Search NASA⌕ Search

SEARCH · Search NASA

Results for “ePIC detector”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

76 records · Page 5

THE LACK OF DIFFUSE, NON-THERMAL HARD X-RAY EMISSION IN THE COMA CLUSTER: THE SWIFT BURST ALERT TELESCOPE'S EYE VIEW

The Coma Cluster of galaxies hosts the brightest radio halo known and has therefore been the target of numerous searches for associated inverse Compton (IC) emission, particularly at hard X-ray energies where the IC signal must eventually dominate over thermal emission. The most recent search with the Suzaku Hard X-ray Detector failed to confirm previous IC detections with RXTE and BeppoSAX, instead setting an upper limit 2.5 times below their non-thermal flux. However, this discrepancy can be resolved if the IC emission is very extended, beyond the scale of the cluster radio halo. Using reconstructed sky images from the 58-month Swift Burst Alert Telescope (BAT) all-sky survey, the feasibility of such a solution is investigated. Building on Renaud et al., we test and implement a method for extracting the fluxes of extended sources, assuming specified spatial distributions. BAT spectra are jointly fit with an XMM-Newton EPIC-pn spectrum derived from mosaic observations. We find no evidence for large-scale IC emission at the level expected from the previously detected non-thermal fluxes. For all non-thermal spatial distributions considered, which span the gamut of physically reasonable IC models, we determine upper limits for which the largest (most conservative) limit is {approx}<4.2 x 10{sup -12} erg s{sup -1} cm{sup -2} (20-80 keV), which corresponds to a lower limit on the magnetic field B > 0.2 {mu} G. A nominal flux upper limit of <2.7 x 10{sup -12} erg s{sup -1} cm{sup -2}, with corresponding B > 0.25 {mu} G, is derived for the most probable IC distribution given the size of the radio halo and likely magnetic field radial profile.

79 ASTRONOMY AND ASTROPHYSICS↗

Instrumentation and Control Selection for the 12 GeV Hall-B Magnets at Jefferson Lab

Here, as part of the Jefferson Lab 12 GeV accelerator upgrade, the Experimental Physics Hall B detector system requires two superconducting magnets – a Torus and a Solenoid. The specifications required maximum space for the detectors which led to the choice of conduction cooling for each magnet. The Torus consists of 6 trapezoidal 'race-track'-type coils connected in series with an operating current of 3770 A. The Solenoid is an actively shielded 5 Tesla magnet consisting of 5 coils connected in series operating at 2416 A. Within the hall the two magnets are located in close proximity to each other and are surrounded by particle detectors. We describe the philosophy behind the instrumentation selection and control design that accounts for this proximity and other challenging working conditions. We describe the choice of sensor technologies, as well as the control and data acquisition methods. The magnet power and cryogenic control sub-systems are implemented using Allen Bradley Control Logix 1756-L72 Programmable Logic Controllers. Sensor instrumentation read-backs are routed into the PLC via National Instruments cRIO hardware (Field Programmable Gate Arrays or FPGA/RT application) using Jefferson Lab designed FPGA-based multi-sensor-excitation-chassis. Configuration, monitoring, and alarm handlers for the magnet systems are provided via an Experimental Physics Instrumentation & Control System interface (EPICS). Failure Modes and Effects Analysis (FMEA) and the requirement to monitor critical parameters during operation guided the selection of instrumentation and associated hardware. The design of the quench protection and voltage tap sub-systems was driven by the anticipated level of voltages developed during a magnet quench. The primary hard-wired quench detection and protection sub-system together with the secondary PLC-based protection sub-system is also discussed. The successful commissioning and subsequent performance of these magnets demonstrates the robustness of the design and implementation approach that was adopted by the Jefferson Lab team and serves as an excellent 'How To' guide for future projects of this size and complexity.

12 GeV↗

Nine Years of XMM-Newton Pipeline: Experience and Feedback

The Strasbourg Astronomical Observatory is member of the Survey Science Centre (SSC) of the XMM-Newton satellite. Among other responsibilities, we provide a database access to the 2XMMi catalogue and run the part of the data processing pipeline performing the cross-correlation of EPIC sources with archival catalogs. These tasks were all developed in Strasbourg. Pipeline processing is flawlessly in operation since 1999. We describe here the work load and infrastructure setup in Strasbourg to support SSC activities. Our nine year long SSC experience could be used in the framework of the Simbol-X ground segment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

CRYOGENIC CONTROLS FOR FERMILAB'S SRF CAVITIES AND TEST FACILITY

A new superconducting radio frequency (SRF) cavities test facility is now operational at Fermilab's Meson Detector Building (MDB). The Cryogenic Test Facility (CTF), located in a separate building 500 m away, supplies the facility with cryogens. The design incorporates ambient temperature pumping for superfluid helium production, as well as three 0.6 kW at 4.5 K refrigerators, five screw compressors, a helium purifier, helium and nitrogen inventory, cryogenic distribution system, and a variety of test cryostats.To control and monitor the vastly distributed cryogenic system, a flexible scheme has been developed. Both commercial and experimental physics tools are used. APACS+, a process automation control system from Siemens-Moore, is at the heart of the design. APACS+ allows engineers to configure an ever evolving test facility while maintaining control over the plant and distribution system. APACS+ nodes at CTF and MDB are coupled by a fiber optic network. DirectLogic205 PLCs by KOYO are used as the field level interface to most I/O.The top layer of this system uses EPICS (Experimental Physics and Industrial Control System) as a SCADA/HMI. Utilities for graphical display, control loop setting, real time/historical plotting and alarming have been implemented by using the world-wide library of applications for EPICS.OPC client/server technology is used to bridge across each different platform.This paper presents this design and its successful implementation.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