Search NASA⌕ Search

SEARCH · Search NASA

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Thermoelectric-Driven Liquid-Metal Plasma-Facing Structures (TELS) Final Report

The Thermoelectric-Driven Liquid-Metal Plasma-Facing Structures (TELS) project was able to establish the experimental conditions necessary for flowing liquid metal surfaces in order to be utilized as surfaces facing fusion relevant energetic plasma flux. The work has also addressed additional developments along with progressing along the timeline detailed in the proposal. A no-cost extension was requested to conduct other relevant experiment- specifically regarding the characterization droplet ejection during energetic plasma flux impact. A specially designed trench module, which could accommodate trenches with different aspect ratios was fabricated and installed in the TELS setup and plasma gun experiments were performed. Droplet ejection was characterized using high speed image acquisition and also surface mounted probes were used to characterize the plasma. The Gantt chart below had been provided with the original proposal, indicating the tasks to be performed in the third year of funding. These tasks are listed above in the progress report outline, and their progress status is detailed below.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

Policy Reforms to Unleash Domestic Critical Minerals Mining and Processing

The United States faces growing strategic and economic risks due to its limited ability to mine, process, and refine the minerals required for national defense, energy systems, advanced manufacturing, and emerging technologies. Although the country possesses significant geological resources, development has been slowed by long and unpredictable permitting timelines, fragmented regulatory responsibilities, limited midstream processing capacity, and a shrinking technical workforce. These structural barriers have created supply chain vulnerabilities that constrain industrial growth and reduce national resilience. This report presents a comprehensive set of reforms intended to modernize the nation’s approach to critical minerals. The recommendations address federal permitting, environmental review processes, the legal framework governing mining activities, interagency coordination, domestic processing and refining capacity, and the education and workforce systems needed to support long term industry development. The analysis emphasizes practical steps to shorten project timelines, improve regulatory clarity, expand processing infrastructure, enable recovery from both conventional and nontraditional sources, and update outdated requirements that hinder the development of essential materials. Taken together, the recommended reforms would strengthen domestic supply chains, improve investment certainty, and reduce dependence on external minerals and processing infrastructure. By aligning policy, regulatory frameworks, and workforce capabilities with national needs, the United States can build a more resilient and secure critical minerals ecosystem that supports long term economic competitiveness and technological leadership.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Equipment Testing Environment (ETE) Specification

Cyber security has been difficult to quantify from the perspective of defenders. The effort to develop a cyber-attack with some ability, function, or consequence has not been rigorously investigated in Operational Technologies. This specification defines a testing structure that allows conformal and repeatable cyber testing on equipment. The purpose of the ETE is to provide data necessary to analyze and reconstruct cyber-attack timelines, effects, and observables for training and development of Cyber Security Operation Centers. Standardizing the manner in which cyber security on equipment is investigated will allow a greater understanding of the progression of cyber attacks and potential mitigation and detection strategies in a scientifically rigorous fashion.

97 MATHEMATICS AND COMPUTING↗

Community Planning for Solar: Conducting a Community Solar Survey

This guide is designed to assist community officials, volunteers, and regional planning agency staff in conducting a survey of residents to learn about attitudes and development preferences towards solar energy within the community. The guide will provide the key steps, timelines, distribution options, ethics, and considerations that should be made in developing a survey distribution strategy. The guide also contains an overview of various question types and response categories, with considerations for the type of data that are needed for the study. The guide concludes with recommendations for managing data and databases, data visualization, and reporting results. The appendix includes samples of materials used in a solar energy survey, from invitation letters to the survey. This document is intended to provide a practical guide for implementing a survey in communities that are proactively planning for solar development. The guide offers a practical “how-to” plan for conducting a survey. It may be advantageous to consult with an expert in survey development who will be familiar with any methods and techniques described in this guide, but this is not necessary. This guide offers basic considerations and examples of questions and analyses to help a community understand preferences of the community.

14 SOLAR ENERGY↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

Next Generation Solar Collectors for CSP

The intent of “Next Generation Solar Collectors for CSP” program was to develop key technology elements for collectors in Phase 1 (Budget Period 1), design these elements in Phase 2 (Budget Period 2) and to deploy and test the final collector in Phase 3 (Budget Period 3). 3M and DOE mutually agreed to terminate the program at the end of Budget Period 1, primarily due to timeline issues. However, significant advancements were achieved in developing a next generation reflective material and panel that has the potential to significantly improve the efficiency of CSP systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High Current Density Cables for Simpler HTS Magnets in Fusion Energy Systems

