Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous improvement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Environmental Management System Plan

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.

99 GENERAL AND MISCELLANEOUS↗

NASA Johnson Space Center: Total quality partnership

The development of and benefits realized from a joint NASA, support contractor continuous improvement process at the Johnson Space Center (JSC) is traced. The joint effort described is the Safety, Reliability, and Quality Assurance Directorate relationship with its three support contractors which began in early 1990. The Continuous Improvement effort started in early 1990 with an initiative to document and simplify numerous engineering change evaluation processes. This effort quickly grew in scope and intensity to include process improvement teams, improvement methodologies, awareness, and training. By early 1991, the support contractor had teams in place and functioning, program goals established and a cultural change effort underway. In mid-l991 it became apparent that a major redirection was needed to counter a growing sense of frustration and dissatisfaction from teams and managers. Sources of frustration were isolated to insufficient joint participation on teams, and to a poorly defined vision. Over the next year, the effort was transformed to a truly joint process. The presentation covers the steps taken to define vision, values, goals, and priorities and to form a joint Steering Committee and joint process improvement teams. The most recent assessment against the President's award criteria is presented as a summary of progress. Small, but important improvement results have already demonstrated the value of the joint effort.

Harlan, Charlie↗

Reusable Solid Rocket Motor - Accomplishments, Lessons, and a Culture of Success

The Reusable Solid Rocket Motor represents the largest solid rocket motor ever flown and the only human rated solid motor. Each Reusable Solid Rocket Motor (RSRM) provides approximately 3-million lb of thrust to lift the integrated Space Shuttle vehicle from the launch pad. The motors burn out approximately 2 minutes later, separate from the vehicle and are recovered and refurbished. The size of the motor and the need for high reliability were challenges. Thrust shaping, via shaping of the propellant grain, was needed to limit structural loads during ascent. The motor design evolved through several block upgrades to increase performance and to increase safety and reliability. A major redesign occurred after STS-51L with the Redesigned Solid Rocket Motor. Significant improvements in the joint sealing systems were added. Design improvements continued throughout the Program via block changes with a number of innovations including development of low temperature o-ring materials and incorporation of a unique carbon fiber rope thermal barrier material. Recovery of the motors and post flight inspection improved understanding of hardware performance, and led to key design improvements. Because of the multidecade program duration material obsolescence was addressed, and requalification of materials and vendors was sometimes needed. Thermal protection systems and ablatives were used to protect the motor cases and nozzle structures. Significant understanding of design and manufacturing features of the ablatives was developed during the program resulting in optimization of design features and processing parameters. The project advanced technology in eliminating ozone-depleting materials in manufacturing processes and the development of an asbestos-free case insulation. Manufacturing processes for the large motor components were unique and safety in the manufacturing environment was a special concern. Transportation and handling approaches were also needed for the large hardware segments. The reusable solid rocket motor achieved significant reliability via process control, ground test programs, and postflight assessment. Process control is mandatory for a solid rocket motor as an acceptance test of the delivered product is not feasible. Process control included process failure modes and effects analysis, statistical process control, witness panels, and process product integrity audits. Material controls and inspections were maintained throughout the sub tier vendors. Material fingerprinting was employed to assess any drift in delivered material properties. The RSRM maintained both full scale and sub-scale test articles. These enabled continuous improvement of design and evaluation of process control and material behavior. Additionally RSRM reliability was achieved through attention to detail in post flight assessment to observe any shift in performance. The postflight analysis and inspections provided invaluable reliability data as it enables observation of actual flight performance, most of which would not be available if the motors were not recovered. These unique challenges, features of the reusable solid rocket motor, materials and manufacturing issues, and design improvements will be discussed in the paper.

