Search NASA⌕ Search

SEARCH · Search NASA

Results for “early building design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Conceptual Design of a Water Tank Critical Facility for SPARC

Critical experiments, sometimes referred to zero-power reactors, are crucial tools in developing and validating nuclear physics predictions and thus an indispensable capability to ensure criticality safety during all parts of the nuclear fuel cycle and in reducing uncertainties in reactor physics predictions toward optimizing nuclear energy production. The System Physics Advanced Reactor Facility (SPARC) project was recently initiated to enable large-scale criticality experiments using a horizontal split table machine well suited toward solid core materials systems (fuel, moderator, reflector). The facility selected for this mission was a former pool-type research reactor building and thus also well suited toward a second critical experiment capability able to house full-size light-water reactor (LWR) fuel bundles. A conceptual design study was undertaken to review past water tank critical experiments used for LWR physics experiments and to develop an early engineering design for a new critical assembly tank (CAT). The work described here shows that a relatively simple CAT concept can be constructed and deployed in the SPARC facility to meet the urgent demands for new critical experiments on advanced LWR fuel bundles designs. The SPARC facility layout is conducive to the receipt and upending of LWR fuel bundles using existing containers and equipment from the LWR industry. The facility’s overhead crane can then be used to handle fuel bundles and place them in a vertical storage rack or in the CAT for critical experiments, both of which fit within the building’s “open basement” alongside other equipment planned for SPARC and the horizontal split table. A slightly lower area in the basement can serve as a large drain tank so that fail-safe valves drain the CAT reactor tank for safe shutdown. Neutronic configurations were determined where a 3 × 3 array of fuel bundles can be surrounded by full-length “loose rods” to adjust reactivity so that critical is achieved when the bundles are fully submerged. Viable configurations were determined for both pressurized- and boiling-water-reactor-type fuel bundles. This design concept was used to develop an early planning basis for establishing the CAT capability alongside the otherwise planned SPARC project in order to help streamline the process. Recent presidential executive orders have highlighted the need to achieve power uprates in LWR plants and the CAT capability will be a crucial element of these initiatives. Based on the work described herein, it is recommended that an earnest and timely project begin in order to establish this urgently needed capability.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) Parachute Modeling and Flight Mechanics Performance

The Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) program is designed to test and qualify the supersonic parachute for the Mars entry, descent, and landing stage of the Mars Sample Return campaign. The ASPIRE2 test was planned for early 2026 and would have involved testing the parachute at deployments of Mach 2.1 and higher load conditions than previous Mars missions. The ASPIRE2 simulation builds upon a previous test framework from the ASPIRE tests in 2017-2018 used to qualify the Mars 2020 parachute, but due to new requirements, the modeling and simulation for ASPIRE2 has needed development and characterization of different sensitivities. This paper looks at the mission design as of mid-2024 and presents the trade space for qualifying the parachute in a dynamic environment.

Evan Roelke↗

Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) Parachute Modeling and Flight Mechanics Performance

The Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) program is designed to test and qualify the supersonic parachute for the Mars entry, descent, and landing stage of the Mars Sample Return campaign. The ASPIRE2 test was planned for early 2026 and would have involved testing the parachute at deployments of Mach 2.1 and higher load conditions than previous Mars missions. The ASPIRE2 simulation builds upon a previous test framework from the ASPIRE tests in 2017-2018 used to qualify the Mars 2020 parachute, but due to new requirements, the modeling and simulation for ASPIRE2 has needed development and characterization of different sensitivities. This paper looks at the mission design as of mid-2024 and presents the trade space for qualifying the parachute in a dynamic environment.

Evan Roelke↗

Early experiences building a software quality prediction model

Early experiences building a software quality prediction model are discussed. The overall research objective is to establish a capability to project a software system's quality from an analysis of its design. The technical approach is to build multivariate models for estimating reliability and maintainability. Data from 21 Ada subsystems were analyzed to test hypotheses about various design structures leading to failure-prone or unmaintainable systems. Current design variables highlight the interconnectivity and visibility of compilation units. Other model variables provide for the effects of reusability and software changes. Reported results are preliminary because additional project data is being obtained and new hypotheses are being developed and tested. Current multivariate regression models are encouraging, explaining 60 to 80 percent of the variation in error density of the subsystems.

