Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Silicon material task - Low cost solar array project /JPL/DOE/

The paper describes the silicon material task of the low-cost solar array project, which has the objective of establishing a silicon production capability equivalent to 500 mW per year at a price less than 10 dollars/kg (1975 dollars) in 1986. The task program is divided into four phases: technical feasibility, scale-up studies (the present phase), experimental process system development units, and implementation of large-scale production plants, and it involves the development of processes for two groups of materials, that is, semiconductor grade and solar cell grade. In addition, the effects of impurities on solar cell performance are being investigated. Attention is given to problem areas of the task program, such as environmental protection, material compatibility between the reacting chemicals and materials of construction of the equipment, and waste disposal.

Lutwack, R.↗

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merion M.↗

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merlon M.↗

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merlon M.↗

The parabolic concentrating collector: A tutorial

A tutorial overview of point-focusing parabolic collectors is presented. Optical and thermal characteristics are discussed. Data representing typical achievable collector efficiencies are presented and the importance of balancing collector cost with concentrator quality is argued through the development of a figure of merit. Various types of two-axis tracking collectors are described. The Department of Energy program to develop these devices is briefly discussed, as are present and projected costs for these collectors.

Truscello, V. C.↗

Economical space power systems

A commercial approach to design and fabrication of an economical space power system is investigated. Cost projections are based on a 2 kW space power system conceptual design taking into consideration the capability for serviceability, constraints of operation in space, and commercial production engineering approaches. A breakdown of the system design, documentation, fabrication, and reliability and quality assurance estimated costs are detailed.

Burkholder, J. H.↗

Solar Stirling system development

A low-cost, high-efficiency dish-Stirling solar thermal-electric power system is being developed for test in 1981. System components are the solar concentrator, receiver, fossil fuel combustor, thermal energy storage (TES), engine-generator, and power processing. System conceptualization is completed and design is in progress. Two receiver alternatives are being evaluated, a direct-coupled receiver-engine configuration with no TES and a heat pipe receiver with TES. System cost projections are being made. Goals for the system development task are (1) to develop an advanced dish-Stirling technology, utilizing a team of industrial contractors, (2) to demonstrate that technology at the system level, and (3) to determine how to achieve low production cost.

Stearns, J. W., Jr.↗

Outer-planet probe/flyby missions

Results are presented for preliminary studies of low-cost outer-planet probe/flyby missions. The scientific rationale for such missions is discussed, along with possible mission modes, spacecraft concepts, launch-vehicle options, and a recommended set of outer-planet missions. Descriptions are given for a 1990 Titan probe/flyby mission and a 1991 Saturn probe/flyby mission. Projected costs are analyzed for these two missions as well as for a 1992 Neptune probe/flyby mission, a 1994 Uranus probe/flyby mission, and a 2003 Pluto flyby mission.

Swenson, B. L.↗

Apogee motor rocketry reliability improvements

Since 1963, solid-propellant apogee motors have been placing satellites into geosynchronous orbits. Major technological breakthroughs are not required to satisfy future mission requirements; however, there is a need to improve reliability to enhance cost effectiveness. A summary of results and conclusions derived from a review of missions, where failure of a solid motor was inferred, and from a correlation of system factors with failures are reported. Highlights of a solid motor diagnostic instrumentation study are presented. Finally, recommendations are provided for areas of future apogee motor upgrade, which will increase project cost effectiveness by reducing the potential for future flight failures.

Behm, J.↗

The Lunar Mapping and Modeling Project

LMMP was initiated in 2007 to help in making the anticipated results of the LRO spacecraft useful and accessible to Constellation. The LMMP is managing and developing a suite of lunar mapping and modeling tools and products that support the Constellation Program (CxP) and other lunar exploration activities. In addition to the LRO Principal Investigators, relevant activities and expertise that had already been funded by NASA was identified at ARC, CRREL (Army Cold Regions Research & Engineering Laboratory), GSFC, JPL, & USGS. LMMP is a cost capped, design-to-cost project (Project budget was established prior to obtaining Constellation needs)

Noble, Sarah↗

Apogee motor rocketry reliability improvements

Since 1963, solid propellant apogee motors have been placing satellites into geosynchronous orbits. Major technological breakthroughs are not required to satisfy future mission requirements; however, there is a need to improve reliability to enhance cost effectiveness. Several management test options are discussed. A summary of results and conclusions derived from review of missions, where failure of a solid motor was inferred, and correlation of system factors with failures are reported. Highlights of a solid motor diagnostic instrumentation study are presented. Finally, recommendations are provided for areas of future apogee motor upgrade, which will increase project cost effectiveness by reducing the potential for future flight failures.

Behm, J.↗

But what will it Cost? The history of NASA cost estimating

Within two years of being chartered in 1958 as an independent agency to conduct civilian pursuits in aeronautics and space, NASA absorbed either wholly or partially the people, facilities, and equipment of several existing organizations. These included the laboratories of the National Advisory Committee of Aeronautics (NACA) at Langley Research Center in Virginia, Ames Research Center in California, and Lewis Research Center in Ohio; the Army Ballistic Missile Agency (ABMA) at Redstone Arsenal Alabama, for which the team of Wernher von Braun worked; and the Department of Defense Advanced Research Projects Agency (ARPA) and their ongoing work on big boosters. These were especially valuable resources to jump start the new agency in light of the shocking success of the Soviet space probe Sputnik in the autumn of the previous year and the corresponding pressure from an impatient American public to produce some response. Along with these inheritances, there came some existing systems engineering and management practices, including project cost estimating methodologies. This paper will briefly trace the origins of those methods and how they evolved within the agency over the past three decades.

