Search NASA⌕ Search

SEARCH · Search NASA

Results for “capacity planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Electrical load management at the Goldstone DSN Complex

A Power Load Management Plan was deveoped which utilizes the unique power generating capabilities of the stations to reduce the stress on the local utility's reserve capacity and reduce the cost of electrical power at the stations. The plan has greatly reduced the cost of Goldstone electrical power by completely eliminating the use of commercial power during the local utility's high usage periods each day.

Rayburn, J. C.↗

International Space Station Major Constituent Analyzer On-orbit Performance

The Major Constituent Analyzer (MCA) is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic change-out, including the ORU 02 analyzer and the ORU 08 Verification Gas Assembly. The most recent ORU 02 and ORU 08 assemblies are operating nominally. For ORU 02, the ion source filaments and ion pump lifetime continue to be key determinants of MCA performance. Additionally, testing is underway to evaluate the capacity of the MCA to analyze ammonia. Finally, plans are being made to bring the second MCA on ISS to an operational configuration.

Gardner, Ben D.↗

Supporting Hazard Analysis for Wildfire Response Using fmdtools and MIKA

The System Wide Safety (SWS) Safety Demonstrator (SD) Series drives development of an increasingly capable In-Time Aviation Safety Management System (IASMS) focusing on humanitarian applications, starting with wildfire response (SD-1). The goals of this report are to (1) provide an early hazard analysis and mitigation evaluation of wildfire response to support these efforts and (2) provide a demonstration of capabilities of the Fault Model Design Tools (fmdtools) and Manager for Intelligent Knowledge Access (MIKA) tools. fmdtools provides a modeling, simulation, and resiliency analysis framework in which a wildfire response model, the System Modeling and Analysis of Resiliency in Scalable Traffic Management for Emergency Response Operations (SMARt-STEReO), is built. MIKA is an intelligent knowledge manager with several capabilities, including assisting in hazard analysis by extracting and analyzing hazards from historical incident reports. The following topics are covered in the report: Understanding Wildfire Hazard Dynamics. We provide a description and simulated examples of how hazards occur in the SMARt-STEReO model of wildfire response and their effect on its outcome. This provides a common mental model and focuses the analysis presented in the remainder of the report. Wildfire Hazard Identification. MIKA identifies wildfire hazards from three relevant datasets: the ICS-209-PLUS, SAFECOM, and SAFENET. Hazards are manually organized into a taxonomy and MIKA analyzes each hazard’s effects, likelihood, severity, and risk. Evaluating Mitigation Strategies. The SMARt-STEReO wildfire response model built in fmdtools evaluates a subset of identified hazards. Specifically, we simulate the effect of communications faults and equipment faults on operator safety, the effect of changing winds and flammability, and a scenario with multiple ignition points and heavy smoke. Tool Limitations and Usage Considerations. We provide a discussion of appropriate tool use cases as well as limitations and considerations for usage. The tool findings are used to synthesize recommendations for wildfire response operations, which can be captured as part of an IASMS. Key recommendations are as follows: Hazards are identified from a broad spectrum of sources including aircraft subsystems, operational sources, and ground crew operations. Highest risk operational environment hazards identified are Evacuations. The highest risk manned aerial operations hazard categorized is Jumper Operations Mishap. Ground crew hazards that are highest risk are Burns, Cargo Operations Overhead, Dehydration, Entrapment, Falling Objects, Heart Attacks, Heat Exhaustion, Inadequate Training or Certification, Vehicle Breakdown, and Vehicle Collision. Modelled containment failures arise from a mismatch between the difficulty of the firefighting scenario and the capacity (e.g., speed, effectiveness, awareness) of the response. In firefighting scenarios where containment is possible (e.g., because the fire does not spread too quickly), these mismatches can occur because of a change in environmental conditions (e.g., wind, flammability, etc) or because of planning, equipment, or communications faults. Improvements to communications increase the capacity of the firefighting response by reducing the time needed to respond to the fire. While surveillance does not increase this capacity by itself, it increases operator safety by increasing state awareness, enabling firefighters to evade approaching fires. Increasing both has a synergistic effect. In general, these performance and resilience increases generalize over fault scenarios as well as unforeseen changes to circumstances (i.e., wind, aridity, etc.). However, these improvements need to be designed so as not to make the system prone to persistent large-scale communications outages, which can reduce performance.

