Search NASA⌕ Search

SEARCH · Search NASA

Results for “decommissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

2020 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Rev. 29)

This 2020 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 29) provides water use information for production and potable water wells at the Idaho National Laboratory (INL) Site for calendar year 2020. It also provides detailed information for new, modified, and decommissioned wells Two new wells (TRA-2317 and USGS-150) were drilled in 2019 and are included in this report. One well (USGS-147) was modified in 2020. The location maps and detailed construction diagrams are provided.in the appendix. Fifty-six monitoring wells and boreholes were abandoned (decommissioned) in calendar year 2020. The location maps and construction diagrams, if available, for the decommissioned monitoring wells and boreholes are provided in the appendix. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990), the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003, and the Final Unified Decree issued August 26, 2014.

99 GENERAL AND MISCELLANEOUS↗

Preliminary Environmental and Financial Viability Analysis of Circular Economy Scenarios for Satisfying PV System Service Lifetime

PV deployment has grown rapidly in recent decades, and this growth is expected to continue. At the same time, the rapid increase in PV panel efficiencies offers the opportunity to repower/revamp existing installations - replacing operational, lower-efficiency panels before the end of their 30-year service lifetime with newer, higher-efficiency panels. As a result, an increasing volume of PV panels could be decommissioned well before reaching the end of their 30-year service lifetime. Two broad strategies can be applied to manage the expected increase in decommissioned PV panels: (i) recycle prematurely decommissioned panels, and (ii) prevent recycling of these panels by satisfying the typical service lifetime of 30 years through circular economy strategies such as repair and reuse. Each strategy presents an environmental and economic trade-off. Retaining and satisfying the lifetime of the older, lower-efficiency panels avoids environmental burdens from recycling or landfilling but incurs burdens from additional repair and forgoing the opportunity to install newer panels with greater electricity-generation capabilities. This study assesses whether satisfying the expected service lifetime of a PV system through circular economy scenarios generates a greater environmental and financial benefit than recycling used panels and installing newer panels with higher efficiencies. The circular economy scenarios include repair and reuse of the PV system. Specifically, the study determines whether it is better for the environment to keep a PV panel in use for its 30-year service life after accounting for potential repair and additional transportation, or to replace older panels with more efficient new ones. In addition, we explore whether satisfying the service lifetime of PV panels proves competitive with the recycling route from a financial perspective.

14 SOLAR ENERGY↗

Considerations for Safeguards Implementation in the Post-Operational Facility Life Cycle

Hundreds of facilities around the world under International Atomic Energy Agency (IAEA) safeguards are currently permanently shutdown or undergoing decommissioning. For facilities in States with a comprehensive safeguards agreement (CSA) in force, safeguards obligations under the CSA extend until the IAEA has determined for safeguards purposes that a facility has been decommissioned (i.e., the IAEA has verified that the nuclear material has been removed and residual structures and equipment essential for its use have been removed or rendered inoperable). The IAEA Department of Safeguards recently issued a report providing high-level guidance to States on IAEA safeguards implementation throughout the post-operational life cycle phases of facilities and locations outside facilities. These phases include permanent shutdown, closed-down, and decommissioned for safeguards purposes. Additional consideration is needed for how post-operational facilities might be consistently evaluated when developing State-level safeguards approaches. This work presents ideas about how the IAEA might implement the State-level concept and associated elements (e.g., State-specific factors) throughout the post-operational life cycle, focusing on maintaining effectiveness and gaining efficiencies where appropriate. Considerations include whether State-specific factors should influence facility status, how a change in a facility’s post-operational status might impact a State’s acquisition path analysis, and how rendering inoperable/removal of essential equipment could affect resources expended on safeguards implementation.