Hamaker, Joseph W.↗

Recycling Flight Hardware Components and Systems to Reduce Next Generation Research Costs

With the recent 'new direction' put forth by President Obama identifying NASA's new focus in research rather than continuing on a path to return to the Moon and Mars, the focus of work at Kennedy Space Center (KSC) may be changing dramatically. Research opportunities within the micro-gravity community potentially stands at the threshold of resurgence when the new direction of the agency takes hold for the next generation of experimenters. This presentation defines a strategy for recycling flight experiment components or part numbers, in order to reduce research project costs, not just in component selection and fabrication, but in expediting qualification of hardware for flight. A key component of the strategy is effective communication of relevant flight hardware information and available flight hardware components to researchers, with the goal of 'short circuiting' the design process for flight experiments

Turner, Wlat↗

Excavation costs for lunar materials

A lunar strip mining system is presented which is capable of excavating and transporting 3 million metric tons of ore per year to a central processing plant on the moon's surface. The mining system would grow from a single front-end loader in the first year, to a fleet of ten haulers in the 30th year. Lunar personnel requirements would consist of a single individual, whose primary function would be to perform maintenance. All of the mining equipment would either operate automatically or by remote control from earth. The projected cost for the lunar mining system is approximately $12 to $37 per ton of ore over the life of the mine, an important part of the overall economics of exploiting lunar resources.

Carrier, W. D., III↗

Developing a Standard Test Program for CubeSats

Developers of CubeSats and other miniaturized satellites often lack the schedule and budget to devise and implement an extensive environmental test campaign. CubeSat projects have become increasingly common at Jet Propulsion Laboratory (JPL) over the past few years, revealing the need for a standard CubeSat test program to maximize the likelihood of mission success while meeting project cost and schedule constraints. In this paper, we describe our efforts to develop a general protoflight test program for CubeSats in low-Earth orbit (LEO) and compare this test program with a typical test program for non-CubeSat LEO satellites and instruments. We investigate the effectiveness of the CubeSat test program—both as a design and workmanship screen and as a standard needing minimal project-specific tailoring—and discuss potential areas for improvement.

Seal, Gabriella L.↗

NASA Earth Exchange – Current overview of climate and wildfire-oriented works

NASA Earth Exchange (NEX) combines state-of-the-art supercomputing, Earth system modeling, and NASA remote sensing data feeds to deliver a work environment for exploring and analyzing petabyte-scale datasets covering large regions, continents, or the globe. As an accessible platform, NEX can accelerate fundamental research, develop new applications, and reduce overall project costs by providing the research community with data, software, and high-end computing power. Two research thrusts for the NEX community are developing and distributing the NEX-GDDP-CMIP6 downscaled climate dataset and the community-driven wildfire research. NEX-GDDP-CMIP6 dataset is comprised of global downscaled climate scenarios derived from the General Circulation Model (GCM) runs conducted under the Coupled Model Intercomparison Project Phase 6 (CMIP6) and across two of the four “Tier 1” greenhouse gas emissions scenarios known as Shared Socioeconomic Pathways (SSPs). The wildfire research thrust leverages geostationary and low earth orbit remote sensing platforms and advanced modeling (WRF). We present a high-level overview of the NEX community, discuss relevant datasets and show several visualization techniques of data used in the wildfire research activity.

NEX↗

Analysis of success probability/cost trades for small landers in a Mars network

The premise to be tested in this analysis is whether cost economics may accrue by delivering more landers designed to lower reliability of operation (compared to fewer landers of higher reliability) to obtain a desired probability of achieving a given number of lander successes. Generally, the application in mind is a network of penetrators, although the analysis may apply as well to other small lander concepts or even to simple rovers. The method of analysis is based on a probabilistic model of lander success and a related probabilistic model of project cost including the lander, spacecraft carrier, and integration, but not launch or operations costs. Quantitative results are obtained in a normalized and parametric fashion. Sensitivity to the assumed model parameters is also examined.

Friedlander, Alan L.↗

A Mars environmental survey (MESUR) - Feasibility of a low cost global approach

In situ measurements of Mars' surface and atmosphere are the objectives of a novel network mission concept called the Mars Environmental SURvey (MESUR). As envisioned, the MESUR mission will emplace a pole-to-pole global distribution of 16 landers on the Martian surface over three launch opportunites using medium-lift (Delta-class) launch vehicles. The basic concept is to deploy small free-flying probes which would directly enter the Martian atmosphere, measure the upper atmospheric structure, image the local terrain before landing, and survive landing to perform meteorology, seismology, surface imaging, and soil chemistry measurements. Data will be returned via dedicated relay orbiter or direct-to-earth transmission. The mission philosophy is to: (1) 'grow' a network over a period of years using a series of launch opportunities; (2) develop a level-of-effort which is flexible and responsive to a broad set of objectives; (3) focus on Mars science while providing a solid basis for future human presence; and (4) minimize overall project cost and complexity wherever possible.

Hubbard, G. S.↗