Search NASA⌕ Search

SEARCH · Search NASA

Results for “cleanup”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James↗

Green PCB Remediation from Sediment Systems (GPRSS) Project

An ongoing problem facing the global environment community including NASA centers is the removal and remediation of polychlorinated biphenyls (PCBs). PCBs were commonly used in a variety of materials including paints, caulking, and adhesives due to the advantageous physical and chemical properties that PCBs imparted to these various materials. Unfortunately, these properties have made the treatment of sites contaminated with these chemicals extremely difficult to deal with, due to their inherent chemical stability. The remediation of sediments contaminated with PCBs is especially difficult, primarily due to the risk of releasing the contaminant into the environment during the treatment process. Traditional treatment options involve the use of dredging and incineration of the contaminated soils/sediments, in which the chance of releasing the contaminants is greatly increased. The purpose of this project is to develop cleanup technology capable of remediating contaminated sediments in-situ, with minimum intrusion. This allows for the minimization of any potential contaminant release during the treatment process, providing a safer method for cleanup operations (as opposed to dredging/incineration) and still treating the basic problem of PCB contamination (as opposed to capping).

System↗

Fire Safety Implications of Preliminary Results from Saffire IV and V Experiments on Large Scale Spacecraft Fires

The spread and growth of flames over large solid fuel samples and their effect on the pressurized spacecraft were studied inside the Cygnus spacecraft while in orbit after departing the International Space Station. These experiments were developed by NASA’s Advanced Exploration Systems Division in the Human Exploration and Operations Mission Directorate. The ignited materials consisted of poly-methyl methacrylate (PMMA), cotton fabric and a cotton/fiberglass fabric blend. The samples were all 40 cm wide and with various lengths ranging from 18 cm for the PMMA samples to 50 cm for the fabrics. The overall results from these tests and their impact on the spacecraft are presented with emphasis on the fire safety implications of the results. The experiments included, a post-fire cleanup system, vehicle internal volume measurements, and transport of acid gases (HCl and HF). Measurements included video images, flame spread rate, flame temperatures and radiant heat output; energy release through oxygen calorimetry; distributed measurements of CO2 concentration and temperature at six locations in the spacecraft; CO2, CO, O2, HF and HCl concentrations; vehicle pressurized volume; and aerosol concentrations. Details of the flame growth and spread are discussed in other papers as are details of the post-fire cleanup system performance. The fire events had a measurable impact on the vehicle pressure, temperature, and carbon dioxide concentration. However, despite having heat release rates up to 10 kW, the average vehicle conditions did not rise to unacceptable levels. The combined results of the experiments provide significant new understanding of the impact of sample and flow duct height on flame spread and growth in addition to an improved perspective of the impact of a fire event on a spacecraft.

micorgravity↗

Fire Safety Implications of Preliminary Results from Saffire IV and V Experiments on Large Scale Spacecraft Fires

The spread and growth of flames over large solid fuel samples and their effect on the pressurized spacecraft were studied inside the Cygnus spacecraft while in orbit after departing the International Space Station. These experiments were developed by NASA’s Advanced Exploration Systems Division in the Human Exploration and Operations Mission Directorate. The ignited materials consisted of poly-methyl methacrylate (PMMA), cotton fabric and a cotton/fiberglass fabric blend. The samples were all 40 cm wide and with various lengths ranging from 18 cm for the PMMA samples to 50 cm for the fabrics. The overall results from these tests and their impact on the spacecraft are presented with emphasis on the fire safety implications of the results. The experiments included, a post-fire cleanup system, vehicle internal volume measurements, and transport of acid gases (HCl and HF). Measurements included video images, flame spread rate, flame temperatures and radiant heat output; energy release through oxygen calorimetry; distributed measurements of CO2 concentration and temperature at six locations in the spacecraft; CO2, CO, O2, HF and HCl concentrations; vehicle pressurized volume; and aerosol concentrations. Details of the flame growth and spread are discussed in other papers as are details of the post-fire cleanup system performance. The fire events had a measurable impact on the vehicle pressure, temperature, and carbon dioxide concentration. However, despite having heat release rates up to 10 kW, the average vehicle conditions did not rise to unacceptable levels. The combined results of the experiments provide significant new understanding of the impact of sample and flow duct height on flame spread and growth in addition to an improved perspective of the impact of a fire event on a spacecraft.

