Search NASA⌕ Search

SEARCH · Search NASA

Results for “docking simulations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Six degree of freedom simulation system for evaluating automated rendezvous and docking spacecraft

Future logistics supply and servicing vehicles such as cargo transfer vehicles (CTV) must have full 6 degree of freedom (6DOF) capability in order to perform requisite rendezvous, proximity operations, and capture operations. The design and performance issues encountered when developing a 6DOF maneuvering spacecraft are very complex with subtle interactions which are not immediately obvious or easily anticipated. In order to deal with these complexities and develop robust maneuvering spacecraft designs, a simulation system and associated family of tools are used at TRW for generating and validating spacecraft performance requirements and guidance algorithms. An overview of the simulator and tools is provided. These are used by TRW for autonomous rendezvous and docking research projects including CTV studies.

Rourke, Kenneth H.↗

Autonomous spacecraft rendezvous and docking

A storyboard display is presented which summarizes work done recently in design and simulation of autonomous video rendezvous and docking systems for spacecraft. This display includes: photographs of the simulation hardware, plots of chase vehicle trajectories from simulations, pictures of the docking aid including image processing interpretations, and drawings of the control system strategy. Viewgraph-style sheets on the display bulletin board summarize the simulation objectives, benefits, special considerations, approach, and results.

Tietz, J. C.↗

Simulation of Mission Phases

This position with the Simulation and Graphics Branch (ER7) at Johnson Space Center (JSC) provided an introduction to vehicle hardware, mission planning, and simulation design. ER7 supports engineering analysis and flight crew training by providing high-fidelity, real-time graphical simulations in the Systems Engineering Simulator (SES) lab. The primary project assigned by NASA mentor and SES lab manager, Meghan Daley, was to develop a graphical simulation of the rendezvous, proximity operations, and docking (RPOD) phases of flight. The simulation is to include a generic crew/cargo transportation vehicle and a target object in low-Earth orbit (LEO). Various capsule, winged, and lifting body vehicles as well as historical RPOD methods were evaluated during the project analysis phase. JSC core mission to support the International Space Station (ISS), Commercial Crew Program (CCP), and Human Space Flight (HSF) influenced the project specifications. The simulation is characterized as a 30 meter +V Bar and/or -R Bar approach to the target object's docking station. The ISS was selected as the target object and the international Low Impact Docking System (iLIDS) was selected as the docking mechanism. The location of the target object's docking station corresponds with the RPOD methods identified. The simulation design focuses on Guidance, Navigation, and Control (GNC) system architecture models with station keeping and telemetry data processing capabilities. The optical and inertial sensors, reaction control system thrusters, and the docking mechanism selected were based on CCP vehicle manufacturer's current and proposed technologies. A significant amount of independent study and tutorial completion was required for this project. Multiple primary source materials were accessed using the NASA Technical Report Server (NTRS) and reference textbooks were borrowed from the JSC Main Library and International Space Station Library. The Trick Simulation Environment and User Training Materials version 2013.0 release was used to complete the Trick tutorial. Multiple network privilege and repository permission requests were required in order to access previous simulation models. The project was also an introduction to computer programming and the Linux operating system. Basic C++ and Python syntax was used during the completion of the Trick tutorial. Trick's engineering analysis and Monte Carlo simulation capabilities were observed and basic space mission planning procedures were applied in the conceptual design phase. Multiple professional development opportunities were completed in addition to project duties during this internship through the System for Administration, Training, and Education Resources for NASA (SATERN). Topics include: JSC Risk Management Workshop, CCP Risk Management, Basic Radiation Safety Training, X-Ray Radiation Safety, Basic Laser Safety, JSC Export Control, ISS RISE Ambassador, Basic SharePoint 2013, Space Nutrition and Biochemistry, and JSC Personal Protective Equipment. Additionally, this internship afforded the opportunity for formal project presentation and public speaking practice. This was my first experience at a NASA center. After completing this internship I have a much clearer understanding of certain aspects of the agency's processes and procedures, as well as a deeper appreciation from spaceflight simulation design and testing. I will continue to improve my technical skills so that I may have another opportunity to return to NASA and Johnson Space Center.

Carlstrom, Nicholas Mercury↗

STS-63 Commander Wetherbee Explains Five Minute Window and Mir Rendezvous

In a preflight interview, Commander James B. Wetherbee of the STS-63 Discovery mission gives an overview of the upcoming rendezvous with Mir and the five minute window in which the rendezvous takes place. Computerized simulations show the docking of the Discovery Orbiter with Mir.

Source record↗

Development of a Deployable Nonmetallic Boom for Reconfigurable Systems of Small Spacecraft

In 2005, NASA commenced Phase 1 of the Modular Reconfigurable High Energy Technology Demonstrator (MRHE) program to investigate reconfigurable systems of small spacecraft. During that year, Lockheed Martin's Advanced Technology Center (ATC) led an accelerated effort to develop a 1-g MRHE concept demonstration featuring robotic spacecraft simulators equipped with docking mechanisms and deployable booms. The deployable boom built for MRHE was the result of a joint effort in which ATK was primarily responsible for developing and fabricating the Collapsible Rollable Tube (CRT patent pending) boom while Lockheed Martin designed and built the motorized Boom Deployment Mechanism (BDM) under a concurrent but separate IR&D program. Tight coordination was necessary to meet testbed integration and functionality requirements. This paper provides an overview of the CRT boom and BDM designs and presents preliminary results of integration and testing to support the MRHE demonstration.