High current density cables are needed for the engineering design of potentially low cost, simpler geometry high temperature superconducting (HTS) magnets in the promising magnetic configurations as a fusion pilot plant (FPP) option. Significant technology maturation efforts are underway by privately funded startups with the goal to demonstrate mature HTS magnet technology. Test results, however, indicate critical engineering issues remain to be addressed to meet performance goals, and demonstrate HTS coil operation repeatability and reliability. To this end, exploring and enabling multiple viable conductor and cable options is vital. Partnering with a private fusion startup and manufacturers of superconducting strands and cables, Princeton Plasma Physics Laboratory (PPPL) is exploring and seeking to de-risk the aggressive high field approach presently targeted by others. Our main objective is to develop, test and calibrate novel high current density cables for a broad deployment of affordable and reliable coils using Bi-2212 conductors. If successful, such a project will provide technical feasibility for promising FPP configurations including spherical tokamaks (ST) and compact stellarators. Here, we aim at the state-of-the-art Bi-2212 cable technologies toward a current density of 100 A/mm 2 at 16 T and 4.2 K–10 K operation for low cost, simpler geometry toroidal field (TF) coils for compact stellarators developed by fusion startup companies on a timeline consistent with the FPP initiatives and beyond.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Recovery Act: Innovative CO 2 Sequestration from Flue Gas Using Industrial Sources and Innovative Concept for Beneficial CO 2 Use

The overall goal of this DOE Phase 2 project was to further develop and conduct pilot-scale and field testing of a biomimetic in-duct scrubbing system for the capture of gaseous CO 2 coupled with sequestration of captured carbon by carbonation of alkaline industrial wastes. The Phase 2 project, reported on here, combined efforts in enzyme development, scrubber optimization, and sequestrant evaluations to perform an economic feasibility study of technology deployment. The optimization of carbonic anhydrase (CA) enzyme reactivity and stability are critical steps in deployment of this technology. A variety of CA enzyme variants were evaluated for reactivity and stability in both bench scale and in laboratory pilot scale testing to determine current limits in enzyme performance. Optimization of scrubber design allowed for improved process economics while maintaining desired capture efficiencies. A range of configurations, materials, and operating conditions were examined at the Alcoa Technical Center on a pilot scale scrubber. This work indicated that a cross current flow utilizing a specialized gas-liquid contactor offered the lowest system operating energy. Various industrial waste materials were evaluated as sources of alkalinity for the scrubber feed solution and as sources of calcium for precipitation of carbonate. Solids were mixed with a simulated sodium bicarbonate scrubber blowdown to comparatively examine reactivity. Supernatant solutions and post-test solids were analyzed to quantify and model the sequestration reactions. The best performing solids were found to sequester between 2.3 and 2.9 moles of CO 2 per kg of dry solid in 1-4 hours of reaction time. These best performing solids were cement kiln dust, circulating dry scrubber ash, and spray dryer absorber ash. A techno-economic analysis was performed to evaluate the commercial viability of the proposed carbon capture and sequestration process in full-scale at an aluminum smelter and a refinery location. For both cases the in-duct scrubber technology was compared to traditional amine- based capture. Incorporation of the laboratory results showed that for the application at the aluminum smelter, the in-duct scrubber system is more economical than traditional methods. However, the reverse is true for the refinery case, where the bauxite residue is not effective enough as a sequestrant, combined with challenges related to contaminants in the bauxite residue accumulating in and fouling the scrubber absorbent. Sensitivity analyses showed that the critical variables by which process economics could be improved are enzyme concentration, efficiency, and half-life. At the end of the first part of the Phase 2 project, a gate review (DOE Decision Zero Gate Point) was conducted to decide on the next stages of the project. The original plan was to follow the pre-testing phase with a detailed design for the field testing. Unfavorable process economics, however, resulted in a decision to conclude the project before moving to field testing. It is noted that CO 2 Solutions proposed an initial solution to reduce process costs through more advanced enzyme management, however, DOE program requirements restricting any technology development extending beyond 2014 as commercial deployment timeline did not allow this solution to be undertaken.

Dando, Neal↗

NoiseSpotter Feedback

NoiseSpotter is currently designed for a 2-week deployment. This timeline will likely be problematic for MHK developers. Developers will want a robust/proven system that they can deploy and not worry about for longer than 2 weeks (especially for the continued monitoring of a site).

42 ENGINEERING↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report was developed in tandem with the Furthering Advancements to Shorten Time (FAST) to Commissioning PSH Challenge and represents the underlying technical analysis that informed the competition. Lead by Oak Ridge National Laboratory, the report is designed to address barriers and solutions to PSH development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. The document’s scope includes post-licensing activities and excludes factors related to permitting or licensing.

