Search NASA⌕ Search

SEARCH · Search NASA

Results for “building layout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Positron beams at Ce+BAF

Positron beams would provide a new and meaningful probe for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab). The JLab Positron Working Group, formed in 2018 and now with over 250 members from 75 institutions, continues to develop an experimental program with high duty-cycle positron beams including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). In this presentation we describe a start-to-end layout for positron beams at 12 GeV CEBAF utilizing the Low Energy Research Facility (LERF) at Jefferson Lab to build two new injectors. A GaAs dc high voltage photo-gun first generates >1 mA of polarized electrons which are then accelerated to 80-150 MeV and directed to a high-power spinning W target for polarized bremsstrahlung and positron pair creation. A second injector then collects, bunches and accelerates the positrons to 123 MeV. The positron beams are transported by a new beam line and injected into the CEBAF acceptance for acceleration to the end stations with energies up to 12 GeV. The layout is optimized to provide Users with positron spin polarization >60% and intensity greater than >100 nA, and with higher intensities when polarization is not required.

Benesch, J.↗

Bioinjection Performance Review for the Building 100 Area and 4.5 Acre Site at the Pinellas County, Florida, Site

This document provides a summary of a review of the performance of bioinjection activities at the Building 100 Area and the 4.5 Acre Site at the Pinellas County, Florida, Site since 2010, determines how best to optimize future injection events, and identifies the approach for the bioinjection event in 2016 at (1) the 4.5 Acre Site and (2) the Essentra property at the Building 100 Area. Because this document describes the next bioinjection event at the 4.5 Acre Site, it also serves as an addendum to the Interim Remedial Action Plan for Emulsified Edible Oil Injection at the 4.5 Acre Site (DOE 2013). In addition, this document revises the injection layout and injection intervals for the Essentra property that were originally described in the Interim Corrective Measure Work Plan for Source and Plume Treatment at the Building 100 Area (DOE 2014), and is a de facto update of that document. Bioinjection consists of injection of emulsified vegetable oil (EVO) and the microorganism Dehalococcoides mccartyi (DHM; formerly known as Dehalococcoides ethenogenes) into the subsurface to enhance biodegradation of trichloroethene (TCE), dichloroethene (DCE), and vinyl chloride (VC). VC is the only contaminant that exceeds its maximum contaminant level (10 micrograms per liter onsite and 1 microgram per liter onsite) on the 4.5 Acre Site and the Essentra property. Bioinjection was conducted at the 4.5 Acre Site in 2010 and 2013. Approximately 49,900 gallons of EVO and DHM were injected at 95 injection points in February 2010, and approximately 22,900 gallons of EVO and DHM were injected at 46 injection points in July 2013. The injection locations are shown on Figure 1. The goal of bioinjection at the 4.5 Acre Site is to decrease contaminant concentrations to maximum contaminant levels along the west and southwest property boundaries (to meet risk–based corrective action requirements) and to minimize the extent of the contaminant plume in the interior of the site. Bioinjection was conducted at the Building 100 Area in 3 phases from October 2014 through November 2015 (Figures 2–4). Approximately 32,850 gallons of EVO and DHM were injected using 62 temporary injection points in the onsite plumes in October and November 2014, 16,500 gallons were injected using 33 temporary injection points in the offsite plumes in February 2015, and 51,000 gallons were injected beneath the building using 8 horizontal wells in November 2015. The goal of bioinjection at the Building 100 Area is to enhance contaminant biodegradation to stabilize or shrink the contaminant plumes.