Moore, Dennis R.↗

Strategy Guideline: Partnering for High Performance Homes

High performance houses require a high degree of coordination and have significant interdependencies between various systems in order to perform properly, meet customer expectations, and minimize risks for the builder. Responsibility for the key performance attributes is shared across the project team and can be well coordinated through advanced partnering strategies. For high performance homes, traditional partnerships need to be matured to the next level and be expanded to all members of the project team including trades, suppliers, manufacturers, HERS raters, designers, architects, and building officials as appropriate. In an environment where the builder is the only source of communication between trades and consultants and where relationships are, in general, adversarial as opposed to cooperative, the chances of any one building system to fail are greater. Furthermore, it is much harder for the builder to identify and capitalize on synergistic opportunities. Partnering can help bridge the cross-functional aspects of the systems approach and achieve performance-based criteria. Critical success factors for partnering include support from top management, mutual trust, effective and open communication, effective coordination around common goals, team building, appropriate use of an outside facilitator, a partnering charter progress toward common goals, an effective problem-solving process, long-term commitment, continuous improvement, and a positive experience for all involved. This guide is intended for use by all parties associated with the design and construction of high performance homes. It serves as a starting point and features initial tools and resources for teams to start collaborating to continually improve the energy efficiency and durability of new houses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 24: Strategic Energy Management (SEM) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Strategic energy management (SEM) focuses on achieving energy-efficiency improvements through systematic and planned changes in facility operations, maintenance, and behaviors (OM&B) and capital equipment upgrades in large energy-using facilities, including industrial buildings, commercial buildings, and multi-facility organizations such as campuses or communities. Facilities can institute a spectrum of SEM actions, ranging from a simple process for regularly identifying energy-savings actions, to establishing a formal, third-party recognized or certified SEM framework for continuous improvement of energy performance. In general, SEM programs that would be considered part of a utility program will contain a set of energy-reducing goals, principles, and practices emphasizing continuous improvements in energy performance or savings through energy management and an energy management system (EnMS).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

This paper will present a model that uses the Supply-Chain Operations Reference (SCOR) model as a foundation for a framework to illustrate the information needed throughout a product lifecycle to support a healthy supply chain management function and the subsequent contract requirements to enable it. It will also show where in the supply chain the information must be extracted. The ongoing case study used to exemplify the model is NASA's (National Aeronautics and Space Administration) Ares I program for human spaceflight. Effective supply chain management and contract requirements are ongoing opportunities for continuous improvement within government agencies, specifically development of systems for human spaceflight operations. Multiple reports from the Government Accountability Office (GAO) reinforce this importance. The SCOR model is a framework for describing a supply chain with process building blocks and business activities. It provides a set of metrics for measuring supply chain performance and best practices for continuously improving. This paper expands the application of the SCOR to also provide the framework for defining information needed from different levels of the supply chain and at different phases of the lifecycle. These needs can be incorporated into contracts to enable more effective supply chain management. Depending on the phase of the lifecycle, effective supply chain management will require involvement from different levels of the organization and different levels of the supply chain.

Paxton, Joseph↗

Performance Excellence Lean Six Sigma

Lean Six Sigma (LSS) organization at Y-12 sponsors the deployment of Performance Enterprise System (PES) and provides continuous improvement facilitation and training for the Y-12 site. Six- Question Survey was issued to 100 Y-12 employees at random, with the option to report one’s organization. Goals included: To gain an insight of Y-12 employees knowledge of PES & the Lean Six Sigma group • Generate employee desire to take PES class • Generate employee desire to perform continuous improvement.

99 GENERAL AND MISCELLANEOUS↗

Spacecraft COst REduction Team (SCORE): TQM/CI on a massive scale

The business of building satellites and space systems has matured. Few missions require, or can afford, excellent performance at any price. The new paradigm is doing more with less, providing quality systems at lower cost--in other words, doing our job 'Faster-Better-Cheaper.' The TRW Spacecraft COst REduction (SCORE) initiative was launched in 1990 by Daniel S. Goldin, then general manager of TRW's Space & Technology Group. The SCORE mission is to apply continuous improvement (CI) techniques to effect major reductions in the cost (our primary goal) and span time (as a corollary) required for the production of spacecraft. SCORE is a multi-year initiative that is having a profound effect on both the procedural and the cultural aspects of how we do business. The objectives of this initiative are being realized. The focus of this paper is not on the results of SCORE per se, but rather on the things we have leaned about how to do continuous improvement on a massive scale, with multilevel (hierarchical) CI teams. The following sections summarize the chronology of the SCORE initiative, from team formation to development of the year-end report for 1991. Lessons learned, the core of this presentation, are discussed--with particular focus on the unique aspects of SCORE. The SCORE initiative is continuing and, as a part of our evolving culture, will never end. It has resulted in profound insights into the way we do work and (the topic at hand) how to do CI for large and complex multidisciplinary development activities.

