Hybrid robust predictive optimization method of power system dispatch

A method of power system dispatch control solves power system dispatch problems by integrating a larger variety of generation, load and storage assets, including without limitation, combined heat and power (CHP) units, renewable generation with forecasting, controllable loads, electric, thermal and water energy storage. The method employs a predictive algorithm to dynamically schedule different assets in order to achieve global optimization and maintain the system normal operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Parallel Particle Advection using Work Requesting

Particle advection is an important vector field visualization technique that is difficult to apply to very large data sets in a distributed setting due to scalability limitations in existing algorithms. In this paper, we report on several experiments using work requesting dynamic scheduling which achieves balanced work distribution on arbitrary problems with minimal communication overhead. We present a corresponding prototype implementation, provide and analyze benchmark results, and compare our results to an existing algorithm.

97 MATHEMATICS AND COMPUTING↗

Timing Tricks For Complicated Accelerators [PowerPoint]

A brief description of the Los Alamos Neutron Science Center is given first, including static and dynamic scheduling. The principal tricks presented are prescient feed forward and pulser replication. Tricks with flip/flop pulsers are also included.

43 PARTICLE ACCELERATORS↗

Runway Scheduling Using Generalized Dynamic Programming

A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

optmization↗

Adaptive Framework for Maintenance Scheduling Based on Dynamic Preventive Intervals and Remaining Useful Life Estimation

Data-based prognostic methods exploit sensor data to forecast the remaining useful life (RUL) of industrial settings to optimize the scheduling of maintenance actions. However, implementing sensors may not be cost-effective or practical for all components. Traditional preventive approaches are not based on sensor data; however, they schedule maintenance at equally spaced intervals, which is not a cost-effective approach since the distribution of the time between failures changes with the degradation state of other parts or changes in working conditions. This study introduces a novel framework comprising two maintenance scheduling strategies. In the absence of sensor data, we propose a novel dynamic preventive policy that adjusts intervention intervals based on the most recent failure data. When sensor data are available, a method for RUL prediction, designated k-LSTM-GFT, is enhanced to dynamically account for RUL prediction uncertainty. The results demonstrate that dynamic preventive maintenance can yield cost reductions of up to 51.8% compared to conventional approaches. The predictive approach optimizes the exploitation of RUL, achieving costs that are only 3–5% higher than the minimum cost achievable while ensuring the safety of critical systems since all of the failures are avoided.

Nunes, Pedro (ORCID:0000000180012172)↗

Developing a Reduced 240-Bus WECC Dynamic Model for Frequency Response Study of High Renewable Integration

The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.

dynamic simulation↗

A Fast Dynamic Internal Predictive Power Scheduling Approach for Power Management in Microgrids: Preprint

This paper presents a Dynamic Internal Predictive Power Scheduling (DIPPS) approach for optimizing power management in microgrids, particularly focusing on external power exchanges among diverse prosumers. DIPPS utilizes a dynamic objective function with a time-varying binary parameter to control the timing of power transfers to the external grid, facilitated by efficient usage of energy storage for surplus renewable power. The microgrid power scheduling problem is modeled as a mixed-integer nonlinear programming (MINLP-PS) and subsequently transformed into a mixed-integer linear programming (MILPPS) optimization through McCormick's relaxation to reduce computational complexity. A predictive window window with 6 data points is solved at an average of 0.92s, a 97.6% improvement over the 38.27s required for the MINLP-PS formulation, implying the numerical feasibility of the DIPPS approach for real-time implementation. Finally, the approach is validated against a static objective using real-world load data across three case studies with different time-varying parameters, demonstrating the ability of DIPPS to optimize power exchanges and efficiently utilize distributed resources while shifting the external power transfers to specified time durations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Dynamic Planner: The Sequencer, Scheduler, and Runway Allocator for Air Traffic Control Automation

The Dynamic Planner (DP) has been designed, implemented, and integrated into the Center-TRACON Automation System (CTAS) to assist Traffic Management Coordinators (TMCs), in real time, with the task of planning and scheduling arrival traffic approximately 35 to 200 nautical miles from the destination airport. The TMC may input to the DP a series of current and future scheduling constraints that reflect the operation and environmental conditions of the airspace. Under these constraints, the DP uses flight plans, track updates, and Estimated Time of Arrival (ETA) predictions to calculate optimal runway assignments and arrival schedules that help ensure an orderly, efficient, and conflict-free flow of traffic into the terminal area. These runway assignments and schedules can be shown directly to controllers or they can be used by other CTAS tools to generate advisories to the controllers. Additionally, the TMC and controllers may override the decisions made by the DP for tactical considerations. The DP will adapt to computations to accommodate these manual inputs.

Wong, Gregory L.↗

On-the fly scheduling of execution of dynamic hardware behaviors

Methods for dynamically executing computer code across multiple disparate processing unit architectures are disclosed. During execution of a first portion of computer code on a first processing unit, it is determined that a first dynamic hardware behavior of a plurality of dynamic hardware behaviors will occur at a subsequent point in time, based on a second dynamic hardware behavior that is occurring. The methods include determining to execute code corresponding to the first dynamic hardware behavior on a second processing unit, rather than the first processing unit, and scheduling computer program code corresponding to the first dynamic hardware behavior to execute on the second processing unit rather than the first processing unit. Upon completion of execution of the computer code corresponding to the first dynamic hardware behavior, a remaining portion of the computer code is scheduled to execute on the first processing unit.