54 ENVIRONMENTAL SCIENCES↗

Next Generation Flight Displays Using HTML5

The Human Integrated Vehicles and Environments (HIVE) lab at Johnson Space Center (JSC) is focused on bringing together inter-disciplinary talent to design and integrate innovative human interface technologies for next generation manned spacecraft. As part of this objective, my summer internship project centered on an ongoing investigation in to building flight displays using the HTML5 standard. Specifically, the goals of my project were to build and demo "flight-like" crew and wearable displays as well as create a webserver for live systems being developed by the Advanced Exploration Systems (AES) program. In parallel to my project, a LabVIEW application, called a display server, was created by the HIVE that uses an XTCE (XML (Extensible Markup Language) Telemetry and Command Exchange) parser and CCSDS (Consultative Committee for Space Data System) space packet decoder to translate telemetry items sent by the CFS (Core Flight Software) over User Datagram Protocol (UDP). It was the webserver's job to receive these UDP messages and send them to the displays. To accomplish this functionality, I utilized Node.js and the accompanying Express framework. On the display side, I was responsible for creating the power system (AMPS) displays. I did this by using HTML5, CSS and JavaScript to create web pages that could update and change dynamically based on the data they received from the webserver. At this point, I have not started on the commanding, being able to send back to the CFS, portion of the displays but hope to have this functionality working by the completion of my internship. I also created a way to test the webserver's functionality without the display server by making a JavaScript application that read in a comma-separate values (CSV) file and converted it to XML which was then sent over UDP. One of the major requirements of my project was to build everything using as little preexisting code as possible, which I accomplished by only using a handful of JavaScript libraries. As a side project, I created a model of the HIVE lab and Building 29 using SketchUp. I obtained the floorplans of the building from the JSC Geographic Information Systems (GIS), which were computer-aided design (CAD) files, and imported them into SketchUp. I then took those floorplans and created a 3D model of the building from them. Working in conjunction with the Hybrid Reality lab in Building 32, the SketchUp model was imported into Unreal Engine for use with the HTC Vive. Using the Vive, I was able to interact with the model I created in virtual reality (VR). The purpose of this side project was to be able to visualize potential lab layouts and mockup designs as they are in development in order to finalize design decisions. Pending approval, the model that I created will be used in the Build-As-You-Test: Can Hybrid Reality Improve the SE/HSI Design Process project in the fall. Getting the opportunity to work at NASA has been one of the most memorable experiences of my life. Over the course of my internship, I improved my programming and web development abilities substantially. I will take all the skills and experiences I have had while at NASA back to school with me in the fall and hope to pursue a career in the aerospace industry after graduating in the spring.

Greenwood, Brian↗

HFiTT - Higgs Factory in Tevatron Tunnel

Among various options for a Higgs factory [1], a photon collider has the distinct advantage of the lowest energy requirement for an electron beam. This advantage is especially important for a circular Higgs factory, in which the synchrotron radiation power increases to the fourth power of the electron energy. For an e + e - collider, the minimum required energy per beam is 120 GeV, while for a photon collider it is 80 GeV. The corresponding ratio of synchrotron radiation power is 5 to 1. This makes it possible to consider building a photon collider at Fermilab, which will be named HFiTT, or Higgs Factory in Tevatron Tunnel. The layout is shown in Figure 1. A photon collider is based on Inverse Compton Scattering (ICS) by shooting a low energy (~3.5 eV) laser beam into a high energy (10s of GeV) electron beam to generate a back-scattered high energy (10s of GeV) photon beam for collision. The cross section for γγ → H is large and comparable to e + e - → ZH (~200 fb). Since this is an s-channel resonance, the required photon energy is low (63 GeV), corresponding to 80 GeV for an electron beam. Our design goal is 10,000 Higgs per year. If we look to the far future of electron collider technology, very high gradient acceleration techniques such as plasma wakefield acceleration are asymmetric between electrons and positrons. It is therefore important to develop a technology that will allow physicists to accelerate electrons only and still access annihilation reactions with precisely understood point-like interactions. The photon collider fills this need. This project will not only carry out important measurements of the Higgs boson properties but will also demonstrate the unique technologies needed to construct photon collider experiments at higher energies.