Bullard, Jerry D.↗

Kennedy Space Center's NASA/Contractor Team-Centered Total Quality Management Seminar: Results, methods, and lessons learned

It is apparent to everyone associated with the Nation's aeronautics and space programs that the challenge of continuous improvement can be reasonably addressed only if NASA and its contractors act together in a fully integrated and cooperative manner that transcends the traditional boundaries of proprietary interest. It is, however, one thing to assent to the need for such integration and cooperation; it is quite another thing to undertake the hard tasks of turning such a need into action. Whatever else total quality management is, it is fundamentally a team-centered and team-driven process of continuous improvement. The introduction of total quality management at KSC, therefore, has given the Center a special opportunity to translate the need for closer integration and cooperation among all its organizations into specific initiatives. One such initiative that NASA and its contractors have undertaken at KSC is a NASA/Contractor team-centered Total Quality Management Seminar. It is this seminar which is the subject of this paper. The specific purposes of this paper are to describe the following: Background, development, and evolution of Kennedy Space Center's Total Quality Management Seminar; Special characteristics of the seminar; Content of the seminar; Meaning and utility of a team-centered design for TQM training; Results of the seminar; Use that one KSC contractor, EG&G Florida, Inc. has made of the seminar in its Total Quality Management initiative; and Lessons learned.

Kinlaw, Dennis C.↗

Using CASE to Exploit Process Modeling in Technology Transfer

A successful business will be one that has processes in place to run that business. Creating processes, reengineering processes, and continually improving processes can be accomplished through extensive modeling. Casewise(R) Corporate Modeler(TM) CASE is a computer aided software engineering tool that will enable the Technology Transfer Department (TT) at NASA Marshall Space Flight Center (MSFC) to capture these abilities. After successful implementation of CASE, it could then go on to be applied in other departments at MSFC and other centers at NASA. The success of a business process is dependent upon the players working as a team and continuously improving the process. A good process fosters customer satisfaction as well as internal satisfaction in the organizational infrastructure. CASE provides a method for business process success through functions consisting of systems and processes business models; specialized diagrams; matrix management; simulation; report generation and publishing; and, linking, importing, and exporting documents and files. The software has an underlying repository or database to support these functions. The Casewise. manual informs us that dynamics modeling is a technique used in business design and analysis. Feedback is used as a tool for the end users and generates different ways of dealing with the process. Feedback on this project resulted from collection of issues through a systems analyst interface approach of interviews with process coordinators and Technical Points of Contact (TPOCs).

Renz-Olar, Cheryl↗

Progress in Addressing Workers' Concerns Related to Chemical Vapors at the Hanford Site - 19054