Hogue, Karen↗

Communities in energy transition: exploring best practices and decision support tools to provide equitable outcomes

Abstract The U.S. coal industry has been in a state of decline for the past decade, a trend ushered by flat electricity demand, increased regulatory pressure, and market competition from cost-competitive clean energy sources. The receding economic viability of the coal industry has been acutely felt by the communities with immediate economic ties to coal-fired generation. With the energy transition underway, the question of how to engage communities as stakeholders in the decision-making process and address their needs through an equitable and just transition remains unresolved. To that end, this paper explores the economic, environmental, and social challenges presented by the energy transition at the community level, highlighting four case studies from transitioning coal-dependent communities across the United States to ultimately identify best practices in coal plant decommissioning processes. This paper weaves these community-identified best practices into two support tools—a decommissioning checklist and a redevelopment decision-making framework—that can be used to engage communities in the power plant retirement decision, the site reclamation phase, and eventual redevelopment of the site and revitalization of the surrounding community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated soft snake robot for gamma spectroscopy of radiologically contaminated ducting

Anticipated growth in the number and complexity of nuclear facilities entering the decommissioning phase of their lifespan requires innovative methods of mitigating radiological and safety hazards for workers. Advancements in robotics provide opportunities for remote characterization of radiologically contaminated ducts and pipes, reducing worker exposure. However, the nuclear decommissioning industry has shown a hesitancy in adopting new technology due to concerns regarding capital costs and a lack of demonstration data in representative environments. This work aims to leverage novel soft robotics to develop and demonstrate a sensor-integrated characterization tool for contaminated ducting systems. Two gamma spectrometers – one scintillation-based and one solid-state – were selected and integrated into a pneumatically-actuated snake-like soft robot using stretchable electronic cabling. The robot was then demonstrated at the Idaho National Laboratory’s Critical Infrastructure Test Range Complex. The robot maneuvered through a pseudo-constrained corridor containing several sealed sources and the integrated spectrometers collected spectra at various points along the path of travel. Both spectrometers successfully collected spectra with identifiable, isotope-specific peaks. To evaluate the effect of contamination buildup on the collected spectra, the robot with the integrated scintillation detector was tested using a liquid radioactive source. The resulting spectra showed little detection interference from the liquid contamination; however, a short-lived isotope was used which may not be representative of longer-lived contamination.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Performance Evaluation of Augmented Teleoperation of Contact Manipulation Tasks

At Argonne National Laboratory, an enhanced telerobotic concept has been suggested by providing augmented virtual fixtures for precise and dexterous manipulation. The proposed technology incorporated a human-robot interface that can assist personnel on the processes of Deactivation and Decommissioning in sites of high radiation. It has been implemented on a dual-arm robot system, known as Baxter, by integrating the Robotic Operating System (ROS) with 3D sensors and visual-haptic operator interface. However, what remained before its practical utilization is the capability for precisely placing the virtual fixtures. To this end, the objectives involved camera calibration, which required hardware fabrication and setup, as well as modification and implementation of ROS. The goal of this Research and Development is to develop an augmented-reality- based operator interface for human-inclusive, intelligent, and autonomous robotic system for the Deactivation and Decommissioning (D and D) of radioactive sites. The objectives are to develop: Collaborative Robot; Multi-modal Mixed-Reality Human-Robot Interface; Intelligent and Autonomous Behaviors. In order to achieve this, Baxter's Head-Kinect camera and Left-Hand camera need to be calibrated to overlap the real environment with the simulated environment. Camera calibration, which is crucial for precisely placing the virtual fixtures, was successful after running the simulations. The real and simulated environments overlapped, permitting the utilization of augmented teleoperation and the dexterous manipulation of Baxter for D and D applications in nuclear sites. Future steps: Performance evaluation of augmented teleoperation of contact manipulation tasks: Multiple-Camera 3D Reconstruction and Automation. Oculus Interface: Augmented reality and machine learning for enhanced telerobotic operation (Augmented Tele-autonomy): Machine-learning techniques for complex and flexible autonomous robotic behaviors. Interactive remote operation of robotic systems. Mesh cutting with simulation and real robot.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing The Mechanical Properties of Polyurethane Foams

