Search NASA⌕ Search

SEARCH · Search NASA

Results for “building management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation questionnaire, and a scoring formula.

Jones, Harry↗

Data, Meet Compute: NASA's Cumulus Ingest Architecture

NASA's Earth Observing System Data and Information System (EOSDIS) houses nearly 30PBs of critical Earth Science data and with upcoming missions is expected to balloon to between 200PBs-300PBs over the next seven years. In addition to the massive increase in data collected, researchers and application developers want more and faster access - enabling complex visualizations, long time-series analysis, and cross dataset research without needing to copy and manage massive amounts of data locally. NASA has looked to the cloud to address these needs, building its Cumulus system to manage the ingest of diverse data in a wide variety of formats into the cloud. In this talk, we look at what Cumulus is from a high level and then take a deep dive into how it manages complexity and versioning associated with multiple AWS Lambda and ECS microservices communicating through AWS Step Functions across several disparate installations

EOSDIS↗

Virtual Construction of Space Habitats: Connecting Building Information Models (BIM) and SysML

Current trends in design, construction and management of complex projects make use of Building Information Models (BIM) connecting different types of data to geometrical models. This information model allow different types of analysis beyond pure graphical representations. Space habitats, regardless their size, are also complex systems that require the synchronization of many types of information and disciplines beyond mass, volume, power or other basic volumetric parameters. For this, the state-of-the-art model based systems engineering languages and processes - for instance SysML - represent a solid way to tackle this problem from a programmatic point of view. Nevertheless integrating this with a powerful geometrical architectural design tool with BIM capabilities could represent a change in the workflow and paradigm of space habitats design applicable to other aerospace complex systems. This paper shows some general findings and overall conclusions based on the ongoing research to create a design protocol and method that practically connects a systems engineering approach with a BIM architectural and engineering design as a complete Model Based Engineering approach. Therefore, one hypothetical example is created and followed during the design process. In order to make it possible this research also tackles the application of IFC categories and parameters in the aerospace field starting with the application upon the space habitats design as way to understand the information flow between disciplines and tools. By building virtual space habitats we can potentially improve in the near future the way more complex designs are developed from very little detail from concept to manufacturing.

space architecture↗

Use of Soft Computing Technologies for a Qualitative and Reliable Engine Control System for Propulsion Systems

The problem to be addressed in this paper is to explore how the use of Soft Computing Technologies (SCT) could be employed to improve overall vehicle system safety, reliability, and rocket engine performance by development of a qualitative and reliable engine control system (QRECS). Specifically, this will be addressed by enhancing rocket engine control using SCT, innovative data mining tools, and sound software engineering practices used in Marshall's Flight Software Group (FSG). The principle goals for addressing the issue of quality are to improve software management, software development time, software maintenance, processor execution, fault tolerance and mitigation, and nonlinear control in power level transitions. The intent is not to discuss any shortcomings of existing engine control methodologies, but to provide alternative design choices for control, implementation, performance, and sustaining engineering, all relative to addressing the issue of reliability. The approaches outlined in this paper will require knowledge in the fields of rocket engine propulsion (system level), software engineering for embedded flight software systems, and soft computing technologies (i.e., neural networks, fuzzy logic, data mining, and Bayesian belief networks); some of which are briefed in this paper. For this effort, the targeted demonstration rocket engine testbed is the MC-1 engine (formerly FASTRAC) which is simulated with hardware and software in the Marshall Avionics & Software Testbed (MAST) laboratory that currently resides at NASA's Marshall Space Flight Center, building 4476, and is managed by the Avionics Department. A brief plan of action for design, development, implementation, and testing a Phase One effort for QRECS is given, along with expected results. Phase One will focus on development of a Smart Start Engine Module and a Mainstage Engine Module for proper engine start and mainstage engine operations. The overall intent is to demonstrate that by employing soft computing technologies, the quality and reliability of the overall scheme to engine controller development is further improved and vehicle safety is further insured. The final product that this paper proposes is an approach to development of an alternative low cost engine controller that would be capable of performing in unique vision spacecraft vehicles requiring low cost advanced avionics architectures for autonomous operations from engine pre-start to engine shutdown.