Chou, Weiren↗

Algorithmic and GPU enhancements for molecular dynamics in Cabana and LAMMPS

The focus of this milestone was to implement and test new algorithms and optimizations for improved GPU performance by molecular dynamics (MD) and related particle codes. The work was done in the CoPA Cabana library, the CabanaMD mini-app which uses Cabana to implement and benchmark prototypical MD models, and the LAMMPS MD code which is used by the ECP EXAALT project as well as for materials modeling generally. Efforts included (a) implementation of new or optimized algorithms for fundamental MD kernels like neighbor-list building and FFTs which are also widely used in other particle methods, (b) performance testing of data structure layouts for both simple pairwise and computationally intense neural network potentials, (c) optimizations aimed at improving GPU performance for models with small atom counts, and (d) optimizations specific to the SNAP interatomic potential due to its importance for the EXAALT project.

36 MATERIALS SCIENCE↗

Technical Safety Requirements for the Waste Storage Facilities

This document contains Technical Safety Requirements (TSR) for the Radioactive and Hazardous Waste Management (RHWM) WASTE STORAGE FACILITIES, which include Area 612 (A612) and the Decontamination and Waste Treatment Facility (DWTF) Storage Area at Lawrence Livermore National Laboratory (LLNL). The TSRs constitute requirements regarding the safe operation of the WASTE STORAGE FACILITIES. These TSRs are derived from the Documented Safety Analysis for the Waste Storage Facilities (DSA) (LLNL 2006). The analysis presented therein determined that the WASTE STORAGE FACILITIES are low-chemical hazard, Hazard Category 2 non-reactor nuclear facilities. The TSRs consist primarily of inventory limits and controls to preserve the underlying assumptions in the hazard and accident analyses. Further, appropriate commitments to safety programs are presented in the administrative controls sections of the TSRs. The WASTE STORAGE FACILITIES are used by RHWM to handle and store hazardous waste, TRANSURANIC (TRU) WASTE, LOW-LEVEL WASTE (LLW), mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL as well as small amounts from other U.S. Department of Energy (DOE) facilities, as described in the DSA. In addition, several minor treatments (e.g., drum crushing, size reduction, and decontamination) are carried out in these facilities. The WASTE STORAGE FACILITIES are located in two portions of the LLNL main site. A612 is located in the southeast quadrant of LLNL. The A612 fenceline is approximately 220 m west of Greenville Road. The DWTF Storage Area, which includes Building 693 (B693), Building 696 Radioactive Waste Storage Area (B696R), and associated yard areas and storage areas within the yard, is located in the northeast quadrant of LLNL in the DWTF complex. The DWTF Storage Area fenceline is approximately 90 m west of Greenville Road. A612 and the DWTF Storage Area are subdivided into various facilities and storage areas, consisting of buildings, tents, other structures, and open areas as described in Chapter 2 of the DSA. Section 2.4 of the DSA provides an overview of the buildings, structures, and areas in the WASTE STORAGE FACILITIES, including construction details such as basic floor plans, equipment layout, construction materials, controlling dimensions, and dimensions significant to the hazard and accident analysis. Chapter 5 of the DSA documents the derivation of the TSRs and develops the operational limits that protect the safety envelope defined for the WASTE STORAGE FACILITIES. This TSR document is applicable to the handling, storage, and treatment of hazardous waste, TRU WASTE, LLW, mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste received or generated in the WASTE STORAGE FACILITIES. Section 5, Administrative Controls, contains those Administrative Controls necessary to ensure safe operation of the WASTE STORAGE FACILITIES. Programmatic Administrative Controls are in Section 5.6. This Introduction to the WASTE STORAGE FACILITIES TSRs is not part of the TSR limits or conditions and contains no requirements related to WASTE STORAGE FACILITIES operations or to the safety analyses of the DSA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Safety Requirements for the Waste Storage Facilities

