Search NASA⌕ Search

SEARCH · Search NASA

Results for “controller area network”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

LANL's near-real-time measurement control bolt-on to LANMAS

Los Alamos National Laboratory (LANL) has created a near-real-time Measurement Control Program (MCP) that integrates with Local Area Network Material Accounting System (LANMAS). The program was designed to take the place of an aging accounting system at LANL which incorporated the measurement control. LANL's Material Control and Accountability (MC&A) group developed many bolt-on features to enhance LANMAS called LAM CAS (Los Alamos Material Control and Accounting System), one of those bolt-on enhancements was to develop the MCP to replace the previous version. MCP was developed with the multiple end-user groups in mind by creating a near-real-time system that was user friendly, provided access controls, and account status of the measurement control systems.

42 ENGINEERING↗

Advanced Communication and Control for Distributed Energy Resource Integration: Phase 2 Scientific Report

The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design and proof-of-design, and Phase II involves real-world demonstration of the Phase I design architecture. The scope of work for Phase II of this ACCP involves demonstrating the Phase I design architecture in large scale real-world settings while integrating with the operations of one or more electricity supplier feeder lines. The communication and control architectures for integrated demonstration shall encompass combinations of software and hardware components, including: sensors, data acquisition and communication systems, remote monitoring systems, metering (interval revenue, real-time), local and wide area networks, Web-based systems, smart controls, energy management/information systems with control and automation of building energy loads, and demand-response management with integration of real-time market pricing. For Phase II, BPL Global shall demonstrate the Phase I design for integrating and controlling the operation of more than 10 DER units, dispersed at various locations in one or more Independent System Operator (ISO) Control Areas, at an aggregated scale of more than 1 MW, to provide grid support. Actual performance data with respect to each specified function above is to be collected during the Phase II field demonstration. At a minimum, the Phase II demonstration shall span one year of field operations. The demonstration performance will need to be validated by the target customer(s) for acceptance and subsequent implementation. An ISO must be involved in demonstration planning and execution. As part of the Phase II work, BPL Global shall develop a roadmap to commercialization that identifies and quantifies the potential markets for the integrated, aggregated DER systems and for the communication and control technologies demonstrated in Phase I. In addition, the roadmap must identify strategies and actions, as well as the regional and national markets where the aggregated DER systems with communication and control solutions will be introduced, along with a timeline projected for introduction into each identified market. In Phase I of this project, we developed a proof-of-concept ACCP system and architecture and began to test its functionality at real-world sites. These sites had just over 10 MW of DERs and allowed us to identify what needed to be done to commercialize this concept. As a result, we started Phase II by looking at our existing platform and identified its strengths and weaknesses as well as how it would need to evolve for commercialization. During this process, we worked with different stakeholders in the market including: Independent System Operators, DER owners and operators, and electric utility companies to fully understand the issues from all of the different perspectives. Once we had an understanding of the commercialized ACCP system, we began to document and prepare detailed designs of the different system components. The components of the system with the most significant design improvements were: the on-site remote terminal unit, the communication technology between the remote site and the data center, and the scalability and reliability of the data center application. As we began to implement the Phase II ACCP system, we upgraded the real-world demonstration sites from Phase I of the project as well as added additional sites to broaden the types of DER the platform was tested with. We worked with the owners and operators of these sites to understand how the system was meeting their needs and made modifications throughout the project as needed. This also included an effort to continue to understand the barriers to commercial adoption of the ACCP architecture and standardized communication protocols. The final aspect of this phase of the project was to prepare resources to aid in the commercial adoption of the ACCP architecture and standardized communication protocols. This entailed: presentations at conferences, published articles and papers, and web-based technical resources to provide tools to aid in the design and implementation of ACCP systems.

03 NATURAL GAS↗

Continuous Test and Transition Infrastructure for Quantum Networking for Science Complex

We propose a network architecture with a separate quantum dataplane and a conventional control plane: (a) Quantum Data Plane: The Quantum Data plane consists of links of dark fibers connecting quantum switches and repeaters, which in turn, connect to quantum computers, memory and sensors. Since the current reach is limited to local areas, it will begin as a collection of site networks at laboratories, (b) Conventional Control Plane: The Control plane provides management access to quantum devices for configuration and provisioning via control nodes with firewall and encryption capabilities. Continuous Test and Transition Infrastructure: We propose an infrastructure with a control plane connecting multiple sites via encrypted tunnels over conventional networks consisting of the following: (a) Site Quantum Networks: Individual site networks supported by their fiber plants connect laboratories that house and connect to their quantum devices for testing and interoperability.(b) Site Control Planes: Sites are connected over individual control planes with control hosts with Software Defined Networking capabilities, which can be peered with other networks via ESnet.(c) Progressive Expansion: Initially, sites will develop individual data planes with their specific quantum devices and fiber connections, and mechanisms to interface with conventional networks. They progressively expand and interconnect, under a wide-area ecosystem of peered control planes for device testing, interoperability development and roll off into production environments.

