Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Nuclear Thermal Energy Storage Configurations for Industrial Combined Heat and Power Supply: Conceptual Study and Engineering Designs

The industries examined in this report primarily rely on moderate-temperature heat provided by gas- or coal-fired boilers and combined heat and power (CHP) plants, delivered through standard process steam systems. High-temperature energy demands are often industry-specific and typically exceed the capabilities of high-temperature gas-cooled reactors (HTGRs). While it is technically feasible to replace process steam from fossil-based heat sources with nuclear energy, certain industries, such as methanol production and pulp and paper, face technoeconomic challenges in integrating nuclear energy without major changes or a technological shift. This is mainly due to the limited external energy demand remaining after the use of internal byproducts, waste heat recovery, and simple efficiency improvements. Achieving full decarbonization of these processes with nuclear energy would require significant technological advancements, involving experimental technology and substantial investments, making widespread adoption in existing industrial plants unlikely in the near term. This study reviews TES options in the context of enabling a flexible CHP supply while maintaining a steady nuclear heat input. Heat storage systems that interface between the reactor primary fluid and the CHP system offer superior performance and flexibility. Specifically, steam extraction downstream of the reheater with a two-tank molten-salt TES appears as the best solution regarding thermodynamic system benefits and system drawbacks. Using selected system configurations, a conceptual design of an industrial energy park was developed for industries with varying energy demands, such as steel production plants utilizing electric arc furnaces (EAFs) and chemical plants, as well as for those with constant energy demands, like petroleum refineries. This design highlights the capabilities of TES and explores its potential business cases. The study also conceptually develops the potential for integrating additional energy sources with nuclear systems through the implementation of TES. The potential of the HTGR-TES-CHP system was also evaluated considering key uncertainties such as industrial demand profiles, external grid access availability, and eligible tax credit levels, using the Holistic Energy Resource Optimization Network. Sensitivity of net present value to these uncertainties was analyzed to determine the optimal number of nuclear reactors (and CHP systems) and the suitable TES capacity. The results were interpreted from a decision-maker’s perspective, focusing on three key areas: deployment strategy (oversized units vs. undersized units with TES support), industrial process characteristics (thermal-intensive single profiles vs. electricity-intensive combined profiles), and operational goals (maximizing profits vs. minimizing natural gas (NG) consumption or external grid dependence). The optimization results indicate that the HTGR-TES-CHP system significantly reduces reliance on NG boilers for individual industrial processes by 9-60% (in NG capacity factor), with an average reduction of 38%, compared to standalone NG boiler operation case (Business As Usual [BAU]). For combined industrial processes, the reduction ranges from 37-77%, with an average of 60%. Additionally, the system greatly reduces dependence on external grids. In meeting industrial electrical demands, a 33-100% self-sufficient internal electricity supply is achieved for single industrial process, with an average of 74%, compared to the BAU scenario, where 100% of electricity is imported. For combined processes, 35-100% of internal electricity demands are met by the reactor, with an average of 73%. At last, the relative NG price levels at which the proposed HTGR-TES-CHP system can cost-effectively enter the market currently dominated by existing NG boilers were estimated. For a moderate HTGR CAPEX level ($\$$2500/kWth, $\$$6329/kWe), the analysis suggests that NG prices must be 2.5 to 7 times higher than HTGR variable operating and maintenance costs for single industrial process, and 5.5 to 9.5 times higher for a combined process scenario. Tax credit modeling shows that the Investment Tax Credit significantly reduces the price threshold needed to break even, making the system competitive with NG boilers in certain cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modeling and analysis of synthetic liquid fuel production from CO 2 and nuclear energy using methanol-to-diesel process

Electrofuels (e-fuels) are synthetic fuels produced from carbon dioxide (CO 2 ) and electricity for blending with or replacing petroleum fuels. Nuclear energy is an attractive energy feedstock for e-fuel production because of its low environmental footprint and its ability to provide steady heat and power essential for e-fuels production. We modeled and evaluated the cost and environmental footprint of e-fuels production in the distillate range for three nuclear power scales, 100, 500, and 1000 MWe, through methanol and olefins intermediates leveraging commercial or high technology readiness level (TRL) processes. Compared to the commonly studied e-fuels from Fischer Tropsch process that has a distillate yield of <70% with the rest being low value naphtha, the proposed process via methanol intermediate increases the product selectivity with distillate yield of 96% and only 4% naphtha. The modeled process has a carbon conversion ratio of 98%, and a process energy efficiency of 56% relative to the total equivalent nuclear electricity input. The e-fuel plant economics and GHG emissions were estimated by considering CO 2 collected from ethanol plants adjacent to nuclear power plants. The estimated minimum fuel selling prices (MFSP) of e-fuel is in the range of $5.7-$9.1/gal depending on e-fuel plant scale, electricity cost, and CO 2 transportation distance. The corresponding e-fuels life cycle GHG emissions is estimated in the range of 5-6 gCO 2 e/MJ of liquid fuel using the R&D Greenhouse gases, Regulated Emissions, and Energy use in Technologies (R&D GREET) model.

