Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Three-Stage Production Cost Modeling Approach for Evaluating the Benefits of Intra-Hour Scheduling Between Balancing Authorities

This paper introduces a production cost modeling approach for evaluating the benefits of intra-hour scheduling among Balancing Authorities (BAs). System operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA) real time (RT). In addition to contingency reserve, each BA will need to carry out 'up' and 'down' load following and regulation reserve capacity requirements in the DA and HA time frames. In the RT simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current RT operation with hourly schedules, a new constraint was introduced to force each BA net exchange schedule deviation from HA schedules to be within North American Electric Reliability Corporation (NERC) area control error (ACE) limits. Case studies that investigate the benefits of moving from hourly exchange schedules between Western Electricity Coordinating Council (WECC) BAs into 10-minute exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.

17 WIND ENERGY↗

Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

Richards, Stephen F.↗

A hierarchically distributed architecture for fault isolation expert systems on the space station

The Space Station Axiomatic Fault Isolating Expert Systems (SAFTIES) system deals with the hierarchical distribution of control and knowledge among independent expert systems doing fault isolation and scheduling of Space Station subsystems. On its lower level, fault isolation is performed on individual subsystems. These fault isolation expert systems contain knowledge about the performance requirements of their particular subsystem and corrective procedures which may be involved in repsonse to certain performance errors. They can control the functions of equipment in their system and coordinate system task schedules. On a higher level, the Executive contains knowledge of all resources, task schedules for all systems, and the relative priority of all resources and tasks. The executive can override any subsystem task schedule in order to resolve use conflicts or resolve errors that require resources from multiple subsystems. Interprocessor communication is implemented using the SAFTIES Communications Interface (SCI). The SCI is an application layer protocol which supports the SAFTIES distributed multi-level architecture.

Miksell, Steve↗

A Comparison of Techniques for Scheduling Earth-Observing Satellites

Scheduling observations by coordinated fleets of Earth Observing Satellites (EOS) involves large search spaces, complex constraints and poorly understood bottlenecks, conditions where evolutionary and related algorithms are often effective. However, there are many such algorithms and the best one to use is not clear. Here we compare multiple variants of the genetic algorithm: stochastic hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on ten realistically-sized EOS scheduling problems. Schedules are represented by a permutation (non-temperal ordering) of the observation requests. A simple deterministic scheduler assigns times and resources to each observation request in the order indicated by the permutation, discarding those that violate the constraints created by previously scheduled observations. Simulated annealing performs best. Random mutation outperform a more 'intelligent' mutator. Furthermore, the best mutator, by a small margin, was a novel approach we call temperature dependent random sampling that makes large changes in the early stages of evolution and smaller changes towards the end of search.

Globus, Al↗

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incorporating energy storage and user experience in isolated microgrid dispatch using a multi-objective model

In order to coordinate multiple different scheduling objectives from the perspectives of economy, environment, and users, a practical multi-objective dynamic optimal dispatch model incorporating energy storage and user experience is proposed for isolated microgrids. In this model, besides microturbine units, energy storage is employed to provide spinning reserve services for microgirds; and furthermore, from the perspective of demand side management, a consumer satisfaction indicator is developed to measure the quality of user experience. A two-step solution methodology incorporating multi-objective optimisation and decision analysis is put forward to address this model. First, a powerful heuristic optimisation algorithm, called the -dominance based evolutionary algorithm, is used to find a well-distributed set of Pareto-optimal solutions of the problem. Thereby, the best compromise solutions are identified from the entire solutions with the use of decision analysis by integrating fuzzy C-means clustering and grey relation projection. The simulation results on the modified Oak Ridge National Laboratory Distributed Energy Control and Communication lab microgrid test system demonstrate the effectiveness of the proposed approach.