Rehnmark, Fredrik↗

Application of adaptive control to space stations

The space station will be deployed and assembled in low earth orbit with multiple Shuttle trips. Several construction phases will be required involving both ground and in-orbit operations. In this paper, the construction process of a four-panel space station and its control problems are discussed. The applicability of a direct model reference adaptive control technique with plant augmentation is investigated. Control during several key assembly operation periods has been simulated. These include Shuttle docking with initial-phase station, habitat module mating, and Shuttle docking with operational station. High rate of convergence and robust performance have been observed for all the simulated cases even with 40 percent model parameter errors and model truncations and more than 100 percent instant mass property variations. Controller with severe gain saturations is also discussed and results show only slight performance deterioration.

Ih, C.-H. C.↗

Initial Investigation of Reaction Control System Design on Spacecraft Handling Qualities for Earth Orbit Docking

A program of research, development, test, and evaluation is planned for the development of Spacecraft Handling Qualities guidelines. In this first experiment, the effects of Reaction Control System design characteristics and rotational control laws were evaluated during simulated proximity operations and docking. Also, the influence of piloting demands resulting from varying closure rates was assessed. The pilot-in-the-loop simulation results showed that significantly different spacecraft handling qualities result from the design of the Reaction Control System. In particular, cross-coupling between translational and rotational motions significantly affected handling qualities as reflected by Cooper-Harper pilot ratings and pilot workload, as reflected by Task-Load Index ratings. This influence is masked but only slightly by the rotational control system mode. While rotational control augmentation using Rate Command Attitude Hold can reduce the workload (principally, physical workload) created by cross-coupling, the handling qualities are not significantly improved. The attitude and rate deadbands of the RCAH introduced significant mental workload and control compensation to evaluate when deadband firings would occur, assess their impact on docking performance, and apply control inputs to mitigate that impact.

Bailey, Randall E.↗

Space tug automatic docking control study

A study was conducted to investigate the space tug automatic docking control capabilities. The subjects considered are: (1) docking sensor requirements, (2) the influence of the docking mechanism, and (3) the implications and effects of a docking abort. A digital computer simulation, was developed which included the primary aspects of the docking maneuver.

Wohl, J.↗

Evolving the SpaceFOM: Lessons Learned and Future Development

For over fifty years, simulation has been a cornerstone technology for space missions. In many cases, one single simulator, developed by one team, is not enough to meet the simulation objectives. Astronaut crew training, docking, vehicle testing and complex mission planning all require several simulations to be connected and to interoperate, in order to achieve the goal of the simulation. To facilitate the development of interoperable simulations, an open standard, the SISO SpaceFOM was developed in collaboration between government, industry and academia. The standard was released in 2020. The initial release of SpaceFOM focuses on the core interoperability topics for space simulation: (i) specifying spatial data using several, well defined reference frames, (ii) managing time (including real-time, hard real-time, and as-fast-as-possible execution), (iii) composition of systems with subsystems such as space vehicles, and (iv) execution control, such as initializing, running, pausing, and terminating simulations. The initial release of SpaceFOM focuses on the core interoperability topics for space simulation: (i) specifying spatial data using several, well defined reference frames, (ii) managing time (including real-time, hard real-time, and as-fast-as-possible execution), (iii) composition of systems with subsystems such as space vehicles, and (iv) execution control, such as initializing, running, pausing, and terminating simulations. A number of requirements for the next version of SpaceFOM have been identified and proposed solutions are already under development. One key area is the object classes used for data exchange, where a richer set of classes have been proposed, based on practical use cases. For time management, the use of variable time resolutions and variable time steps is also proposed. For execution control, save and restore of simulations is considered as well as improved robustness, to handle failing components. A number of clarifications are also under consideration. This paper provides both a forward-looking view of the technical developments underway and a retrospective on the standard's evolution. The authors emphasize that prioritizing core challenges and delivering a practical first version were crucial steps. While not every idea was implemented in the initial release, the timely delivery of a functional standard enabled real-world applications, the growth of a user community, and the collection of valuable insights to shape future versions. The authors look forward to working with the next version of SpaceFOM together with the growing user community.