The Department of Energy has many radioactive facilities that are on the path of deactivation and decommissioning (D and D). These facilities can sit cold and dark for many years before final disposition, and must be maintained to ensure no radiological release occurs in the interim. Improvements and additions to D and D tool sets can greatly: Save time and money, Reduce worker risk. Conventional fixatives widely used often take the form of paints or films that are not readily applicable to 3-dimensional void spaces. Foams are one promising platform that may offer solutions to a number of contaminated problem sets such as: Gloveboxes, Pipes, Tanks. SRNL is working to characterize various commercial foams that would encapsulate the interior volume of a given space and are capable of immobilizing any remaining contamination. One key performance metric of these foams is how well they will perform in an accident scenario. To this end, SRNL is researching the mechanical properties of these foams to ensure that the material can withstand the environment of application while maintaining structural integrity. ASTM standard E3191-18 served as a guiding document for this project, outlining the requirements that foaming fixatives used for the mitigation of radioactive contamination need to meet before being implemented. Objective: Quantification of the mechanical properties of 6 commercial polyurethane foams was performed using multiple ASTM standards to record measurements for: Compression testing: Flexible Foams, Force required to produce 50% compression, Rigid Foams, Compressive and apparent modulus, Point of 10% core deformation, The 'Zero Deformation' point, Compressive strength, Yield point. Tensile testing: Tensile strength, Tensile stress, Percent elongation. Experiment 1: An electromechanical compressive tester (MTS Criterion Series 43) was used to evaluate 6 foams (4 flexible, 2 rigid). Per ASTM D1621, each rigid foam was compressed at 10% of the measured thickness per minute until the sample was 13% of it's original thickness. Per ASTM D35/4, each flexible foam was pre-flexed twice to 80% original thickness at a rate of 250 mm/min, then compressed to 80% original thickness at a rate of 50 mm/min. Experiment 2: An electromechanical tensile tester (MTS Criterion Series 43) was used to evaluate 6 foams (4 flexible, 2 rigid). Per ASTM D1623, rigid foams were pulled apart at a rate of 1.27 mm/min until the sample broke. Per ASTM D35/4, flexible foams were pulled apart at a rate of 500 mm/min until the sample broke. The strongest material in both compression and tensile testing scenarios was found to be the rigid intumescent polyurethane Hilti foam. The experiments revealed that the Hilti foam in a tensile scenario had a peak stress value that was larger than the closest competitor by a factor of 2.3 and a compressive yield point that was larger than the closest competitor by a factor of 1.4, indicating that the Hilti foam is the best choice for implementation in mechanically harsh environments. The performance metrics measured can serve as a basis for future mechanical tests that would help set relevant ASTM standards (E3191) for intumescent polyurethane foams in fixating applications. Tests like surface adhesion, impact, and flame tests would serve as a better indicator as to how this material would perform in environmentally harsh scenarios often found in decommissioned nuclear facilities. Further tests of the foams' intumescent properties would also be important should these foams be implemented in environmentally harsh scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Machine Vision-based Robot Manipulators for Nuclear Applications - 20370

Decommissioning and dismantling of nuclear facilities are major challenges facing the nuclear industry. Robot manipulators with capabilities of restoring nuclear structures and significantly prolonging nuclear power generation in addition to their applications in decommissioning and dismantling (D and D) would immensely ease the above-mentioned challenge. Ability to remotely sense/monitor and analyze dangerous and hazardous environments such as nuclear reactors as well as performing reparatory tasks in such environments using robot manipulators require additional information from vision sensors. Structural sample collection and inspection as well as restoration require object and position information. Computer vision is used to obtain precise 3D position information. The current work uses the Sawyer robot with the integrated Cognex camera. The research presents an approach to facilitate and improve operations in a nuclear reactor using robotic vision control. The vision control system is modeled with Augmented Image Space-based visual servoing approach. Results showing accurate robot control. Object recognition is used to recognize the image and calculate it poses. To transform coordinates of the object's pose from the camera frame to the robotic frame transformation matrices are employed. Future work will employ a 3D camera (with depth information) using Denso robot. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distribution Development for Residual Inventory at the New York West Valley Site - 20400