Li, Yang↗

Combining In-situ and In-transit Processing to Enable Extreme-Scale Scientific Analysis

With the onset of extreme-scale computing, I/O constraints make it increasingly difficult for scientists to save a sufficient amount of raw simulation data to persistent storage. One potential solution is to change the data analysis pipeline from a post-process centric to a concurrent approach based on either in-situ or in-transit processing. In this context computations are considered in-situ if they utilize the primary compute resources, while in-transit processing refers to offloading computations toa set of secondary resources using asynchronous data transfers. In this paper we explore the design and implementation of three common analysis techniques typically performed on large-scale scientific simulations: topological analysis, descriptive statistics, and visualization. We summarize algorithmic developments, describe a resource scheduling system to coordinate the execution ofvarious analysis workflows, and discuss our implementation using the DataSpaces and ADIOS frameworks that support efficient data movement between in-situ and in-transit computations. Wedemonstrate the efficiency of our lightweight, flexible framework by deploying it on the Jaguar XK6 to analyze data generated by S3D, a massively parallel turbulent combustion code. Our framework allows scientists dealing with the data deluge at extreme scale to perform analyses at increased temporal resolutions, mitigate I/O costs, and significantly improve the time to insight.

Bennett, Janine C.↗

Dispatch Manager for NEML2 Constitutive Model Calculations Embedded in MOOSE

This report describes the extended capabilities of the NEML2 constitutive modeling library, including a flexible and efficient work dispatching system designed to leverage both CPU and GPU resources. This enhancement addresses one of the primary computational challenges in large-scale simulations: the ability to distribute and execute batches of material model evaluations across heterogeneous computing devices. The new dispatch system introduces a modular set of dispatcher and scheduler classes that coordinate the flow of data and execution between devices. The dispatcher is responsible for efficiently packaging work, managing device-specific memory operations, and synchronizing results. This modularity allows for extensibility, making it straightforward to integrate additional computing backends in the future. From an implementation standpoint, the dispatcher system interfaces seamlessly with NEML2's existing models. They handle device-aware tensor operations, optimize memory transfers, and support asynchronous execution when applicable. This design ensures that batches of material points can be evaluated concurrently, substantially improving throughput compared to previous single-device or serial implementations. These improvements not only enhance the raw performance of NEML2 but also improve its usability in multiscale and high-fidelity simulations, where the simultaneous evaluation of large material point batches is critical. Benchmarks included in the report demonstrate the system’s scalability, highlighting its effectiveness when leveraging modern GPU architectures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

Source record↗

Government-to-government cooperation in space station development

A memoranda of understanding was recently signed between the United States (NASA) and three international Space Station partners - Canada, European Space Agency (ESA), and Japan. The international partners are performing parallel Phase B preliminary design studies, concurrent with the U.S., on their proposed elements/systems for possible integration and operation with the U.S. Space Station System complex. During the 21-month Space Station Phase B study, a large amount of technical interface data will have to be transferred between the U.S. and the international partners. Scheduled bilateral technical coordination meetings will also be held. The coordination and large number of interfaces required to integrate the international requirements into the Space Station require a clean interface management organizational structure and operation procedures to accomplish the integration task. The international coordination management organizational structure, management tools, and communications network are discussed including the proposed international elements/systems being studied by the international partners.

Nassiff, S. H.↗

Power spectra of mesospheric velocities in polar regions

The mobile SOUSY radar was operated on Andoya in Northern Norway during the MAP/WINE campaign from November 1983 to February 1984 and for about two weeks in June 1984 to study the seasonal dependence of mesospheric structures and dynamics at polar latitudes. During the winter period, measurements were carried out on 57 days, primarily in coordination with the schedule of the rocket experiments. Echoes were detected in the troposphere and stratosphere up to 30 km and at mesospheric heights from about 50 to 90 km with a distinct maximum around noon. In summer, the radar system was operated continuously from 19th to the 28th of June 1984. Echoes occurred almost for 24 hours in the height range from 70 to 95 km showing no recognizable diurnal variation. Similar observations in polar latitudes were carried out for several years with the Poker Flat Radar in Alaska.