Rao, Nageswara S.↗

Dynamic consensus and extended high gain observers as a tool to achieve practical frequency synchronization in power systems under unknown time-varying power demand

In this paper, we consider the frequency synchronization problem in a network of lossless, connected, and network-reduced power system. Frequency synchronization is an important problem in power systems as frequency deviation can lead to degraded power quality, tripping of generators, etc. We present a load-estimator-based consensus algorithm in a network of fourth-order generator models that achieves practical frequency synchronization in the presence of unknown time-varying power demand. We do not assume that the demand is generated by a known model. We follow a multiple time-scale approach for the stability analysis. It is shown that synchronization is achieved for the case of constant power demand, by showing that the system is exponentially stable. Furthermore, for the case of time-varying power demand, we show the error trajectories are ultimately bounded, and the synchronization error is proportional to an upper bound on the derivative of the time-varying power demand. We simulate the controller performance on a four area network which is equivalent to the IEEE New England 39-Bus system.

42 ENGINEERING↗

Secure ICCP Final Report

Inter-Control Center Communications Protocol (ICCP), defined by the IEC 60870-6 TASE.2 standard, was developed to enable data exchange over wide area networks between electric system entities, including utility control centers, Independent System Operators (ISOs), Regional Transmission Operators (RTOs) and Independent Power Producers (IPP) also known as Non-Utility Generators (NUG). ICCP is an unprotected protocol, and as a result is vulnerable to such actions as integrity violation, interception or alteration, spoofing, and eavesdropping. Because of these vulnerabilities with unprotected ICCP communication, security enhancements, referred to as Secure ICCP, have been added and are included in the ICCP products that utilities have received since 2003 when the standard was defined. This has resulted in an ICCP product whose communication can be encrypted and authenticated to address these vulnerabilities.

97 MATHEMATICS AND COMPUTING↗

Decentralized Low-Rank State Estimation for Power Distribution Systems

This article considers the low-observability state estimation problem in power distribution networks and develops a decentralized state estimation algorithm leveraging the matrix completion methodology. Matrix completion has been shown to be an effective technique in state estimation that exploits the low dimensionality of the power system measurements to recover missing information. This technique can utilize an approximate (linear) load flow model, or it can be used with no physical models in a network where no information about the topology or line admittance is available. The direct application of matrix completion algorithms requires solving a semi-definite programming (SDP) problem, which becomes computationally challenging for large networks. We therefore develop a decentralized algorithm that capitalizes on the popular proximal alternating direction method of multipliers (proximal ADMM). The method allows us to distribute the computation among different areas of the network, leading to a scalable algorithm. By doing all computations at individual control areas and only communicating with neighboring areas, the algorithm eliminates the need for data to be sent to a central processing unit and thus increases efficiency and contributes to the goal of autonomous control of distribution networks. We illustrate the advantages of the proposed algorithm numerically using standard IEEE test cases.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Control room consolidation at Hanford tank farms for improved conduct of operation - 15345

