Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost benefit analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Evaluation of a Drag-Free Control Concept for Missions in Low Earth Orbit

Atmospheric drag causes the greatest uncertainty in the equations of motion for spacecraft in Low Earth Orbit (LEO). If atmospheric drag eflects can be continuously and autonomously counteracted through the use of a drag-fee control system, drag may essentially be eliminated from the equations of motion for the spacecraft. The main perturbations on the spacecraft will then be those due to the gravitational field, which are much more easily predicted Through dynamical analysis and numerical simulation, this paper presents some potential costs and benefits associated with the fuel used during continuous drag compensation. In light of this cost-benefit analysis, simulation results are used to validate the concept of drag-free control for LEO spacecraft missions having certain characteristics.

Fleck, Melissa E.↗

The resilience value of residential solar + storage systems in the continental U.S.

Abstract Behind the meter rooftop solar plus storage (PVESS) has the potential to benefit the hosting customers by providing affordability, environmental, and reliability and resilience value. Whereas the bill reduction and environmental benefits of PVESS are well studied, its monetary resilience benefits are less understood. The increasing trend of power interruptions driven by extreme weather events heightens the need to understand these benefits. This study leverages various publicly available datasets to perform a cost benefit analysis of adding to determine the resilience value of PVESS for a typical single family home in each county in the continental U.S. We find that PVESS is very effective to technically mitigate interruptions across the country. However, the monetary benefits in the base case only cover about 14% of battery costs, with no county exceeding 60%. This is somewhat expected, given that PVESS provide other monetary benefits that are not part of this analysis. Through sensitivities, we find that higher frequency of extreme weather events roughly triples the resilience value of PVESS and that higher values of lost load double the same metric. Our sensitivity analysis shows that the benefit cost ratio of PVESS for customers living in areas with higher-than-average frequency of long duration interruptions and value of lost load is already above one even without considering other value streams. We conclude with recommendations that regulators and utilities could implement to enable customers to calculate and capture the resilience value of PVESS more efficiently.

Baik, Sunhee↗

Monitoring the defoliation of hardwood forests in Pennsylvania using LANDSAT

An automated system for conducting annual gypsy moth defoliation surveys using LANDSAT MSS data and digital processing techniques is described. A two-step preprocessing procedure was developed that uses multitemporal data sets representing forest canopy conditions before and after defoliation to create a digital image in which all nonforest cover types are eliminated or masked out of a LANDSAT image that exhibits insect defoliation. A temporal window for defoliation assessment was identified and a statewide data base was established. A data management system to interface image analysis software with the statewide data base was developed and a cost benefit analysis of this operational system was conducted.

Dottavio, C. L.↗

Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

Identifying and selecting alternative materials and technologies that have the potential to reduce the identified HazMats and hazardous air pollutants (HAPs), while incorporating sound corrosion prevention and control technologies, is a complicated task due to the fast pace at which new technologies emerge and rules change. The alternatives are identified through literature searches, electronic database and Internet searches, surveys, and/or personal and professional contacts. Available test data was then compiled on the proposed alternatives to determine if the materials meet the test objectives or if further)laboratory or field-testing will be required. After reviewing technical information documented in the PAR, government representatives, technical representatives from the affected facilities, and other stakeholders involved in the process will select the list of viable alternative coatings for consideration and testing under the project's Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes and Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, both prepared by ITB. Test results will be reported in a Joint Test Report upon completion oftesting. The selection rationale and conclusions are documented in this PAR. A cost benefit analysis will be prepared to quantify the estimated capital and process costs of coating alternatives and cost savings relative to the current coating processes, however, some initial cost data has been included in this PAR. For this coatings project, isocyanates, as found in aliphatic isocyanate polyurethanes, were identified as the target HazMat to be eliminated. Table 1-1 lists the target HazMats, the related process and application, current specifications, and affected programs.