Czechowsky, P.↗

Systems Architecture for Fully Autonomous Space Missions

The NASA Goddard Space Flight Center is working to develop a revolutionary new system architecture concept in support of fully autonomous missions. As part of GSFC's contribution to the New Millenium Program (NMP) Space Technology 7 Autonomy and on-Board Processing (ST7-A) Concept Definition Study, the system incorporates the latest commercial Internet and software development ideas and extends them into NASA ground and space segment architectures. The unique challenges facing the exploration of remote and inaccessible locales and the need to incorporate corresponding autonomy technologies within reasonable cost necessitate the re-thinking of traditional mission architectures. A measure of the resiliency of this architecture in its application to a broad range of future autonomy missions will depend on its effectiveness in leveraging from commercial tools developed for the personal computer and Internet markets. Specialized test stations and supporting software come to past as spacecraft take advantage of the extensive tools and research investments of billion-dollar commercial ventures. The projected improvements of the Internet and supporting infrastructure go hand-in-hand with market pressures that provide continuity in research. By taking advantage of consumer-oriented methods and processes, space-flight missions will continue to leverage on investments tailored to provide better services at reduced cost. The application of ground and space segment architectures each based on Local Area Networks (LAN), the use of personal computer-based operating systems, and the execution of activities and operations through a Wide Area Network (Internet) enable a revolution in spacecraft mission formulation, implementation, and flight operations. Hardware and software design, development, integration, test, and flight operations are all tied-in closely to a common thread that enables the smooth transitioning between program phases. The application of commercial software development techniques lays the foundation for delivery of product-oriented flight software modules and models. Software can then be readily applied to support the on-board autonomy required for mission self-management. An on-board intelligent system, based on advanced scripting languages, facilitates the mission autonomy required to offload ground system resources, and enables the spacecraft to manage itself safely through an efficient and effective process of reactive planning, science data acquisition, synthesis, and transmission to the ground. Autonomous ground systems in turn coordinate and support schedule contact times with the spacecraft. Specific autonomy software modules on-board include mission and science planners, instrument and subsystem control, and fault tolerance response software, all residing within a distributed computing environment supported through the flight LAN. Autonomy also requires the minimization of human intervention between users on the ground and the spacecraft, and hence calls for the elimination of the traditional operations control center as a funnel for data manipulation. Basic goal-oriented commands are sent directly from the user to the spacecraft through a distributed internet-based payload operations "center". The ensuing architecture calls for the use of spacecraft as point extensions on the Internet. This paper will detail the system architecture implementation chosen to enable cost-effective autonomous missions with applicability to a broad range of conditions. It will define the structure needed for implementation of such missions, including software and hardware infrastructures. The overall architecture is then laid out as a common thread in the mission life cycle from formulation through implementation and flight operations.

Esper, Jamie↗

Computational Model of Human and System Dynamics in Free Flight: Studies in Distributed Control Technologies

This paper presents a set of studies in full mission simulation and the development of a predictive computational model of human performance in control of complex airspace operations. NASA and the FAA have initiated programs of research and development to provide flight crew, airline operations and air traffic managers with automation aids to increase capacity in en route and terminal area to support the goals of safe, flexible, predictable and efficient operations. In support of these developments, we present a computational model to aid design that includes representation of multiple cognitive agents (both human operators and intelligent aiding systems). The demands of air traffic management require representation of many intelligent agents sharing world-models, coordinating action/intention, and scheduling goals and actions in a potentially unpredictable world of operations. The operator-model structure includes attention functions, action priority, and situation assessment. The cognitive model has been expanded to include working memory operations including retrieval from long-term store, and interference. The operator's activity structures have been developed to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. System stability and operator actions can be predicted by using the model. The model's predictive accuracy was verified using the full-mission simulation data of commercial flight deck operations with advanced air traffic management techniques.

