At least 91 records · Page 5

Next Generation System Analysis Model Recently Added Features and Future Plans - Abstract

The Nuclear Waste Policy Act of 1982, as amended (NWPA 1982), established the federal government’s responsibility to accept spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste owners and generators for ultimate disposition. SNF generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWM system are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWM system. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. Recent major enhancements that have been implemented into NGSAM since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort and buffer car acquisition. • Addition of heavy haul and barge routes for some sites, as well as support for user-defined inter-modal routes. • Updates to the logic that checks the thermal maps prior to package transport. • Addition of an allocation method that predicts when reactor sites will pack assemblies from their pools for dry storage and allocates packages to those reactor sites in the preceding periods, favoring direct transport packages and reducing the number of packages that reactor sites pack for dry storage at their ISFSIs. • Addition of reactor site family operational limits, which are used to limit the number of loads from the pool and from dry storage at a given reactor site per year. • Support has been added for multiple canister loading maps and packages having multiple compatible transportation overpacks. • Updates in the handling of non-commercial fuel, including a new database containing data to support the updates. • Support for repackaging at reactor sites. • Implementing additional output reports or modifying existing reports. • User edits can now be created and edited via the NGSAM website. • Ability to load packages for dry storage at ISF pools. • Same-type package blending at DOE sites. • Support for multi-mode transloading at reactor sites. These new features have improved NGSAM capabilities and/or improve the user experience with the model and will be discussed in more detail. The initial NGSAM requirements for advanced reactor fuels, reprocessing, treatment, and conditioning are preliminary and are described at a high level in this paper: analysts will provide more specific requirements to the NGSAM team in the future. Additionally, there are many data needs associated with modeling advanced reactors in NGSAM, but many of the data or plans are still in progress and/or yet to be fully defined. However, this document describes an initial exploration of the data relevant to this program. Advanced reactor data will likely require revision as concepts evolve and new considerations are made. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by DOE. No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The U.S. Department of Energy Office of Nuclear Energy (DOE-NE) Integrated Waste Management (IWM) program is examining a suite of IWM system options and conducting supporting analyses to enable future informed choices. The IWM program is currently organized into the following four major areas: (1) IWM facilities and equipment concepts and development, (2) transportation capability analysis and support, (3) information technology solutions and support, and (4) system integration analysis and support. This paper focuses on the activities ongoing in the IWM system integration analysis and support area. Two main research activities in this area are: data and tools development, validation, and maintenance; and special studies, analyses, and assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Elevated Temperature Graphite Mechanical Testing

High purity graphite will be used for core components within most High Temperature Reactor (HTR) designs. Several "high tech” industries currently utilize synthetic, high-purity, commercially available graphite components to fabricate photovoltaic cells, semi-conductors, optical fibers, and other high value electronic industry products. New advanced HTR designs are also interested in using these graphite grades for long-term, internal core component applications. Consequently, the US Department of Energy, Advanced Reactor Technologies (DOE-ART) program has spent several years testing different high purity graphite grades for potential use within these new nuclear reactor designs. A significant part of that effort has been in the development and improvement of American Society for Testing and Materials (ASTM) test standards specifically for nuclear graphite grades. Nearly all ASTM test standards have either been developed or improved by the DOE-ART program over the past 25 years. The ART program continues to assist in the development of new ASTM test standards in support of the future commercial HTR fleet currently being designed and built in the USA. The newest effort undertaken by ART is the development of high temperature mechanical testing practices that may be acceptable for a future ASTM test standard (or guide) for this critical material property measurement.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Digitalization mapping and assessment process supporting ION strategic transformation activities

