At least 91 records · Page 5

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Wind Turbine Drivetrain Condition Monitoring - An Overview (Presentation)

High operation and maintenance costs still hamper the development of the wind industry despite its quick growth worldwide. To reduce unscheduled downtime and avoid catastrophic failures of wind turbines and their components have been and will be crucial to further raise the competitiveness of wind power. Condition monitoring is one of the key tools for achieving such a goal. To enhance the research and development of advanced condition monitoring techniques dedicated to wind turbines, we present an overview of wind turbine condition monitoring, discuss current practices, point out existing challenges, and suggest possible solutions.

17 WIND ENERGY↗

Wind Turbine Drivetrain Reliability Assessment and Remaining Useful Life Prediction

This presentation describes a methodology for predicting probability of failure of wind turbine gearbox bearings failed by axial cracking. This methodology was applied to a commercial MW size wind plant and generated results were correlated with actual failures. This work is partnered with WindESCo and funded through DOE's Technology Commercialization Fund.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

A proposed criteria to identify wind turbine drivetrain bearing loads that induce roller slip based white-etching cracks

In this article, the type of roller slip behavior that may result in the formation of white-etching cracks (WECs) in wind turbine gearbox bearings is identified. A new hypothesis based on the inner raceway normal contact load magnitude at the time of roller slip is proposed as the probable cause of WECs. For this purpose, the maximum normal contact loads are identified when roller slip occurs in high-speed shaft bearings at different mean wind speeds. Subsequently, the annual probability of occurrence of the maximum normal loads are obtained. The probability of maximum load under slip exceeding a limit probability is hypothesized as a probable cause for WEC. In order to apply the proposed hypothesis, two different wind turbines high-speed shaft bearings are used: the cylindrical roller bearing of the General Electric 1.5 SLE turbine and the tapered roller bearing of Vestas V52 turbine. Both the chosen bearings are on the generator side of the high-speed shaft. For both turbines, measurement data together with analytical models are used for identifying the slip and the maximum normal contact loads. We propose forecasting the probability of exceedance of a threshold maximum normal contact load level during slip to identify the possibility for inducing WECs.

17 WIND ENERGY↗

Investigation of main bearing operating conditions in a three-Point mount wind turbine drivetrain

Wear-related failures of spherical roller bearings in the main bearing position of three-point mount wind turbines have been higher than expected and can contribute to higher than anticipated operation-and-maintenance costs. In this paper, the operational conditions of such a main bearing—including measured axial displacement and velocity subject to the estimated axial loads—are described for an instrumented, commercial wind turbine. The field measurements suggest a maximum axial speed between the bearing rings that is less than 2 millimeters per second. It is estimated that the axial speed between the ring and rollers is approximately 25% of this value. When compared to a speed of rolling from approximately 200–352 millimeters per second, the measured axial sliding is therefore significantly less than 1% of the speed of rolling. Previous numerical studies of lubricant film formation in rolling contacts have shown that the effect of axial sliding starts to be noticeable only when this ratio exceeds 10%; therefore, the axial velocity represents only a small disturbance to the nominal pure rolling case, and the influence on oil film building can be neglected. A simple analytic model of the main bearing motion was also developed and demonstrated similar displacement and velocity characteristics.

17 WIND ENERGY↗