At least 91 records · Page 5

Cost, capability, and risk for planetary operations

The three key factors for flight projects - cost, capability, and risk - are examined with respect to their interplay, the uplink process, cost drivers, and risk factors. Scientific objectives are translated into a computer program during the uplink process, and examples are given relating to the Voyager Interstellar Mission, Galileo, and the Comet Rendezvous Asteroid Flyby. The development of a multimission sequence system based on these uplinks is described with reference to specific subsystems such as the pointer and the sequence generator. Operational cost drivers include mission, flight-system, and ground-system complexity, uplink traffic, and work force. Operational risks are listed in terms of the mission operations, the environment, and the mission facilities. The uplink process can be analyzed in terms of software development, and spacecraft operability is shown to be an important factor from the initial stages of spacecraft development.

Mclaughlin, William I.↗

Spacecraft platform cost estimating relationships

The three main cost areas of unmanned satellite development are discussed. The areas are identified as: (1) the spacecraft platform (SCP), (2) the payload or experiments, and (3) the postlaunch ground equipment and operations. The SCP normally accounts for over half of the total project cost and accurate estimates of SCP costs are required early in project planning as a basis for determining total project budget requirements. The development of single formula SCP cost estimating relationships (CER) from readily available data by statistical linear regression analysis is described. The advantages of single formula CER are presented.

Gruhl, W. M.↗

A Systematic Framework for Projecting the Future Cost of Offshore Wind Energy

Offshore wind costs are expected to decline rapidly in the short and medium term future as the industry grows and gains experience in manufacturing, installing, and operating commercial scale projects. Estimating the future costs of offshore wind energy is critical for evaluating the technology's economic performance, how it can fit into a broader clean energy economy, and how R&D investment can be allocated to advance the technology. We present a newly developed approach for forecasting these costs which focuses on an empirically-derived learning rate for capital costs and prescribed cost and performance improvements for operational costs and capacity factor. We establish baseline costs for a series of reference fixed-bottom and floating projects in 2021 and project cost trajectories to 2035, presenting both an average cost trajectory as well as describing the range of potential future costs associated with site-specific cost variations and uncertainty in the estimate of the learning rate. We also conduct sensitivity analyses showing the impact of different global deployments by 2035 and variations in the prescribed operational costs and capacity factors. The results show that fixed-bottom and floating offshore wind capital costs could decrease to around $\$$2,400/kW and $\$$3,300/kW by 2035, respectively, with ranges of $\$$2,100/kW - $\$$2,750/kW for fixed-bottom projects and $\$$2,850/kW - $\$$5,500/kW for floating projects. The levelized cost of energy of fixed-bottom and floating wind projects could decrease to $\$$53.1/MWh and $\$$63.9/MWh by 2035, with ranges of $\$$48.4/MWh - $\$$59.7/MWh for fixed-bottom projects and $\$$46.5/MWh - $\$$99.9/MWh for floating projects. By presenting the uncertainty associated with the forecast we provide a transparent description of the spectrum of potential cost trajectories for offshore wind.

17 WIND ENERGY↗

LSA Low-cost Solar Array project

The activities of the Low-Cost Silicon Solar Array Project during the period October through December, 1977 are reported. The LSSA Project is assigned responsibility for advancing silicon solar array technology while encouraging industry to reduce the price of arrays to a level at which photovoltaic electric power systems will be competitive with more conventional power sources early in the next decade. Set forth are the goals and plans with which the Project intends to accomplish this and the progress that was made during the quarter.

Source record↗

Site Selection and Cost Estimation of Pilot-Scale CO2 Saline Storage Study in the Gulf of Mexico

Presentation at NETL Carbon Management Project Review Meeting held in Pittsburgh, Pennsylvania, August 15–19, 2022. The presentation provides a high-level overview of initial conceptual analysis evaluating site selection, geologic assessment, infrastructure, and project cost considerations associated with the development of pilot-scale CO2 storage projects in the offshore Gulf of Mexico.

