Search NASA⌕ Search

SEARCH · Search NASA

Results for “dc microgrid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

83 records · Page 5

Control, Fault Management, and Grid Support Functionality of an MV AC-DC Solid State Transformer based EV Extreme Fast Charging Station

Electric vehicles (EVs) have become increasingly popular in recent times while revolutionizing the consumer and commercial transportation market. The development of charging infrastructure has become one of the priorities for increasing the adoption of EVs. Extreme fast charging (XFC) technology can reduce the so-called ’range anxiety’ of consumers as they significantly reduce the charging time. With the advent of wide band-gap (WBG) power devices and improvement in power electronic converters, medium voltage (MV) solid state transformer (SST) based XFC system has the potential to replace the traditional XFC stations because of the lower footprint, ease of installation, enhanced control feature, and better system efficiency. The control system design is one of the critical aspects of the SST development process. Careful consideration and detailed analysis are required to find out suitable control method for the SST based on its topology among different centralized and decentralized control architectures. Also, the control parameters selection and potential improvement to the transient response of the controller ought to be investigated. Another major concern of the SST is different types of internal fault which reduces the overall reliability of the XFC system. As a result, designing a robust protection system is essential. Among different fault modes, open circuit switch faults have received significant attention as an active research area because of their likelihood and severe effects on converters. Therefore, the power stages used in the XFC system require functional and accurate open circuit switch fault management methods. An equally significant aspect of this SST based XFC is its compatibility in a microgrid where there is no synchronous generator present. When the grid is not available, the XFC SSTs can provide grid forming capability and continue supplying the critical loads in islanded mode. The transition between grid connected and islanded mode, especially the grid resynchronization process has to be carefully performed for the safety of the microgrid components. The challenges posed by the aforementioned issues have inspired the work done in this dissertation. Here, a 13.2 kV, 1 MVA, AC/DC SST for the XFC system is examined and a comparative analysis is conducted to select the control architecture based on feasibility of implementation and performance. A detailed control parameter design process is demonstrated considering the sensor dynamics and delay. The selected decentralized control method is augmented by introducing a novel sensor-less load current feedforward method to provide better voltage regulation at the DC bus during a change of load. Next, in the fault management section, a hierarchical failure mode effect analysis (FMEA) is proposed to enable a systematic design of the internal fault protection of the XFC SST as there are limited examples in the literature regarding the analysis of the safety and design of the protection of a power electronic converter system. Novel open circuit switch fault management methods for the converters in the system are presented. Finally, XFC SST based MV microgrid operations in grid connected mode and islanded mode are explored. A secondary control method for grid resynchronization is presented and a design process of control parameters is shown to ensure the stability of the secondary voltage and frequency regulation.

30 DIRECT ENERGY CONVERSION↗

Enabling Seamless Integration of EV Charging Infrastructure with Weak Electric Grids

Widespread adoption of Electric Vehicles (EVs) for light, medium, and heavy-duty applications has gained significant interest. Based on ownership and user preferences, light duty and local delivery medium-duty EVs are typically connected to grid distribution networks whereas larger medium duty and heavy-duty EVs are typically connected to distribution or even sub-transmission networks. Challenges with at-scale EVs and charging infrastructure supporting them include interoperability, distribution network upgrades, surge in demand charges, power quality issues, voltage stability, etc. Based on real-world data, steady-state and dynamic assessments of light-duty EV charging with a focus on DC Fast Charging (DCFC) for weak distribution grids is presented. Three main areas of contributions in this paper include - steady state and dynamic power quality measurements and assessments using real world data, transient assessments of light duty EV integration with weak distribution networks (IEEE 13 node feeder system) under grid-connected and microgrid modes, and formulation of an intelligent charging decision algorithm to enable an impact-minimal charging.

actionable intelligence↗

Distributed ADMM Using Private Blockchain for Power Flow Optimization in Distribution Network With Coupled and Mixed-Integer Constraints

The optimization problem for scheduling distributed energy resources (DERs) and battery energy storage systems (BESS) integrated with the power grid is important to minimize energy consumption from conventional sources in response to demand. Conventionally this optimization problem is solved in a centralized manner, limiting the size of the problem that can be solved and creating a high communication overhead because all the data is transferred to the central controller. These limitations are addressed by the proposed distributed consensus-based alternating direction method of multiplier (DC-ADMM) optimization algorithm, which decomposes the optimization problem into subproblems with private cost function and constraints. The distribution feeder is partitioned into low coupling subnetworks/regions, which solves the private subproblem locally and exchanges information with the neighboring regions to reach consensus. The relaxation strategy is employed for mixed-integer and coupled constraints introduced in the optimal power flow (OPF) problem by stationary and transportable BESS because DC-ADMM convergence is only guaranteed for strict convex problems. The information exchange and synchronization between subnetworks/regions are vital for distributed optimization. In this work, both of these aspects are addressed by the blockchain. The smart contract deployed on the blockchain network acts as a mediator for secure data exchange and synchronization in distributed computation. The blockchain-based distributed optimization problem’s effectiveness is tested for a 0.5-MW laboratory microgrid for one hour ahead and day-ahead for the IEEE 123-bus and EPRI J1 test feeders, and results are compared with a centralized solution.

