Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

88 records · Page 5

Review and Modeling of Integrated Energy Systems with Nuclear Reactor Coupled Desalination and District Heating

Detailed reviews of a past advanced nuclear reactor based integrated energy system, as well as other nuclear reactor and fossil fuel based integrated energy systems have been performed for this work. Review of the utilization of heat from nuclear reactors for various applications and cogeneration has been done. The heat can be utilized by extraction of the steam from the turbine while the steam is still at a desired temperature. While use of nuclear process heat for district heating in countries like Finland, France, China, Poland, and elsewhere is discussed, more focus of the review has been given on nuclear desalination processes. Integrated energy systems (IES) where distinct types of reactors like PWR, BWR, sodium cooled fast reactor, heavy water reactor and other advanced reactors are coupled with various nuclear desalination processes like multi-effect distillation (MED), multi-stage flashing (MSF) and reverse osmosis (RO) methods have been discussed. The nuclear desalination plant at Aktau has been discussed in more detail due to its decades of successful operation. The IES of the Aktau plant coupled with 5-effect MED desalination plant has been taken as a reference for modeling the Open Modelica (OM) based IES of this work. Here, the OM IES model shows good agreement with the MED plant output of Aktau and can be extended for future applications of IES.

42 ENGINEERING↗

Defining weather scenarios for simulation-based assessment of thermal resilience of buildings under current and future climates: A case study in Brazil

In response to increasingly severe weather conditions, optimization of building performance and investment provides an opportunity to consider co-benefits of thermal resilience during energy efficiency retrofits. This work aims to assess thermal resilience of buildings using building performance simulation to evaluate the indoor overheating risk under nine weather scenarios, considering historical (2010s), mid-term future (2050s), and long-term future (2090s) typical meteorological years, and heat wave years. Such an analysis is based on resilience profiles that combine six integrated indicators. A case study with a district of 92 buildings in Brazil was conducted, and a combination of strategies to improve thermal resilience was identified. Results reflect the necessity of planning for resilience in the context of climate change. This is because strategies recommended under current conditions might not be ideal in the future. Therefore, an adaptable design should be prioritized. Cooling energy consumption could increase by 48 % by the 2050s, while excessive overheating issues could reach 37 % of the buildings. Simple passive strategies can significantly reduce the heat stress. A comprehensive thermal resilience analysis should ultimately be accompanied by a thorough reflection on the stakeholders’ objectives, available resources, and planning horizon, as well as the risks assumed for not being resilient.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Subcontracted activities related to TES for building heating and cooling

The subcontract program elements related to thermal energy storage for building heating and cooling systems are outlined. The following factors are included: subcontracts in the utility load management application area; life and stability testing of packaged low cost energy storage materials; and development of thermal energy storage systems for residential space cooling. Resistance storage heater component development, demonstration of storage heater systems for residential applications, and simulation and evaluation of latent heat thermal energy storage (heat pump systems) are also discussed. Application of thermal energy storage for solar application and twin cities district heating are covered including an application analysis and technology assessment of thermal energy storage.

Martin, J.↗

LNPK 156 Geothermal Coalition: Designing and Deploying Clean Energy in a Justice40 Cold Climate Community

The LNPK 156 Geothermal Coalition formed around the idea of building a new geothermal heating and cooling system in Duluth, MN for the Lincoln Park Justice40 neighborhood. The Coalition has been spearheaded by the City of Duluth and the local non-profit Ecolibrium3, and is named after the census tract of the neighborhood containing large portions of Lincoln Park, as well as a wastewater treatment plant, managed by the Western Lake Superior Sanitary District (WLSSD). The idea of building a geothermal system came to fruition over the period of about a decade, with repeated observations that the warm water discharged from the wastewater treatment plant was an energy-rich resource that has currently been untapped and released into the St. Louis River. The objective of this project was to build a geothermal system that harnesses wastewater heat recovery methods and satisfies the demand in a portion of Lincoln Park – a neighborhood experiencing high energy burdens, low life-expectancy, and where the natural gas and fuel oil used to heat homes and businesses results in decreased air quality and increased carbon emissions. The goal was to utilize this wastewater heat recovery method to benefit the neighborhood hosting the wastewater plant itself.