Trevino, Luis↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Application of Earth Observation Data for Improved Environmental and Disaster Monitoring in Central America

Since its establishment in 1991, the Central American Integration System (SICA, in Spanish) has served as a force for integrating the eight countries of Central America and the Dominican Republic, and in recent years, SICA’s General Secretariat and its various technical secretariats have focused on integrating Earth observations into various regional and national processes. In 2019, for instance, a joint statement was signed between SICA’s General Secretariat and NASA, toward strengthening the region’s use of Earth observations. SICA has also pursued cooperation with the Group on Earth Observations’ AmeriGEO regional initiative, the Japanese Aerospace Agency (JAXA), the United Nations Office of Outer Space Affairs (UNOOSA), and the Copernicus program, among others. Just in the framework of the NASA-SICA Joint Statement, and towards the goal of strengthening the region’s use of Earth observations across sectors, a large number of training webinars has been conducted, particularly benefiting national institutions, non-governmental organizations, and universities. Additionally, targeted support has been provided in the areas of environmental monitoring and disaster management. From 2019 through 2021, for instance, a number of feasibility studies were implemented by NASA’s DEVELOP program in collaboration with SICA technical secretariats. In 2020, in response to devastating Hurricanes Eta and Iota, the SERVIR program also provided support for extending the HYDRAFloods algorithm which had been originally developed for the Mekong to Central America. Support is also being provided toward monitoring land cover change across the Mesoamerican Biological Corridor. In the framework of the “observing the Earth for the benefit of all” theme, this presentation will also focus on how Central America can serve as a case study for the development of Earth observation capacity, applicable to other regions of the world.

applied sciences↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK). and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.

Feinberg, Lee D.↗

NASA Advanced Explorations Systems: 2018 Advancements in Life Support Systems

The NASA Advanced Exploration Systems (AES) Life Support Systems (LSS) project strives to develop reliable, energy-efficient, and low-mass spacecraft systems to provide envi-ronmental control and life support systems (ECLSS) critical to enabling long duration human missions beyond low Earth orbit (LEO). Highly reliable, closed-loop life support systems are among the capabilities required for the longer duration human space exploration missions planned in the mid-2020s and beyond. The LSS Project is focused on three life support areas: air revitalization, wastewater processing/water management and environmental monitoring. Building upon the International Space Station (ISS) LSS systems (where applicable), the three-fold mission of the LSS Project is to address discrete LSS technology gaps, to improve the reliability of LSS systems, and to advance LSS systems toward integrated testing aboard the ISS. This paper is a follow on to the AES LSS development status reported in 2017 and provides additional details on the progress made since that publication with specific attention to the status of the Aerosol Sampler ISS Flight Experiment, the Spacecraft Atmosphere Monitor (SAM) Flight Experiment, the Brine Processor Assembly (BPA) Flight Experiment as well as the progress of the terrestrial development in air, water and environmental monitoring technologies.

trace contaminant control↗

Fluid Servicing Road Area SWMUs 037 and 102 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of the IGWM activities conducted during the 2021 reporting period at the Fluid Servicing Road Area (FSRA) of Kennedy Space Center (KSC), Florida. The IGWM program was implemented at sites where active remediation was not occurring to monitor and track plume footprints and concentrations. FSRA is located east of the Vehicle Assembly Building and includes Components Cleaning Facility (CCF) also known as Solid Waste Management Unit (SWMU) 030; Converter Compressor Building (CCB) also known as SWMU 089; Area South of K7-516 (516S) also known as SWMU 100; Propellants Support Building Area (PSBA) also known as SWMU 102; and Former Drum Storage Area (FDSA) also known as SWMU 037.