This document contains Technical Safety Requirements (TSR) for the Radioactive and Hazardous Waste Management (RHWM) WASTE STORAGE FACILITIES, which include Area 625 (A625) and the Decontamination and Waste Treatment Facility (DWTF) Storage Area at Lawrence Livermore National Laboratory (LLNL). The TSRs constitute requirements regarding the safe operation of the WASTE STORAGE FACILITIES. These TSRs are derived from the 'Documented Safety Analysis for the Waste Storage Facilities' (DSA) (LLNL 2008). The analysis presented therein determined that the WASTE STORAGE FACILITIES are low-chemical hazard, Hazard Category 2 non-reactor nuclear facilities. The TSRs consist primarily of inventory limits and controls to preserve the underlying assumptions in the hazard and accident analyses. Further, appropriate commitments to safety programs are presented in the administrative controls sections of the TSRs. The WASTE STORAGE FACILITIES are used by RHWM to handle and store hazardous waste, TRANSURANIC (TRU) WASTE, LOW-LEVEL WASTE (LLW), mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL as well as small amounts from other U.S. Department of Energy (DOE) facilities, as described in the DSA. In addition, several minor treatments (e.g., size reduction and decontamination) are carried out in these facilities. The WASTE STORAGE FACILITIES are located in two portions of the LLNL main site. A625 is located in the southeast quadrant of LLNL. The A625 fenceline is approximately 225 m west of Greenville Road. The DWTF Storage Area, which includes Building 693 (B693), Building 696 Radioactive Waste Storage Area (B696R), and associated yard areas and storage areas within the yard, is located in the northeast quadrant of LLNL in the DWTF complex. The DWTF Storage Area fenceline is approximately 90 m west of Greenville Road. A625 and the DWTF Storage Area are subdivided into various facilities and storage areas, consisting of buildings, tents, other structures, and open areas as described in Chapter 2 of the DSA. Section 2.4 of the DSA provides an overview of the buildings, structures, and areas in the WASTE STORAGE FACILITIES, including construction details such as basic floor plans, equipment layout, construction materials, controlling dimensions, and dimensions significant to the hazard and accident analysis. Chapter 5 of the DSA documents the derivation of the TSRs and develops the operational limits that protect the safety envelope defined for the WASTE STORAGE FACILITIES. This TSR document is applicable to the handling, storage, and treatment of hazardous waste, TRU WASTE, LLW, mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste received or generated in the WASTE STORAGE FACILITIES. Section 5, Administrative Controls, contains those Administrative Controls necessary to ensure safe operation of the WASTE STORAGE FACILITIES. Programmatic Administrative Controls are in Section 5.6.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Safety Requirements for the Waste Storage Facilities

This document contains Technical Safety Requirements (TSR) for the Radioactive and Hazardous Waste Management (RHWM) WASTE STORAGE FACILITIES, which include Area 625 (A625) and the Decontamination and Waste Treatment Facility (DWTF) Storage Area at Lawrence Livermore National Laboratory (LLNL). The TSRs constitute requirements regarding the safe operation of the WASTE STORAGE FACILITIES. These TSRs are derived from the Documented Safety Analysis for the Waste Storage Facilities (DSA) (LLNL 2009). The analysis presented therein determined that the WASTE STORAGE FACILITIES are low-chemical hazard, Hazard Category 2 non-reactor nuclear facilities. The TSRs consist primarily of inventory limits and controls to preserve the underlying assumptions in the hazard and accident analyses. Further, appropriate commitments to safety programs are presented in the administrative controls sections of the TSRs. The WASTE STORAGE FACILITIES are used by RHWM to handle and store hazardous waste, TRANSURANIC (TRU) WASTE, LOW-LEVEL WASTE (LLW), mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL as well as small amounts from other U.S. Department of Energy (DOE) facilities, as described in the DSA. In addition, several minor treatments (e.g., size reduction and decontamination) are carried out in these facilities. The WASTE STORAGE FACILITIES are located in two portions of the LLNL main site. A625 is located in the southeast quadrant of LLNL. The A625 fenceline is approximately 225 m west of Greenville Road. The DWTF Storage Area, which includes Building 693 (B693), Building 696 Radioactive Waste Storage Area (B696R), and associated yard areas and storage areas within the yard, is located in the northeast quadrant of LLNL in the DWTF complex. The DWTF Storage Area fenceline is approximately 90 m west of Greenville Road. A625 and the DWTF Storage Area are subdivided into various facilities and storage areas, consisting of buildings, tents, other structures, and open areas as described in Chapter 2 of the DSA. Section 2.4 of the DSA provides an overview of the buildings, structures, and areas in the WASTE STORAGE FACILITIES, including construction details such as basic floor plans, equipment layout, construction materials, controlling dimensions, and dimensions significant to the hazard and accident analysis. Chapter 5 of the DSA documents the derivation of the TSRs and develops the operational limits that protect the safety envelope defined for the WASTE STORAGE FACILITIES. This TSR document is applicable to the handling, storage, and treatment of hazardous waste, TRU WASTE, LLW, mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste received or generated in the WASTE STORAGE FACILITIES. Section 5, Administrative Controls, contains those Administrative Controls necessary to ensure safe operation of the WASTE STORAGE FACILITIES. Programmatic Administrative Controls are in Section 5.4.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The development of criticality response materials - 14282