15 GEOTHERMAL ENERGY↗

Geothermal District Heating in the United States: 2021 Update

As of 2021, there are 23 geothermal district heating (GDH) systems in the United States. Most are over 30 years old. This paper presents an overview of GDH development in the United States and the performance of GDH systems over time. Calculations of the estimated levelized cost of heat (LCOH) for existing U.S. GDH systems were made using NREL's GEOPHIRES tool. Estimated LCOH for existing U.S. GDH systems ranges from $15 to $105/MWhth. This paper explores other factors in GDH development such as resource and system size, capacity factor, and the role of policy. U.S. GDH utilization and deployment are compared to worldwide trends. Results show that the market for GDH in the United States has been weak over the past 40 years due to the combination of inexpensive fossil fuel alternatives (mostly natural gas), lack of incentives focused on heating/cooling, and other factors. Future opportunities for increased GDH deployment in the United States related to increased demand for low-carbon heating and cooling solutions (driven by decarbonization goals in the residential, commercial and industrial heating/cooling sectors, and particularly aggressive ones on college campuses) are outlined. Lastly, this paper identifies policy mechanisms that have been implemented in other countries to incentivize GDH (such as financial incentives targeting GDH, geothermal risk reduction mechanisms, carbon prices benefiting low-carbon heat production, and others).

geothermal district heating↗

Design, modeling and simulation of nuclear-powered integrated energy systems with cascaded heating applications

Nuclear-renewable integrated energy systems (IES) consist of a variety of energy generation and conversion technologies and can be used to meet heterogeneous end uses (e.g., electricity, heat, and cooling demands). In addition to supply-demand balance, end-use heat demands usually require heat supply of certain temperature ranges. The effective and efficient utilization of heat produced within an IES is, therefore, a critical challenge. Here, this paper examines design options of an IES that includes heating processes of multiple temperature grades. We investigate a cascaded design configuration, where the remaining residual heat after high-grade heating processes [e.g., hydrogen production through high-temperature steam electrolysis (HTSE)] is recovered to meet the low-grade heating needs [e.g., district heating (DH)]. Additionally, a thermal energy storage system is integrated into the DH system to address the imbalance between heat supply and demand. This paper primarily focuses on the design and modeling of the proposed system and evaluates its operation with a 24-h transient process simulation using a DH demand profile with hourly resolution. The results indicate that the residual heat from the HTSE exhaust is insufficient for the DH demand, and additional topping heat directly from the reactor process steam is needed. Furthermore, the inclusion of thermal energy storage within the DH system provides the necessary balance between thermal generation and demand, thereby ensuring a consistent rated temperature of the DH supply water. This approach helps minimize the control actions needed on the reactor side.

08 HYDROGEN↗

Need for research and training reactors for advanced reactor designs

Full text of publication follows. Research and training reactors have served a valuable role in helping train workforce for currently operating fleet of light water reactors. These research and training reactors have been used in reactor laboratory classes to familiarize the students with such vital concepts as approach to criticality, reactor period, neutron moderation, reactivity, flux distribution and leakage, etc. As the industry moves toward advanced non-light-water reactor designs, it is critical that research and training reactors be developed and deployed at university campuses to help train the new generation of nuclear and non-nuclear engineers who are likely to design, build, and operate these advanced reactors. Among the designs currently being pursued for nuclear power generation include molten salt, sodium cooled, and gas cooled designs, with options for various fuel forms. Thus, industry and DOE in collaboration with academic institutions should devise plans on how to familiarize the next generation of nuclear workforce with hands-on experience necessary for such designs. These research and training reactors will play a vital role in familiarizing the future workforce with hands-on experience with concepts associated with fast spectrum reactors, gas cooled reactors, and other features not associated with light water reactors. In addition to classical nuclear engineering concepts, these advanced research and training reactors can also be used for hands-on training as well as for research on features being considered in the design of GEN-IV reactors: cyber security for digital control room operations, hybrid energy system, hydrogen generation, district heating, autonomous control... (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Optimizing district energy systems by integrating Borehole Thermal Energy Storage Using a Mixed-Integer Linear Programming g-function framework with a Multi-Timescale Rolling Horizon method