Washington River Protection Solutions (WRPS) manages the underground waste storage tanks at the Hanford site in Washington State on behalf of the DOE Office of River Protection. There are 177 tanks distributed among 18 tank farms spread across an area of desert scrub covering about 20 square miles. A single evaporator facility supports the tanks to provide waste reduction activities. Farms and associated equipment, including exhausters, have been operated locally since installation. Upgrades over time introduced limited automation, but using inconsistent platforms, and providing isolated control locations around the farms. However, as the Tank Farms move from maintenance operations to production operations, with increased numbers of waste transfers and evaporator campaigns, and also prepare for integration with the adjacent Hanford Waste Treatment Plant, then operational improvements were planned and are being implemented. Infrastructure improvement projects included upgrades of control systems to a common platform, and installation of a fiber optic based local area network to the majority of farms, which together provided a distributed control system supporting tank farms. This new infrastructure provided the basis to propose consolidation of control and monitoring operations to a single location. More than a single location, the new Central Control Room was to increase effectiveness of operations by providing full status of all activities being performed across the Tank Farms and the Evaporator. The recent addition of productivity e-tools also would provide capability for management, supervisors and operators to make informed decisions regarding facility operations, through custom online applications designed to provide real time information derived from operational data. For example, tracking turnover activities between shifts, and maintaining compliance with limited conditions for operations. The Central Control Room would also have a single supervisor able to effectively manage the status of all assets and processes. The expected benefits of this arrangement include increased operator utility, increased situational awareness, improved response time for upset conditions, improvement in operator environment, and reductions in operating costs. The projected ROI for the Central Control Room when fully operational was projected to be about two years based on reduced costs from freeing up operations staff to perform other work plus the time and material savings realized by operations being performed with increased situational awareness. So the Central Control Room would become a hub for monitoring and controlling facility operations while responding to real time information affecting productivity and performance, from a centralized location customized to a fresh working environment. Over a 14-month period, WRPS developed the concept and engineering, procured over 500 items, modified and installed in renovated building, and completed transition and testing of this new Central Control Room, turning over the initial phase to Operations for 24/7 use in April 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying Availability in SCADA Environments Using the Cyber Security Metric MFC

Supervisory Control and Data Acquisition (SCADA) systems are distributed networks dispersed over large geographic areas that aim to monitor and control industrial processes from remote areas and/or a centralized location. They are used in the management of critical infrastructures such as electric power generation, transmission and distribution, water and sewage, manufacturing/industrial manufacturing as well as oil and gas production. The availability of SCADA systems is tantamount to assuring safety, security and profitability. SCADA systems are the backbone of the national cyber-physical critical infrastructure. Herein, we explore the definition and quantification of an econometric measure of availability, as it applies to SCADA systems; our metric is a specialization of the generic measure of mean failure cost.

Availability↗

Quantifying the Impact of Unavailability in Cyber-Physical Environments

The Supervisory Control and Data Acquisition (SCADA) system discussed in this work manages a distributed control network for the Tunisian Electric & Gas Utility. The network is dispersed over a large geographic area that monitors and controls the flow of electricity/gas from both remote and centralized locations. The availability of the SCADA system in this context is critical to ensuring the uninterrupted delivery of energy, including safety, security, continuity of operations and revenue. Such SCADA systems are the backbone of national critical cyber-physical infrastructures. Herein, we propose adapting the Mean Failure Cost (MFC) metric for quantifying the cost of unavailability. This new metric combines the classic availability formulation with MFC. The resulting metric, so-called Econometric Availability (EA), offers a computational basis to evaluate a system in terms of the gain/loss ($/hour of operation) that affects each stakeholder due to unavailability.

Availability↗

Gemini Scout Control Software

The Gemini Scout Control Software consists of two Windows applications that allow the Gemini Scout vehicle to be controlled by an operator. The Embedded application runs on the vehicle's Gemini Scout Control Software onboard computer and controls the vehicle's various motors and sensors. This application reports the vehicle's status and receives vehicle commands overthe local-area-network. The Embedded applicationalso allows the user to control the vehicle using a USB game-pad connected directly to the vehicle. The Operator Control Unit (OCU) application runs on an external PC and communicates with the vehicle via an Ethernet connection. The OCU application sends commands to and receives data from the Embedded application running on the vehicle. The OCU application also communicates directly with the digital video encoders and radios in order to display video from the vehicle's cameras and the status of the radio link. The OCU application has a graphical user interface (GUI) that displays the vehicle's status and allows the user to change various vehicle settings. Finally, the OCU application receives input from a USB game-pad connected to the PC in order to control the vehicle's functions.

Clinton Hobart, Justin Garretson↗

Attack-resilient algorithms and testbed federation for wide-area protection and control in smart grid

