Search NASA⌕ Search

SEARCH · Search NASA

Results for “data storage systems buffer data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

74 records · Page 5

Verification and Validation of the Stakeholder Tool for Assessing Radioactive Transportation (START) – 22323

The U.S. Department of Energy (DOE) Office of Integrated Waste Management is planning for the eventual transportation, storage, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and DOE sites. The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based, geospatial decision-support tool developed for evaluating routing options and other aspects of transporting SNF and HLW, covering rail, truck, barge, and intermodal infrastructure and operations in the continental United States. The verification and validation (V&V) process is intended to independently assess START to provide confidence in the ability of START to accurately provide intended results. The V&V process checks the START tool using a variety of methods, ranging from independent hand calculations to comparison of START performance and results to those of other codes. The V&V activity was conducted independently from the START development team with opportunities to provide feedback and collaborate throughout the process. The V&V analyzed attributes of transportation routes produced by START, including route distance and both population and population density captured within buffer zones around routes. Population in the buffer zone, population density in the buffer zone, and route distance were all identified as crucial outputs of the START code and were subject to V&V tasks. Some of the improvements identified through the V&V process were standardizing the underlying population data in START, changing the projection of the population raster data, and changes to the methodology used for population density to improve its applicability for expected users. This collaboration also led to suggested improvements to some of the underlying shape file segments within START. A formal series of test routes went through the V&V process from START version 3.2.1 following the implementation of the recommended improvements to START. The V&V of the buffer zone population and distance reported in START were achieved by utilizing a custom workflow developed in QGIS. This platform was chosen because it is fully independent of START. The buffer zone population and route distances in START showed excellent agreement to independent V&V test results. Over 200 route test cases were run; in all cases, the percent difference in the population within the buffer zone was less than +/- 5%, and the majority of cases were below +/- 1%. These cases were also duplicated in ArcMap, which is Environmental Systems Research Institute’s (ESRI) GIS desktop application. The ArcMap results also show good agreement; however, they cannot be considered independent of START because START also uses ESRI software. The V&V tasks are currently addressing population density and estimated radiation dose in START as well as implementing further automation of the V&V process to allow larger suites of test routes to be run more easily and quickly by less experienced GIS users. These improvements to the V&V process will make it a valuable tool for the development team and the stakeholders so that each new iteration of START can easily be checked for quality and consistency. This paper and presentation will describe the V&V process, findings and implications, and ongoing V&V activities.

START, DOE, Transporation, dose, GIS↗

Big Sky Regional Carbon Sequestration Partnership (Phase III Final Scientific/Technical Report)

The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.

54 ENVIRONMENTAL SCIENCES↗