Hazard analysis↗

Temporal planning for transportation planning and scheduling

In this paper we describe preliminary work done in the CORTES project, applying the Heuristic Scheduling Testbed System (HSTS) to a transportation planning and scheduling domain. First, we describe in more detail the transportation problems that we are addressing. We then describe the fundamental characteristics of HSTS and we concentrate on the representation of multiple capacity resources. We continue with a more detailed description of the transportation planning problem that we have initially addressed in HSTS and of its solution. Finally we describe future directions for our research.

Frederking, Robert E.↗

Advances in Discrete-Event Simulation for MSL Command Validation

In the last five years, the discrete event simulator, SEQuence GENerator (SEQGEN), developed at the Jet Propulsion Laboratory to plan deep-space missions, has greatly increased uplink operations capacity to deal with increasingly complicated missions. In this paper, we describe how the Mars Science Laboratory (MSL) project makes full use of an interpreted environment to simulate change in more than fifty thousand flight software parameters and conditional command sequences to predict the result of executing a conditional branch in a command sequence, and enable the ability to warn users whenever one or more simulated spacecraft states change in an unexpected manner. Using these new SEQGEN features, operators plan more activities in one sol than ever before.

discrete event simulation↗

Heat Pipe Thermal Conditioning Panel

The development, fabrication, and evaluation of heat pipe thermal conditioning panels are discussed. The panels were designed and fabricated to be compatible with several planned NASA space vehicles, in terms of panel size, capacity, temperature gradients, and integration with various heat exchangers and electronic components. It was satisfactorily demonstrated that the heat pipe thermal conditioning panel meets the thermal efficiency and heat transport requirements.

Saaski, E. W.↗

The 4.5 inch diameter IPV Ni-H2 cell development program

Interest in larger capacity Ni-H2 battery cells for space applications has resulted in the initiation of a development/qualification/production program. Cell component design was completed and component hardware fabricated and/or delivered. Finished cell design projections demonstrate favorable specific energies in the range of 70 to 75 Whr/Kg (32 to 34 Whr/Lb) for capacities of 100 to 250 Ah. It is further planned during this effort to evaluate the advanced cell design technology which has evolved from the work conducted at the NASA/Lewis Research Center.