Wijaya, Nur↗

The influence of various test plans on mission reliability

Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

Stahle, C. V.↗

Process-based balance of system cost modeling for offshore wind power plants in the United States

This paper describes the development of a process-based and open-source balance of system cost model that provides the capability to evaluate both existing and novel offshore wind technologies. Individual design and installation steps are represented with bottom-up engineering models that compute times and costs associated with the process; furthermore, operational constraints are assigned to each process so that delays caused by weather and presence of marine mammals may be accounted for in the overall project timeline. The model structure, assumptions, inputs, and results are vetted with industry partners and compared against actual projects for validation. Installation times show reasonable agreement with real data. Project cost sensitivities are investigated to compute the system-level impact of different design choices. First, individual vessel efficiencies are computed for varying numbers of installation vessels and weather time series to show the diminishing returns of more than two feeder barges. Then, array cable capital costs and installation times are determined for a representative project with different turbine sizes. These values quantify the cost-benefit tradeoffs and show a net-cost savings of decreasing numbers of turbines, increased turbine spacing, and fewer turbine terminations. These results demonstrate that the balance of system model features the accuracy, functionality, and accessibility to serve as the foundation for a wide range of analyses to identify cost reduction potentials for offshore wind energy in the United States.

17 WIND ENERGY↗

Baseline Cost Model for Hydropower: Documentation (2025)

Hydropower currently contributes about 80 GW of conventional and 23 GW of pumped storage capacity to the United States (US) power grid. Previous studies have estimated a considerable amount of remaining US hydropower resources, including non-powered dams (NPD) (Hadjerioua et al., 2012), new stream-reach developments (NSD) (Kao et al., 2014), pumped storage hydropower (PSH) and canal/conduit (Kao et al., 2022). The combined theoretical capacity potential of these various hydropower resources is comparable to the existing US hydropower capacity. There is a continuing interest in developing this hydropower potential, particularly to help meet the increasing demand for electricity. However, available data (Sasthav and Oladosu, 2022) show that the rate of new hydropower development has slowed considerably over time despite the interest of industry stakeholders. This is partly due to the competition from other energy resources and from the highly dispersed nature of remaining hydropower resources, which lead to high information requirements for evaluating the feasibility of potential projects. Cost information provides the most succinct summary of the feasibility of a potential hydropower project required by stakeholders, including developers, investors, policymakers, consumer groups, etc., considering investment options. The best estimates of hydropower costs can be obtained through detailed engineering design and cost assessments of individual projects. However, this approach has high data and resource (time, funds, cross-disciplinary expertise) requirements that render it inapplicable for rapid cost estimation with limited data. Although innovative approaches can overcome some of these impediments (see Oladosu and Ma, 2024 for such an application to potential NPD projects), the development of such approaches still requires significant amounts of resources and are not generally applicable to all hydropower project types. Therefore, statistical and parametric methods using simpler cost specifications remain of significant utility to hydropower stakeholders and are, at the least, complementary to more detailed approaches, particularly when evaluating many potential projects.

13 HYDRO ENERGY↗

A simulation study of carbon storage with active reservoir management

As part of the Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-Hub) project led by Battelle Memorial Institute, a study was conducted to determine the feasibility of storing carbon dioxide (CO 2 ) in the stacked saline rock formations of the Sleepy Hollow Field (SHF), located in Red Willow County, southern Nebraska. A series of CO 2 injection simulation scenarios, with and without active reservoir management (ARM; brine extraction), were evaluated to investigate the feasibility of storing 50+ million tonnes (Mt) of CO 2 . The results indicated CO 2 injection combined with ARM may enable permanent storage of 50+ Mt of CO 2 . The area of review (AOR), the area in which underground sources of drinking water (USDWs) might be endangered during CO 2 injection, was assessed for the simulation scenarios. In comparison to a case without ARM, brine extraction resulted in a much smaller AOR, covering an area of 42 square miles (108.8 km 2 ), roughly one-fourth the size of an AOR resulting from CO 2 injection without ARM. Our findings, presented in this paper, indicate that CO 2 injection with ARM can improve the CO 2 storage capacity of a geologic storage complex up to 100% while also reduce the rate of pressure buildup in the subsurface, resulting in a 75% reduction in AOR. This may help in lowering carbon capture and storage project costs, risks, and effort needed to meet monitoring requirements for a storage project.