Washington River Protections Solutions, LLC (WRPS) is the prime contractor for the Department of Energy (DOE) Tank Farm Operations at the Hanford Site, and is responsible for the management and retrieval of millions of gallons of radioactive and chemical wastes, stored in 177 underground tanks; a legacy of decades of production activities at the Site. The potential for workforce exposure to the chemical vapors from the tanks has long been a concern for the workforce and for DOE and its tank contractors; concerns about tank vapors is an issue that pre-dates WRPS's incumbency as the Tank Operations Contractor. In response to an increase in the number of tank vapor events reported by workers at the Hanford Site in 2014, WRPS commissioned the Savannah River National Laboratory with establishing and overseeing a panel of external, independent experts (Tank Vapor Assessment Team (TVAT)) to examine chemical vapor management and related worker-protection measures at the Hanford Tank Farms. The TVAT released the Hanford Tank Vapor Assessment Report (SRNL-RP-2014-00791) in late 2014, which included several recommendations to reduce the potential for chemical vapor exposures. From 2015- 2018, governmental and external groups conducted additional assessments to review the progress made in implementing the TVAT recommendations, and the overall Industrial Hygiene (IH) program. All of these assessments specifically recommended WRPS take action to improve communications with the workforce around the subject of tank vapors. Some further recommended assessing the effectiveness of vapors-related communications. In fiscal year 2016, WRPS and DOE Office of River Protection (DOE-ORP) formed an Integrated Project Team (IPT) to: (1) develop the strategy for addressing chemical vapors and (2) define the future chemical vapor protection actions at the Tank Farms. The actions are designed to address the recommendations from the external assessments as part of the overall effort to mitigate vapors-related exposure incidences, and to ensure workers are safe and feel safe while working in and around the Hanford Tank Farms. A comprehensive vapor management communication plan, engagement processes, and effectiveness measurements were established as essential components of the IPT effort. The Chemical Protection Program Office (CPPO) was formed, in part, to deliver on these IPT initiatives, monitor performance, and drive improvements to WRPS's vapors-related communications and engagement efforts at the Hanford Tank Farms. The CPPO was created as a temporary program office tailored to address these unique challenges by augmenting traditional company performance monitoring and communications (i.e. all employee e-mails, posters, and formal briefings). Modeled in broad concept after the successful program office WRPS created to support the American Recovery and Reinvestment Act, CPPO has also proven successful in its mission. Because concerns about chemical vapors in the workplace were expressed by the workforce, they are a key stakeholder. As such, the CPPO has concentrated its information sharing efforts toward the WRPS workforce. With a focus on empathetic engagement, continuous improvement, and transparent information sharing, the CPPO has developed and implemented a strategy for improving worker trust in vapors-related communications and increasing the workforce knowledge of responses taken to address chemical vapors. Effective implementation of this strategy is demonstrated by the results of workforce surveys, which indicate measured and important improvement in the effectiveness of vapors-communications and the knowledge level workers report about vapor issues compared to the previous year. This paper discusses the utilization of a temporary program office and the unique approach that the CPPO implemented to achieve success, including: strategic application of the technical and communications staff skill mix of the organization (including talent development opportunities such as stretch assignments for WRPS's Strategic Talent Development program members and support from WRPS college interns), teaming with other WRPS' organizations such as IH, Engineering and Communications and Public Relations (C and PR), the development of new types of information sharing to support the effort, and the methods by which the effectiveness of the communications efforts are measured to drive continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification assistance program: international co-operation on vitrification technology

With 10 vitrification lines in operation (3 on WVP in Sellafield, 1 on AVM in Marcoule and 6 on AVH in La Hague), Sellafield Ltd and Areva NC benefit from the most in-depth experience worldwide in the vitrification of highly active liquors within a framework of commercial operations. Based on the two-step process design, using a calciner and an induction-heated hot melter, which was initially deployed in Marcoule in 1978, core vitrification equipment has been continuously improved by the independent development programmes of the two companies. In March 2005, Sellafield Ltd and Areva NC signed the Vitrification Assistance Program (hereafter referred to as VAP); a co-operative project lasting 4 years during which Areva NC is to share some areas of their experience and expertise with Sellafield Ltd. Now at the halfway point of this project, this paper summarises the work performed by the VAP team to date, highlighting the early benefits and lessons learned. The following points will be developed: - Equipment delivery and preparation for implementation on WVP - Training organization and dissemination to WVP teams - Lessons learned from the early changes implemented in operations (Calciner, Melter, Dust Scrubber and Primary off gas system), and initial feedback from the first campaign using a VAP equipped line. In conclusion: The vitrification process and technology implemented at Sellafield and at La Hague, based on the two-step process, have proved to be efficient in treating high active liquor of various types. Ten lines based on this principle have been successfully operated for more than 15 years in France and in the UK. The process has also been demonstrated to be sufficiently versatile to benefit from continuous improvement and development programmes. VAP, as a complete package to support vitrification technology and knowledge transfer from AREVA NC to Sellafield Ltd, has provided the framework for fruitful technical exchanges and discussions between the two companies. From equipment delivery to knowledge embedding within the WVP teams, both companies have worked hard together to respect the tight schedule of the contract, despite growing external constraints. This has been closely managed in order to achieve the best results for the VAP without jeopardizing the continuing production operations on both the Sellafield and La Hague sites. For future campaigns, WVP1 will be equipped with an automatic heating control system similar to the one used at La Hague (i.e. based on 4 kHz). This will facilitate the work of the WVP operators and finalise the conversion of WVP melter control systems from manual to automatic, meaning that the melters on all 3 lines will be automatically controlled. Further implementation of VAP equipment is also planned on the other lines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A historical perspective of Global Warming Potential from Municipal Solid Waste Management