Miller, L.↗

2018 NISAR Applications Workshop: Forest and Disturbance; Workshop Report

Forest lands cover the globe and are important sources for providing ecosystem services including: carbon sequestration, biodiversity, timber, air and water quality. As such, counties around the world have dedicated programs for managing them. Accurate and timely information concerning the status of these forests (moisture, biomass, disturbance type, etc.) is essential to those Nations’ human and ecological health as well as economy. The joint NASA/US Forest Service workshop focused on arming forest land managers with observations and remote sensing information from the upcoming NASA-ISRO (Indian Space Research Organization) SAR (Synthetic Aperture Radar) (NISAR) satellite mission (expected to launch early 2022). Participants included representatives from different US Federal Agencies, private sector, and non-governmental organizations (NGO) that are key players in facilitating integration of Earth Observations (EO) into forest management and decision support workflows. They included scientists, technicians, and program managers with a responsibility for data acquisition and exploitation such as product development, delivery, and use, and capacity building. Discussions were held over two days to convey the broader forest and disturbance community information needs for various representative participants and programs and to facilitate the delivery of NISAR mission geospatial products and observational capabilities. Case studies were presented to demonstrate the current state of practice in the use of SAR remote sensing for applications of direct importance to forest and disturbance land management community. Eleven organizations presented their information requirements in response to a set of questions provided by the NASA team, then the NASA team responded by describing the degree to which NISAR could meet these requirements. Discussion ensued about needed data product specifications to increase utility (e.g., projection, latency, etc.), tools and capacity building. The general findings of this workshop were that (a) NISAR observations will be particularly useful to the global forest carbon and disturbance monitoring applications, but that certain data product design decisions (projections and radiometric and terrain corrections) need to be considered to increase utility; b) the biomass and disturbance detection algorithms meet many of the community needs, however there are other information products of value (e.g., soil moisture or disturbance classification, not just detection) and all products should be compliant with existing community standards for reporting uncertainty; c) providing SAR education to the community will be key specifically thinking about putting the information first and the SAR theory second, providing a simple guide of standard data processing steps (e.g., dB (decibel) to power conversion and speckle filtering); d) the community needs a user-friendly interface for finding free, archived data over their geographic regions of interest; e) user-friendly tools that connect to open-sources GIS (Global Information System) software (e.g., QGIS (Quantum GIS)) that include a graphical user interface (GUI) for SAR processing that enables both download and cloud processing. To integrate these findings and prepare the community before NISAR launches, it was suggested that there be a dedicated NISAR Forest and Disturbance Applications Working Group (as per the specifications in the NISAR Utilization Plan). After launch, it was decided that the community continue capacity building activities.

Stavros, Natasha↗

Airspace Systems Program: Next Generation Air Transportation System, NextGen Systems Analysis, Integration and Evaluation Project: Project Plan - Version 1.0

The key objectives of the NASA ASP are to: Improve mobility, capacity efficiency and access of the airspace system. Improve collaboration, predictability, and flexibility for the airspace users. Enable accurate modeling and simulation of air transportation systems. Accommodate operations of all classes of aircraft. Maintain system safety and environmental protection. In support of these program objectives, the major goal of the NextGen-SAIE Project is to enable the transition of key capacity and efficiency improvements to the NAS. Since many aspects of the NAS are unique to specific airport or airspace environments, demand on various parts of the NAS is not expected to increase equally as system demand grows. SAIE will provide systems level analysis of the NAS characteristics, constraints, and demands such that a suite of capacity-increasing concepts and technologies for system solutions are enabled and facilitated. The technical objectives in support of this goal are the following: Integration, evaluation, and transition of more mature concepts and technologies in an environment that faithfully emulates real-world complexities. Interoperability research and analysis of ASP technologies across ATM functions is performed to facilitate integration and take ASP concepts and technologies to higher Technology Readiness Level (TRL). Analyses are conducted on the program s concepts to identify the system benefits or impacts. System level analysis is conducted to increase understanding of the characteristics and constraints of airspace system and its domains.

Quon, Leighton↗

Deep space propagation experiments at Ka-band

Propagation experiments as essential components of the general plan to develop an operational deep space telecommunications and navigation capability at Ka-band (32 to 35 GHz) by the end of the 20th century are discussed. Significant benefits of Ka-band over the current deep space standard X-band (8.4 GHz) are an improvement of 4 to 10 dB in telemetry capacity and a similar increase in radio navigation accuracy. Propagation experiments are planned on the Mars Observer Mission in 1992 in preparation for the Cassini Mission to Saturn in 1996, which will use Ka-band in the search for gravity waves as well as to enhance telemetry and navigation at Saturn in 2002. Subsequent uses of Ka-band are planned for the Solar Probe Mission and the Mars Program.

Butman, Stanley A.↗

Demand Capacity Balancing at Vertiports for Urban Air Mobility

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗

Fueling the National Aero-Space Plane with slush hydrogen

The National Aerospace Plane is a horizontal take off and landing, single stage-to-orbit vehicle using hydrogen as the fuel. The first flights are planned for the mid 1990s. The high heating value, cooling capacity, and combustion properties make hydrogen the fuel of choice, but the low density results in a large vehicle. Both the fuel cooling capacity and density are increased with the use of slush hydrogen and result in significant reductions in size of the vehicle. A national program to advance this technology and to find engineering solutions to the many design issues is now underway.