Today’s energy infrastructure is undergoing a massive transformation across all generation, transmission, and distribution systems to provide reliability, efficiency, and sustainability to the power system network. During the past 10 years, there has been a remarkable enhancement in developing close-loop wide-area protection and control (WAPAC) applications, such as automatic generation control (AGC), wide-area protection scheme (WAPS), synchrophasor-based wide-area voltage control system (WAVCS), etc., in the energy management system (EMS) to provide an adequate situational awareness to control center operators during physical disturbances and natural events. The rapid digitalization, unencrypted communication, and numerous data-sharing devices have increased digital access points that have exposed the grid network to countless cyberattacks pertinent to the WAPAC cybersecurity. Given the amount of complex grid network coupled with legacy infrastructures, it is untrustworthy to completely rely on information technology (IT)-based conventional security measures to defend against evolving cyberattacks. Hence, there is a compelling need to go beyond the traditional paradigm of ‘security by obscurity’ and ‘bolt-on’ security measures, and develop a suite of innovative security solutions at multiple layers to transform the current “fault-resilient” grid into “fault and attack-resilient” grid of the future. This dissertation specifically focuses on developing application-specific attack-resilient solutions for critical WAPAC applications in the smart grid. The first part of the study, Attack-Resilient Wide-Area Protection Scheme, presents a cyber-physical attack-resilient system (CPARS) for WAPS, where two anomaly detection methods are proposed to detect multi-level cyberattacks followed by the rules-based intrusion mitigation system (RIMS) to initiate effective mitigation strategies, tailored to these attacks, to restore the normal grid operation after disturbances. The first anomaly detection component, Machine learning-based Anomaly Detection for Centralized WAPS, discusses a novel architecture and methodology for developing a machine-learning-based anomaly detection system (ADS) for the centralized wide-area protection system (CWAPS) by applying the variational mode decomposition (VMD) technique and decision tree (DT) algorithms using cyber logs and synchrophasor measurements. The second component, Multi-Agent-based Anomaly Detection for Decentralized WAPS, presents a two-level hierarchical multi-agent-based decentralized WAPS against the system-aware stealthy cyber-attacks. Finally, for the RIMS, the state transition diagram-based mitigation measures are defined based on the grid operation states and experimental testing and evaluation are presented in a cyber-physical testbed environment. The second part of the study, Attack-Resilient Wide-Area Voltage Control System, addresses the existing vulnerabilities in the wide-area voltage control system (WAVCS), presents the methodology for performing an impact analysis during data integrity attacks, and proposes a data-driven attackresilient system (DARS) by incorporating machine learning-based ADS and rules-based anomaly mitigation system (RAMS) to detect these attacks and provide necessary mitigation actions to maintain the transient voltage stability after disturbances. Finally, the third part, Networked Federation Testbed (NEFTSec) for Smart Grid Cybersecurity, focuses on developing an interconnected federated testbed through a common network like the internet, describes its conceptual architectures, and also presents its design components for experimental testing, validation, and evaluation. Further, it presents the co-simulation interface algorithm (CIA) to facilitate the geographically-dispersed real-time distributed simulation (GD-RTDS) during the cyber-physical federation. In general, this dissertation presents innovative attack-resilient solutions for WAPAC applications that are experimentally tested and evaluated using the PowerCyber testbed and NEFTSec platform to accelerate the transition of state-of-the-art research works to the real-field deployments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connected Traffic Signal Coordination Optimization Framework through Network-Wide Adaptive Linear Quadratic Regulator–Based Control Strategy

Traffic congestion in metropolitan areas causes several significant challenges, such as longer travel times, decreased productivity, increased fuel consumption and vehicle emissions, and even severe injuries during crashes. Traffic signal control is a management approach to reduce traffic congestion and allocate the appropriate right of way for safety and mobility efficiency, both in temporal and spatial domains. Here, this study proposes a network-wide adaptive signal control coordination optimization framework based on the linear quadratic regulator algorithm. The traffic flow conditions driven by signal control inputs are formulated based on their network-wide state-space representation. After modeling traffic control regulation constraints, an adaptive linear quadratic regulator algorithm is designed to maximize the network-wide total throughput under the current conditions. Optimal signal control split time durations for multiple intersections in the network are derived by solving the algebraic Riccati equation. Furthermore, the recursive least square parameter estimation method is employed to quantify dynamic traffic condition changes. To verify the effectiveness of this proposed signal control framework, both simulation and real-world experimental tests are conducted for multiple intersections in downtown Chattanooga, Tennessee, United States. In preparation for real-world experimental tests, pipelines for real-time data processing implementation and historical traffic flow data analysis are conducted. The test results demonstrate that the proposed control framework achieves a decrease in travel time by up to 19.4%, total time spent (TTS) by up to 11.9%, and relative queue balance (RQB) by up to 15.6%. The research findings indicate that the proposed signal control framework can be generalized to handle large scale signal control optimization network-wide.