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351 ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Operations led to contamination in a number of facilities and locations. Some of that contamination has migrated from waste disposal zones to other layers, formations, and features on and off the WNYNSC. Phase I decommissioning activities are ongoing and involve the removal of a number of areas and structures that have been associated with contamination. The purpose of this work is to outline the approach for characterizing contamination not associated with disposed wastes, contaminated structures, or specific releases. In this work, the term, residual radiological activity, is used to describe environmental contamination that exists subsequent to the completion of Phase I decommissioning activities, that is not associated with disposed wastes, contaminated structures, or specific releases. Contamination from the Site was quantified relative to data that characterize the concentrations of radionuclides that exist in background. Background concentrations are those present in the area but having no influence from Site related activities. The existence of residual radiological activity that is elevated relative to background has the potential to contribute to future risks to human health and the environment. As a consequence, the residual inventory information is used to inform the West Valley Probabilistic Performance Assessment (PPA) model to characterize potential future risks to human health and the environment. The centralized West Valley Data Management System (DMS) was the source of information for the data assembled in this analysis. The DMS is a fairly large compilation consisting of thousands of records from investigation studies, with sample dates ranging from 1990 to present. Samples from monitoring wells, boreholes, geoprobe studies, surface water, surface soils, storm water outfalls, ventilation stack filters, plant and animal tissues, and more are included in the DMS. Results are typically reported in units of activity per unit volume. For the purpose of the analyses presented here, all results were converted into consistent units of pCi per unit volume. Since 1990, data have been collected from various locations across the WNYNSC at different times with varying frequency over the course of several decades. As a consequence, a number of potential issues can arise with respect to the assembly of a dataset that is deemed adequate for the characterization of residual radiological activity. These issues were assessed and resolved to the extent possible through careful consideration of the properties of the distributions. The intent was to use data which characterize the current state of the Site. Radionuclides can be designated to one of several groups depending on their origin. In this work the groups considered were 1) Naturally Occurring Radioactive Material (NORM), 2) fallout, and 3) Other (including power plant, medical research, etc). This grouping is a useful construct with respect to the interpretation of fixed laboratory results. For example, NORM radionuclides that exist within a decay chain should have approximately equivalent distributions of concentrations if they are representative of background conditions. Insights such as these can be used as a check to identify sample results that need to be further investigated or omitted due to issues associated with reported results from fixed laboratory analyses. This type of analysis provided a foundation for the assessment of the adequacy of sample results for use in subsequent components of an assessment. The general process for the assessment of residual radiological contamination at the Site consists of a sequence of several steps. First, for each analyte, several statistical tests were performed to assess the weight of evidence against the null hypothesis that the mean of the distribution of concentrations was equal to zero. If the mean of the distribution of concentrations for a given radionuclide was not found to be greater than zero, then it was removed from consideration as a component of the residual radiological contamination. If there was significant evidence to reject the hypothesis of the mean being equal to zero, the second step was to compare the distribution of the data from the Site to that of the corresponding background. A suite of tests was used to compare the distributions of the site and background data. The results of these tests were collectively used to determine if site data are elevated relative to background. The third step was to develop distributions using a Bayesian framework to characterize the distribution of mean of the increment present above background for each of the radionuclides. The Bayesian model implemented allowed for the comparison of site-specific records to background concentrations to better approximate contamination attributed to the Site. A final screening step was employed for radionuclides that exceed background. This screening step compared 95% upper confidence limits (UCLs) from the increment distribution developed in the previous step to the risk screening levels. This approach yields a list of analytes that were determined to be elevated relative to background.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stakeholder-Engaged Structured Decision Making for the Los Alamos Legacy Cleanup Mission - 20501