Agresti, W. W.↗

Early Results from a Broad Compatibility Study of Various Materials with Ionic Silver Biocide

Ionic silver is baselined for microbial control in spacecraft potable water systems forfuture exploration missions, but materials compatibility analysis is required to evaluate thepassive depletion of ionic silver concentration onto wetted material surfaces over time.Various articles concerning such testing have been published that examine interactions withwater containing ionic silver biocide, but most tests have focused on only a couple ofmaterials each and comparing results of different evaluations to one another has provedchallenging.This paper reports the first results from static exposure testing of a large arrayof material coupons to a 400 parts per billion (ppb) aqueous silver fluoride (AgF) solution,using a surface to volume ratio of approximately 2 cm-1. The test is designed in two mainstages. Stage 1 is a one-week screening to evaluate silver uptake. Materials that performmodestly to well after that week are promoted to Stage 2, which is a longer test with periodicsampling to examine the silver uptake rates over time; these samples are evaluated for otherwater quality parameters in addition to the remaining silver concentration. In a tangentialinvestigation, select materials that take up some silver in Stage 1 may be “aged” by repeatingthe Stage 1 test to determine whether repeated exposure reduces silver uptake rate, andsuccessfully aged materials may then continue to Stage 2 testing. The materials under testinclude metallic and polymeric materials with various surface finishes, treatments, andcoatings, as well as select other materials historically used in spacecraft water systems. Thistest began in August 2019, and thus only includes early results; future follow-on papers willinclude additional results as the test progresses. The ultimate goal builds a broad, easilycomparable data set that can be used to guide material selections for silver biocide-compatible spacecraft water system design.

Silver Biocide↗

Trinity

The Manhattan Project was established in August 1942. Its mission: beat the Nazis to the atomic bomb. Los Alamos was selected as the site for the weapons design laboratory. J. Robert Oppenheimer served as the Laboratory’s director. In early summer 1944, Los Alamos scientists discovered plutonium would not work in a gun assembly. Thus, Oppenheimer reorganized the Laboratory to build an implosion bomb

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

NASA Mars 2020 Landed Mission Development

In January of 2014, NASA received fifty-eight proposals from U.S. and international teams for science and exploration technology investigations, for consideration for inclusion as part of NASA's next mobile landed mission to Mars. The results of the competitive procurement were released in late July of 2014: Seven payloads were selected for the investigations that would contribute to meeting the overall objectives of the mission. The extraordinary scientific and technology development interest in the Mars 2020 mission is a direct result of NASA's sustained and coordinated plan for the exploration of Mars, and ultimately, its search for life elsewhere in the universe. The Mars 2020 Mission will preserve the heritage and directly build upon NASA's Mars Science Laboratory Mission and Curiosity Rover to implement its mission. In this paper, early development history leading to its development announcement, as well as key development status and design features for its implementation, is summarized.

MSR↗

NASA Mars 2020 landed mission development

In January of 2014, NASA received fifty-eight proposals from U.S. and international teams for science and exploration technology investigations, for consideration for inclusion as part of NASA’s next mobile landed mission to Mars. The results of the competitive procurement were released in late July of 2014: Seven payloads were selected for the investigations that would contribute to meeting the overall objectives of the mission. The extraordinary scientific and technology development interest in the Mars 2020 mission is a direct result of NASA’s sustained and coordinated plan for the exploration of Mars, and ultimately, its search for life elsewhere in the universe. The Mars 2020 Mission will preserve the heritage and directly build upon NASA’s Mars Science Laboratory Mission and Curiosity Rover to implement its mission. In this paper, early development history leading to its development announcement, as well as key development status and design features for its implementation, is summarized.