Hannum, Ned P.↗

Robot Acting on Moving Bodies (RAMBO): Interaction with tumbling objects

Interaction with tumbling objects will become more common as human activities in space expand. Attempting to interact with a large complex object translating and rotating in space, a human operator using only his visual and mental capacities may not be able to estimate the object motion, plan actions or control those actions. A robot system (RAMBO) equipped with a camera, which, given a sequence of simple tasks, can perform these tasks on a tumbling object, is being developed. RAMBO is given a complete geometric model of the object. A low level vision module extracts and groups characteristic features in images of the object. The positions of the object are determined in a sequence of images, and a motion estimate of the object is obtained. This motion estimate is used to plan trajectories of the robot tool to relative locations rearby the object sufficient for achieving the tasks. More specifically, low level vision uses parallel algorithms for image enhancement by symmetric nearest neighbor filtering, edge detection by local gradient operators, and corner extraction by sector filtering. The object pose estimation is a Hough transform method accumulating position hypotheses obtained by matching triples of image features (corners) to triples of model features. To maximize computing speed, the estimate of the position in space of a triple of features is obtained by decomposing its perspective view into a product of rotations and a scaled orthographic projection. This allows use of 2-D lookup tables at each stage of the decomposition. The position hypotheses for each possible match of model feature triples and image feature triples are calculated in parallel. Trajectory planning combines heuristic and dynamic programming techniques. Then trajectories are created using dynamic interpolations between initial and goal trajectories. All the parallel algorithms run on a Connection Machine CM-2 with 16K processors.

Davis, Larry S.↗

RF and Optical Communications: A Comparison of High Data Rate Returns From Deep Space in the 2020 Timeframe

As NASA proceeds with plans for increased science data return and higher data transfer capacity for science missions, both RF and optical communications are viable candidates for significantly higher-rate communications from deep space to Earth. With the inherent advantages, smaller apertures and larger bandwidths, of optical communications, it is reasonable to expect that at some point in time and combination of increasing distance and data rate, the rapidly emerging optical capabilities would become more advantageous than the more mature and evolving RF techniques. This paper presents a comparison of the burden to a spacecraft by both RF and optical communications systems for data rates of 10, 100, and 1000 Mbps and large distances. Advanced technology for RF and optical communication systems have been considered for projecting capabilities in the 2020 timeframe. For the comparisons drawn, the optical and RF ground terminals were selected to be similar in cost. The RF system selected is composed of forty-five 12-meter antennas, whereas the selected optical system is equivalent to a 10-meter optical telescope. Potential differences in availability are disregarded since the focus of this study is on spacecraft mass and power burden for high-rate mission data, under the assumption that essential communications will be provided by low-rate, high availability RF. For both the RF and optical systems, the required EIRP, for a given data rate and a given distance, was achieved by a design that realized the lowest possible communications subsystem mass (power + aperture) consistent with achieving the lowest technology risk. A key conclusion of this paper is that optical communications has great potential for high data rates and distances of 2.67 AU and beyond, but requires R&D and flight demonstrations to prove out technologies.