The Los Alamos National Laboratory (LANL) environmental legacy cleanup program requires decisions to be made for environmental remediation, decommissioning and disposal or management of radioactive waste. This legacy cleanup program was established to address groundwater contamination, material disposal areas (MDAs) that have been used to dispose of radioactive and other waste material, and 'aggregate areas' that might produce radioactive or other chemical waste as a result of remediation activities. The LANL site is regulated for environmental concerns under the Resource Conservation and Recovery Act (RCRA). However, some parts of LANL, such as material disposal area G (MDA G), have disposed of radioactive waste under DOE Order 435.1, and are subject to other regulations. For example, decommissioning the remote-handled TRU material stored in 33 shafts at MDA G falls under EPA's 40 CFR 191. Collectively, the regulations are all aimed in the same direction of finding the best solution, either through constructs such as 'as low as reasonably achievable' (ALARA), considering balancing factors as opposed to only cost and human health risk, and, under EPA regulations such as RCRA and NEPA, evaluating impact from all chemicals and both human health and ecological endpoints. Despite the basic goals and objectives of the regulations or their guidance, the main challenge is in their implementation. Arguably perhaps, but really in principle, all of these (and similar) regulations are asking for a decision analysis to be performed. Implementation challenges encountered have included lack of understanding of decision analysis in the industry, lack of effective stakeholder engagement in the decision analysis process, and lack of appreciation of the need to separate value judgments from science, the latter leading to developing conservative, or protective, science-based models. Conservative models lead to poor solutions, lack of effective stakeholder engagement leads to long drawn out protracted approaches to finding a solution (which also might never be found with this approach), and lack of understanding of decision analysis and Bayesian statistics causes poor models to be built, which creates unfortunate situations of 'garbage in, garbage out' becoming the basis for decision making. Stakeholder-engaged structured decision making (SDM) is an approach to solving problems that relies on the theory of decision science to involve stakeholders in the decision-making process. This approach incorporates stakeholder values using a scientifically rigorous methodology that separates value judgments from science in a way that helps avoid the pitfalls of biased, protective, or conservative modeling. This approach has its foundation in Keeney's 1992 treatise on value-focused thinking [1]. Keeney advocated a paradigm shift in decision making based on the idea that the standard way of thinking about decisions is backwards. The standard approach of focusing first on identifying alternatives rather than on articulating values results in a reactive approach with the emphasis on mechanics and fixed choices instead of the core values that have meaning to stakeholders. This paradigm shift effectively engages all stakeholders in the decision-making process while using a values focused thinking approach that can lead to the identification of decision opportunities and the creation of better alternatives. The intent is to be proactive and generate solutions that are related directly to values and objectives as identified by stakeholders. There are, perhaps, two overarching reasons why SDM can be used to benefit LANL's environmental legacy cleanup. Some of LANL's remaining waste management and environmental management problems are challenging and complex (for example, the Cr and RDX plumes, and MDAs) and while the traditional approach has, arguably, worked well for relatively simple risk-based problems, it cannot, or should not, be applied to more complex problems if the most effective and efficient solutions are desired. The second reason is cost. This has perhaps become more critical since publication of the Government Accountability Office (GAO) reports that DoE's environmental liability is considered a high-risk concern for the nation [2]. The focus of SDM is on structuring solutions to decision risk problems by first addressing stakeholder and decision maker values and subsequently developing decision objectives and ways to measure those objectives, preference weighting across objectives, identifying decision alternatives that best achieve those values, and characterizing uncertainty in predictions of the measures. Because a complete decision model is created using SDM, it can be evaluated to find the main elements of the model that drive, or predict, the best solution. This approach creates complete decision models that are transparent, traceable, reproducible and technically defensible. The science behind SDM, or decision analysis, is well founded, yet it is not unusual to see ad hoc approaches to decision making implemented under various environmental regulations that are pertinent to the LANL site, including NEPA, RCRA and DOE Order 435.1. Such ad hoc approaches are often not transparent or traceable, and lack reproducibility and technical defensibility. The LANL legacy cleanup program has embarked on using SDM to address the complex problems that remain. Stakeholder meetings have been held, and a prototype version of the stakeholder value system has been developed. Further meetings are expected in the future to address specific project needs. This is a long-term endeavor considering the complex environmental problems faced by DOE EM in Los Alamos (EM-LA), and careful planning, consideration of stakeholder value systems, and engagement with stakeholders throughout the SDM process is expected to lead to a successful endpoint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Amphiphilic Block Copolymers for Flocculation and Hydrophobization of Legacy Waste Suspensions in Flotation Driven Dewatering Operations