microgravity fire safety↗

PFAS Treatment Pilot Study using Granular Activated Carbon at Kennedy Space Center, Florida

Per- and polyfluoroalkyl substances (PFAS) have been found in investigative derived waste (IDW) generated from groundwater sampling and remediation activities conducted at Kennedy Space Center (KSC), Florida. PFAS are exceptionally strong compounds because of carbon-fluorine bonds resulting in resistance to degradation, low chemical reactivity, compound stability, and persistence in the environment. The regulatory status of PFAS is very dynamic. PFAS is not considered a hazardous waste and has no federal or state (Florida) cleanup requirements at this time. Due to the current and unknown future of the regulatory and treatment landscape, non-hazardous IDW, based upon site volatile organic compounds (VOCs) regulated under Title 40 of Federal Regulations part 261, containing PFAS is not being processed for off-site waste disposal under KSC’s Resource Conservation and Recovery Act permit as a proactive precaution. Long-term storage of aqueous IDW in the meantime was determined to be inadequate due to the potential for spills and/or leaks. A very limited number treatment methods are available at this time. To date, granular activated carbon (GAC) and ion exchange technologies have been found to be some of the most consistent treatment options for removing PFAS from aqueous media. Therefore, a pilot study using GAC was developed at KSC to determine the feasibility of treating non-hazardous IDW containing PFAS to reduce the total volume of PFAS waste and minimize the risk of leaks or spills while storing the waste until complete PFAS-destructive treatment options are more readily available. NASA wanted the pilot test to be able to demonstrate the ability to completely remove 18 PFAS compounds and the site VOCs to below the state of Florida groundwater cleanup target levels (GCTLs).

Michael J Deliz↗

General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

EVA Planning: Using Neutral Buoyancy Laboratory (NBL) Training to Predict in-Flight Energy Expenditure