Abilleira, Fernando↗

Overview of the physics basis for the ARC fusion power plant

Commonwealth Fusion Systems plans to build ARC as the first fusion power plant at a site in Chesterfield County, Virginia, USA by the early 2030s. We present an overview of analysis comprising the physics basis of the ARC V3A design, a high-magnetic-field tokamak with 𝐵 0 =11.4 T, 𝐼 𝑝 =12.0 MA, 𝑅 0 =4.62 m, 𝑎 =1.18 m. ARC V3A is designed to produce 𝑃 𝑓⁡𝑢⁢𝑠 ≈1.13 GW DT fusion power and deliver ⩾400 MW net electric power to the grid. This overview includes quantitative analysis of fundamental issues for design of and operational plasma scenarios for a tokamak power plant, and lays out the design targets and strategic choices for ARC, including empirical fusion performance projections, assessment of H-mode access, ion cyclotron resonance heating simulations, alpha particle physics and time-dependent full-pulse simulations. This is complemented by topical papers on fusion performance and transport, disruption physics, boundary physics and magnetohydrodynamic stability. Critically, these studies identify key model uncertainties and physics risks to be retired through SPARC operation. Due to the modular nature of ARC, early results from SPARC can be incorporated into the design of the first ARC as well as subsequent replacements of the ARC vacuum vessel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Marshall Center: Its place in NASA

The organizational structure and facilities available at the Marshall Space Flight Center are described and the role of the Center in NASA program management is demonstrated in a review of the Center's past history and current development projects. Particular attention is given to space shuttle and the space transportation system; the preparation of experiments and management of Spacelab missions; and the development of the space telescope. Energy related activities discussed include the automatic guidance and control of the longwall shearing machine for coal extraction, systems for the solar heating and cooling of buildings, and the design of the solar power satellite. Products developed by Center personnel highlighted include the power factor controller to reduce electrical consumption by motors and the image enhancement process being used to restore early historical photographs. A free flying solar power source to increase mission duration of the orbiter and its payloads; techniques for the orbital assembly of large space structures; facilities for materials processing in space; the orbit transfer vehicle, solar electric propulsion systems; and the preparation of science and applications payloads are also described.

Source record↗

Low cost paths to binary optics

Application of binary optics has been limited to a few major laboratories because of the limited availability of fabrication facilities such as e-beam machines and the lack of standardized design software. Foster-Miller has attempted to identify low cost approaches to medium-resolution binary optics using readily available computer and fabrication tools, primarily for the use of students and experimenters in optical computing. An early version of our system, MacBEEP, made use of an optimized laser film recorder from the commercial typesetting industry with 10 micron resolution. This report is an update on our current efforts to design and build a second generation MacBEEP, which aims at 1 micron resolution and multiple phase levels. Trails included a low cost scanning electron microscope in microlithography mode, and alternative laser inscribers or photomask generators. Our current software approach is based on Mathematica and PostScript compatibility.

Nelson, Arthur↗

The Mars Exploration Rover Project

The twin rovers of the Mars Exploration Rover Project successfully landed on the surface of Mars in January 2004, and initiated a highly successful science and exploration campaign. This marked the culmination of an unprecedented four-year effort to design, build, launch, and operate two of the most complex planetary spacecraft ever built. The project was started in the aftermath of the 1999 Mars mission failures, and was commissioned to take advantage of the highly advantageous 2003 opportunity. The development schedule from project start to launch was only 35 months, so schedule management was the most significant challenge facing the project. This problem was compounded when early assumptions about the extent of design heritage from Mars Pathfinder proved to be flawed. The project derived a number of useful lessons learned in solving these challenges that can be applied to future missions.

Mars↗

LST: The National Space Observatory concept - An observatory for future astronomer involvement in planning and use

The Large Space Telescope (LST) will be a unique facility which must be designed to serve the needs of all potential users throughout the world. This requires that a representative group of astronomers work intimately with the engineers in the early design of the telescope and that astronomers continue to be closely involved in the planning throughout the life of the project. Forty scientists are now defining the auxiliary instruments and their operation. Later, others will build instruments and participate in assigning observing time on the telescope, on the basis of the scientific merit of the proposed observation.

Roman, N. G.↗

Propulsion/ASME Rocket-Based Combined Cycle Activities in the Advanced Space Transportation Program Office