The existing fleet of commercial nuclear power plants (NPPs) are an important asset in the nation’s portfolio of electrical generating resources. Their continued safe and reliable operation are critical to providing a large source of carbon-free electricity to power the nation’s economy. The United States Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops the scientific bases, methods, and tools, for the continued safe and economical operation of the nation's commercial NPPs. The Plant Modernization Pathway within LWRS Program focuses on providing guidance to industry on the full-scale implementation of modernization solutions for NPPs that significantly reduce the technical and financial risks associated with modernization. This research is focused on helping the nuclear industry understand how to digitize and digitalize their NPPs so that they can design their modernization solutions to be scalable, sustainable, and integrated both laterally and horizontally within their organization. That is, this research creates a digital transformation in NPPs by reshaping cultural mindsets and by identifying business efficiencies. In partnership with industry, and using four previously established guiding principles for digitalization, this research supported NPP modernization through assessing readiness for digitalization as a means to achieve integrated operations for nuclear. Specifically, this research created an assessment to review an entire organization’s work processes to gather information about the digitalization health of the plant. The assessment tools were administered to plant employees, and the results were used to develop a digitalization plan. The survey assessment identified the optimal candidate processes that would most benefit from a digitalization initiative which were revealed through analytical frameworks. One analysis calculated mean digitalization health indicator scores for all endorsed activities which allowed the researchers to rank and color code the results for easy identification. Individual health indicator scores are also provided, should our industry partner wish to understand these findings according to their own organizational priorities, business considerations and desired end-state. The results were also analyzed from the perspective that organizations are comprised of different types of innovators (e.g., generators, optimizers, conceptualizers, and implementers), which differentially affects the organization’s ability to comprehend and adapt to change (i.e., opportunities to innovate). Understanding the relative composition of innovator types at an NPP allows them to gather insights into the strengths and weaknesses they have in innovating how work is performed. For the utility that partnered with this research team, the results showed that implementers make up the largest portion of respondents and conceptualizers the smallest portion. Knowing the proportion of innovator types gave this organization insights on how they can effectively implement their innovation solutions. Additionally, the results were analyzed from a technical, economic, and risk perspective to identify and quantify work reduction opportunities (WROs). Recognizing that not all cost-saving opportunities are the same, a Technical, Economic and Risk Assessment (TERA) was performed to evaluate WROs to identify areas of greatest potential and lowest risk. The key results from TERA included a digitalization opportunity score for each activity, and a calculation of potential cost savings. These two outputs formed the bases for calculating a priority index and rank for the activities/processes assessed. From the prioritization calculations, TERA can then help the utility 1) decide what digitalization priorities to invest money in implementing and then 2) calculates how much should be invested in the digitalization initiatives selected to achieve cost savings and/or an acceptable return on investment. Last, onsite interviews revealed several inefficiencies in the standard work processes that occur cross-departmentally that are due to the absence of digitized and digitalized processes. Examples of these include time spent scanning paper documents and then uploading the documents electronically, obtaining signatures, and searching for desired information. This represents a digital but not digitalized process. Over 15 opportunities to improve work processes were identified through this multi-method digitalization assessment. The various analytical assessments used (e.g., TERA, digitalization health indicator scores), as well as discussions with the utility partner, corroborated that all the opportunities identified had a strong potential to make work processes more efficient and to improve overall performance of the NPP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is organized into the following five major areas: 1) Consent-Based Siting, 2) IWM Facilities and Equipment Concepts and Development, 3) Transportation Capability Analysis and Support, 4) Information Technology Solutions and Support, and 5) System Integration Analysis and Support. This paper discusses the activities ongoing in the IWMP System Integration Analysis and Support area. Two main areas of research in system integration are data and tools development, as well as system analysis assessments. One of the tools being developed in the system integration area is the Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) tool. It is being developed as a foundational resource for DOE-NE to manage SNF data, along with several compatible analysis tools for time-dependent characterization of SNF and related systems. UNF-ST&DARDS has the unparalleled ability to track SNF through the entire back end of the fuel cycle—from the time the fuel is discharged from a reactor through its disposal in a geological repository. UNF ST&DARDS interfaces with the SCALE code system for nuclear analysis and COBRA-SFS for thermal analysis. Another main tool being developed is the Next Generation System Analysis Model (NGSAM). NGSAM is an agent-based simulation software tool expressly designed to be capable of modeling the waste management system. NGSAM has been developed to enable informed decision-making by providing the capability of analyzing various potential system options for the management of SNF and HLW. Using NGSAM, system architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analysis assessments may investigate the implications of various strategies such as different acceptance rates, acceptance queues, facility capacities and options, standardized canisters, and different assumed system operation start dates. Recently, some system analysis effort has begun to look at how the waste management system might operate for advanced reactor fuel cycles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Medium-duty Urban Range Extended Connected Powertrain (Final Scientific Technical Report)