97 MATHEMATICS AND COMPUTING↗

Co-scheduling of network resource provisioning and host-to-host bandwidth reservation on high-performance network and storage systems

A cross-domain network resource reservation scheduler configured to schedule a path from at least one end-site includes a management plane device configured to monitor and provide information representing at least one of functionality, performance, faults, and fault recovery associated with a network resource; a control plane device configured to at least one of schedule the network resource, provision local area network quality of service, provision local area network bandwidth, and provision wide area network bandwidth; and a service plane device configured to interface with the control plane device to reserve the network resource based on a reservation request and the information from the management plane device. Corresponding methods and computer-readable medium are also disclosed.

97 MATHEMATICS AND COMPUTING↗

Hybrid Multi-Layer Network Control for Emerging Cyber-Infrastructures

There were four basic task areas identified for the Hybrid-MLN project. They are: Multi-Layer, Multi-Domain, Control Plane Architecture and Implementation; Heterogeneous DataPlane Testing; Simulation; Project Publications, Reports, and Presentations.

97 MATHEMATICS AND COMPUTING↗

Sliding Mode Network Perimeter Control

Urban traffic congestion is a chronic problem faced by many cities in the US and worldwide. It results in inefficient infrastructure use as well as increased vehicle fuel consumption and emission levels. Congestion is intertwined with delay, as road users waste precious hours on the road, which in turn reduces productivity. Researchers have developed, and continue to design, tools and systems to alleviate this problem. Network perimeter control is one such tool that has been studied extensively. It attempts to control the flow of vehicles entering a protected area to ensure that the congested regime predetermined by the Network Fundamental Diagram (NFD) is not reached. In this paper, a method derived from sliding mode control theory is presented. Its main advantages over proportional-integral controllers include (1) minimal tuning, (2) no linearization of the governing equations, (3) no assumptions with regard to the shape of the NFD, and (4) ability to handle various demand profiles without the need to retune the controller. A sliding mode controller was implemented and tested on a congested grid network. The results show that the proposed controller produces network-wide delay savings and disperses congestion effectively.

42 ENGINEERING↗

LambdaStation: Exploiting Advance Networks In Data Intensive High Energy Physics Applications

Lambda Station software implements selective, dynamic, secure path control between local storage & analysis facilities, and high bandwidth, wide-area networks (WANs). It is intended to facilitate use of desirable, alternate wide area network paths which may only be intermittently available, or subject to policies that restrict usage to specified traffic. Lambda Station clients gain awareness of potential alternate network paths via Clarens-based web services, including path characteristics such as bandwidth and availability. If alternate path setup is requested and granted, Lambda Station will configure the local network infrastructure to properly forward designated data flows via the alternate path. A fully functional implementation of Lambda Station, capable of dynamic alternate WAN path setup and teardown, has been successfully developed. A limited Lambda Station-awareness capability within the Storage Resource Manager (SRM) product has been developed. Lambda Station has been successfully tested in a number of venues, including Super Computing 2008. LambdaStation software, developed by the Fermilab team, enables dynamic allocation of alternate network paths for high impact traffic and to forward designated flows across LAN. It negotiates with reservation and provisioning systems of WAN control planes, be it based on SONET channels, demand tunnels, or dynamic circuit networks. It creates End-To-End circuit between single hosts, computer farms or networks with predictable performance characteristics, preserving QoS if supported in LAN and WAN and tied security policy allowing only specific traffic to be forwarded or received through created path. Lambda Station project also explores Network Awareness capabilities.

97 MATHEMATICS AND COMPUTING↗

Cyber‐physical system testbed for power system monitoring and wide‐area control verification

The electric power system is intrinsically a cyber‐physical system (CPS) with power flowing inthe physical system and information flowing in the cyber‐network. Testbeds arecrucial for understanding the cyber‐physical interactions and provideenvironments for prototyping novel applications. This study proposes afour‐layer architecture for CPS testbeds with emphases on communication networkemulation and networked physical components. A configurable software‐definednetwork is employed to bridge physical components with wide‐area applicationsfor closed‐loop control. In order to distribute physically coupled devices intomultiple software simulations, this study proposes a data broker setup based ona distributed messaging environment to achieve low‐latency data streaming. Thedecoupled design with data streaming allows for building testbed components asmodules and running them in a distributed manner. Case studies verify the databroker setup for low‐latency sensing and actuation, as well as the communicationemulation setup for the desired network latency. Also illustrated is a replayattack scenario using synchrophasors in the Western Electricity CoordinatingCouncil (WECC) 181‐bus system for demonstrating the closed‐loop cyber‐physicalsimulation capability of the testbed.

Cui, Hantao↗