NASA's Office Of Aeronautics and Space Transportation Technology (OASTT) has establish three major coals. "The Three Pillars for Success". The Advanced Space Transportation Program Office (ASTP) at the NASA's Marshall Space Flight Center in Huntsville,Ala. focuses on future space transportation technologies under the "Access to Space" pillar. The Advanced Reusable Technologies (ART) Project, part of ASTP, focuses on the reusable technologies beyond those being pursued by X-33. The main activity over the past two and a half years has been on advancing the rocket-based combined cycle (RBCC) technologies. In June of last year, activities for reusable launch vehicle (RLV) airframe and propulsion technologies were initiated. These activities focus primarily on those technologies that support the year 2000 decision to determine the path this country will take for Space Shuttle and RLV. In February of this year, additional technology efforts in the reusable technologies were awarded. The RBCC effort that was completed early this year was the initial step leading to flight demonstrations of the technology for space launch vehicle propulsion. Aerojet, Boeing-Rocketdyne and Pratt & Whitney were selected for a two-year period to design, build and ground test their RBCC engine concepts. In addition, ASTROX, Pennsylvania State University (PSU) and University of Alabama in Huntsville also conducted supporting activities. The activity included ground testing of components (e.g., injectors, thrusters, ejectors and inlets) and integrated flowpaths. An area that has caused a large amount of difficulty in the testing efforts is the means of initiating the rocket combustion process. All three of the prime contractors above were using silane (SiH4) for ignition of the thrusters. This follows from the successful use of silane in the NASP program for scramjet ignition. However, difficulties were immediately encountered when silane (an 80/20 mixture of hydrogen/silane) was used for rocket ignition.

Hueter, Uwe↗

The EXIST Mission Concept Study

EXIST is a mission designed to find and study black holes (BHs) over a wide range of environments and masses, including: 1) BHs accreting from binary companions or dense molecular clouds throughout our Galaxy and the Local Group, 2) supermassive black holes (SMBHs) lying dormant in galaxies that reveal their existence by disrupting passing stars, and 3) SMBHs that are hidden from our view at lower energies due to obscuration by the gas that they accrete. 4) the birth of stellar mass BHs which is accompanied by long cosmic gamma-ray bursts (GRBs) which are seen several times a day and may be associated with the earliest stars to form in the Universe. EXIST will provide an order of magnitude increase in sensitivity and angular resolution as well as greater spectral resolution and bandwidth compared with earlier hard X-ray survey telescopes. With an onboard optical-infra red (IR) telescope, EXIST will measure the spectra and redshifts of GRBs and their utility as cosmological probes of the highest z universe and epoch of reionization. The mission would retain its primary goal of being the Black Hole Finder Probe in the Beyond Einstein Program. However, the new design for EXIST proposed to be studied here represents a significant advance from its previous incarnation as presented to BEPAC. The mission is now less than half the total mass, would be launched on the smallest EELV available (Atlas V-401) for a Medium Class mission, and most importantly includes a two-telescope complement that is ideally suited for the study of both obscured and very distant BHs. EXIST retains its very wide field hard X-ray imaging High Energy Telescope (HET) as the primary instrument, now with improved angular and spectral resolution, and in a more compact payload that allows occasional rapid slews for immediate optical/IR imaging and spectra of GRBs and AGN as well as enhanced hard X-ray spectra and timing with pointed observations. The mission would conduct a 2 year full sky survey in scanning mode, interrupted for several orbits per day by GRB follow-ups, followed by a combined pointing-scanning mission phase for optical/IR spectroscopy and redshifts for the large AGN sample found in the survey as well as GRBs and LSST transients. A Team of university, NASA, and industry investigators will conduct the study to determine the full sensitivity and capabilities of this new configuration for EXIST. It will build on the extensive studies of the prior design for the mission and the HET and will incorporate the optical/IR telescope (hereafter IRT) now fully developed by our ITT partner for the NextView Commercial Remote Sensing mission (early 2008 launch) with a focal plane to be developed at GSFC based in part on JWST/NIRSPEC designs. No new technology is needed for either the IRT or HET instruments. The study will pay close attention to full mission cost and present a design for the Decadal Survey Workshop to ensure this even more capable EXIST mission is once again part of the next Decadal Survey.

