Search NASA⌕ Search

SEARCH · Search NASA

Results for “control room”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Large screen display for the Mission Control Center

The Mission Control Center (MCC), located at the Johnson Space Center near Houston, Texas, is the primary point of control and monitoring for National Space Transportation System (NSTS) flight activities. NSTS flight managers monitor and command spacecraft from one of two Flight Control Rooms (FCR). Each FCR is equipped with five large screen displays for group dissemination of spacecraft system status and vehicle position relative to Earth geography. The primary or center screen display is ten feet in height and twenty feet in width. The secondary or side screens are seven and one-hald feet high and ten feet wide. The center screen projection system is exhibiting high maintenance costs and is considered to be in wear-out phase. The replacement of the large center screen displays at the MCC is complicated by the unique requirements of the Flight Controller user. These requirements demand a very high performance, multiple color projection system capable of the display of high resolution text, graphics and images produced in near real time. The current system to be replaced, the replacement system requirements, the efforts necessary to procure the major element of this system (the projector) for the government, and how the new capabilities are to be integrated into the existing MCC operational configuration are discussed.

Skudlarek, Martin J.↗

Modified Fittings Enhance Industrial Safety

Kennedy Space Center is not only home to one of the largest buildings in the world - the massive Vehicle Assembly Building - it also hosts a number of one-of-a-kind facilities. The more than 30-mile-long campus has witnessed every launch from the Space Shuttle Launch Pad, as well as many homecomings at the Shuttle Landing Facility. Just as important, the Space Station Processing Facility (SSPF) has seen each element of the International Space Station (ISS) that passes through Kennedy before it goes into orbit. The SSPF is where ISS components are checked, tested, and adjusted before being packed into the Space Shuttle for transport. In an environment like the SSPF - spanning 457,000 square feet of processing areas, operational control rooms, laboratories, logistics areas, and office space - large workstands and equipment used to support the processing of ISS components need to be moved around the facility. One of the devices employed for this task is an air pallet. An air pallet moves on cushions of air instead of wheels. Compressed air inflates the cushions underneath the pallet and is then expelled through exhaust holes. This forms a thin film of air between the cushions and the floor, lifting the platform off the floor and making it easy to move the heavy workstands, equipment, and ISS components. Concerned with the safety of the connections on the pressurized air hoses used for the air pallets, engineers at Kennedy modified an existing commercial cam and groove fitting to control the air supply hose in the event of an accidental release of a pressurized hose. This modification prevented the hose from detaching and, propelled by compressed air, striking workers or equipment. "At the time, these were not available on commercial coupling halves, so NASA made a modification and then put them into use. If a worker were to accidentally try to remove a pressurized hose from the pallet, it no longer rapidly separated, and it safely relieved the pressure," says Paul Schwindt, an engineer at Kennedy who together with Alan Littlefield, also an engineer at Kennedy, designed the modification.

Source record↗

Internet Protocol Display Sharing Solution for Mission Control Center Video System

With the advent of broadcast television as a constant source of information throughout the NASA manned space flight Mission Control Center (MCC) at the Johnson Space Center (JSC), the current Video Transport System (VTS) characteristics provides the ability to visually enhance real-time applications as a broadcast channel that decision making flight controllers come to rely on, but can be difficult to maintain and costly. The Operations Technology Facility (OTF) of the Mission Operations Facility Division (MOFD) has been tasked to provide insight to new innovative technological solutions for the MCC environment focusing on alternative architectures for a VTS. New technology will be provided to enable sharing of all imagery from one specific computer display, better known as Display Sharing (DS), to other computer displays and display systems such as; large projector systems, flight control rooms, and back supporting rooms throughout the facilities and other offsite centers using IP networks. It has been stated that Internet Protocol (IP) applications are easily readied to substitute for the current visual architecture, but quality and speed may need to be forfeited for reducing cost and maintainability. Although the IP infrastructure can support many technologies, the simple task of sharing ones computer display can be rather clumsy and difficult to configure and manage to the many operators and products. The DS process shall invest in collectively automating the sharing of images while focusing on such characteristics as; managing bandwidth, encrypting security measures, synchronizing disconnections from loss of signal / loss of acquisitions, performance latency, and provide functions like, scalability, multi-sharing, ease of initial integration / sustained configuration, integration with video adjustments packages, collaborative tools, host / recipient controllability, and the utmost paramount priority, an enterprise solution that provides ownership to the whole process, while maintaining the integrity of the latest technological displayed image devices. This study will provide insights to the many possibilities that can be filtered down to a harmoniously responsive product that can be used in today's MCC environment.