Williams, W. Dan↗

Converting an MPLM to a PMM

The Multi-Purpose Logistics Module (MPLM) are pressurized modules for transporting equipment, supplies and experimental devices to and from the International Space Station (ISS). An MPLM is carried in the cargo bay of a Shuttle and attached to the Unity or Harmony modules on the ISS for the duration of a mission, usually about 10 days. From there, supplies are offloaded, and finished experiments and waste are reloaded. The MPLM is then returned to the Space Shuttle payload bay for return to Earth. Three modules were built, Leonardo, Raffaello and Donatello. The modules were provided to NASA under contract by the Italian Space Agency. Each MPLM was built to be on-orbit a maximum of one month at a time. The MPLM Leonardo is being modified to turn it into the Pressurized Multipurpose Module (PMM), which will remain permanently attached to the ISS following the STS- 133 mission. The Space Shuttle is the only vehicle or rocket that has the capacity to carry the MPLM to the ISS. With the planned retirement of the Space Shuttle in 2011, NASA has found another use for the MPLM. With the modifications of the MPLM into a PMM the ISS will have another permanent module as part of the ISS that will be used as a storage module

Perez, Hector P.↗

Southern Bhutan Ecological Forecasting Tech Paper: Modeling Asian Elephant (Elephas maximus) Habitat Suitability along the Southern Bhutan Border with NASA Earth Observations

Asian elephants (Elephas maximus) are a flagship species essential for the functioning of forest ecosystems, and they also have cultural significance in Bhutan. Elephants receive the highest legal protection as listed under Schedule I of the Bhutan Forests and Nature Conservation Act, 1995. Yet, they face threats of extinction due to poaching for ivory as well as the loss and fragmentation of their habitat. Due to the recent clearing of forests and the growing populations in these areas, there has been an increase in incidents of human-elephant conflict. These conflicts have been detrimental to farmer’s annual harvests and livelihoods and have led to retaliatory killing and injury of elephants in southern Bhutan. The DEVELOP Southern Bhutan Ecological Forecasting team partnered with the Bhutan Foundation and Bhutan Tiger Center to help address this problem. The team integrated NASA Earth observations, including Landsat 5 Thematic Mapper (TM), Landsat 8 Operational Land Imager (OLI), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), and the Shuttle Radar Topography Mission (SRTM) to acquire information on land cover change and elephant habitat suitability along the southern border of Bhutan. The team utilized Esri ArcGIS Pro and Software for Assisted Habitat Modeling (SAHM) for data analysis, modeling, and visualization. The team used elephant occurrence data and environmental variables to model current habitat suitability for migrating elephant populations. This analysis provided partners with maps to inform decisions about the placement and conservation of elephant corridors and helped build their capacity to use satellite data for future studies and project planning.

Palchen Wangchuk↗

Southern Bhutan Ecological Forecasting Project Summary - Modeling Asian Elephant (Elephas Maximus) Habitat Suitability along the Southern Bhutan Border with NASA Earth Observations

Asian elephants (Elephas maximus) are a flagship species essential for the functioning of forest ecosystems, and they also have cultural significance in Bhutan. Elephants receive the highest legal protection as listed under Schedule I of the Bhutan Forests and Nature Conservation Act, 1995. Yet, they face threats of extinction due to poaching for ivory as well as the loss and fragmentation of their habitat. Due to the recent clearing of forests and the growing populations in these areas, there has been an increase in incidents of human-elephant conflict. These conflicts have been detrimental to farmer’s annual harvests and livelihoods and have led to retaliatory killing and injury of elephants in southern Bhutan. The DEVELOP Southern Bhutan Ecological Forecasting team partnered with the Bhutan Foundation and Bhutan Tiger Center to help address this problem. The team integrated NASA Earth observations, including Landsat 5 Thematic Mapper (TM), Landsat 8 Operational Land Imager (OLI), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), and the Shuttle Radar Topography Mission (SRTM) to acquire information on land cover change and elephant habitat suitability along the southern border of Bhutan. The team utilized Esri ArcGIS Pro and Software for Assisted Habitat Modeling (SAHM) for data analysis, modeling, and visualization. The team used elephant occurrence data and environmental variables to model current habitat suitability for migrating elephant populations. This analysis provided partners with maps to inform decisions about the placement and conservation of elephant corridors and helped build their capacity to use satellite data for future studies and project planning.

DEVELOP Project Summary↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