Lewis, pattie↗

Characterization of 10-ft. Diameter Aluminum Alloy 2219 Integrally Stiffened Cylinders

The integrally stiffened cylinder (ISC) process, pioneered by NASA Langley Research Center, offers significant savings for launch vehicle structures. The ISC process is a near net shape, advanced manufacturing method for fabrication of single-piece, thin-walled barrels with internal longitudinal stiffeners, eliminating the need for longitudinal welding and machining. A cost-benefit analysis of the ISC process estimated a 50 % reduction in manufacturing costs and a 10% weight savings over the current multi-piece, machined and welded construction approach for stiffened barrels. In 2017, commercial-scale manufacturing trials were pursued, leading to a successful manufacturing demonstration of 10-ft. diameter ISC barrels fabricated from Al alloy 2219. Some cracking was observed in the stiffeners during fabrication. Optical metallography was performed to evaluate the as-formed microstructures to identify potential causes of cracking, along with mechanical testing to evaluate formability. Results revealed that cracking in the stiffeners was attributed to three likely causes: 1) large Al-Cu stringer particles, 2) stick-slip friction between the mandrel and ISC due to non-optimized lubrication, and 3) differences in material flow rate between the wall and stiffener locations. Testing to gauge formability revealed a significant decrease in ductility in the longitudinal directional for the as-formed condition, attributed to reduced ductility due to the large Al-Cu stringer particles. These results provide guidance toward materials and processing modifications for future ISC forming trials.

Tayon, Wesley A.↗

Electroprecipitation Mechanism Enabling Silica and Hardness Removal through Aluminum-Based Electrocoagulation

We evaluate the effectiveness of an aluminum-based electrocoagulation pretreatment system to remove dissolved silica and hardness. Silica and hardness limit water recovery during membrane-based desalination applications when silica and hardness exceed the solubility limit and generate scale on the membrane surface. We show that simultaneous removal of nearly all silica (95 ± 4%) and a significant amount of hardness (40–60%) occurs with a hydraulic residence time of 2 h and a charge loading between 0 and 1200 C/L. Increasing the residence time maximized the hardness removal (58 ± 8%) via the formation of larger flocs, which allowed for more constituent removal by gravity settling. We highlight the trade-offs between improved energy efficiency at lower charge loadings and an improved removal rate at a higher charge loading. We further compare the percentage of silica and hardness removed in multicomponent solutions and compare this to single component feed solution. We discuss the implications that operational considerations have in terms of cost and treatment capacity. Finally, a cost–benefit analysis comparing chemical coagulation with electrocoagulation indicates that electrocoagulation could be half the cost of chemical coagulation and could produce more stable effluent pH and conductivity.

36 MATERIALS SCIENCE↗

Update on Multi-Variable Parametric Cost Models for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to perform relative cost comparisons between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. This paper reports on recent revisions and improvements to our ground telescope cost model and refinements of our understanding of space telescope cost models. One interesting observation is that while space telescopes are 50X to 100X more expensive than ground telescopes, their respective scaling relationships are similar. Another interesting speculation is that the role of technology development may be different between ground and space telescopes. For ground telescopes, the data indicates that technology development tends to reduce cost by approximately 50% every 20 years. But for space telescopes, there appears to be no such cost reduction because we do not tend to re-fly similar systems. Thus, instead of reducing cost, 20 years of technology development may be required to enable a doubling of space telescope capability. Other findings include: mass should not be used to estimate cost; spacecraft and science instrument costs account for approximately 50% of total mission cost; and, integration and testing accounts for only about 10% of total mission cost.

Stahl, H. Philip↗

Towards a Multi-Variable Parametric Cost Model for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to perform relative cost comparisons between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. This paper hypothesizes a single model, based on published models and engineering intuition, for both ground and space telescopes: OTA Cost approximately (X) D(exp (1.75 +/- 0.05)) lambda(exp(-0.5 +/- 0.25) T(exp -0.25) e (exp (-0.04)Y). Specific findings include: space telescopes cost 50X to 100X more ground telescopes; diameter is the most important CER; cost is reduced by approximately 50% every 20 years (presumably because of technology advance and process improvements); and, for space telescopes, cost associated with wavelength performance is balanced by cost associated with operating temperature. Finally, duplication only reduces cost for the manufacture of identical systems (i.e. multiple aperture sparse arrays or interferometers). And, while duplication does reduce the cost of manufacturing the mirrors of segmented primary mirror, this cost savings does not appear to manifest itself in the final primary mirror assembly (presumably because the structure for a segmented mirror is more complicated than for a monolithic mirror).

Space Mirror Technology↗

Optical Telescope Assembly Cost Estimating Model

Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5- parameter cost model that explains 93% (Adjusted R2) of the cost variation in a database of 46 total ground and space telescope assemblies. This model can be used to estimate the most probably cost for the Habitable Exoplanet Telescope Assembly.