10 SYNTHETIC FUELS↗

Techno-economic analysis and environmental benefits of solar industrial process heating based on parabolic trough collectors

In this work, detailed techno-economic and environmental analyses are conducted for employing a 5 MWt parabolic trough-based solar industrial process heat (SIPH) plant in Salt Lake City, Utah. According to the results, an optimum solar multiple of 1.5 was determined, allowing the plant to generate annual thermal energy of 15389.24 MWth with a capacity factor of 35.1% and levelized cost of heat (LCOH) of $\$ 26.3$/MWth. Considering a 30% investment tax credit and a 30% reduction in the total installed cost could reduce the LCOH to $\$ 19.30$/MWth and $\$ 18.52$/MWth, respectively. Employing parabolic trough collectors could avoid emissions of 3,582,422.47 kg, 147.99 kg, 3,341.66 kg, and 14.32 kg for CO 2 , PM, NOx, and SO 2 , respectively per year compared to a natural gas-based plant. Further, it also caused an annual external cost savings of between $\$ 99,900$ and $\$ 357,004$. Including the external costs in the LCOH analysis shows that the SIPH plant is economically competitive with a natural gas-based plant, further demonstrating its value. A further comparison demonstrated the economic superiority of a parabolic trough-driven IPH plant over a photovoltaic-driven electric boiler plant. In summary, with reducing installed costs and providing incentives, parabolic trough-driven IPH plants will be an economically and environmentally viable option.

14 SOLAR ENERGY↗

Molten salt thermal energy storage for utility peaking loads

This paper considers the use of thermal energy storage (TES) in molten salts to increase the capacity of power plants. Five existing fossil and nuclear electric utility plants were selected as representative of current technology. A review of system load diagrams indicated that TES to meet loads over 95% of peak was a reasonable goal. Alternate TES heat exchanger locations were evaluated, showing that the stored energy should be used either for feedwater heating or to generate steam for an auxiliary power cycle. Specific salts for each concept are recommended. Design layouts were prepared for one plant, and it was shown that a TES tube/shell heat exchanger system could provide about 7% peaking capability at lower cost than adding steam generation capacity. Promising alternate heat exchanger concepts were also identified.

Ferrara, A.↗

Thermal storage requirements for parabolic dish solar power plants

The cost effectiveness of a high temperature thermal storage system is investigated for a representative parabolic dish solar power plant. The plant supplies electrical power in accordance with a specific, seasonally varying demand profile. The solar power received by the plant is supplemented by power from fuel combustion. The cost of electricity generated by the solar power plant is calculated, using the cost of mass-producible subsystems (specifically, parabolic dishes, receivers, and power conversion units) now being designed for this type of solar plant. The trade-off between fuel and thermal storage is derived in terms of storage effectiveness, the cost of storage devices, and the cost of fuel. Thermal storage requirements, such as storage capacity, storage effectiveness, and storage cost are established based on the cost of fuel and the overall objective of minimizing the cost of the electricity produced by the system. As the cost of fuel increases at a rate faster than general inflation, thermal storage systems in the $40 to $70/kWthr range could become cost effective in the near future.

Wen, L.↗

Creep-Resistant Ferritic-Martensitic Steels for Power Plant Applications

Creep-resistant ferritic-martensitic steels are essential materials used in power plants for electricity generation. The efficiency and emissions of the plant are closely related to the operating temperature. Materials used in the hottest sections are one of the main limiting factor for plant operation at 650 °C. This review describes the recent development of creep-resistant ferritic-martensitic steels from a large dataset of in-house research. The findings are tied to available literature for discussion. A first steel, CPJ-7, was developed with an operating temperature approaching 650 °C, and a refined design, JMP, showed the potential to operate at 650 °C. Approximately fifty different ingots, each weighing ~ 7 kg, were vacuum induction melted and processed. Overall, wrought and cast versions of CPJ-7 present superior creep properties when compared to wrought and cast versions of COST alloys for steam turbine and P91/92 for boiler applications. The prolonged creep life was attributed to slowing down the process of the destabilization of the MX and M 23 C 6 precipitates at 650 °C. The cast version of CPJ-7 also revealed superior mechanical performance, above commercially available cast 9% Cr martensitic steel or derivatives. Following the work on CPJ-7, the JMP steels were designed with higher Co for increased solid solution strengthening, Si for oxidation resistance and increased W for matrix strength and stability. The JMP steels showed increases in creep life compared to CPJ-7 between 118 and 150% at 650 °C for testing at various stresses between 138 and 207 MPa. On a Larson–Miller plot, the performance of the JMP steels surpasses that of state-of-the-art MARBN steel. The influence of various elements within the composition of the alloys on the microstructure and mechanical properties is discussed. This review presents approximately 420,000 h of in-house creep testing, the equivalent of almost 50 years of cumulative creep tests.