The project goal is to develop and demonstrate a Class 4 delivery vehicle that reduces fuel consumption by 50% or more when compared to an equivalent vehicle with a conventional internal combustion engine (ICE) powertrain driven on a comparable duty cycle. This shall be achieved using a plug-in hybrid electric (PHEV) configuration that optimizes the efficiency of the ICE. The proposed solution aims to be commercially viable for fleets to procure the system without additional incentives. To accomplish this, commercialized light-duty vehicle electric drive components shall be used. A PHEV configuration for Class 4 MD/HD vocational vehicles using commercialized light-duty vehicle electric drive components will require the development of a new topology for the hybrid powertrain applicable to medium-duty vehicles. Prior research indicates that an identified novel power split device could provide a fuel economy improvement potential of up to 51%. Utilizing an advanced battery management algorithm that will allow operation closer to the battery limits, the project will minimize battery capacity to achieve the desired performance results while maintaining the cost target for high commercialization. The solution must be cost effective to purchase and integrate into a Class 4 delivery vehicle, deliver the intended fuel economy improvement, and perform as well, or better, than the current conventional ICE powertrain. MD/HD vehicles typically require higher power, which is one factor that results in high costs for the powerful electric machines typical in larger HEV/PHEV systems. A key element in the project is the use of commercially available Bosch electric drive components (e.g., motors, batteries, and power electronics) from the larger passenger vehicle segment. This leverages the economies of scale to decrease cost and improve reliability beyond current purpose-built low-volume commercial vehicle components. These innovations will result in a game-changing PHEV system that meets DOE’s 50% fuel consumption reduction target, grants the vehicle an uncompromised driving range, and achieves the cost point for widespread adoption.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Scalable Approach to Minimize Charging Costs for Electric Bus Fleets

Incorporating battery electric buses into bus fleets faces three primary challenges: a BEB’s extended refuel time, the cost of charging, both by the consumer and the power provider, and large compute demands for planning methods. When BEBs charge, the additional demands on the grid may exceed hardware limitations, so power providers divide a consumer’s energy needs into separate meters even though doing so is expensive for both power providers and consumers. Prior work has developed a number of strategies for computing charge schedules for bus fleets; however, prior work has not worked to reduce costs by aggregating meters. Additionally, because many works use mixed integer linear programs, their compute needs make planning for commercial-sized bus fleets intractable. This work presents a multi-program approach to computing charge plans for electric bus fleets. The proposed method solves a series of subproblems where the solution to the charge problem becomes more refined with each problem, moving closer to the optimal schedule. The results demonstrate how runtimes are reduced by using intermediate subproblems to refine the bus charge solution so that the proposed method can be applied to large bus fleets of 100+ buses. Not only will we demonstrate that runtimes scale linearly with the number of buses but we will also show how the proposed method scales to large bus fleets of over 100 buses while managing the monthly cost of energy.

Mortensen, Daniel (ORCID:0000000276494452)↗

R&D Insights for Extreme Fast Charging of Medium- and Heavy-Duty Vehicles: Insights from the NREL Commercial Vehicles and Extreme Fast Charging Research Needs Workshop, August 27-28, 2019

As battery costs have declined and battery performance has improved, the applicability of vehicle electrification has expanded beyond passenger cars to the commercial vehicle sector. However, due to the larger batteries that would be needed for the medium- and heavy-duty (MDHD) sector, the electric charging capabilities to serve these larger commercial vehicles will need to be substantially more powerful than light-duty chargers. More specifically, such 'extreme fast charging' (XFC) will likely need to reach the megawatt scale to provide a full charge in less than 30 minutes in some applications. In addition, the combined cost of electrified vehicles and charging must be competitive with the costs of petroleum-based technologies and other alternatives to encourage widespread adoption of battery electric vehicles (BEVs) among MDHD fleets. Most of these fleets have a commercial mission and demand low total cost of ownership (TCO) (which motivates minimal refueling times) and high performance from their vehicles.