Highlights: • Five scenarios are compared based on different waste management systems from 1970 to 2010. • Technology development for incineration and vehicular exhaust system throughout the time period is considered. • Compared scenarios show continuous improvement regarding environmental performance of waste management system. • Energy and material recovery from waste account for significant savings of Global Warming Potential (GWP) today. • Technology development for incineration has played key role in lowering the GWP during past five decades. - Abstract: The Municipal Solid Waste Management (MSWM) sector has developed considerably during the past century, paving the way for maximum resource (materials and energy) recovery and minimising environmental impacts such as global warming associated with it. The current study is assessing the historical development of MSWM in the municipality of Aalborg, Denmark throughout the period of 1970 to 2010, and its implications regarding Global Warming Potential (GWP{sub 100}), using the Life Cycle Assessment (LCA) approach. Historical data regarding MSW composition, and different treatment technologies such as incineration, recycling and composting has been used in order to perform the analysis. The LCA results show a continuous improvement in environmental performance of MSWM from 1970 to 2010 mainly due to the changes in treatment options, improved efficiency of various treatment technologies and increasing focus on recycling, resulting in a shift from net emission of 618 kg CO{sub 2}-eq. tonne{sup −1} to net saving of 670 kg CO{sub 2}-eq. tonne{sup −1} of MSWM.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Teamwork for Oversight of Processes and Systems (TOPS). Implementation guide for TOPS version 2.0, 10 August 1992

As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.

Strand, Albert A.↗

THE MIRA–TITAN UNIVERSE: PRECISION PREDICTIONS FOR DARK ENERGY SURVEYS

Large-scale simulations of cosmic structure formation play an important role in interpreting cosmological observations at high precision. The simulations must cover a parameter range beyond the standard six cosmological parameters and need to be run at high mass and force resolution. A key simulation-based task is the generation of accurate theoretical predictions for observables using a finite number of simulation runs, via the method of emulation. Using a new sampling technique, we explore an eight-dimensional parameter space including massive neutrinos and a variable equation of state of dark energy. We construct trial emulators using two surrogate models (the linear power spectrum and an approximate halo mass function). The new sampling method allows us to build precision emulators from just 26 cosmological models and to systematically increase the emulator accuracy by adding new sets of simulations in a prescribed way. Emulator fidelity can now be continuously improved as new observational data sets become available and higher accuracy is required. Finally, using one ΛCDM cosmology as an example, we study the demands imposed on a simulation campaign to achieve the required statistics and accuracy when building emulators for investigations of dark energy.

79 ASTRONOMY AND ASTROPHYSICS↗

Projecting Recent Advancements in Battery Technology to Next–Generation Electric Vehicles

Electric vehicles (EVs) have seen rapid growth in adoption over the last several years. Advancements to increase battery life and performance, policy shifts, and high charging rate are expected to further accelerate the development of next generation of EVs. Battery improvements continue to emerge, enabling increased driving range, total distance driven over the life of vehicles, and ability to charge at high rates. Herein, an analysis framework to provide insights into inclusive design metrics, such as specific energy of batteries, energy consumption of vehicles, and charging power infrastructure development, is developed. Various cell-level fast charge protocols to realistic battery designs to understand the infrastructure needs associated with achieving range replacement of 32.25 km min -1 (20 mi min -1 ) are also scaled. Additionally, by calculating scaled power and peak to average power ratio, it is found that there needs to be more distinct alignment between the research efforts focused at the cell level and what is being developed for EV charging infrastructure needs. Finally, impact of high direct current voltage architecture in next-generation EVs is discussed. The findings in this work provide an insight into recent advancements in battery technology to next-generation EVs.