97 MATHEMATICS AND COMPUTING↗

Dynamic Risk-Aware Patch Scheduling

A program that defines and assesses the dynamic risk of software vulnerabilities and considers the dynamic risks into patch scheduling to reduce security risks posed by vulner­abilities and provide formal guidance to security operations at various organizations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Comparison of Machine Learning Methods for Frequency Nadir Estimation in Power Systems

An increasing penetration level of inverter-based renewable energy resources changes the inertia of power systems, posing challenges for maintaining the desired system frequency stability. An accurate frequency nadir estimation is crucial for power system operators to prepare preventive actions against large frequency excursions. In this paper, five machine learning methods - linear regression, gradient boosting, support vector regression, an artificial neural network, and XGBoost - are applied to two different datasets, i.e., 1) the unit generation dataset and 2) the system total inertia and headroom dataset, for the prediction of the frequency nadir. The training and testing datasets are generated through extensive generation scheduling simulations using Multi-timescale Integrated Dynamic and Scheduling (MI-DAS) toolbox on the Western Electricity Coordinating Council 240-bus system with high renewable penetration levels. Numerical results show that all five machine learning methods perform well in predicting the nadir frequency of the system. Among them, the gradient boosting and the XGBoost are clear winners yielding the best prediction accuracy in terms of four evaluation metrics.

data driven↗

A Comparison of Machine Learning Methods for Frequency Nadir Estimation in Power Systems: Preprint

An increasing penetration level of inverter-based renewable energy resources changes the inertia of power systems, posing challenges for maintaining the desired system frequency stability. An accurate frequency nadir estimation is crucial for power system operators to prepare preventive actions against large frequency excursions. In this paper, five machine learning methods - linear regression, gradient boosting, support vector regression, an artificial neural network, and XGBoost - are applied to two different sets of preprocess data for the prediction of the frequency nadir in the Western Electricity Coordinating Council 240-bus system with high renewable penetration levels. The training and testing data sets are collected by extensive generation scheduling simulations on the Multi-timescale Integrated Dynamic and Scheduling (MIDAS) toolbox. Numerical results show that all five machine learning methods can achieve high performance accuracy for power system nadir frequency estimation. Among them, the gradient boosting and the XGBoost are clear winners by providing the best prediction accuracy.

data driven↗

Link Scheduling in Satellite Networks via Machine Learning Over Riemannian Manifolds

Low Earth Orbit (LEO) satellites play a crucial role in enhancing global connectivity, serving a complementary solution to existing terrestrial systems. In wireless networks, scheduling is a vital process that allocates time-frequency resources to users for interference management. However, LEO satellite networks face significant challenges in scheduling their links towards ground users due to the satellites’ mobility and overlapping coverage. This paper addresses the dynamic link scheduling problem in LEO satellite networks by considering spatio-temporal correlations introduced by the satellites’ movements. The first step in the proposed solution involves modeling the network over Riemannian manifolds, thanks to their representation as symmetric positive definite matrices. We introduce two machine learning (ML)-based link scheduling techniques that model the dynamic evolution of satellite positions and link conditions over time and space. To accurately predict satellite link states, we present a recurrent neural network (RNN) over Riemannian manifolds, which captures spatio-temporal characteristics over time. Furthermore, we introduce a separate model, the convolutional neural network (CNN) over Riemannian manifolds, which captures geometric relationships between satellites and users by extracting spatial features from the network topology across all links. Simulation results demonstrate that both RNN and CNN over Riemannian manifolds deliver comparable performance to the fractional programming-based link scheduling (FPLinQ) benchmark. Remarkably, unlike other ML-based models that require extensive training data, both models only need 30 training samples to achieve over 99% of the sum rate while maintaining similar computational complexity relative to the benchmark.

42 ENGINEERING↗

Optimizing Mars Airplane Trajectory with the Application Navigation System

Planning complex missions requires a number of programs to be executed in concert. The Application Navigation System (ANS), developed in the NAS Division, can execute many interdependent programs in a distributed environment. We show that the ANS simplifies user effort and reduces time in optimization of the trajectory of a martian airplane. We use a software package, Cart3D, to evaluate trajectories and a shortest path algorithm to determine the optimal trajectory. ANS employs the GridScape to represent the dynamic state of the available computer resources. Then, ANS uses a scheduler to dynamically assign ready task to machine resources and the GridScape for tracking available resources and forecasting completion time of running tasks. We demonstrate system capability to schedule and run the trajectory optimization application with efficiency exceeding 60% on 64 processors.

Frumkin, Michael↗

ROBUS-2: A Fault-Tolerant Broadcast Communication System

The Reliable Optical Bus (ROBUS) is the core communication system of the Scalable Processor-Independent Design for Enhanced Reliability (SPIDER), a general-purpose fault-tolerant integrated modular architecture currently under development at NASA Langley Research Center. The ROBUS is a time-division multiple access (TDMA) broadcast communication system with medium access control by means of time-indexed communication schedule. ROBUS-2 is a developmental version of the ROBUS providing guaranteed fault-tolerant services to the attached processing elements (PEs), in the presence of a bounded number of faults. These services include message broadcast (Byzantine Agreement), dynamic communication schedule update, clock synchronization, and distributed diagnosis (group membership). The ROBUS also features fault-tolerant startup and restart capabilities. ROBUS-2 is tolerant to internal as well as PE faults, and incorporates a dynamic self-reconfiguration capability driven by the internal diagnostic system. This version of the ROBUS is intended for laboratory experimentation and demonstrations of the capability to reintegrate failed nodes, dynamically update the communication schedule, and tolerate and recover from correlated transient faults.

Torres-Pomales, Wilfredo↗