25 ENERGY STORAGE↗

Joint Work Plan for DPC Filler Testing

The US generates approximately 2,000 Metric Tons of Heavy Metal (MTHM) of commercial spent fuel (SNF) each year and currently stores ~ 85,000 MTHM of commercial SNF at 70+ reactor sites, the disposal of which is the responsibility of the US Department of Energy (DOE). SNF is initially stored in spent nuclear fueld pools (SFPs). SFPs were initially constructed by US utilities for temporary fuel storage, but with no final disposal pathway available, SFPs are reaching capacity. To allow continued operation of the nation's commercial nuclear reactor fleet, utilities started transferring SNF from SFPs (wet storage) to dry cask storage systems, typically using dual-purpose (storage and transportation) canisters (DPCs). And while DPCs were designed, licensed and loaded to meet Nuclear Regulatory Commission (NRC) requirements that preclude the possibility of a critical event during SNF storage and transport, they were not designed or loaded to preclude the possibility of a criticality event during the regulated post-closure period following disposal, which could be up to 1,000,000 years (Price, 2019). DPC filler option criteria are detailed and materials that exhibit these attributes are explored. This document is an update of the SNL Joint Workplan on Filler Investigations for DPCs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2021 Microbial U (Summary Report)

The US nuclear industry is on the cusp of significant growth in the areas of advanced reactors, SMRs, and microreactors. The existing commercial nuclear reactor fleet is considering expanding the life of the reactor cores by slightly increasing enrichment of their fuel. The common thread is the demand for High Assay Low Enriched Uranium (HALEU). A technical challenge exists with a blend down of Highly Enriched Uranium (HEU) from spent nuclear fuel (SNF) to meet the American Society for Testing and Materials (ASTM) and the “Y12” specifications. U-236 impacts reactor performance and is not desired in fresh fuel cores. In order to meet tight specifications, U-236 must be diluted by addition of fresh HEU. Fresh HEU is highly sought after and not plentiful in the US. A solution to this issue lies in the application of a technology to selectively remove the U-236 with non-hazardous microorganisms, which will be evaluated in this project by experimentally separating different isotopes of uranium.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Behind the Meter Storage for Electric Vehicle Charging, Electrochemical and Thermal Energy Storage, and Solar Photovoltaic

In response to the potentially large and irregular demand from EVs, along with changing load profiles from buildings with on-site generation, utilities are evaluating multiple options for managing dynamic loads, including time-of-use pricing, demand charges, battery storage, and curtailment of variable generation. Buildings, as well as commercial, public, and workplace EV charging operations, can use a combination of electrochemical battery storage and thermal energy storage coupled with on-site generation to manage energy costs as well as provide resiliency and reliability for EV charging and building energy loads. We are completing a behind the meter storage analysis that focuses on determining the optimal system designs and energy flows for thermal and electrochemical behind the meter storage with on-site solar photovoltaic (PV) generation enabling electric vehicle charging in various climates, building types, and utility rate structures. In completing this analysis, we have developed a tool that combines existing battery models via the System Advisor Model (SAM) and building modeling software via EnergyPlus into a single interface. This tool allows us to simulate a building with a detailed battery model to properly size the battery, thermal energy storage, and solar PV systems to maximize profit for the system owner. This also allows us to assess how the battery degrades under various supervisory control dispatch algorithms to control charging/discharging; we can also see how thermal energy storage is created and used to complement the battery to reduce thermal loads in the building. With this project, we can analyze new batteries that are designed specifically for energy storage, rather than designed to be extremely energy dense for electric vehicle applications, using battery lifetime models from other national labs and the existing SAM battery model, which has detailed lifetime and degradation parameters. We can also assess novel thermal storage technologies by integrating them into the whole building energy simulation program EnergyPlus. Because the model calls both SAM and EnergyPlus, required inputs need to be compatible for both models. These inputs include, on a high-level, the following: weather files, building and electric vehicle load profiles, electricity rate tariff information, and system cost information for the stationary battery, solar PV, and thermal storage system. The various buildings we are studying for this analysis are retail big-box grocery store, commercial office building, fleet vehicle depot and operations facility, multi-family residential, and electric vehicle charging station. For these different applications, the battery and thermal storage will be dispatched differently, and the various technologies are sized differently to optimize cost.