The Sellafield nuclear facility in the UK comprises a highly complex suite of plants and processes. This in turn demands a consistent and high performance from Emergency Response teams and management in order to demonstrate readiness to respond and combat any nuclear emergency. In order to continue to improve such readiness, a comprehensive programme of development has been undertaken by the Licensee. The programme spans the totality of the emergency response cycle which is resolved into three broad areas: Preparedness; Response; Building Specific File. Within these broad categories the focus of the materials changes from broad and general materials in the preparedness section to actual scenario specific materials in the Building Specific Files Sellafield Ltd. provided the scope of work for the totality of the criticality response materials, known collectively as Criticality Accident Response Data (CARD). The UK National Nuclear Laboratory (NNL) was challenged to technically underpin, develop and present the information in a format and layout that would satisfy the requirements of consistency, brevity, simplicity and relevance. One of the key areas targeted for improvement, and the focus of this paper, was the criticality accident response information that sits within the Building Specific File. At this level of the emergency response cycle by necessity the information must be detailed and specific and enable the emergency responder to understand the problem and assist in formulating a recovery plan. One of the key challenges faced by NNL and discussed in this paper was how to provide the emergency responder with the greatest amount of relevant information in the simplest form. NNL solved this problem by presenting the information in a 'four-block' format which includes a common set of information in textual and diagrammatic form. This paper presents on overview of the criticality accident specific four-blocker, highlights the problems encountered and focuses on the new and innovative materials developed. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary waste management plan of European spallation

The European Spallation Source (ESS) is the European common effort in designing and building a next generation large-scale user facility for studies of the structure and dynamics of materials. The proposed schematic layout of the ESS facility is based on a linear driver (linac) directing the proton beam (5 MW of 2.5 GeV) of 2.8 ms long pulses with a 20 Hz on a tungsten target where neutrons are produced via spallation reactions. Further the neutrons will be moderated to thermal and sub-thermal energies in a couple of moderators placed around the target. The moderators feed 22 beamlines guiding the neutrons to the scattering instruments, mainly for neutron scattering research, as has been previously mentioned. The objective of this work is to develop a waste management plan for ESS facility. In this respect two important aspects are analyzed. First the present status of the problem is outlined as follow. Estimate types and quantities of waste that the ESS project will generate at different stages: commission, operation, decommissioning were derived using: i) precise Monte Carlo calculations ii) scaling the activity from the operation experience of the existing spallation source installations for waste such it is difficult to predict level of activation or for components of the facility in stage of the preconceptual model. Associated waste treatment/conditioning options and final disposal route were further analyzed in order to define the waste type and packet descriptions in agreement with Swedish regulations and policy. It was found that the compilation of completely new waste type descriptions for qualification of the ESS waste for disposal will be necessary. Particular attention was devoted to 'problematic waste' as Beryllium reflector, C-14 from graphite used as core zone of the beam-dump and collimators or waste arising from the purification systems of both Helium and water cooling circuits. Management of waste on ESS site: collection/segregation systems, characterization system, storage options, is also described. In the second step, the acquired information is used for planning and implementing actions involving all participants (ESS, treatment facility operator, disposal operator, regulatory body and other authorized authorities). (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Room Return Path Sensitivity