There exists a degrading legacy fuel pond at the Sellafield site (UK), known as the First-Generation Magnox Storage Pond (FGMSP). After being placed into a passive care and maintenance regime resulting in a long storage period, the fuel rods, primarily their cladding, corroded in the pond forming magnesium hydroxide based sludges and suspended material. These ponds are a grave concern to the British government in terms of hazard and risk reduction. Therefore, decommissioning of these ponds is a top priority beginning with the contaminant retrievals process [1]. The pond has accumulated significant quantities of waste materials amongst the skips of fuel, including but not limited to: large inventories of corroded Magnox sludge, fuel rod fragments, metal fragments (from fuel skips), concrete degradation products (from the pond infrastructure), wind-blown sand, and other materials such as bird guano and animal remains. This challenge requires a chemically robust technology to complete sludge retrievals [2]. As nuclear is different, a more stringent process operation criteria is required. From the criteria, flotation was selected as a viable technology. Flotation involves the application of collector molecules which modify the hydrophobicity of suspended particles allowing them to adsorb to rising bubbles. As some particles lack inertia for flotation due to their size, dual flocculant/collector agents can be deployed for greater particle recovery, in this case, amphiphilic diblock copolymers. Two copolymers of Poly(acrylic acid)-b-poly(n-butyl acrylate) (or PAA-b-PnBA), of different hydrophobic chain lengths (PBA) were synthesized for flotation campaigns. Flotation has shown promise to be a valuable rapid dewatering strategy for decommissioning of legacy waste ponds whilst upholding the required operational criteria. This research has shown: PAA-b-PnBA copolymers promote flocculation of Mg(OH){sub 2} particulates. Diblock copolymers retain more fluid than traditional surfactant based collectors wrt. relative particulate recovery performance- where longer PnBA chain length polymers performed best. Performance appears to be hydrodynamically limited due to over-flocculation of Mg(OH){sub 2}. Potential to combine with sedimentation for high particle recovery with low fluid carryover.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEM and MELT In-Can Vitrification Process for Fukushima Daiichi Water Treatment Secondary Waste - 20034