54 ENVIRONMENTAL SCIENCES↗

FBI fingerprint identification automation study. AIDS 3 evaluation report. Volume 2: Technical feasibility

The results of this effort are presented in a manner for use by both the AIDS 3 Operational and Economic Feasibility subtasks as well as the Development of Alternative subtask. The approach taken was to identify the major functions that appear in AIDS 3 and then to determine which technologies would be needed for support. The technologies were then examined from the point of view of reliability, throughput, security, availability, cost and possible future trends. Whenever possible graphs are given to indicate projected costs of rapidly changing technologies.

Mulhall, B. D. L.↗

6.26 Low Cost Basalt Fiber for Automotive Applications

Vehicle lightweighting is an essential component to the automotive industry to improve fuel economy of internal combustion engine (ICE) vehicles to meet ever improving emission standards and to improve the range of electric vehicles (EV). Composite materials offer high specific modulus and specific strength, which makes them appealing for these light weighting efforts. Sheet molding compounds (SMC) are particularly interesting from an automotive perspective because of the relatively low cost and high volume of producing SMC parts. Traditionally, composite materials for automotive application are glass fiber reinforced because of the attractive price - performance ratio, but basalt fibers are a cost and recycling competitive reinforcement alternative in this market. The aim of this project was to examine the feasibility of utilizing basalt fiber for automotive applications. More specifically, an effort was made to examine different fiber sizings on basalt fiber combined with vinyl-ester (VE) resin, and their performance as part of an SMC process. In addition to offering vehicle lightweighting with fiber reinforced polymer composites, basalt fiber is a fully recyclable material and thus supports the IACMI technical goal of: Demonstrate that the technology is capable at a sufficient scale for >80% recyclability or reuse of fiber reinforced polymer composites in five years into useful components with projected cost and quality at commercial scale competitive with virgin materials on a pathway to 95% recyclability or reuse starting in ten years. Three different fiber sizings were applied to a continuous roving of basalt fiber and compared to a traditional Electrical/Chemical Resistance (E-CR) glass fiber that is typically used in these types of applications. Fiber tows were examined for Loss on Ignition percentage (LOI%), Tex, and tow strength. Some sizings clearly outperformed others, and the ability to process these fibers on a pilot scale SMC line was demonstrated. A test plan for the manufacturing and mechanical testing of SMC panels was developed. This work continues outside the time frame allocated for this project. When this work is completed, it will be added to this report and posted as Appendix C. Glass fiber reinforced SMC materials have already proven feasible as a light weighting method for traditionally steel parts like the Volkswagen (VW) Atlas lift-gate (Figure 1); this project team is seeking the feasibility of basalt fiber as a drop-in replacement for glass fiber reinforced SMC. Sizing development for basalt fibers has proven that the mechanical properties are better than E-glass and closer to S-glass, which makes it an interesting material for SMC applications. Better mechanical properties translate to less material needed to achieve load case requirement for target applications. The business case has already been demonstrated for 100,000 parts per year of glass fiber reinforced SMC Atlas lift-gates compared to traditional steel manufacturing processes. Reduced overhead and assembly costs are offset by glass fiber SMC higher cost per kg beyond 100,000 parts per year, which is still a relatively low volume for the automotive industry. For basalt fiber reinforced SMC to become feasible for automotive applications, the price-performance ratio has to be precisely determined. Based on the mechanical performance it is possible to establish a range of applications and technical solutions in which the potential of basalt SMC can be utilized, while the price of the material can be used to compile the business case for such applications. Based on these business cases and the sustainability indicators, glass fiber reinforcement (or other) materials can be directly substituted. Volkswagen’s commitment to reducing carbon emissions cannot be understated. Basalt fiber shows promise of reducing the carbon footprint in SMC materials, especially if sizing optimizations can be made with thermoplastic based SMC. To fully realize the value of basalt fiber reinforced materials, a lifecycle cost analysis should be performed on basalt’s production and recycling, and then compared against E-glass. From this assessment, a true judgement can be made on the commercialization potential of this material. Figure 1. Example of Fiber Reinforced Polymer Composite Liftgate As a conclusion, we can state that Mafic basalt fiber is not a direct replacement for E-glass or E-CR glass based on price, but should be considered a technical solution when E-glass does not provide adequate performance in a composite design and S-glass, aramid and carbon fibers are too costly. Mafic basalt fiber can be placed on the high-performance fiber spectrum next to S-glass for performance but at one third the price. It should be considered for more technically challenging structural designs wherein the performance can demonstrate 20-25% performance enhancement over E-glass to elicit more strength or a weight reduction. Both Michelman and Mafic produce thermoplastic sizings which, in combination with Nylon and polypropylene resin and fibers, can further advance high speed composite implementations while maintaining an eco-friendly manufacturing process.

