Photovoltaic module electrical termination design requirement study

Pertinent electrical termination attributes were identified and used in the development of selection criteria which included function, environmental durability, utility, manufacturing, code, and cost. Significant aspects of each criteria are discussed, and eight different types of terminations are ranked according to their performance in remote, residential, intermediate, and industrial applications.

Mosna, F. J., Jr.↗

Design requirements for SRB production control system. Volume 1: Study background and overview

The solid rocket boosters assembly environment is described in terms of the contraints it places upon an automated production control system. The business system generated for the SRB assembly and the computer system which meets the business system requirements are described. The selection software process and modifications required to the recommended software are addressed as well as the hardware and configuration requirements necessary to support the system.

Source record↗

Design requirements for SRB production control system. Volume 2: System requirements and conceptual description

In the development of the business system for the SRB automated production control system, special attention had to be paid to the unique environment posed by the space shuttle. The issues posed by this environment, and the means by which they were addressed, are reviewed. The change in management philosphy which will be required as NASA switches from one-of-a-kind launches to multiple launches is discussed. The implications of the assembly process on the business system are described. These issues include multiple missions, multiple locations and facilities, maintenance and refurbishment, multiple sources, and multiple contractors. The implications of these aspects on the automated production control system are reviewed including an assessment of the six major subsystems, as well as four other subsystem. Some general system requirements which flow through the entire business system are described.

Source record↗

Design requirements for SRB production control system. Volume 4: Implementation

The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

Source record↗

Fighter aircraft flight control technology design requirements

The evolution of fighter aircraft flight control technology is briefly surveyed. Systems engineering, battle damage considerations for adaptive flutter suppression, in-flight simulation, and artificial intelligence are briefly discussed.

Nelson, W. E., Jr.↗

Electrical insulation design requirements and reliability goals

The solar cells in a photovoltaic module which must be electrically isolated from module exterior surfaces to satisfy a variety of safety and operating considerations are discussed. The performance and reliability of the insulation system are examined. Technical requirements involve the capability of withstanding the differential voltage from the solar cells to the module frame. The maximum system voltage includes consideration of maximum open circuit array voltages achieved under low-temperature, high-irradiance conditions, and transient overvoltages due to system feedback of lightning transients. The latter is bounded by the characteristics of incorporated voltage limiting devices such as MOVs.

Ross, R. G., Jr.↗

Information for space radar designers: Required dynamic range vs resolution and antenna calibration using the Amazon rain forest

Calibration of the vertical pattern of the antennas for the SEASAT scatterometer was accomplished using the nearly-uniform radar return from the Amazon rain forest. A similar calibration will be attempted for the SIR-B antenna. Thick calibration is important to establish the radiometric calibration across the swath of the SIR-B, and the developed methodology will provide an important tool in the evaluation of future spaceborne imaging radars. This calibration was made by the very-wide-beam SEASAT scatterometer antennas because at 14.65 GHz the scattering coefficient of the rain forest is almost independent of angle of incidence. It is expected that the variation in scattering coefficient for the rain forest across the relatively narrow vertical beam of the SIR-B will be very small; even at L band the forest should be essentially impenetrable for radar signals, the volume scatter from the treetops will predominate as at higher frequencies. The basic research elements include: (1) examination of SIR-B images over the rain forest to establish the variability of the scattering coefficient at finer resolutions than that of the SEASAT scatterometer; (2) analysis of the variability of SIR-B data detected prior to processing for either azimuth compression or; possibly, range compression so that averages over relatively large footprints can be used; (3) processing of data of the form of (2) using algorithms that can recover the vertical pattern of the antenna.

Moore, R. K.↗

Design Requirements for Amorphous Piezoelectric Polymers

An overview of the piezoelectric activity in amorphous piezoelectric polymers is presented. The criteria required to render a polymer piezoelectric are discussed. Although piezoelectricity is a coupling between mechanical and electrical properties, most research has concentrated on the electrical properties of potentially piezoelectric polymers. In this work, we present comparative mechanical data as a function of temperature and offer a summary of polarization and electromechanical properties for each of the polymers considered.

Ounaies, Z.↗

Spacecraft radiators for advanced mission requirements

Design requirements for spacecraft heat rejection systems are identified, and their impact on the construction of conventional pumped fluid and hybrid heat pipe/pumped fluid radiators is evaluated. Heat rejection systems to improve the performance or reduce the cost of the spacecraft are proposed. Heat rejection requirements which are large compared to those of existing systems and mission durations which are relatively long, are discussed.

Leach, J. W.↗

VARED: Verification and Analysis of Requirements and Early Designs

Requirements are a part of every project life cycle; everything going forward in a project depends on them. Good requirements are hard to write, there are few useful tools to test, verify, or check them, and it is difficult to properly marry them to the subsequent design, especially if the requirements are written in natural language. In fact, the inconsistencies and errors in the requirements along with the difficulty in finding these errors contribute greatly to the cost of the testing and verification stage of flight software projects [1]. Large projects tend to have several thousand requirements written at various levels by different groups of people. The design process is distributed and a lack of widely accepted standards for requirements often results in a product that varies widely in style and quality. A simple way to improve this would be to standardize the design process using a set of tools and widely accepted requirements design constraints. The difficulty with this approach is finding the appropriate constraints and tools. Common complaints against the tools available include ease of use, functionality, and available features. Also, although preferable, it is rare that these tools are capable of testing the quality of the requirements.

Badger, Julia↗

Civil helicopter design and operational requirement

Design and operational requirements and other factors that have a restraining influence on expansion of the helicopter market are discussed. The needs of operators, users, pilots and the community at large are examined. The impact of future technology developments and other trends such as use, energy shortages, and civil and military helicopter requirements and development is assessed. Areas where research and development are needed to provide opportunities for lowering life cycle costs and removing barriers to further expansion of the industry are analyzed.

Waters, K. T.↗