Fukushima Daiichi Nuclear Power Station was severely damaged by a tsunami induced by the earthquake on March 11, 2011. A large amount of water treatment secondary waste has been generated from the purification work of contaminated water that consists of the water flowing into the reactor building. The Mid and Long-Term Road map specifies that solid waste at Fukushima Daiichi Nuclear Power Station should be stored safely and reasonably according to its characteristics. In order to meet this goal, a versatile treatment solution is needed, and the In-Can vitrification seems to be a suitable solution. The DEM and MELT In-Can vitrification process is being developed and qualified in France to treat waste arising from decommissioning and dismantling operations. This qualification is carried out through the consortium of the DEM and MELT project coordinated by CEA which gathers Orano, ECM technologies and Andra. The DEM and MELT In-Can vitrification process is a robust, simple and versatile in situ vitrification process. It is designed for high or intermediate level waste and is compact enough to be implemented in an existing facility or close to the waste to be treated. It is developed to treat liquid and solid waste, to produce a small amount of secondary waste and to minimize investment and operating costs. The DEM and MELT In-Can vitrification process is also developed with a modular design in order to be adapted to nuclear operators needs and requirements. The In-Can melting process has already been developed and fully qualified by the CEA for Alpha liquid waste and can be rated TRL 7 for this scope. The In-Can vitrification technology is considered as a qualified solution that could be applied for the treatment of waste resulting from the D and D work in Fukushima Daiichi Nuclear Power Station. The feasibility evaluation of the DEM and MELT In-Can vitrification process for Fukushima Daiichi water treatment secondary waste is a project led by Orano, CEA and ANADEC. This R and D project is performed by the funds from the Ministry of Economy, Trade and Industry as The Subsidy Program 'Project of Decommissioning and Contaminated Water Management'. This paper presents the first results of this feasibility evaluation, from the scenarios and glass formulation definition to the industrial implementation feasibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the 3 m{sup 3} Low Level Radioactive Waste Container in Taiwan - 20037

Chinshan Nuclear Power Plant stopped its business operation in July, 2019, and Kuosheng Nuclear Power Plant will also be permanently shut down in 2023. Nuclear Reactor Facilities Regulation Act requires a nuclear facility must be dismantled in 25 years after being permanently ceased operation. According to the approved decommissioning plan of Chinshan Nuclear Power Plant and the proposed one of Kuosheng Nuclear Power Plant, the 3 m{sup 3} low level radioactive waste container is planned to store the low level radioactive wastes with higher radiation produced during the decommissioning. However, 3 m{sup 3} low level radioactive waste containers are not used or developed in Taiwan before. To meet such need, Institute of Nuclear Energy Research develops a new type of 3 m{sup 3} low level radioactive waste container and performs the corresponding analyses and tests based on Guidelines of Applying the Usage License of Low Level Radioactive Waste Containers and Regulations for the Safe Transport of Radioactive Material. In this article, it provides the information of the low level radioactive waste containers that have been approved or is under reviewing in Taiwan, and so do the design specifications of the developed 3 m{sup 3} waste container. Besides, the numerical evaluation and test results of the developed 3 m{sup 3} waste container are also included in this article. Based on the evaluation and test results, the developed 3 m{sup 3} waste container satisfies the requirements of the storage container and industrial package type 2. Institute of Nuclear Energy Research will submit the usage license applications to the authority this year, and the usage licenses would be granted in 2021, expectedly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} for Fukushima Daiichi Water Treatment Secondary Wastes - 20212