Metabolic rate (“met rate”) is the amount of energy expended over a period of time and is influenced by many factors including body composition, level of physical activity, resting metabolic rate, sex, age, and food intake. Met rate is measured during Extravehicular Activity (EVA) training at the Neutral Buoyancy Laboratory (NBL) and during in-flight EVAs through indirect calorimetry, calculating energy expenditure from respiratory measurements of O 2 consumption and/or CO 2 production. During Extravehicular Activity (EVA) planning, metabolic cost is important to consider and is used to inform EVA duration based on spacesuit consumables associated with life support systems. Currently, NBL and previous ISS EVA met rate data for specified crewmembers are utilized to predict in-flight EVA metabolic costs based on a proposed EVA timeline. Timeline data collected during training is used to relate met rates to specific EVA activities, which are in turn assigned to more generalized EVA task categories, categorizing by both task type and restraint type. EVA task categories include EVA Setup/Cleanup, Worksite Setup/Cleanup, Cable Routing, Bolts, Fluid Connectors, Electrical Connectors, R&R Work, Miscellaneous Work, Incapacitated Crew Rescue (being rescued or performing), Assisted Crew Rescue (being assisted or performing), and Translation. Restraint types consist of Free-Float, Body Restraint Tether (BRT), Articulating Portable Foot Restraint (APFR), and Space Station Remote Manipulator System (SSRMS). From a crewmember’s historical data, individualized 10th, 50th and 90th percentile met rate estimates are generated for each task category and used to estimate the proposed EVA timeline metabolic cost. In-flight metabolic data (“As-Executed”) from recent ISS US EVAs 85-88 (totaling eight EVA crewmember met rates) was compared with their predicted metabolic cost (“As-Planned”) to evaluate the accuracy of the current met rate estimation method. Across the four EVAs, As-Executed Cumulative EVA Total Metabolic Cost (M = 5893.78 BTU, SD = 816.60) was not significantly different compared to As-Planned Cumulative EVA Total Metabolic Cost (M = 6106.60 BTU, SD = 826.62; t(7) = 0.751 , p = .477). Though not a significant difference, generally, As-Planned total estimates were slightly higher than As-Executed total metabolic cost. Relative Error for Cumulative EVA Total Metabolic Cost ranged from -33% to 14.7%, depending on the crewmember and EVA. When comparing As-Planned to A-Executed EVA task categories for Bolts, Electrical Connectors, EVA Cleanup, EVA Setup, Miscellaneous Work, Translation, Worksite Cleanup, and Worksite Setup during these EVAs, no significant differences were observed, however, there was a significant difference in As-Planned (M = 783.71 BTU, SD = 408.88) compared to As-Executed (M = 608.87 BTU, SD = 425.29) metabolic cost for the task category of Repair-and-Replace (R&R) Work (t(17) = 3.21 , p = .005). Looking closer within the R&R Work task category, As-Executed R&R Work with Free-Float restraint type (M = 706.17 BTU, SD = 352.18) was significantly less than As-Planned R&R Work with Free-Float restraint type (M= 887.96 BTU, SD = 381.42; t(12) = 2.59, p < .024). As-Executed R&R Work with SSRMS Restraint type (M = 355.89 BTU, SD = 534.65) was not significantly different from As-Planned values (M = 512.69 BTU, SD = 383.34; t(4) = 1.88, p = 0.132). These findings suggest that the energy expended performing R&R Work (Free-Float) is lower in flight than predicted. Accurate predictions of the metabolic cost of EVA are essential for planning and executing successful ISS EVAs. Overall, the current met rate prediction method is similar to actual in-flight values, slightly erring on the side of overestimation. Future work includes analysis of more historical in-flight EVA data to increase the power of the analysis, evaluating the NBL-ISS met rate conversion factor between NBL and ISS tasks, as well as exploring methods of substitution when crewmembers are missing prior task category data.

Lauren Cox↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Non-Nuclear Plowshare and Vela Uniform Sites - 20447

The Plowshare Program was initiated by the Atomic Energy Commission, a predecessor agency to the US Department of Energy (DOE), to investigate peaceful uses of nuclear devices. 'Vela Uniform,' part of the broader Project Vela, was designed to use nuclear and other explosions to increase the capability of the United States to detect nuclear tests through seismicity. There were underground nuclear tests conducted off the Nevada National Security Site (NNSS) as part of the Plowshare Program (e.g., the Gnome-Coach, New Mexico, Site) and the Vela Uniform Program (e.g., Project Shoal, Nevada, Site) at which the DOE Office of Legacy Management (LM) has been conducting long-term surveillance and maintenance since fiscal year (FY) 2006. There are many additional locations, particularly for the Plowshare Program, that were considered for nuclear tests or used for non-nuclear tests off the NNSS. Some were only named on paper, but at 30 sites, field work such as drilling test wells and conducting tests using conventional explosives was done. A Plowshare nuclear explosion had been proposed at Project Chariot but was canceled in 1962. In 1992, the discovery of soils contaminated with radionuclides from tracer experiments led to a cleanup by the DOE Office of Environmental Management (EM) of the Project Chariot, Alaska, Site, which was completed in 1994. Following the cleanup of the Project Chariot site, EM was concerned that there might be environmental liabilities at other Plowshare or Vela Uniform sites where field investigations were done, even if the nuclear test was never conducted. The EM Program at the Nevada Site Office began examining records and visiting selected locations that were evaluated for Plowshare and Vela Uniform non-nuclear tests. In total, 161 Plowshare and 14 Vela Uniform sites or proposed projects were identified. The Desert Research Institute (DRI) created summaries of the work carried out at these sites and developed a collection of unclassified documents for them. Preliminary investigations had been conducted at these sites by both LM and EM since the early 2000's. In 2016, in preparation for accepting responsibility for the sites, LM started a program to determine if there were any environmental or safety liabilities associated with them. In 2019, LM formally accepted responsibility for these sites off the NNSS where non-nuclear explosive tests were conducted or where underground nuclear tests were proposed as part of the Plowshare and Vela Uniform programs but were never conducted. LM responsibilities will include maintaining institutional knowledge of the sites, responding to public inquiries, and addressing any concerns at each site. To minimize risk associated with site management, LM has archived all historical records compiled by DRI and has performed limited investigations at sites identified by the prior studies as having a higher potential liability. Preserving records related to site operations reduces the risk of doing unnecessary site investigations in the future caused by the loss of institutional knowledge. During the investigations, some maintenance needs were identified and will be addressed by the end of FY 2021. At the end of FY 2021, investigations, maintenance, and archiving activities will be complete. Remnants of test activities found at sites include craters, mud pits, debris, and open boreholes. Open boreholes are being plugged and abandoned in accordance with state regulatory standards. Other issues are being addressed in accordance with land owner requests and preferences as well as state regulations. Archiving activities include the development of project summaries identifying key operational details and current condition to allow site managers to be easily briefed. The LM experience at non-nuclear Plowshare and Vela Uniform sites applies to other programs where there is the potential for liability associated with the non-nuclear aspects of nuclear programs. This may include support activities or early phases of planned nuclear projects. Preserving institutional knowledge enables land managers to adequately address any concerns associated with operations and lowers risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2019-20 Waste Streams - 20491