Standard practice for HVAC return design has evolved from running a dedicated return to each room with a supply, to systems with returns in more centrally located areas of the home with jump ducts, transfer grilles, or simply door undercuts used as return air pathways from isolated rooms. In these latter systems, hallways and stairwells act as large open ducts for conveying air back to a single (or sometimes multiple) central return. When partition doors to an isolated room are closed, the return airflow resistance goes up, significantly impacting airflow balance if an adequate relief pathway is not installed. Airflow imbalances can lead to comfort and building durability issues and increased envelope leakage. To combat this, some jurisdictions have requirements for return air pathways. The supply system topology–or layout–impacts the airflow balance stability in response to adjustments of return pathway resistances. Branching supply topologies typically have reduced static pressure after each split. The static pressure at the final split will be lower than the primary supply plenum. Because of this, if there is a restriction in a room’s return path, supply airflow will tend to redistribute to adjacent ducts at the end of the branch. A properly designed trunk and branch supply system can effectively equalize static pressure by reducing the cross sectional area after each takeoff . Maintaining static pressure within the trunk will reduce the system’s sensitivity to changes in return paths. However, in practice, it is difficult to design and time consuming to install a complex supply plenum. Velocity effects and poor takeoff placement also impact airflow balance. This report considers return systems in three main categories: distributed, with a return duct to each room; multiple central, with one return grille on each floor of a home; and single central, with a single return grille located near the air handling unit. Three supply categories are also considered: radial splitter box, trunk and branch, and home-run with all ducts connecting directly to a central manifold.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Designing for Supply and Return Air System Interaction in Residential Buildings

Standard practice for HVAC return design has evolved from running a dedicated return to each room with a supply, to systems with returns in more centrally located areas of the home with jump ducts, transfer grilles, or simply door undercuts used as return air pathways from isolated rooms . In these latter systems, hallways and stairwells act as large open ducts for conveying air back to a single (or sometimes multiple) central return. When partition doors to an isolated room are closed, the return airflow resistance goes up, significantly impacting airflow balance if an adequate relief pathway is not installed. Airflow imbalances can lead to comfort and building durability issues and increased envelope leakage. To combat this, some jurisdictions have requirements for return air pathways. The supply system topology – or layout - impacts the airflow balance stability in response to adjustments of return pathway resistances. Branching supply topologies typically have reduced static pressure after each split. The static pressure at the final split will be lower than the primary supply plenum. Because of this, if there is a restriction in a room’s return path, supply airflow will tend to redistribute to adjacent ducts at the end of the branch. A properly designed trunk and branch supply system can effectively equalize static pressure by reducing the cross sectional area after each takeoff . Maintaining static pressure within the trunk will reduce the system’s sensitivity to changes in return paths. However, in practice, it is difficult to design and time consuming to install a complex supply plenum. Velocity effects and poor takeoff placement also impact airflow balance. This fact sheet considers return systems in three main categories: distributed, with a return duct to each room; multiple central, with one return grille on each floor of a home; and single central, with a single return grille located near the air handling unit. Three supply categories are also considered: radial splitter box, trunk and branch, and home-run with all ducts connecting directly to a central manifold. A complete description of the modeling work and results can be found in the companion technical report.

buildings↗

Shallow Water Offshore Wind Optimization for the Great Lakes (DE-FOA-0000415) Final Report: A Conceptual Design for Wind Energy in the Great Lakes