Stahl, H Philip↗

Parametric Cost Model for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5-parameter first-article optical telescope assembly cost model OTA$ (FY17) = $20M x 30(S/G)x D(1.7)x λ(-0.5)x T(-0.25)x e(-0.028) (Y-1960)Where S/G = 1 for space and 0 for ground telescopes, D = diameter, λ= diffraction limited wavelength, T = operating temperature and Y = year of development. The model explains 92% (Adjusted R2) of the cost variation in a database of 47 total ground and space telescope assemblies (OTA). The MSFC model estimates the most likely cost for only the OTA. Where an OTA is defined as the subsystem which collects electromagnetic radiation and focuses it (focal) or concentrates it (afocal) into the science instruments. An OTA consists of the primary mirror, secondary mirror, auxiliary optics and support structure (such as optical bench or truss structure, primary support structure, secondary support structure or spiders, straylight baffles, mechanisms for adjusting the optical components, electronics or power systems for operating these mechanisms, etc.). Finally, duplication only reduces cost for the manufacture of identical systems(i.e. multiple aperture sparse arrays or interferometers). And, while duplication does reduce the cost of manufacturing the mirrors of segmented primary mirror, this cost savings does not appear to manifest itself in the final primary mirror assembly(presumably because the structure for a segmented mirror is more complicated than for a monolithic mirror).

Space Telescope Cost Model, Parametric Cost Model↗

Parts Quality Management: Direct Part Marking via Data Matrix Symbols for Mission Assurance

A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part-marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using 15 marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, orbital), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (data plates, label printing, direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including in-house vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

Moss, Chantrice↗

Forecasting the impact of virtual environment technology on maintenance training

To assist NASA and the Air Force in determining how and when to invest in virtual environment (VE) technology for maintenance training, we identified possible roles for VE technology in such training, assessed its cost-effectiveness relative to existing technologies, and formulated recommendations for a research agenda that would address instructional and system development issues involved in fielding a VE training system. In the first phase of the study, we surveyed VE developers to forecast capabilities, maturity, and estimated costs for VE component technologies. We then identified maintenance tasks and their training costs through interviews with maintenance technicians, instructors, and training developers. Ten candidate tasks were selected from two classes of maintenance tasks (seven aircraft maintenance and three space maintenance) using five criteria developed to identify types of tasks most likely to benefit from VE training. Three tasks were used as specific cases for cost-benefit analysis. In formulating research recommendations, we considered three aspects of feasibility: technological considerations, cost-effectiveness, and anticipated R&D efforts. In this paper, we describe the major findings in each of these areas and suggest research efforts that we believe will help achieve the goal of a cost-effective VE maintenance training system by the next decade.

Schlager, Mark S.↗

Parametric Cost Models for Space Telescopes

Multivariable parametric cost models for space telescopes provide several benefits to designers and space system project managers. They identify major architectural cost drivers and allow high-level design trades. They enable cost-benefit analysis for technology development investment. And, they provide a basis for estimating total project cost. A survey of historical models found that there is no definitive space telescope cost model. In fact, published models vary greatly [1]. Thus, there is a need for parametric space telescopes cost models. An effort is underway to develop single variable [2] and multi-variable [3] parametric space telescope cost models based on the latest available data and applying rigorous analytical techniques. Specific cost estimating relationships (CERs) have been developed which show that aperture diameter is the primary cost driver for large space telescopes; technology development as a function of time reduces cost at the rate of 50% per 17 years; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and increasing mass reduces cost.

Stahl, H. Philip↗

Parts Quality Management: Direct Part Marking of Data Matrix Symbol for Mission Assurance

A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using direct part marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, Low Earth Orbit), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (label printing, data plates, and direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including inhouse vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

Moss, Chantrice↗

Environmental and cost benefits of multi‐purpose buffers in an agricultural watershed for biomass production

Abstract The cost‐benefit of riparian buffers to landowners has not been fully understood despite its ecosystem benefits. This study investigates the environmental and economic value of multi‐purpose buffers for biomass production under alternative land‐management scenarios at the watershed scale. The work incorporates the Soil and Water Assessment Tool with a field‐scale tool, the Agriculture Conservation Practice Framework, and cost‐benefit analysis. Our work took place in the agriculturally dominant Raccoon River watershed (RRW) in Iowa. The cost analysis includes implementing and harvesting the switchgrass buffers, the value of nitrogen and phosphorus fertilizer, and the forgone income of cropland to determine the net return under 12 alternative feedstock scenarios. We estimated that 14 603 Mg of nitrogen and 2563 Mg of phosphorus runoffs can be intercepted by riparian buffers in the RRW, representing a nutrient loss reduction of 11% of nitrogen and 26% of phosphorus. These nutrients are valued at $1.31 million (M) for phosphorus and $1.24 M for nitrogen as fertilizers. The trapped nutrients account for 12% of the riparian buffers’ total cost. We found that net economic returns increase with biomass market price, increase with maintenance fertilizer application, and decrease with the cropland areas that are converted to buffers. Under current land management, a biomass market price at $60 per dry ton of biomass would be economically viable at the sub‐basin level when maintenance fertilizers are applied. At $80 per dry ton, all 108 sub‐basins in the RRW would be profitable up to $517 a year. The results highlight the trade‐offs between water quality and profitability. Published 2021. This article is a U.S. Government work and is inthe public domain in the USA. Biofuels, Bioproducts and Biorefining published by Society of Industrial Chemistry and John Wiley & Sons Ltd.