30 DIRECT ENERGY CONVERSION↗

Integrated Dispatching and Charging Management of an Autonomous Electric Vehicle Ride-Hailing Fleet

Electrification and autonomous driving are two important trends in transportation systems. The convergence of these two technologies will introduce opportunities to improve transportation systems' operation and energy efficiency. One potential application is the commercial ride-hailing fleet with autonomous electric vehicles (AEVs). In order to harvest promising benefits from introducing AEVs into ride-hailing fleets, some unavoidable challenges will need to be resolved to ensure the fleets operates functionally and efficiently. This paper discusses the challenges of dispatching AEVs and their interactions with charging infrastructure. An integrated decision making framework for dispatching and charging has been designed using a system optimization approach to study the AEVs' management within the period when they drop off passengers and pick up the next passengers. Its potential fleet-wide benefits have been illustrated by comparing operations under a heuristic approach. A simulation platform has been designed to test different decision making strategies for the ride-hailing AEV fleets operational performance. Using this platform, detailed case studies have been performed with different fleet sizes, dispatching strategies, and charging infrastructure network settings. Comprehensive analyses from various aspects have been conducted to understand the AEVs' fleet operation performance, (e.g., zero occupancy vehicle miles traveled, successfully served ratio of ride-hailing requests, fleet vehicle charging downtime, and charging infrastructure utilization). Results have provided a deep understandings on operation's dynamics under various fleet system configurations and also have demonstrated advantages of the optimization-based approach for the AEV fleet management. Studies in this paper inform better designs on the future of sophisticated management strategies and charging infrastructure to support ride-hailing AEV fleet operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PV Fleet Performance Data Initiative Program and Methodology

The US Department of Energy’s PV Fleet Performance Data Initiative has been launched in order to collect and evaluate production data across multiple PV fleet partners. Performance statistics are anonymized, aggregated and shared to represent a snapshot of the US commercial and utility-scale fleet. Production data have been collected from over 1500 systems representing more than 1.3 GWdc capacity. Preliminary analysis indicates median performance loss rates are in line with previous publications of system degradation, on the order of –0.6%/yr to –0.9%/yr (preliminary numbers subject to change). These values are higher than module-only degradation rates which are often used in pro-forma estimates of project performance and economics, potentially exposing owner/operators to increased risk if systems under-perform over time.

41 EE - Solar Energy Technologies Office (EE-4S)↗

2019 California Vehicle Survey

The 2019 California Vehicle Survey of residential and commercial light-duty fleet owners in California assessed consumer preferences for vehicles and included a targeted sample of plug-in electric vehicle (PEV) owners. In addition to economic and demographic data, the survey integrated light-duty vehicle holding and use information with vehicle choice data, which was collected via a set of eight exercises on vehicle and fuel type choice. The PEV owner survey participants provided additional data on charging behavior, electricity rates, and their main motivations for purchasing PEVs.

1Hz data↗

The Port of Los Angeles Zero- and Near-Zero-Emission Freight Facilities Shore to Store Project