The primary objective of the project was to develop a innovative Gravity Base Foundation (GBF) concepts, including fabrication yards, launching systems and installation equipment, for a 500MW utility scale project in the Great Lakes (Lake Erie). The goal was to lower the LCOE by 25%. The project was the first to investigate an offshore wind project in the Great Lakes and it has furthered the body of knowledge for foundations and installation methods within Lake Erie. The project collected historical geotechnical information for Lake Erie and also used recently obtained data from the LEEDCo Icebreaker Project (FOA DE-EE0005989) geotechnical program to develop the conceptual designs. Using these data-sets, the project developed design wind and wave conditions from actual buoy data in order to develop a concept that would de-risk a project using a GBF. These wind and wave conditions were then utilized to create reference designs for various foundations specific to installation in Lake Erie. A project partner on the project (Weeks Marine) provided input for construction and costing the GBF fabrication and installation. By having a marine contractor with experience with large marine projects as part of the team provides credibility to the LCOE developed by NREL. NREL then utilized the design and construction costing information as part of the LCOE model. The report summarizes the findings of the project; Developed a cost model and “baseline” LCOE; Documented Site Conditions within Lake Erie; Developed Fabrication, Installation and Foundations Innovative Concept Designs; Evaluated LCOE Impact of Innovations; Developed Assembly line “Rail System” for GBF Construction and Staging; Developed Transit-Inspired Foundation Designs which incorporated: Semi-Floating Transit with Supplemental Pontoons Barge mounted Winch System; Developed GBF with “Penetration Skirt”; Developed Integrated GBF with Turbine Tower; Developed Turbine, Plant Layout and O&M Strategies. The report details lowering LCOE by 22.3% and identified additional strategies that could further lower LCOE when building an utility scale wind farm in the Great Lakes.

17 WIND ENERGY↗

Modeling and Simulation of the ARES UPPER STAGE Transportation, Lifting, Stacking and Mating Operations Within the Vehicle Assembly Building at KSC

This viewgraph presentation describes the modeling and simulation of the Ares Upper Stage Transportation, lifting, stacking, and mating operations within the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC). An aerial view of KSC Launch Shuttle Complex, two views of the Delmia process control layout, and an upper stage move subroutine and breakdown are shown. An overhead image of the VAB and the turning basin along with the Pegasus barge at the turning basin are also shown. This viewgraph presentation also shows the actual design and the removal of the mid-section spring tensioners, the removal of the AFT rear and forward tensioners tie downs, and removing the AFT hold down post and mount. US leaving the Pegasus Barge, the upper stage arriving at transfer aisle, upper stage receiving/inspection in transfer aisle, and an overhead view of upper stage receiving/inspection in transfer aisle are depicted. Five views of the actual connection of the cabling to the upper stage aft lifting hardware are shown. The upper stage transporter forward connector, two views of the rotation horizontal to vertical, the disconnection of the rear bolt ring cabling, the lowering of the upper stage to the inspection stand, disconnection of the rear bolt ring from the upper stage, the lifting of the upper stage and inspection of AFT fange, and the transfer of upper stage in an integrated stack are shown. Six views of the mating of the upper stage to the first stage are depicted. The preparation, inspection, and removal of the forward dome are shown. The upper stage mated on the integrated stack and crawler is also shown. This presentation concludes with A Rapid Upper Limb Assessment (RULA) utilizing male and female models for assessing risk factors to the upper extremities of human beings in an actual physical environment.

Kromis, Phillip A.↗

Theoretical Aeroacoustics: Compiled Mathematical Derivations of Fereidoun 'Feri' Farassat

Dr. Fereidoun 'Feri' Farassat was a theoretical aero-acoustician at the National Aeronautics and Space Administration (NASA) Langley Research Center. This book contains technical derivations, notes, and classes that Dr. Farassat produced during his professional career. The layout of the book has been carefully crafted so that foundational ideas through advanced theories, which altered the technical discipline of aeroacoustics, build upon one another. The book can be used to understand the theories of acoustics and learn one contemporary aeroacoustic prediction approach made popular by Dr. Farassat. Most importantly, this book gives the general reader insight into how one of NASA's best aeroacoustics theoreticians thought, constructed, and solved problems throughout his career.

Miller, Steven A. E.↗

CADAT network translator

Program converts cell-net data into logic-gate models for use in test and simulation programs. Input consists of either Place, Route, and Fold (PRF) or Place-and-Route-in-Two-Dimensions (PR2D) layout data deck. Output consists of either Test Pattern Generator (TPG) or Logic-Simulation (LOGSIM) logic circuitry data deck. Designer needs to build only logic-gate-model circuit description since program acts as translator. Language is FORTRAN IV.