Brown, Michael A.↗

Display Sharing: An Alternative Paradigm

The current Johnson Space Center (JSC) Mission Control Center (MCC) Video Transport System (VTS) provides flight controllers and management the ability to meld raw video from various sources with telemetry to improve situational awareness. However, maintaining a separate infrastructure for video delivery and integration of video content with data adds significant complexity and cost to the system. When considering alternative architectures for a VTS, the current system's ability to share specific computer displays in their entirety to other locations, such as large projector systems, flight control rooms, and back supporting rooms throughout the facilities and centers must be incorporated into any new architecture. Internet Protocol (IP)-based systems also support video delivery and integration. IP-based systems generally have an advantage in terms of cost and maintainability. Although IP-based systems are versatile, the task of sharing a computer display from one workstation to another can be time consuming for an end-user and inconvenient to administer at a system level. The objective of this paper is to present a prototype display sharing enterprise solution. Display sharing is a system which delivers image sharing across the LAN while simultaneously managing bandwidth, supporting encryption, enabling recovery and resynchronization following a loss of signal, and, minimizing latency. Additional critical elements will include image scaling support, multi -sharing, ease of initial integration and configuration, integration with desktop window managers, collaboration tools, host and recipient controls. This goal of this paper is to summarize the various elements of an IP-based display sharing system that can be used in today's control center environment.

Brown, Michael A.↗

The output stage for the ground transmitter at Goonhilly

The power output amplifier of the transmitter for the Goonhilly project uses a travelling tube, type VX527 delivering 4 kW at 6,390 Me/s, with a bandwidth of about 100 Mc/s. This amplifier, together with its power supplies and driver stage is located in a cabin, situated on the turntable underneath the aerial. Input signals for the transmitter are received in the cabin from the main control room at a frequency of 70 Mc/s; they are converted to the to the nominal 6,390 Mc/s before being amplified to about 3 watts by the driver TWT and fed via a waveguide link to the output stage. The output stage, described below, was designed and manufactured by A.E.I. Electronic Apparatus Division, Leicester, England, during the first half of 1962.

TRAVELING WAVE AMPLIFIER↗

Optical monitor panel Patent

Optical monitor panel consisting of translucent screen with test or meter information projected onto it from rear for application in control rooms of missile launching and tracking stations

Griffin, F. D.↗

NASA Lewis 8 by 6 foot supersonic wind tunnel

Performance data are presented for the tunnel, which has a Mach number range from 0.36 to 2.0. The tunnel circuit, test section, model support systems, auxiliary systems, instrumentation, control room equipment, and automatic recording and computing equipment are also described. Information is presented on criteria for designing models and on shop facilities available to prospective users.

Swallow, R. J.↗

NASA Lewis 10 by 10 foot supersonic wind tunnel

Performance data are presented for this tunnel, which has a Mach number range from 2.0 to 3.5. The tunnel circuit, model support systems, auxiliary systems, instrumentation, control room equipment, and automatic recording and computing equipment are described. Information is presented on criteria for designing models, and on shop facilities available to users.

Aiello, R. A.↗

Reliability analysis of forty-five strain-gage systems mounted on the first fan stage of a YF-100 engine

The reliability of 45 state-of-the-art strain gage systems under full scale engine testing was investigated. The flame spray process was used to install 23 systems on the first fan rotor of a YF-100 engine; the others were epoxy cemented. A total of 56 percent of the systems failed in 11 hours of engine operation. Flame spray system failures were primarily due to high gage resistance, probably caused by high stress levels. Epoxy system failures were principally erosion failures, but only on the concave side of the blade. Lead-wire failures between the blade-to-disk jump and the control room could not be analyzed.

Holanda, R.↗

Energy consumption program: A computer model simulating energy loads in buildings

The JPL energy consumption computer program developed as a useful tool in the on-going building modification studies in the DSN energy conservation project is described. The program simulates building heating and cooling loads and computes thermal and electric energy consumption and cost. The accuracy of computations are not sacrificed, however, since the results lie within + or - 10 percent margin compared to those read from energy meters. The program is carefully structured to reduce both user's time and running cost by asking minimum information from the user and reducing many internal time-consuming computational loops. Many unique features were added to handle two-level electronics control rooms not found in any other program.

