model changes to wing, fin and rudder airfoil shapes due to addition of thermal protection system (TPS); 2) Fin actuation system (FAS) modeling ? under prediction of the control surface hinge moments and FAS compliance; and 3) Parametric uncertainties ? insufficient variation in the aerodynamic, FAS and control system models. In response to the MIB findings, the X-43A program has been working RTF through an approved Corrective Action Plan (CAP) over the last two years.

Labbe, Steven G.↗

L-Band System Engineering - Concepts of Use, Systems Performance Requirements, and Architecture

This document is being provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-band and L-band Communications Standard Development. Task 7 was motivated by the five year technology assessment performed for the Federal Aviation Administration (FAA) under the joint FAA-EUROCONTROL cooperative research Action Plan (AP-17), also known as the Future Communications Study (FCS). It was based on direction provided by the FAA project-level agreement (PLA FY09_G1M.02-02v1) for "New ATM Requirements-Future Communications." Task 7 was separated into two distinct subtasks, each aligned with specific work elements and deliverable items. Subtask 7-1 addressed C-band airport surface data communications standards development, systems engineering, test bed development, and tests/demonstrations to establish operational capability for what is now referred to as the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2, which is the subject of this report, focused on preliminary systems engineering and support of joint FAA/EUROCONTROL development and evaluation of a future L-band (960 to 1164 MHz) air/ground (A/G) communication system known as the L-band digital aeronautical communications system (L-DACS), which was defined during the FCS. The proposed L-DACS will be capable of providing ATM services in continental airspace in the 2020+ timeframe. Subtask 7-2 was performed in two phases. Phase I featured development of Concepts of Use, high level functional analyses, performance of initial L-band system safety and security risk assessments, and development of high level requirements and architectures. It also included the aforementioned support of joint L-DACS development and evaluation, including inputs to L-DACS design specifications. Phase II provided a refinement of the systems engineering activities performed during Phase I, along with continued joint FAA/EUROCONTROL L-DACS development and evaluation support.

Henriksen, Stephen↗

Development of a Software Tool to Automate ADCO Flight Controller Console Planning Tasks

This independent study project covers the development of the International Space Station (ISS) Attitude Determination and Control Officer (ADCO) Planning Exchange APEX Tool. The primary goal of the tool is to streamline existing manual and time-intensive planning tools into a more automated, user-friendly application that interfaces with existing products and allows the ADCO to produce accurate products and timelines more effectively. This paper will survey the current ISS attitude planning process and its associated requirements, goals, documentation and software tools and how a software tool could simplify and automate many of the planning actions which occur at the ADCO console. The project will be covered from inception through the initial prototype delivery in November 2011 and will include development of design requirements and software as well as design verification and testing.

Anderson, Mark G.↗

Morpheus 1.5A Lander Failure Investigation Results

On August 9th, 2012, the Morpheus 1.5 Vertical Testbed (VTB) crashed during Free Flight 2 (FF2) at KSC SLF, resulting in the loss of 1.5 VTB hardware. JSC/KSC Morpheus team immediately executed the pre‐rehearsed Emergency Action Plan to protect personnel and property, so damage was limited to 1.5 VTB hardware. JSC/KSC Morpheus team secured data and mapped & recovered debris. Project had pre‐declared loss of VTB to be a test failure, not a mishap.

Munday, Steve↗

Center-TRACON Automation System (CTAS) En Route Trajectory Predictor Requirements and Capabilities

This requirements framework document is designed to support the capture of requirements and capabilities for state-of-the-art trajectory predictors (TPs). This framework has been developed to assist TP experts in capturing a clear, consistent, and cross-comparable set of requirements and capabilities. The goal is to capture capabilities (types of trajectories that can be built), functional requirements (including inputs and outputs), non-functional requirements (including prediction accuracy and computational performance), approaches for constraint relaxation, and input uncertainties. The sections of this framework are based on the Common Trajectory Predictor structure developed by the FAA/Eurocontrol Cooperative R&D Action Plan 16 Committee on Common Trajectory Prediction. It is assumed that the reader is familiar with the Common TP Structure.1 This initial draft is intended as a first cut capture of the En Route TS Capabilities and Requirements. As such, it contains many annotations indicating possible logic errors in the CTAS code or in the description provided. It is intended to work out the details of the annotations with NASA and to update this document at a later time.

framework↗

Scalable Asset Discovery, Vulnerability Scanning, and Penetration Testing for Remote Sites and Wireless Spectrums Utilizing an Embedded Linux Plug - PwniPlug and the Raspberry Pi B+ as a Sample Pen Test

All devices attached to the NASA KSC network are subject to security vulnerability scanning and/or penetration testing. In today's changing environment, vulnerable and/or unprotected systems can easily be overlooked. Systems that are not properly managed can become a potential threat to the operational integrity of our systems and networks. This includes all NASA (internal and external) information systems within NASA KSC Internet Protocol (IP) address space, and NASA KSC facilities. The Office of the Chief Information Officer (OCIO) recommends that all NASA Centers and information systems be subject to penetration testing on a regular interval in accordance with the guidelines identified by the National Institute of Standards and Technology (NIST). (ITS-HBK-2810.04-02A) Protecting information and equipment at NASA is an area of increasing concern. In addition to the CPU's on the network; Supervisory, Control and Data Acquisition (SCADA) systems are especially vulnerable because these systems have lacked standards, use embedded controllers with little computational power and informal software, are connected to physical processes, have few operators, and are increasingly also being connected to corporate networks. The scope of work is comprised of several individual components which together build upon previous work by Drew Branch, NASA KSC Intern. The Pwn Plug is the selected COTS (Commercial-Off-The-Shelf) device chosen to test simplification of mandatory IT Security tasks. The device will be utilized to provide services to NASA KSC and enable an assessment of infrastructure soundness and regulatory compliance in an efficient, economical, and business responsive manner. The Pwn Plug is designed as a pen testing appliance which provides a hardware platform that can support commercial penetration testing efforts at significantly reduced costs. The expected outcomes are: 1) External Penetration Testing, 2) Social Engineering, 3) Procedural Documentation, 4) Recommended Remediation Action Plan, 5) System Retest & Remediation Attestation and 6) Final Reports, out briefing and Presentation. Due to physical and material constraints beyond intern and mentor control, the project was redefined as a working pen-test scenario. Limitations of lab availability and tools dictated an academic exercise. This report was developed within the scenario guidelines suggested by the project mentor. The guidelines were to be creative in developing a Pen Test program for a client.

Penetration Testing↗