Carol Cady↗

Guidance Enhancements and Performance Assessments for the Mars Ascent Vehicle Spin-Stabilized Upper Stage Configuration

he objective of the Mars Sample Return (MSR) campaign is to return samples from the surface of Mars to Earth for research. As one element of the MSR campaign, the Mars Ascent Vehicle (MAV) is responsible for transporting the samples from the surface of Mars to a Low-Martian Orbit (LMO) for retrieval. Complete autonomy is required throughout ascent, and orbital insertion is constrained by tight dispersion boundaries. An unguided, spin-stabilized second stage for MAV has been selected over a guided upper-stage to drive mass savings and reduce overall MSR campaign mass risk, at the cost of reduced GNC capability. To address this design change, the MAV GNC team has derived a robust prediction algorithm, building on previous energy management schemes, that solves for a single inertial pointing direction solution for the spin-stabilized 2nd stage burn. Algorithm stability is explored that compared to previous versions of the algorithm. Also, a set of analytical partials was developed to study MAV’s dispersed orbital insertion performance with respect to MAV system uncertainties. These partials were verified through simulation analysis and prove useful for analytical insight into the dynamics of MAV during the 2nd stage maneuver.

Jason M Everett↗

Guidance Enhancements and Performance Assessments for the Mars Ascent Vehicle Spin-Stabilized Upper Stage Configuration

The objective of the Mars Sample Return (MSR) campaign is to return samples from the surface of Mars to Earth for research. As one element of the MSR campaign, the Mars Ascent Vehicle (MAV) is responsible for transporting the samples from the surface of Mars to a Low-Martian Orbit (LMO) for retrieval. Complete autonomy is required throughout ascent, and orbital insertion is constrained by tight dispersion boundaries. An unguided, spin-stabilized second stage for MAV has been selected over a guided upper-stage to drive mass savings and reduce overall MSR campaign mass risk, at the cost of reduced GNC capability. To address this design change, the MAV GNC team has derived a robust prediction algorithm, building on previous energy management schemes, that solves for a single inertial pointing direction solution for the spin-stabilized 2nd stage burn. Algorithm stability is explored that compared to previous versions of the algorithm. Also, a set of analytical partials was developed to study MAV’s dispersed orbital insertion performance with respect to MAV system uncertainties. These partials were verified through simulation analysis and prove useful for analytical insight into the dynamics of MAV during the 2nd stage maneuver.

GNC↗

In Situ Chemical Reduction Interim Measures Work Plan Hot Spot 3 Mobile Launcher Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This document presents the design details of an In Situ Chemical Reduction (ISCR) Interim Measures Work Plan for Hot Spot 3 within Mobile Launcher Platform Rehabilitation Sites/Vehicle Assembly Building Area, Solid Waste Management Unit (SWMU) 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The interim measures (IM) treatment zone encompasses an area identified as the High Concentration Plume (HCP), which is defined as the area with chlorinated volatile organic compound (CVOC) groundwater concentrations greater than their respective Natural Attenuation Default Concentration (NADC). The objective of the IM is to remove CVOC mass within the treatment area to levels that facilitate a transition to natural attenuation monitoring. The IM design consists of the selected ISCR amendment, Provect-IR, which is a mixture of solid reagents in a single product that promotes enhanced reductive dechlorination and ISCR. ProvectIR includes natural antimethanogenic compounds; multiple hydrophilic, nutrient-rich organic carbon sources; zero valent iron; chemical oxygen scavengers; and vitamin and mineral sources. The proposed treatment area for this IM encompasses less than 1 acre and includes three vertical treatment intervals to reach the NADC plumes that vary per CVOC and depth: 4 to 10 feet below land surface (bls), 10 to 18 feet bls, and 42 to 52 feet bls. The amendment will be distributed through 16 injection points (IP01 through IP16) using dosing rates ranging from 0.4% to 0.6% of soil mass within the treatment interval and a 15% or 20% slurry strength. Dosage rates and slurry strength are based on groundwater geochemistry, soil characteristics, and contaminant concentrations. To aid in the evaluation of the ISCR IM performance, six performance monitoring wells will be installed following injections and sampled semiannually. CVOC parameters will be sampled until concentrations reduce to below their NADC. Underground Injection Control parameters will be sampled until concentrations decrease to background levels or to levels that meet respective groundwater standards. Sampling frequency will be evaluated annually and modified as needed. The path forward for the ISCR IM implementation includes preparing the IM Implementation Work Plan, ISCR injections, monitoring well installation, performance monitoring, and reporting.