Stoller, F. W.↗

IUE and the search for a lukewarm corona

The use of the International Ultraviolet Explorer (IUE) to search for stars having neither a hot corona nor a cool outer atmosphere, but a lukewarm corona is outlined. An interactive computer system permits extensive analysis of the data immediately after transmission to earth, allowing the results of one exposure to influence the taking of subsequent exposures. The observation program is illustrated for the star HR 1099, noting that observations were taken while previous spectra were being analyzed. Observations of many stars of spectral types G and K lead to the construction of a border region on the Hertzsprung-Russell diagram between stars with hot coronas and those with cool outer atmospheres. Stars lying near this border region were then observed, however none with lukewarm coronas were found. The interactive control facility in the satellite control room is considered an important factor in the efficient implementation of the search procedure.

Pasachoff, J. M.↗

Laser angle measurement system

The design and fabrication of a laser angle measurement system is described. The instrument is a fringe counting interferometer that monitors the pitch attitude of a model in a wind tunnel. A laser source and detector are mounted above the mode. Interference fringes are generated by a small passive element on the model. The fringe count is accumulated and displayed by a processor in the wind tunnel control room. Optical and electrical schematics, system maintenance and operation procedures are included, and the results of a demonstration test are given.

Pond, C. R.↗

Test results from a comparative evaluation of a condensation nuclei fire detector

The fire/smoke alarm response of a condensation nuclei fire detector (CNFD) was compared with photoelectric and ionization detectors. Tests were conducted in a former control room 8.5 m by 8.9 with a 2.7 m ceiling. The room had air supplied from above the ceiling and under the floor with return air exiting from ceiling grills. The environment was varied from 278 to 305 K and relative humidities from 8 to 65%. Four detection zones were located in the room. Each zone contained a sampling head for the CNDF, a photodetector, and an ionization detector so that each detector system had four opportunities to alarm during tests. The particle level in the test room was also monitored during tests with a condensation nuclei particle counter. The CNFD responded to 90% of exposures to smoldering plastic and 84% of exposures to visible fire. The photoelectric response was 43 and 12.5% respectively for the same conditions. The ionization response was 9 and 48 respectively.

Bricker, R. W.↗

Design of an expert-system flight status monitor

The present technology used to monitor systems in flight tests is not advanced enough for the modern avionics in high performance aircraft. Research is being conducted at NASA's Dryden Flight Research Facility to design an expert system to monitor test flights. The expert system is to automatically detect any problems in the flight control system (FCS), interpret the problem from the information contained in its knowledge base, inform the systems engineer, and recommend solutions. The data is to be downlinked from the aircraft to the control room. The expert system will lessen the responsibilities of the engineers by providing them with fast, expert advice. Time is the most critical factor in flight testing and the expert system will be able to quickly recognize discrepancies and provide corrections. A demonstration of the expert system, not operating in real time, has already been tested.

Regenie, V. A.↗

Laser angle sensor

A laser angle measurement system was designed and fabricated for NASA Langley Research Center. The instrument is a fringe counting interferometer that monitors the pitch attitude of a model in a wind tunnel. A laser source and detector are mounted above the model. Interference fringes are generated by a small passive element on the model. The fringe count is accumulated and displayed by a processor in the wind tunnel control room. This report includes optical and electrical schematics, system maintenance and operation procedures.

Pond, C. R.↗

Real-time simulator for helicopter rotor wind-tunnel operations

This paper describes the elements and operation of a simulator that is being used to train operators of the Rotor Test Apparatus (RTA) in the large-scale 40- by 80-Foot Wind Tunnel at Ames Research Center. The simulator, named TUTOR (for Tunnel Utilization Trainer with Operating Rotor) duplicates the controls of the rotor and its dynamic behavior, as well as the wind-tunnel controls. The simulation software uses a preexisting blade-element model of a four-bladed rotor with flapping and lead-lag degrees of freedom. Equations were developed for all hardware and controls of the RTA and of the wind tunnel that are normally required to perform a wind-tunnel test of a helicopter rotor. The simulator hardware consists of consoles designed to have the same appearance and functions as those in the control room of the 40- by 80-Foot Wind Tunnel, allowing input from three operators who normally establish the required operating conditions during a test run. Normal operating procedures can be practiced, as well as simulated emergencies such as rotor power failure.

Talbot, P. D.↗