The Japanese government is supporting development work implemented jointly by Veolia subsidiaries Kurion Japan, K.K., Veolia Nuclear Solutions (VNS), Inc., and Veolia Nuclear Solutions Federal Services, LLC for treating radioactive waste generated from Fukushima Daiichi Nuclear Power Station (NPS) water treatment using the GeoMelt{sup TM} In-Container Vitrification (ICV){sup TM} technology. The initial work consisted of glass formulation and engineering-scale testing which was completed in 2018, in the frame of an IRID (International Research Institute for Nuclear Decommissioning) program as part of a project subsidized by Japan's Ministry of Economy, Trade and Industry (METI). The Fukushima Daiichi NPS Mid- and Long-Term Road-map requires investigation of methods to stabilize solid wastes (and to immobilize radioisotopes in the wastes) generated as a result of emergency response and decommissioning activities. Cooling water treatment has resulted in a significant amount of solid and slurry secondary wastes (mostly adsorbents and ion-exchange materials) which will require processing at some point. GeoMelt{sup R} ICV{sup TM} is a joule-heated melter technology which uses a refractory-lined single-use container combining the melter and disposal container. There is no pouring required nor concerns with refractory corrosion which allows the process to accommodate a wide range of waste chemistries and high waste loadings. The testing described here consisted of three engineering-scale melts, each processing between 212 kg and 240 kg of waste simulants, glass formers, and non-radioactive cesium (Cs) and strontium (Sr) tracers. Continuous isokinetic stack sampling of off-gas emissions was performed for each test in order to calculate Cs and Sr retention in the glass wasteform. Single-pass retention of Cs in the final glass wasteform ranged from 91.46 to 99.30%, and single-pass retention of Sr ranged from 99.76 to 100%. Planned particulate recycle will increase these retention levels. Melt 1 processed a mixture of KUR-EH (a zeolite-based ion-exchange material), simulated Advanced Liquid Processing System (ALPS) Carbonate and Iron Slurries, and glass additives. Melt 2 processed a mixture of KUR-EH, KUR-TSG (a titanate-based adsorbent), and glass additives. Melt 3 processed a mixture of KUR-EH, simulated barium sulfate/iron ferrocyanide sludge (AREVA sludge), and glass additives. Waste loadings for these melts ranged from 70 weight percent (wt%) to 82 wt%. Vitrification produces a waste form much denser than the stored water treatment secondary waste wastes, resulting in significant volume reduction. Volume reductions for the three tests ranged from 74 to 79 vol%. Vitrification produces a chemically durable wasteform. Pacific Northwest National Laboratory (PNNL) tested three glass samples from each engineering-scale melt) by the Materials Characterization Center 1 (MCC-1) test, an international standard leach test of the chemical durability of nuclear waste glasses. PNNL also obtained one U.S. reference glass (EA Glass) and two Japan reference glasses P0798) and tested these under the same MCC-1 conditions (90 deg. C, 10 m-1, DIW, and 7, 14, 28-day) as the GeoMelt{sup R} ICV{sup TM} glasses. The GeoMelt{sup R} ICV{sup TM} glasses exhibited lower total normalized releases and 14- to 28-day normalized release rates than the three reference glasses. These results suggest that the GeoMelt{sup R} ICV{sup TM} glasses have durabilities on par with high-level waste glasses under standard test conditions. Post-melt process sampling and analysis indicated no Cs migration into the melter refractory materials and very little deposition of Cs or Sr onto the melter hood or off-gas piping internals. The results of the testing indicated good Cs retention in the glass, high volume reduction and waste loadings, and excellent chemical durability. These factors are important to minimize treatment costs and to protect workers and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study on Radionuclides Selection for DCGLs Development for Site Release of KRR Units 1 and 2 site in Korea - 20256

The selection of Derived Concentration Guideline Levels (DCGLs) in nuclear facilities decommissioning is important because they serve as criteria for site characterization and final status surveys. DCGLs should be derived for KAERI TRIGA Mark II and III research reactor site clearance and prior to the work, a radionuclides list for DCGLs consideration was created. Radionuclides selection for DCGLs was performed according to the procedure proposed by the US NRC based on the characterization survey related to the decommission site. By evaluating the dose contribution of each radionuclide using D and D computer code, radionuclides with a dose contribution fraction of 0.1% or more for the entire radionuclide were selected. As a result, the selected radionuclides were beta radionuclides H-3, C-14 and Sr-90 and gamma radionuclides Co-60, Cs-137, Eu-152 and Eu-154. The selected radionuclides can be presented for consultation with domestic regulatory agencies in the future and will be used as the technical base of DCGLs for the final status survey. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Industry overview of TRANSCEND - 20271

The United Kingdom has a legacy of nuclear facilities to decommission and radioactive waste to manage and dispose of. The TRANSCEND programme is an independent research programme with significant participation from industrial organizations that are involved in that decommissioning programme and radioactive waste management. The participation has led to a programme that is both academically robust enough to attract significant funding from the EPSRC, the universities themselves and relevant enough to be supported financially by the industrial partners who see the needs and drivers. The programme offers benefits in terms of the development of people and in enabling and promoting innovation in both hardware and software tools. Industrial engagement is fundamental to being able to capitalise on that innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