36 MATERIALS SCIENCE↗

Heliostat Sizing Methodology for Solar Heat for Industrial Processes

This study presents a method to obtain a heliostat size that minimizes the levelized cost of a heliostat-based concentrating solar thermal system for industrial process heat (IPH) applications at operating temperatures from 565 to 1550 degrees Celsius. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWhth. Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the levelized cost of heat (LCOH), producing a characteristic U-shaped trend with a robust near-optimal window of 8 - 12 m2; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats under deployment at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY↗

The 18/30 GHz fixed communications system service demand assessment. Volume 2: Main text

The total demand for communications services, and satellite transmission services at the 4/6 GHz, 12/14 GHz, and 18/30 GHz frequencies is assessed. The services are voice, video, and data services. Traffic demand, by service, is distributed by geographical regions, population density, and distance between serving points. Further distribution of traffic is made among four major end user groups: business, government, institutions and private individuals. A traffic demand analysis is performed on a typical metropolitan city to examine service distribution trends. The projected cost of C and Ku band satellite systems are compared on an individual service basis to projected terrestrial rates. Separation of traffic between transmission systems, including 18/30 GHz systems, is based on cost, user, and technical considerations.

Gabriszeski, T.↗

Levelized cost and carbon intensity of solar hydrogen production via water splitting using a scalable and intrinsically safe photocatalytic Z-scheme raceway system

Generating hydrogen from local energy resources such as solar or wind would unlock a low-carbon energy carrier that could be used to reduce greenhouse gas emissions in sectors such as industry and transportation. Yet, the allocation of new or existing power generation solely to hydrogen production remains contentious due to disputes regarding emissions accounting. Photocatalytic (PC) hydrogen production technologies offer a unique solution, as hydrogen is produced directly from solar energy and water, without the need for electricity generation. However, cost projections for all photocatalytic designs to date have suggested that they are not cost competitive compared to conventional electrolysis systems manufactured at scale. Herein, we offer the first illustrative benchmark of cost and carbon intensity of hydrogen produced in a type 2 “Z-scheme” photocatalytic reactor design, which employs suspended semiconducting nanoconductor particles organized into two stacked volumes in a raceway design. The “Z-scheme” system utilizes two separate photoabsorber particles, tuned to drive either the hydrogen evolution reaction or the oxygen evolution reaction individually, connected via a reversible, charge transfer redox couple in solution. Furthermore, the results suggest a highly competitive and scalable technology, that justifies further experimental validation and prototyping in the field.

Carbon↗

Ocean Thermal Energy Conversion (OTEC)

Energy Research and Development Administration research progress in Ocean Thermal Energy Conversion (OTEC) is outlined. The development program is being focused on cost effective heat exchangers; ammonia is generally used as the heat exchange fluid. Projected costs for energy production by OTEC vary between $1000 to $1700 per kW.

Lavi, A.↗

Shuttle payload vibroacoustic test plan evaluation

Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.

Stahle, C. V.↗

Low cost solar array project 1: Silicon material

The low cost production of silicon by deposition of silicon from a hydrogen/chlorosilane mixture is described. Reactor design, reaction vessel support systems (physical support, power control and heaters, and temperature monitoring systems) and operation of the system are reviewed. Testing of four silicon deposition reactors is described, and test data and consequently derived data are given. An 18% conversion of trichlorosilane to silicon was achieved, but average conversion rates were lower than predicted due to incomplete removal of byproduct gases for recycling and silicon oxide/silicon polymer plugging of the gas outlet. Increasing the number of baffles inside the reaction vessel improved the conversion rate. Plans for further design and process improvements to correct the problems encountered are outlined.

Jewett, D. N.↗