Randall K. Sillan↗

Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the 2023 groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) Long-Term Monitoring (LTM) activities. Due to the project contract ending in 2023, this report presents one year of LTM activities instead of the two-year timeframe presented in previous reports. The NASA IA LTM Program includes the following 12 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. The current sampling frequencies for the NASA IA LTM sites are as follows: - FSA1 is sampled annually, alternating between wet and dry seasons. - GSSP is sampled annually during the wet season. - Seven sites are sampled biennially, alternating between the wet and dry seasons (RRLF, M505, O&C, VPF, LETF, MOBIL, and SSPF). - EHF and EDL are sampled biennially during the wet season. - KARS Park 1 is sampled once every 5 years.

remediation↗

Return to Flight Resource Reel 2 of 2

A continuation of the tests performed on the Space Shuttle Discovery in preparation for its return to flight is presented. The tests include: 1) Shuttle Robot Arm Recertification; 2) Michael Hiltz Systems Group Leader; 3) Orbiter Boom Fabrication; 4) Orbiter Boom Final Development; 5) Gary Searle Manager of Orbiter Boom Sensor System (OBSS) Manufacturing and Assembly; 6) Orbiter Boom Qualification Unit; 7) STS-114 Crew Inspects Orbiter Boom at Kennedy Space Center; 8) Orbiter Boom Inspection of Thermal Protection System Animation; 9) External Tank Bipod Redesign; 10) External Tank Flange Redesign; 11) External Tank Bellows Redesign; 12) Shuttle Main Engine Testing and Delivery to Kennedy Space Center; 13) Ronnie Rigney Project Manager Space Shuttle Main Engine Program Office; 14) Gene Goldmman NASA Project Manager Space Shuttle Main Engine Project; 15) Mike Cosgrove Boeing-Rocketdyne Flow Manager; 16) Shuttle Rocket Booster Build-Up; 17) Ascent Imagery Improvements; and 18) STS-114 Flight Control Team and Mission Management Team.

Source record↗

2019 Corrective Measures Implementation and Intermim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from May 2019 through December 2019 at the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida.

MOBILE LAUNCH PLATFORM / VEHICLE ASSEMBLY BUILDING↗

Managing computer-controlled operations

A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.

Plowden, J. B.↗

An Educational Multimedia Presentation on the Introduction to Spacecraft Charging

Over the last few decades, significant knowledge has been gained in how to protect spacecraft from charging; however, the continuing technical advancement in the design and build of satellites requires on-going effort in the study of spacecraft charging. A situation that we have encountered is that not all satellite designers and builders are familiar with the problem of spacecraft charging. The design of a satellite involves many talented people with diverse backgrounds, ranging from manufacturing and assembly to engineering and program management. The complex design and build of a satellite system requires people with highly specialized skills such that cross-specialization is often not achievable. As a result, designers and builders of satellites are not usually familiar with the problems outside their specialization. This is also true for spacecraft charging. Not everyone is familiar with the definition of spacecraft charging and the damage that spacecraft charging can cause. Understanding the problem is an important first step in getting everyone involved in addressing the appropriate spacecraft charging issues during the satellite design and build phases. To address this important first step, an educational multimedia presentation has been created to inform the general engineering community about the basics of spacecraft charging. The content of this educational presentation is based on relevant published technical papers. The presentation was developed using Macromedia Flash. This software produces a more dynamic learning environment than a typical slide show , resulting in a more effective learning experience. The end result is that the viewer will have learned about the basics of spacecraft charging. This presentation is available to the public through our website, www.dplscience.com, free of charge. Viewers are encouraged to pass this presentation to colleagues within their own work environment. This paper describes the content of the multimedia presentation.

Lin, E.↗