Shallow geothermal has gained increasing attention in recent years; however, a reliable framework for its accurate incorporation into large-scale energy system optimization remains lacking. This study proposes a Mixed-Integer Linear Programming (MILP) framework combined with the g-function approach to integrate Borehole Thermal Energy Storage (BTES) technology into energy system optimization. Validation against a Modelica-based reservoir network simulation demonstrates that the proposed framework effectively captures the ground thermal response under varying energy loads and accurately estimates the borefield energy supply. To enhance scalability, a Rolling Horizon with Multi-Timescale (RH-MTS) method is further introduced, reducing computational time by 73 % for the 1-year optimization model with only minor loss of optimality. The framework is demonstrated through the case study of the UC Berkeley campus. Results indicate that BTES is a cost-effective and low-carbon solution: two borefields comprising 382 boreholes can meet 8.0 % and 6.6 % of the total campus heating and cooling demand, respectively, at an average energy rate of 0.70–0.77 USD/kWh and carbon intensity of 0.54 kg-CO2/kWh. Short-term analysis reveals a 35%–65% decline in BTES energy flow after 3–6 months of continuous heating/cooling operation, while long-term simulation shows that annual energy production of BTES can vary by up to 12.0 % after four years before stabilizing. Overall, this study develops a novel optimization framework that couples physics-based g-function method with MILP optimization framework, thereby advancing methodological development for shallow-geothermal integration and providing actionable guidance for BTES deployment in district-energy systems.

Yang, Jiahui↗

Proceedings of the Alternate Energy Systems Seminar

The Alternative Energy Systems Seminar was held on March 30, 1978, and was sponsored jointly be the Southwest District Office of the U.S. Department of Energy and JPL. The seminar was an experiment in information exchange with the aim of presenting, in a single day, status and prospects for a number of advanced energy systems to a diverse, largely nontechnical audience, and to solicit post-seminar responses from that audience as to the seminar's usefulness. The major systems presented are: (1) Solar Photovoltaic; (2) Geothermal; (3) Cogeneration Power; (4) Solar Thermal; (5) Solar Heating and Cooling; (6) Wind Energy; and (7) Systems Considerations.

Source record↗

Making Coal Relevant for Small Scale Applications: Modular Gasification for Syngas/Engine CHP Applications in Challenging Environments

The proposed project includes construction and operation of a power plant consisting of coal gasification facilities and engine generators which would produce electrical power and heat. The recovered heat and a portion of the carbon dioxide emissions from the engines would support an onsite greenhouse and other heat and power customers. The proposed project site is located on the Marathon North Pole Terminal property in North Pole, Alaska. Two gasifiers would convert the coal into syngas, which would be fed through a gas cleanup train and then combusted in six reciprocating engines driving electric generators. Heat recovery on the engine cooling loops and exhaust trains would provide heat to a glycol/water circulation system for use in the greenhouse, in the Marathon facilities and for other customers. Natural gas would fuel two additional engine generators and would also be available to supplement the syngas-fired engines.

01 COAL, LIGNITE, AND PEAT↗

Geologic Seawater Air Conditioning (GeoSWAC) System: Resource Assessment and Techno-Economic Evaluation in Puerto Rico