Fishman, Gerald J.↗

Hardware Verification and Validation for a Navigation Sensor Software Model in Support of Flight Vehicle Performance Analysis

… or, “It’s in the details, how to make complicated software perform like complicated hardware.” In attempts to minimize development time and quickly build an operational vehicle, NASA’s Space Launch System (SLS) has had to be intentional about integrated testing. Constraints on budget and schedule have required balance between testing needs and the desire for an integrated flight vehicle as soon as possible. To provide key insights early in design and analysis cycles, a large amount of effort has shifted into maturing and validating models at the component level with integrated testing as a means to validate their integration. In terms of SLS Navigation, this, and the model-based design approach have pushed explicit requirements for sensor models to be validated against flight hardware to high precision. This paper covers the approach taken to verify and validate the models for the two key navigation sensors on the SLS vehicle, the Redundant Inertial Navigation Sensor and the Rate Gyro Assembly. These models are used in performance evaluation, fault detection, and operations development extensively. Using a mix of data from hardware vendor documentation and testing reports, limited in-house testing, and integration activities, these models were able to be validated against flight hardware at multiple levels, from the internal software design to statistical behavior at the raw sensor and integrated box levels. The high level of insight into the hardware elements is instrumental to support flight certification activities and building confidence in SLS Navigation capability. Focused testing enabled additional insight and validation that proved invaluable and the resulting insights were used to focus and mature models. Additionally, of having validated performance-based hardware models enables a wide breadth of activities including detailed fault detection studies and integration into future vehicle frameworks, such as an upper stage and provide a valuable asset to continued SLS analysis and design.

Evan J Anzalone↗

Hardware Verification and Validation for a Navigation Sensor Software Model in Support of Flight Vehicle Performance Analysis

… or, “It’s in the details, how to make complicated software perform like complicated hardware.” In attempts to minimize development time and quickly build an operational vehicle, NASA’s Space Launch System (SLS) has had to be intentional about integrated testing. Constraints on budget and schedule have required balance between testing needs and the desire for an integrated flight vehicle as soon as possible. To provide key insights early in design and analysis cycles, a large amount of effort has shifted into maturing and validating models at the component level with integrated testing as a means to validate their integration. In terms of SLS Navigation, this, and the model-based design approach have pushed explicit requirements for sensor models to be validated against flight hardware to high precision. This paper covers the approach taken to verify and validate the models for the two key navigation sensors on the SLS vehicle, the Redundant Inertial Navigation Sensor and the Rate Gyro Assembly. These models are used in performance evaluation, fault detection, and operations development extensively. Using a mix of data from hardware vendor documentation and testing reports, limited in-house testing, and integration activities, these models were able to be validated against flight hardware at multiple levels, from the internal software design to statistical behavior at the raw sensor and integrated box levels. The high level of insight into the hardware elements is instrumental to support flight certification activities and building confidence in SLS Navigation capability. Focused testing enabled additional insight and validation that proved invaluable and the resulting insights were used to focus and mature models. Additionally, of having validated performance-based hardware models enables a wide breadth of activities including detailed fault detection studies and integration into future vehicle frameworks, such as an upper stage and provide a valuable asset to continued SLS analysis and design.

Thomas Park↗

NASA's J-2X Engine Builds on the Apollo Program for Lunar Return Missions

In January 2006, NASA streamlined its U.S. Vision for Space Exploration hardware development approach for replacing the Space Shuttle after it is retired in 2010. The revised CLV upper stage will use the J-2X engine, a derivative of NASA s Apollo Program Saturn V s S-II and S-IVB main propulsion, which will also serve as the Earth Departure Stage (EDS) engine. This paper gives details of how the J- 2X engine effort mitigates risk by building on the Apollo Program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. It is well documented that propulsion is historically a high-risk area. NASA s risk reduction strategy for the J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development efforts. In addition, NASA and its industry partner, Rocketdyne, which originally built the J-2, have tapped into their extensive databases and are applying lessons conveyed firsthand by Apollo-era veterans of America s first round of Moon missions in the 1960s and 1970s. NASA s development approach for the J-2X engine includes early requirements definition and management; designing-in lessons learned from the 5-2 heritage programs; initiating long-lead procurement items before Preliminary Desi& Review; incorporating design features for anticipated EDS requirements; identifying facilities for sea-level and altitude testing; and starting ground support equipment and logistics planning at an early stage. Other risk reduction strategies include utilizing a proven gas generator cycle with recent development experience; utilizing existing turbomachinery ; applying current and recent main combustion chamber (Integrated Powerhead Demonstrator) and channel wall nozzle (COBRA) advances; and performing rigorous development, qualification, and certification testing of the engine system, with a philosophy of "test what you fly, and fly what you test". These and other active risk management strategies are in place to deliver the J-2X engine for LEO and lunar return missions as outlined in the U.S. Vision for Space Exploration.

Snoddy, Jimmy R.↗