Simulation Interoperability↗

Evolving the SpaceFOM: Lessons Learned and Future Development

For over fifty years, simulation has been a cornerstone technology for space missions. In many cases, one single simulator, developed by one team, is not enough to meet the simulation objectives. Astronaut crew training, docking, vehicle testing and complex mission planning all require several simulations to be connected and to interoperate, in order to achieve the goal of the simulation. To facilitate the development of interoperable simulations, an open standard, the SISO SpaceFOM was developed in collaboration between government, industry and academia. The standard was released in 2020. The initial release of SpaceFOM focuses on the core interoperability topics for space simulation: (i) specifying spatial data using several, well defined reference frames, (ii) managing time (including real-time, hard real-time, and as-fast-as-possible execution), (iii) composition of systems with subsystems such as space vehicles, and (iv) execution control, such as initializing, running, pausing, and terminating simulations. A number of requirements for the next version of SpaceFOM have been identified and proposed solutions are already under development. One key area is the object classes used for data exchange, where a richer set of classes have been proposed, based on practical use cases. For time management, the use of variable time resolutions and variable time steps is also proposed. For execution control, save and restore of simulations is considered as well as improved robustness, to handle failing components. A number of clarifications are also under consideration. This paper provides both a forward-looking view of the technical developments underway and a retrospective on the standard's evolution. The authors emphasize that prioritizing core challenges and delivering a practical first version were crucial steps. While not every idea was implemented in the initial release, the timely delivery of a functional standard enabled real-world applications, the growth of a user community, and the collection of valuable insights to shape future versions. The authors look forward to working with the next version of SpaceFOM together with the growing user community.

FOMs↗

Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations: Special approach/docking testcase results

As part of the RICIS project, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Maximum Mission (SMM) satellite simulation. In utilizing these fuzzy learning techniques, we use the Approximate Reasoning based Intelligent Control (ARIC) architecture, and so we use these two terms interchangeably to imply the same. This activity is carried out in the Software Technology Laboratory utilizing the Orbital Operations Simulator (OOS) and programming/testing support from other contractor personnel. This report is the final deliverable D4 in our milestones and project activity. It provides the test results for the special testcase of approach/docking scenario for the shuttle and SMM satellite. Based on our experience and analysis with the attitude and translational controllers, we have modified the basic configuration of the reinforcement learning algorithm in ARIC. The shuttle translational controller and its implementation in ARIC is described in our deliverable D3. In order to simulate the final approach and docking operations, we have set-up this special testcase as described in section 2. The ARIC performance results for these operations are discussed in section 3 and conclusions are provided in section 4 along with the summary for the project.

Jani, Yashvant↗

An Orbital Maneuvering Vehicle simulator

The Orbital Maneuvering Vehicle (OMV) is a teleoperated vehicle designed to dock with a target vehicle in space to peform certain tasks. This vehicle is not yet in production, but a simulator of the OMV is located at Marshall Space Flight Center (MSFC). The MSFC facility provides a realistic simulation of the OMV. Various docking maneuvers can be studied in some detail. A special robot has been constructed that provides a moving target for the simulator to dock with. This facility is valuable for conducting studies on the OMV; it also is excellent for personnel training.

Teoh, W.↗

Development of the dynamic motion simulator of 3D micro-gravity with a combined passive/active suspension system

The establishment of those in-orbit operations like 'Rendez-Vous/Docking' and 'Manipulator Berthing' with the assistance of robotics or autonomous control technology, is essential for the near future space programs. In order to study the control methods, develop the flight models, and verify how the system works, we need a tool or a testbed which enables us to simulate mechanically the micro-gravity environment. There have been many attempts to develop the micro-gravity testbeds, but once the simulation goes into the docking and berthing operation that involves mechanical contacts among multi bodies, the requirement becomes critical. A group at the Tokyo Institute of Technology has proposed a method that can simulate the 3D micro-gravity producing a smooth response to the impact phenomena with relatively simple apparatus. Recently the group carried out basic experiments successfully using a prototype hardware model of the testbed. This paper will present our idea of the 3D micro-gravity simulator and report the results of our initial experiments.

Yoshida, Kazuya↗

Return to Flight: Crew Activities Resource Reel 1 of 2

The crew of the STS-114 Discovery Mission is seen in various aspects of training for space flight. The crew activities include: 1) STS-114 Return to Flight Crew Photo Session; 2) Tile Repair Training on Precision Air Bearing Floor; 3) SAFER Tile Inspection Training in Virtual Reality Laboratory; 4) Guidance and Navigation Simulator Tile Survey Training; 5) Crew Inspects Orbital Boom and Sensor System (OBSS); 6) Bailout Training-Crew Compartment; 7) Emergency Egress Training-Crew Compartment Trainer (CCT); 8) Water Survival Training-Neutral Buoyancy Lab (NBL); 9) Ascent Training-Shuttle Motion Simulator; 10) External Tank Photo Training-Full Fuselage Trainer; 11) Rendezvous and Docking Training-Shuttle Engineering Simulator (SES) Dome; 12) Shuttle Robot Arm Training-SES Dome; 13) EVA Training Virtual Reality Lab; 14) EVA Training Neutral Buoyancy Lab; 15) EVA-2 Training-NBL; 16) EVA Tool Training-Partial Gravity Simulator; 17) Cure in Place Ablator Applicator (CIPAA) Training Glove Vacuum Chamber; 16) Crew Visit to Merritt Island Launch Area (MILA); 17) Crew Inspection-Space Shuttle Discovery; and 18) Crew Inspection-External Tank and Orbital Boom and Sensor System (OBSS). The crew are then seen answering questions from the media at the Space Shuttle Landing Facility.

Source record↗