13 HYDRO ENERGY↗

A Survey of Federal and State-Level Solar System Decommissioning Policies in the United States

In the United States, cumulative installed utility-scale solar photovoltaic (PV) capacity reached more than 60 gigawatts (GW)dc at the end of 2020 (Davis et al. 2021b). Federal and state renewable energy and net-zero emissions policies will continue to drive solar development in the United States with installed utility-scale PV projected to quadruple (240 GWdc) by 2030 (Davis et al. 2021a; Heeter 2014). Although more than 75% of all U.S. installed utility-scale PV came online in the last 5 years, federal, state, and local governments are planning for system decommissioning (Davis et al. 2021b). Our research found that as of April 2021, one federal agency, the Bureau of Land Management (BLM), and 15 U.S. states have solar decommissioning policies in place. North Carolina is also in the process of drafting solar decommissioning regulations, and at least 4 states (Maine, Pennsylvania, West Virginia, Texas) proposed solar decommissioning bills in the 2021 legislative session. This report provides a survey and brief overview of both federal and U.S. statewide solar decommissioning policies, and a discussion of some of the potential impacts different policy designs may have on utility-scale solar development, including impacts that might influence construction timelines and over project costs.

14 SOLAR ENERGY↗

Using Advanced Modeling to Accelerate the Scale-Up of Carbon Capture Technologies

Carbon capture and storage (CCS) is one of many approaches that are critical for significantly reducing domestic and global CO2 emissions. The U.S. Department of Energy’s Clean Coal Technology Program Plan envisions 2nd generation CO2 capture technologies ready for demonstration-scale testing around 2020 with the goal of enabling commercial deployment by 2025 [1]. Third generation technologies have a similarly aggressive timeline. A major challenge is that the development and scale-up of new technologies in the energy sector historically takes up to 15 years to move from the laboratory to pre-deployment and another 20 to 30 years for widespread industrial scale deployment. In order to help meet the goals of the DOE carbon capture program, the Carbon Capture Simulation Initiative (CCSI) was launched in early 2011 to develop, demonstrate, and deploy advanced computational tools and validated multi-scale models to reduce the time required to develop and scale up new carbon capture technologies. The CCSI Toolset (1) enables promising concepts to be more quickly identified through rapid computational screening of processes and devices, (2) reduces the time to design and troubleshoot new devices and processes by using optimization techniques to focus development on the best overall process conditions and by using detailed device-scale models to better understand and improve the internal behavior of complex equipment, and (3) provides quantitative predictions of device and process performance during scale up based on rigorously validated smaller scale simulations that take into account model and parameter uncertainty[2]. This article focuses on essential elements related to the development and validation of multi-scale models in order to help minimize risk and maximize learning as new technologies progress from pilot to demonstration scale.

Miller, David↗

Counter Unmanned Aircraft System Metrics Tool

SAND2023-05387O The Counter Unmanned Aircraft System (CUAS) Metrics Tool consists of three applications: • The Data Collection Tool is designed to be used during testing and captures details that can be imported into the Figure Creator application. • The Unmanned Aircraft System (UAS) Log Converter converts different UAS logs into a standardized hierarchical data format with a timeline of geospatial data. • The Figure Creator develops relevant images for the test event. The application includes logic to ingest and correlate data from the Data Collection Tool and the UAS Log Converter to produce the chosen figures. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Mayle, Ashley↗

Offshore Wind Technology Data Update (2019) [Slides]

The 2019 Offshore Wind Technology Data Update compiles information from peer-reviewed literature, market reports, press releases, industry news reports, manufacturer specification sheets, and offshore wind project announcements to provide a comprehensive snapshot of the state of the global wind industry in 2019. These data, including capacity projections, project characteristics, technology trends, and cost estimates, are categorized, tabulated, and plotted to provide easily recognizable and understandable summaries. A particular focus is given to the United States offshore wind project pipeline, including project announcements, state procurements, deployment timelines, infrastructure investments, grid interconnections, and other related developments. The update is intended to be used as a reference document by researchers, analysts, industry practitioners, and government officials.

17 WIND ENERGY↗

DOE Advanced Gas Reactor Fuel Development and Qualification Program Overview

Slides discussing the DOE Advanced Gas Reactor Fuel Development and Qualification Program Overview to include focus on LEU UCO TRISO fuel in cylindrical compacts, with data for fuel qualification in support of reactor licensing and a path to establish a domestic commercial TRISO fuel fabrication capability. Timelines from 2004 through 2029. Major program highlights include: Developed fuel performance models based on past observed behavior, Study to understand differences between US and German (“good”) fuel, Developed and improved fuel fabrication and characterization methods, Fabricated lab-scale fuel (AGR-1) with very high quality; excellent in-pile and post-irradiation high-temperature fuel performance, Scale-up coating fabrication (AGR-2) with excellent in-pile performance, AGR-3/4 fuel fabrication and irradiation experiment to assess FP transport behavior, Scale-up matrix fabrication (AGR-5/6/7); & fuel performance evaluation in progress.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