The Waste Information Management System (WIMS) 2019-20 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and intermodal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 90: US DOE Mixed Waste: Proposals for Dealing with Problematic Waste Streams and Policy Changes

This panel focused on generation and management of low level and mixed low-level radioactive wastes, challenges for disposition, innovative solutions applied at DOE sites, and collaboration among sites to ensure that waste disposition pathways are understood. In addition, potential policy initiatives were discussed including depleted uranium, elemental mercury, and treatment of legacy mixed waste components. As part of the introduction, Theresa Kliczewski provided an overview of why this panel is relevant: problematic mixed waste streams still exist across the DOE cleanup complex. Theresa noted that the DOE EM Headquarters Office of Waste and Materials Management (EM-4.2), for which she is employed with, continues to work with the DOE cleanup sites on a path forward for these problematic mixed waste streams. As part of this effort, EM-4.2 requested that the Energy Facility Contractors Group (EFCOG) perform a review of all the DOE sites problematic mixed waste streams. Panelists with presentations: Challenging Waste Streams: Disposition of Depleted Uranium Oxide Conversion Product (Douglas Tonkay); EFCOG WMWG Challenging Waste Subgroup (Tammy Monday); Mercury Waste Challenges (John Wrapp); Legacy Large Mixed Waste Components (Kalli Shupe)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canonsburg, Pennsylvania, UMTRCA Title I Disposal Site 35 Years Postclosure (1985-2020) - 20288