The City of Los Angeles Harbor Department (Harbor Department, Port of Los Angeles) partnered with Equilon Enterprises LLC (d/b/a Shell Oil Products US) (Shell), Toyota Motor North America (Toyota), and Kenworth Truck Company (Kenworth) partnered with the Port of Hueneme, United Parcel Service, Total Transportation Services Inc., Southern Counties Express, Toyota Logistics Services, Air Liquide, National Renewable Energy Laboratory, Coalition For A Safe Environment, and the South Coast Air Quality Management District to introduce hydrogen fuel into the Southern California drayage truck market by demonstrating near-commercial heavy-duty hydrogen fuel cell electric trucks at and between freight facilities throughout the region, while continuing to lay the groundwork for battery-electric operations. The Shore to Store project built on project team experience to help realize our vision of zero-emission freight operations in the future. Ten Kenworth zero-emission Class 8 fuel cell electric trucks, integrated with Toyota’s fuel cell drive technology, were operated by United Parcel Service, Total Transportation Services Inc., Southern Counties Express, and Toyota Logistics Services in commercial service. The demonstration fleet fueled at the Shore to Store hydrogen fueling stations that were built in Ontario, California, and Wilmington, California. An additional station at the Port of Long Beach (Portal Station) was available for fueling the fleet. Portal Station was supported by grants from the California Energy Commission and South Coast Air Quality Management District and used as match funding for the Shore to Store project. The Port of Hueneme demonstrated two battery-electric yard tractors, and Toyota Logistics Services demonstrated two zero-emission forklifts at their warehouse facility, showcasing elements of the entire supply chain operating with zero emissions. This project showcased a snapshot of the zero-emission supply chain of the future, providing a model by which freight facilities can support zero-emission operations. The Shore to Store project: Demonstrated the technical feasibility of zero-emission hydrogen fueled Class 8 heavy-duty trucks and electric cargo handling equipment in rigorous goods movement operation throughout the Southern California region. Cumulatively completed 59,212 miles of zero-emission operation, with 21,650 miles driven in-service with the fleets, using hydrogen fuel cell electric Class 8 heavy-duty trucks. Operated zero-emission yard tractors for a total of 2,749.6 hours. Created direct localized emission reductions in designated disadvantaged communities, including those in zip codes 90220, 90247, 90248, 90731, 90744, 90802, and 91761. For the 59,212 miles of zero-emission operation, reduced emissions by an estimated total of 15.5 kg NOX (0.163 g/km), 1.01 kg SOX (0.0106 g/km), and 304.8 metric tonnes of CO2e (3.2 kg/km) compared to diesel baseline vehicles including both tailpipe emissions and the emissions from producing the fuel sources.

08 HYDROGEN↗

Optimal Managed Fast-Charging Model for Electric Vehicle Fleets with High Utilization and Multiple Charge-Acceptance Curves

A predictive control/scheduling optimization model is proposed for managed charging of an electric vehicle (EV) fleet - under time-of-use energy and demand prices, high vehicle utilization frequency (short dwell times), multiple charge- acceptance curves (configurable charging rates), and flexible vehicle demand. This context is particularly relevant for flight schools (small electric aircraft) or other commercial facilities where an EV fleet performs multiple operating and fast-charging sessions on the same day. The proposed model performs both the operational and charging scheduling of the vehicles, which is not typically done for residential managed charging and significantly increases problem complexity. The problem is formulated as a MILP model and a case study of a small fast-charging station is presented. Results demonstrate a significant reduction in operating cost, mainly from peak shaving during high demand price periods, achieved by coordinating the operation of different vehicles, chargers and charging rates.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Scalable Technologies Achieving Risk-Informed Condition-Based Predictive Maintenance Enhancing the Economic Performance of Operating Nuclear Power Plants

The primary objective of the research presented in this report is to develop scalable technologies that are deployable across plant assets and across the nuclear fleet to achieve risk-informed predictive maintenance (PdM) strategies at commercial nuclear power plants (NPPs). Over the years, the nuclear fleet has relied on labor-intensive and time-consuming preventive maintenance (PM) programs, driving up operation and maintenance (O&M) costs to achieve high capacity factors. A well-constructed risk-informed PdM approach for an identified plant asset has been developed in this research, taking advantage of advancements in data analytics, machine learning (ML), artificial intelligence (AI), physics-informed modeling, and visualization. These technologies would allow commercial NPPs to reliably transition from current labor-intensive PM programs to a technology driven PdM program, eliminating unnecessary O&M costs. The work presented in the report is being developed as part of a collaborative research effort between Idaho National Laboratory and Public Service Enterprise Group Nuclear, LLC. This report (1) reflects the results of work by LWRS Program researchers with PSEG, Nuclear LLC-owned Salem and Hope Creek Nuclear Power Plants; (2) presents utilization of circulating water system (CWS) heterogeneous data and fault modes from both the Salem and Hope Creek nuclear power plant sites to develop salient fault signatures associated with each fault mode; (3) describes the integration of component-level predictive models into a robust system-level model enabled by the federated-transfer learning; (4) describes the development of physics-informed model of circulating water pump and motor; (5) develops a scalable risk and economic model; and (6) outlines the development of a user-centric visualization application. The outcomes presented in this report lays the foundation and provides a much-needed technical basis to focus on explainability and trustworthiness of ML and AI-based technologies, as part of future research.