Corker, Kevin M.↗

A Novel Application of TMA to Converging Runway Operations in a Simulated NextGen Environment

In 2013, the Airspace Operations Laboratory at NASA Ames Research Center conducted a human-in-the-loop simulation that examined the feasibility of applying a number of Next Generation Air Transportation System (NextGen) solutions to complex arrival operations in and around the New York metroplex. The delivery of arrivals to Newark Liberty International Airport (EWR) was the focus of this simulation, which involved extending the Terminal Sequencing and Spacing (TSS) scheduling capability to precisely schedule arrivals to intersecting runways 22 Left and 11. An important enabler for the concept was the availability of a dependent runway scheduler that was able to coordinate arrival times between aircraft landing on intersecting runways. At the time of the study, there was no functionality within the TSS scheduler to automatically create the dependent runway schedules. Instead, a Traffic Management Coordinator (TMC) manually created a de-conflicted schedule, which allowed for the concept to be tested as well as provided valuable insight into the tool requirements for a dependent runway scheduler. Throughout the course of preparations for the simulation, the individual serving as the TMC developed a number of strategies and procedures for manually adjusting the Scheduled Time of Arrival (STA) of the EWR arrivals in order to ensure that adequate spacing was provided between runway 22L and 11 arrival pairs. This paper describes the strategies and procedures that were developed and details how they were successfully applied during the simulation. Results will also be presented that shed additional light on exactly how the schedules were manipulated and their impact on delivery performance and safety. Ideas for additional TSS enhancements and next steps, based on participant feedback, will also be presented.

Homola, Jeffrey↗

Shared automated vehicle fleet operations for first-mile last-mile transit connections with dynamic pooling

Shared automated vehicles (SAVs) have the potential to promote transit ridership by providing efficient first-mile last-mile (FMLM) connections through reduced operational costs to fleet providers and lower out-of-pocket costs to riders. To help plan for a future of integrated mobility, this paper investigates the impacts of SAVs serving FMLM connections, as a mode that provides flexibility in access/egress decisions and is well coordinated with train station schedules. To achieve this objective, a novel dynamic pooling algorithm was introduced to match SAVs with riders while coordinating the riders' arrival times at the light-rail station to a known train schedule. Microsimulations of SAVs and travelers throughout two central Austin neighborhoods show how larger service areas, higher levels of SAV demand, and longer arrival times between successive trains require larger SAV fleet sizes and higher SAV utilization rates to deliver close traveler wait times. Four-person SAVs appear to perform similar to 6-seat SAVs but will cost less to provide. Using a dynamic pooling algorithm tightly coordinated with train arrivals (every 15 min) delivers 87% of travelers to their stations in time to catch the next train, whereas uncoordinated assignments deliver just 58% of travelers in time.

33 ADVANCED PROPULSION SYSTEMS↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Q-IRIS: The Evolution of the IRIS Task-Based Runtime to Enable Classical-Quantum Workflows

Extreme heterogeneity in emerging HPC systems are starting to include quantum accelerators, motivating runtimes that can coordinate between classical and quantum workloads. We present a proof-of-concept hybrid execution framework integrating the IRIS asynchronous task-based runtime with the XACC quantum programming framework via the Quantum Intermediate Representation Execution Engine (QIR-EE). IRIS orchestrates multiple programs written in the quantum intermediate representation (QIR) across heterogeneous backends (including multiple quantum simulators), enabling concurrent execution of classical and quantum tasks. Although not a performance study, we report measurable outcomes through the successful asynchronous scheduling and execution of multiple quantum workloads. To illustrate practical runtime implications, we decompose a four-qubit circuit into smaller subcircuits through a process known as quantum circuit cutting, reducing per-task quantum simulation load and demonstrating how task granularity can improve simulator throughput and reduce queueing behavior -- effects directly relevant to early quantum hardware environments. We conclude by outlining key challenges for scaling hybrid runtimes, including coordinated scheduling, classical-quantum interaction management, and support for diverse backend resources in heterogeneous systems.

Miniskar, Narasinga Rao [ORNL] (ORCID:000000018259↗