25 ENERGY STORAGE↗

Advanced Distributed Wind Turbine Controls Series: Part 2-Wind Energy in Isolated Grids – Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

In an isolated grid, wind turbines are typically deployed to provide energy to maximize energy production, reduce diesel-fuel consumption, reduce carbon emissions, and reduce costs for energy and fuel transportation. However, in addition to solely providing energy to the power system, wind turbines contain rotating masses and inverter-based controls that can enable various reliability and resilience services through advance controls. As part of the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL) this paper demonstrates, through desktop simulations, advanced wind turbine controls that can be employed to support higher contributions of wind in isolated grids, and to demonstrate ways that wind can play a role in supporting stability of an isolated grid. This isolated grid used in these desktop simulations is comprised of a wind turbine (600 kW), solar PV (430 kW), battery energy storage system (1 MW/1MWh), a simulated diesel generator (2 MW) and various types of loads (critical, dynamic). We developed a model of the subsystems in MATLAB/Simulink and validated them with available data from real-world components on NREL's Flatirons Campus. These validated models are then configured for various case studies. We compare the output of the desktop simulation with a baseline case with the diesel generator. Active and reactive power control of the wind turbine can help improve frequency and voltage responses in the isolated grid, respectively. By utilizing a small integrated battery energy storage system in the DC-link of the wind turbine, we also demonstrate that wind turbines can help blackstart a critical load comparable to its rated power and support other renewables (e.g. solar PV) come online and pick up an additional load. This report illustrates some of these reliability and resilience services a wind turbine can provide in an isolated grid.

17 WIND ENERGY↗

Medium-Duty Delivery Truck Integrated Bidirectional Wireless Power Transfer System With Grid and Stationary Energy Storage System Connectivity

Electric vehicles (EVs) can provide power to the grid or buildings similar to distributed energy resources (DER) for energy balancing applications or optimizing the operation of the microgrids in harmony with the other DER assets. This article presents the operating modes of a bidirectional wireless power transfer (WPT) system designed for a medium-duty package delivery vehicle. The WPT system designed for this study can transfer 20 kW of power across 11 in of air gap using custom-designed double-D (DD) couplers with LCC–LCC tuning networks. The proposed system utilizes a 480-V three-phase grid connection, a plug-in hybrid delivery truck with bidirectional WPT, and a stationary energy storage system (SESS) that can be connected to the primary-side dc link. Due to the differences in primary and secondary dc bus voltages, and considering the voltage of the SESS, asymmetric voltage gains were used in the system. Sensitivity analyses of this system with respect to these voltage levels are presented. Five different operating modes of the grid, SESS, and the EV battery are investigated with experimental results. Control algorithms are described for grid-to-vehicle (G2V) and vehicle-to-grid (V2G) operating modes. A bidirectional WPT system is operated with a power factor of 0.99 on the grid side in every operating mode. The EV battery was charged with 20.3 kW with an overall efficiency of 93.02% in the G2V operating mode. Finally, in the V2G operating mode, the WPT system provided 12.82 kW of power back to the grid with an overall efficiency of 89.08%.

25 ENERGY STORAGE↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Data-Driven Passive Islanding Detection Scheme

This paper proposes a novel statistical parameters based data driven approach for passive islanding detection. The proposed scheme relies in the voltage data, measured at the point of common coupling, and is comprised of three stages. The Stage-1 quickly detects what is termed as coarse islanding, Stage-2 computes the decaying DC detector (DDCD), and 3) finally, the digital relay logic (DRL) is devised in Stage-3. The proposed scheme is tested as per the IEEE-1547, UL 1741 and IEC-62116 standards. Various tests are investigated on the modified IEEE-13 bus system, modeled in PSCAD/EMTDC, under stringent test scenarios such as power mismatch, induction motor starting effect, capacitor bank switching and various level of loads changes, considered for both single and multiple DG systems. The test results reveal that the proposed scheme can detect islanding in less than 2 cycles, and results in nearly zero non detection zone (NDZ). Also, the scheme can very well be used for single-phase microgrids too as it relies only on the single phase voltage information.

anti-islanding protection↗

Fuel Cell Inverter Dataset

This data set contains the three phase AC voltage, three phase AC current, DC voltage and DC current. These data sets were captured during fuel cell inverter operation in grid-connected dispatch, islanded load changes, transition from grid-connected mode to islanded mode and vice-versa.

25 ENERGY STORAGE↗

Bad River Band of Lake Superior Chippewa Indians Solar Project

The Bad River Band of Lake Superior Chippewa (the Tribe) implemented its first phase of energy independence through the installation of approximately 520 kW DC of solar photovoltaic (PV) at three tribal buildings: 200kW DC at the Wastewater Treatment Plant (WWTP), 300 kW DC at the Health & Wellness Center (Health Clinic), and 20 kW AC at the Chief Blackbird Administration Building (Administration Building). The solar PV systems were integrated with the existing utility grid and can operate independent of the grid using Battery Energy Storage Systems (BESS) in combination with solar and existing back-up gas generators. The BESS also creates resiliency, providing power when the grid is down. All three buildings are essential Tribal buildings.

14 SOLAR ENERGY↗

Segmented Energy Routing for a Modular AC/DC Hybrid System

This article presents a modular ac/dc system with both distributed and centralized power ports for energy router (ER) applications. In each module of the described system, photovoltaic (PV) power generation units, battery-type energy storage (ES) units, and critical loads are connected to the cascaded H-bridge (CHB)-organized medium-voltage (MV) dc links, with fully distributed low-voltage (LV) dc power ports. Copies of modules share the centralized load bus and interact with an MV ac grid in parallel. Hybrid power port (HPO) assigns flexibility to the system but makes energy routings a necessity for stable operation. In this article, a segmented energy management strategy for the HPO-ER is proposed. In terms of the grid-side power transferring, the system ratings are intentionally designed to match significant power imbalance. Focally, a segmented energy management strategy is proposed to realize fully autonomous energy routing involving MV ac grid, distributed PV generations, distributed battery storages, and LV load. The system is proven to be stable using the derived impedance-based model considering the interaction between power blocks. The feasibility of the topology and control strategy is also verified through software simulation, laboratorial hardware prototype experiment, and hardware-in-the-loop (HIL) emulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