The DOE Office of Legacy Management (LM) Canonsburg, Pennsylvania, Disposal Site is a former uranium ore-processing site located in the borough of Canonsburg and an important part of US history. For 46 years (1911-1957), the site processed ore, for vanadium, radium and then uranium. Soils and groundwater beneath the site were contaminated by the milling operations. The 15-hectare (37-acre) site is owned by the US government and managed by LM, which serves as the federal land manager and steward of cultural, historical, and natural resources at Cold War legacy sites that have been successfully cleaned up to remedial standards. In 1978 Congress directed DOE to remediate 22 inactive uranium-ore processing sites under the Uranium Mill Tailings Radiation Control Act (UMTRCA), in accordance with standards promulgated by the US Environmental Protection Agency in Title 40 CFR Part 192 (40 (CFR 192). Subpart B of 40 CFR 192 regulates the cleanup of contaminated groundwater at the processing sites. The radioactive materials were encapsulated in US Nuclear Regulatory Commission (NRC)-approved disposal cells, and the NRC general license for UMTRCA Title I sites is established in 10 CFR 40.27. Canonsburg was the first site to be remediated under UMTRCA. From 1983 to 1985, the Canonsburg site underwent cleanup under this US law that provides for the safe and environmentally sound disposal, long-term stabilization, and control of uranium mill tailings in a manner that minimizes or eliminates radiation health hazards to the public. The site is unique in that it is one of only two UMTRCA Title I sites in the eastern half of the United States, the other site being the Burrell, Pennsylvania, Title I Disposal Site, a vicinity property to the Canonsburg site. It has been 35 years since the disposal cell at the Canonsburg site was completed. This paper discusses the many efforts that have been taken to maintain the site and presents some of the lessons learned concerning the long-term care of the site. The discussion includes but is not limited to the following: (1) Preserving site history so the community can better appreciate and understand the site. (2) Community outreach efforts, and the importance of maintaining transparency of environmental monitoring results with the community. (3) Pursuing reuse opportunities that offer the potential for improving the community. (4) Remaining engaged with the local community. (5) Remaining proactive in the long-term care of the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Incorporation of Pump-and-Treat Data in the New Tracking Restoration and Closure (TRAC)Web-Based Mapping Tool - 20339

Groundwater pump-and-treat (P and T) systems are a common remediation strategy for sites with contaminated groundwater within the U.S. Department of Energy (DOE) Office of Environmental Management (EM). Currently, there are six DOE-EM sites with active P and T systems, but integrated information on individual systems is only primarily available in separate annual reports. To provide a broad view of both current and historical P and T operations, data has been collected on all of the P and T systems. This summary information not only includes capital and average annual costs, but also identifies contaminants treated and forecasted P and T closure dates. Principal contaminants of concern treated with P and T systems include trichloroethylene, chromium (VI), strontium-90, technetium-99, and uranium. DOE-EM is continuing to create a web-based mapping tool that compiles information on groundwater contaminants, remediation strategies and, current data related to plumes and cleanup progress within all DOE-EM sites. The information collected on P and T systems will be added to the TRAC (Tracking Restoration and Closure) tool using interactive maps to quickly access and share information. This information sharing supports the transition from active to passive remediation methods and long-term monitoring approaches. TRAC can ensure that managers, stakeholders, regulators, and contractors remain up to date on cleanup progress for all sites within the complex. The information on P and T systems expands the use of TRAC and can assist in project monitoring and budget planning and support potential shifts in management plans based on plume data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal pumping schedule with high-viscosity gel for uniform distribution of proppant in unconventional reservoirs

Hydrocarbon recovery from a hydraulic-fractured unconventional reservoir can be enhanced by replacing slickwater with non-Newtonian high-viscosity gel as a fracturing fluid. However, in the literature, the role of gel rheology on hydrocarbon production from a fractured reservoir is not very well understood. This lack of understanding makes it difficult for the industry to choose appropriate viscosity parameters of fracturing gels. Motivated by these limitations, first, we have developed a high-fidelity model of non-Newtonian fluid flow to simulate fracture propagation, fluid leak-off, and gel flowback processes to predict the oil production from a hydraulic fractured reservoir. Simulation results of the high-fidelity model show how fracture geometry, formation damage, and gel cleanup process varies with the fracturing fluid rheology. Therefore, the developed model is used to understand the effect of gel rheology on hydrocarbon production via a sensitivity analysis, which provides a set of rheological parameters that maximize the cumulative amount of oil production. Finally, utilizing this optimal high-viscosity gel, a model predictive controller is designed to obtain an optimal pumping schedule necessary for producing a target fracture geometry and proppant concentration. The closed-loop simulation results demonstrate that the obtained pumping schedule successfully achieved the desired fracture geometry and proppant concentration at the end of pumping, leading to the maximum oil production from an unconventional reservoir.

13 HYDRO ENERGY↗