09 BIOMASS FUELS↗

How to Design and Implement an Equitable Building Performance Standard: Lessons from the Building Performance Standards Technical Assistance Network

States and local governments seek to accomplish the intersecting goals of reducing greenhouse gas emissions, improving building operations, and bettering the daily lives of their communities. Building Performance Standards (BPS) have emerged as a critical policy lever to reach these intertwined climate and societal goals. These policies, if shaped and implemented well, have the chance to not only help reach our nation's climate, energy, and livability goals, but to do so with the active participation of those traditionally excluded from policy processes. This nascent policy movement provides jurisdictions across the country the opportunity to shape these policies from the outset to deliver comfort, health, and safety in our built environment for all. The US Department of Energy in partnership with our National Laboratories have been providing technical assistance for jurisdictions interested in, adopting, and implementing Building Performance Standards. Through this work, the BPS Technical Assistance Network (TA Network) has tracked and documented the innovative and equitable approaches to BPS across the country. The TA Network has crafted foundational technical analysis, such as building stock and emissions impacts, equity prioritization and peak load impacts, and aggregated cost benefit analysis. And by combining powerful technical analysis with dissemination of best practices resources to support equitable implementation, the TA Network provides jurisdictions with the tools and support necessary to embark on their ambitious policy goals.

building performance standards↗

Looking Beyond Bill Savings to Equity in Renewable Energy Microgrid Deployment

Microgrids powered by renewable energy can provide backup power to critical infrastructure during grid outages. These systems can also play an important role in advancing energy justice by providing economic, environmental, health, and resilience benefits for underserved communities. The value of microgrids is often measured by the economic savings and resilience provided, but there are other energy justice factors that should be considered. This paper describes a methodology for quantifying broader costs and benefits including utility bill savings, value of resilience, social cost of carbon, public health costs, and jobs associated with the construction and operation of microgrids. We evaluate these factors at three case study sites and find that including energy justice values in the cost-benefit analysis of microgrids can change investment decisions. When climate, health, resilience, and job creation are considered, cost-optimal microgrids include more renewable generation, leading to a 52-82% reduction in emissions and diesel fuel use. The net present values of the microgrids grow from negative $626,000-843,000 in the diesel only case to $10-16 million in the hybrid microgrid case and $12-19 million in the renewable microgrid case, indicating potential for greater microgrid deployment if energy justice values are incorporated in decision making. However, we also see large increases in capital expenses, which could limit deployment unless accompanied by innovative financing measures. These findings may be useful to communities as they seek to strengthen resilience to natural disasters while also improving public health, meeting climate goals, and providing economic opportunity for residents.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development and Characterization of the Integrally Stiffened Cylinder (ISC) Process for Launch Vehicles and Aircraft Fuselage Structures

Over the past decade, NASA Langley has led development of the Integrally Stiffened Cylinder (ISC) Process, a near-net shape, flow-forming technology. This innovative process is being evaluated for launch vehicle and commercial aircraft manufacturing. A thick-walled, cylindrical preform is flow-formed in a single operation into a thin-walled barrel with longitudinal stiffeners. The one-piece, stiffened barrels offer a direct replacement for conventional multi-piece welded or riveted structures. A cost-benefit analysis for launch vehicles estimated that the ISC process offers up to a 50% reduction in manufacturing costs and a 10% reduction in mass. NASA, the European Space Agency (ESA), and industry partners have teamed to manufacture 10-ft. diameter aluminum ISCs. The intent is to demonstrate the commercial viability of the process at a scale relevant to the commercial launch and aircraft industries. Development activities will be presented, including process scale-up, formability assessment, microstructural analysis, and mechanical property testing.

ISC, flow forming, near net shape↗