Puerto Rico's hot, humid climate drives a high and persistent demand for cooling, straining an aging and fuel-dependent energy grid while increasing peak electricity loads. Much of this challenge stems from inefficient air-conditioning systems operating in buildings without passive cooling design, making cooling both costly and vulnerable to disruption - especially during hurricanes. To address these issues, researchers evaluated a new alternative called Geologic Seawater Air Conditioning (GeoSWAC), which uses inland wells connected to naturally cold, deep seawater. By avoiding long offshore pipelines and energy-intensive refrigeration cycles, GeoSWAC can cut electricity use by 75-90%, reduce environmental impacts, and operate more reliably during power outages. A case study at the University of Puerto Rico's Rio Piedras campus found that GeoSWAC could deliver significantly lower levelized costs of cooling, reduced operational expenses, and improved water conservation compared to the campus's existing chilled-water plant. The system offers key advantages - including access to a constant cold heat sink, low pumping requirements, and enhanced resilience - for coastal regions such as Puerto Rico, the broader Caribbean, and Florida. However, its effectiveness depends heavily on site-specific geological conditions, such as subsurface connectivity and aquifer characteristics, which require detailed investigation. Future research should refine hydrogeological models, conduct performance and economic analyses, and address regulatory and permitting frameworks to support broader adoption of this promising technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fluidized Bed Gasification For Conversion of Biomass and Waste Materials to Renewable Hydrogen

This project was undertaken in order to study the potential for hydrogen production, at low cost, from mixtures of biomass and municipal solid waste (MSW). This approach allows for the production of hydrogen with a very low fossil carbon burden, while taking advantage of tipping fees (associated with MSW) to improved process economics. The team sourced three primary feedstocks (wood, MSW, and waste plastics) and characterized them comprehensively using established techniques with a long track record in the field of gasification. All three primary feedstocks were highly reactive and lost most of their mass during initial devolatilization. The production of tars, including heavy tars, was quite high, and was most problematic in the case of the MSW and Waste Plastics feedstocks. Little practical difference was identified between the MSW and Waste Plastics materials, and the addition of bed-forming materials (dolomite and brown alumina) to the feedstocks was found to reduce production of tars during devolatilization under thermogravimetric analysis and/or Fischer Assay conditions. A series of four tests in a lab-scale bubbling-fluidized-bed gasifier, at 50 psig of pressure and about 825 C, confirmed these findings. Pellet feedstocks, broken into fragments, were used for these tests, and pellets comprised of 50% MSW and 50% biomass were found to be the best option in terms of fossil carbon burden, economic potential, and gasification characteristics. Tests were then undertaken in a pilot-scale gasifier facility based on the GTI U-Gas fluidized-bed gasification technology. The feedstock handling train of the 20 TPD U-Gas pilot-scale gasifier located in Des Plaines, IL, was operated under simulated gasification conditions, and the 50/50 pellets were found to be very robust and unproblematic. An improved design for the forward end of the feedstock injection screw of the gasifier was developed and installed. The design approach was based on improved passive cooling of the front-most shroud at the end of the screw, since this approach was found in comprehensive modeling studies to be more than sufficient to accomplish the project objectives associated with this phase of the work, while also avoiding thermal gradients that could have caused heat-stress-induced damage to the refractory around the feedstock inlet if an active cooling approach had been applied. Careful technoeconomic analysis (TEA) of two possible 1000 TPD facilities was carried out. The TEA of conversion of MSW with corn stover in one case, and MSW with woody feedstock in the other case, showed that both had the potential to provide hydrogen at about $1/kg (minimum selling price, 2018 dollar basis). Of the two TEA cases, the one that was based on the conversion of wood in the southeastern USA was found to have slightly better economic potential. The other TEA case was based on a real location in Nebraska and called for corn stover feedstock conversion along with MSW. An underserved communities outreach program plan was developed in cooperation with personnel from the Nebraska Public Power District.

08 HYDROGEN↗

Pathways for decarbonization of the buildings sector in Ukraine

The paper focuses on Ukraine’s intention to achieve a two-thirds reduction in buildings’ energy consumption for heating and cooling by 2050, concurrently aiming for net zero greenhouse gas emissions and heightened energy security. Here, the study examines the outcomes of retrofitting existing residential, commercial, and public buildings with highly efficient materials, improving construction standards, and transitioning to advanced heating systems. However, Russia’s invasion in 2022 inflicted substantial damage, prompting a shift from retrofit and decarbonization to reconstruction. The Ukrainian government’s Reconstruction Plan emphasizes clean, sustainable, and resilient energy systems. The study employs energy system and integrated assessment models (TIMES-Ukraine and GCAM-Ukraine) to explore scenarios taking into consideration the war, reconstruction, and a net zero CO 2 pathway. Using two models allowed the inter-model comparison. The analysis addresses vital questions on energy resiliency measures and the compounding effects of decarbonization. Findings indicate that Ukraine’s energy goals can be met through strategic retrofitting and economy-wide decarbonization, emphasizing the importance of low-carbon alternatives like district heating with renewable sources. Electrification with renewables and fuel-switching emerges as crucial for achieving building decarbonization. The study offers valuable insights into navigating energy challenges amidst the war and outlines a pathway for Ukraine’s sustainable energy future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Informing electrification strategies of residential neighborhoods with urban building energy modeling