20 mi/min↗

Transmission X-ray scattering as a probe for complex liquid-surface structures

The need for functional materials calls for increasing complexity in self-assembly systems. As a result, the ability to probe both local structure and heterogeneities, such as phase-coexistence and domain morphologies, has become increasingly important to controlling self-assembly processes, including those at liquid surfaces. The traditional X-ray scattering methods for liquid surfaces, such as specular reflectivity and grazing-incidence diffraction, are not well suited to spatially resolving lateral heterogeneities due to large illuminated footprint. A possible alternative approach is to use scanning transmission X-ray scattering to simultaneously probe local intermolecular structures and heterogeneous domain morphologies on liquid surfaces. To test the feasibility of this approach, transmission small- and wide-angle X-ray scattering (TSAXS/TWAXS) studies of Langmuir films formed on water meniscus against a vertically immersed hydrophilic Si substrate were recently carried out. First-order diffraction rings were observed in TSAXS patterns from a monolayer of hexagonally packed gold nanoparticles and in TWAXS patterns from a monolayer of fluorinated fatty acids, both as a Langmuir monolayer on water meniscus and as a Langmuir–Blodgett monolayer on the substrate. The patterns taken at multiple spots have been analyzed to extract the shape of the meniscus surface and the ordered-monolayer coverage as a function of spot position. These results, together with continual improvement in the brightness and spot size of X-ray beams available at synchrotron facilities, support the possibility of using scanning-probe TSAXS/TWAXS to characterize heterogeneous structures at liquid surfaces.

Fukuto, Masafumi↗

Performance Assessment Assistance Activities in the DOE Complex - 12325

The United States Department of Energy Office of Environmental Management (DOE-EM) has established a Performance Assessment Community of Practice (PA CoP) to foster the sharing of information among performance assessment (PA) and risk assessment practitioners, regulators and oversight personnel. The general intent is to contribute to continuous improvement in the consistency, technical adequacy and quality of implementation of PAs and risk assessments around the DOE Complex. The PA CoP activities have involved commercial disposal facilities and international participants to provide a global perspective. The PA CoP has also sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from on-going modelling activities. The PA CoP encourages activities to provide programmatic and technical assistance in the form of sharing experience and lessons learned with practitioners during the development of PAs and risk assessments. This assistance complements DOE-EM reviews through the Low-Level Waste Disposal Facility Federal Review Group (LFRG) that are conducted after modelling efforts are completed. Such up-front assistance is providing additional value in terms of improving consistency and sharing of information. There has been a substantial increase in the amount of assistance being provided. The assistance has been well received by practitioners and regulators that have been involved. The paper highlights assistance and sharing of information that has been conducted in the last two years to support activities underway in support of proposed disposal facilities at Paducah, Portsmouth, and the Idaho National Laboratory and tank closure at Hanford. DOE-EM established the PA CoP to help improve the consistency and quality of implementation of modelling activities around the DOE Complex. The PA CoP has sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from ongoing modelling activities. Practitioners; project managers; oversight personnel; and regulators from United States and international facilities have participated in the three technical exchanges that have been held to date. At the working level, the PA CoP has sponsored technical assistance in support of modelling activities that are currently underway. The assistance concept provides a means to share specific experience, good practices, and lessons learned on topics of interest at a given site while the modelling is being conducted. Such up-front assistance complements the sharing of information that occurs via regular LFRG meetings and independent LFRG reviews that are conducted when the modelling effort is completed. Examples from assistance activities that have been conducted at Idaho, Paducah, Portsmouth and Hanford were highlighted in this paper. There were differences in the types of assistance provided at each site. In some cases the assistance was focused on technical support for the practitioners and management responsible for the development of the PAs. At other sites, the assistance included working with the developers and regulators/stakeholders involved in the process to help with reaching consensus on critical assumptions. Such interactions have proven to be very effective to help all parties get a chance to discuss their perspectives and better understand the different points of view. In all cases, the assistance was used as a means to share broader perspectives, experiences and lessons learned with personnel engaged in a modelling activities at a given site. The combination of technical exchanges and targeted technical assistance has provided additional means to encourage the sharing of information around the DOE Complex and globally. Feedback from practitioners, oversight personnel, regulators and stakeholders that have been involved has been overwhelmingly positive. It is believed that such sharing of information and experiences is contributing to continuous improvement in the consistency, technical adequacy, and quality of modelling activities. Although different approaches are still being used, there is an improvement in the awareness of lessons learned and implementation of practices that have proven to be effective. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