Pitts, E. R.↗

Automatic Lane-Level Road Network Extraction from Aerial Imagery for Transportation Digital Twins

Accurate road networks are essential for credible traffic microsimulation and transportation digital twins, yet high-definition maps are often difficult to obtain due to limited availability, high cost, or proprietary restrictions. Some build networks from crowdsourced data, such as OpenStreetMap, but these sources often contain geometric and semantic inconsistencies. Others create networks manually, a process that is labor-intensive and difficult to scale. To address these limitations, this work presents an end-to-end pipeline that automatically extracts georeferenced, lane-level road networks from publicly available high-resolution satellite imagery and converts them into simulation-ready assets. The developed end-to-end pipeline has three primary modules: (1) A computer-vision-based module first detects directed lane geometries and intersection layouts. (2) A heuristic-based topology construction module then identifies approach and exit legs and establishes conflict-free lane-to-lane connections. (3) Finally, an automatic simulation-building module converts the extracted network into standard formats, e.g., OpenDRIVE, and generates routable SUMO networks. The framework supports both complete network construction from scratch and local-scale refinement of existing networks through lane-count correction, transition recovery, and geometric regularization. The proposed pipeline provides a practical pathway to generate traffic simulation networks from satellite imagery, significantly reducing manual reconstruction effort and enabling scalable, continuously updated transportation digital twins.

Guo, Hetian [University of Georgia, Athens] (ORCID↗

Indoor Occupant Counting by RF Backscattering

Building HVAC (heating, ventilation and air conditioning) consumes approximately 13% of all energy consumption in USA. Motion detectors, cameras and user programmable thermostats have been shown to be ineffective for HVAC controls to save energy, mostly due to the user concerns of comfort, reliability and privacy. A new HVAC control system based on real-time occupant counting that is fully automated, highly accurate, economically sensible and preserving privacy and aesthetics can thus bring forth a disruptive impact to this large energy sector. Our indoor occupant monitoring technology is based on the radio-frequency identification system (RFID), deployed in the room, not on the occupants. One reader with four antennas can be deployed on the ceiling or behind the ceiling panels for every thousand square feet in home, office and assisted living, with or without room partitions. The sticker-like passive tag, 10 cents each and maintenance-free, are profusely hidden on the wall or inside the furniture at arbitrary position, preserving privacy and aesthetics. The large number of tags can realize diverse observation points to accommodate arbitrary room layouts, which is impractical by other active units of camera, infrared, radar or lidar. With 20 tags, the system can reliably detect the number of occupants. For 100 tags, occupant posture and location can be known. The technology has been verified in the research labs and test buildings with very high accuracy. When the real-time occupant number can be accurately known without assuming devices on occupants or occupant motion, the building HVAC system can be automated to achieve building energy saving without sacrificing occupant comfort. According to our limited testing in a few types of building models and the simplified cost calculation, the RFID system has low overall cost in production, deployment, operation and maintenance. The signal processing algorithm based on machine learning requires very small number of training cases as most learning is transferrable for various layouts, and very low computational needs during operation, according to our testing in four different room sizes and layouts. In our preliminary estimate from HVAC saving alone, the RFID system can potentially pay for itself within 1.5 years, in addition to the other enhancement in building automation systems (BAS). Our commercialization strategy and business pitch deck focus on venturing this Cornell occupant monitoring technology into BAS and energy management markets. We have identified three broad BAS market segments of senior living, residential buildings, and office buildings. We have put together the minimum viable product characteristics for these identified segments, including analyses on total cost and competing technologies, as well as the fit and technical gaps for these market segments. We intend to bring the technology to market by licensing or partnering with existing BAS vendors. A list of potential collaborators and licensing partner candidates was assembled for different aspects of integrating our technology into a potential product that can be used with BAS.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