Electrifying end uses is a key strategy to reducing GHG emissions in buildings. However, it may increase peak electricity demand that triggers the need to upgrade the existing power distribution system, leading to delays in electrification and needs of significant investment. There is also concern that building electrification may cause an increase of energy costs, leading to further energy burden for low-income communities. This study uses the urban scale building modeling tool CityBES to assess the electrification impacts of more than 43,000 residential buildings in a neighborhood of Portland, Oregon, USA. Energy efficiency upgrades were investigated on their potential to mitigate the increase of peak electricity demand and energy burden. Simulation results from the calibrated EnergyPlus models show that electrification with heat pumps for space heating and cooling as well as for domestic water heating can reduce CO2e emissions by 38%, but increase peak electricity demand by about 9% from the baseline building stock. Combining electrification measures and energy efficiency upgrades can reduce CO2e emissions by 48% while reducing peak electricity demand by 6% and saving the median household energy costs by 28%. City and utility decision makers should consider integrating energy efficiency upgrades with electrification measures as an effective residential building electrification strategy, which significantly reduces carbon emissions, caps or even decreases peak demand while reducing energy burden of residents.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

COGIHTO: Comprehensive Geothermal Integrated HVAC Retrofits in Disadvantaged Communities

Geothermal heating and cooling (GHC) systems offer one of the most efficient approaches to provide space conditioning and water heating in buildings. Due to the relatively stable temperature of the ground year-round, these systems can provide an efficient solution to decarbonize heating systems. Yet this technology has faced limited market adoption due to its high first cost. This project seeks to address this barrier by designing a community GHC system at a public housing development in New York, taking advantage of load diversity (in terms of the timing and amount of heating / cooling used per person) that a larger community offers to reduce the size and thus first cost of a GHC system. Project success would result in societal benefit from reduced energy and fossil fuel use, reduced local emissions, and improved comfort, which would positively impact the health and well-being this community. This report presents the findings from Phase 1 project supported by the Department of Energy’s Geothermal Technologies Office and includes the technical design of a GHC at a public housing development in New York. To support the success of a potential deployment of a GHC system, the team conducted community engagement and prepared an assessment of the local workforce needs. The project team, led by EPRI, considered a subset of NYCHA housing developments that were previously identified by NYCHA as suitable for GHC retrofits. This report presents the site selection criteria the team developed and the overall score assigned to each of the eight developments considered. One site was selected for focus of the technical design: Stapleton Houses in Staten Island, a mid-size development with roughly 700 apartments across 6 buildings. The site has an existing hot water hydronic loop served by natural gas boilers for space heating and water heating. The technical design partner assessed baseline energy consumption at the site and established thermal models of the apartment buildings to assist in the design. The team considered several GHC system configurations and selected a hybrid geothermal design fed from water-source heat pumps with auxiliary gas boilers in a central plant. This design best leveraged the existing site configuration and minimized costs due to additional electrical infrastructure upgrades. The report also details the feedback received from community engagement efforts and the findings from the workforce needs assessment and workforce transition plan. Members of the site maintenance staff and the resident advisory council were interviewed for their input and feedback about both the site’s existing heating/cooling infrastructure and how a construction project would impact resident life. This feedback was taken into consideration when completing the geothermal system design. Research was conducted into existing workforce development opportunities available to NYCHA residents. A workforce development plan was established using information from NYCHA’s resident economic empowerment and sustainability group, along with training material and curriculum from the International Ground Source Heat Pump Association (IGSHPA).

15 GEOTHERMAL ENERGY↗