36 MATERIALS SCIENCE↗

solar thermal power systems advanced solar thermal technology project, advanced subsystems development

The preliminary design for a prototype small (20 kWe) solar thermal electric generating unit was completed, consisting of several subsystems. The concentrator and the receiver collect solar energy and a thermal buffer storage with a transport system is used to provide a partially smoothed heat input to the Stirling engine. A fossil-fuel combustor is included in the receiver designs to permit operation with partial or no solar insolation (hybrid). The engine converts the heat input into mechanical action that powers a generator. To obtain electric power on a large scale, multiple solar modules will be required to operate in parallel. The small solar electric power plant used as a baseline design will provide electricity at remote sites and small communities.

Source record↗

The use of bioelectric currents to study gravity perception in roots

Inhibitor-based studies of gravity perception in plants have yielded ambiguous results because gravitropism consists of many steps in series. Inhibiting any step eliminates gravicurvature; it cannot be shown whether gravity perception and transduction are affected by the inhibitory treatment. The use of the vibrating probe has allowed detection of a response that is measurable independent of stimulus transmission and growth, two post-transduction steps of gravitropism. This application of the vibrating probe requires particular attention to artifacts. Calmodulin action and auxin transport are both believed to be components of gravitropism and specific roles have been proposed for them in graviperception. The perception-dependent current measured with the vibrating probe is eliminated by inhibitors of calmodulin, but not by auxin inhibitors. Thus, the vibrating probe has made it possible to offer more direct evidence for a role of calmodulin in transduction, and to reject one for auxin transport in perception and transduction.

Non-NASA Center↗

Requirements for a Hydrogen Powered All-Electric Manned Helicopter

The objective of this paper is to set propulsion system targets for an all-electric manned helicopter of ultra-light utility class to achieve performance comparable to combustion engines. The approach is to begin with a current two-seat helicopter (Robinson R 22 Beta II-like), design an all-electric power plant as replacement for its existing piston engine, and study performance of the new all-electric aircraft. The new power plant consists of high-pressure Proton Exchange Membrane fuel cells, hydrogen stored in 700 bar type-4 tanks, lithium-ion batteries, and an AC synchronous permanent magnet motor. The aircraft and the transmission are assumed to remain the same. The paper surveys the state of the art in each of these areas, synthesizes a power plant using best available technologies in each, examines the performance achievable by such a power plant, identifies key barriers, and sets future technology targets to achieve performance at par with current internal combustion engines.

Datta, Anubhav↗

Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 7: Metal vapor Rankine topping-steam bottoming cycles

Adding a metal vapor Rankine topper to a steam cycle was studied as a way to increase the mean temperature at which heat is added to the cycle to raise the efficiency of an electric power plant. Potassium and cesium topping fluids were considered. Pressurized fluidized bed or pressurized (with an integrated low-Btu gasifier) boilers were assumed. Included in the cycles was a pressurizing gas turbine with its associated recuperator, and a gas economizer and feedwater heater. One of the ternary systems studied shows plant efficiency of 42.3% with a plant capitalization of $66.7/kW and a cost of electricity of 8.19 mills/MJ (29.5 mills/kWh).

Deegan, P. B.↗

Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

Source record↗

Utilizing GEOPHIRES-X Beyond Electricity

The GEOPHIRES tool is a techno-economic simulator for evaluating the thermal performance and cost-competitiveness of geothermal plants for electricity, heating, and/or cooling. The tool combines reservoir, wellbore, and surface plant cost and performance models to estimate overall techno-economic metrics such as net present value or levelized cost of electricity, heating, or cooling. We recently upgraded the tool to an object-oriented Python framework, presented in an accompanying paper. As part of the upgrade, we enhanced the capability to simulate the performance of geothermal plants for heating and cooling, which is the topic of this paper. Specifically, we (1) integrated absorption chillers to investigate the performance of utilizing geothermal heat for cooling, (2) integrated a heat pump module to boost the geothermal temperature and thermal output, (3) integrated a district heating module to estimate heating demand for a district based on local weather data, and simulated heat supply with geothermal energy and peaking boilers, and (4) integrated GEOPHIRES as an engine in the dGeo simulator to perform a geospatial analysis of geothermal district heating feasibility across a large region (e.g., a state or the entire United States) utilizing resource and thermal demand maps. This paper presents background information and case studies for several of these heating and cooling end-use options in GEOPHIRES.

absorption chiller↗

Development of Advanced Ultra-Supercritical (AUSC) Pulverized Coal (PC) Plants

This report presents an independent assessment of pulverized coal (PC) power plants operating at advanced ultrasupercritical (AUSC) steam conditions. At AUSC conditions, PC plants generate electricity at higher efficiencies and with lower carbon footprints than PC plants operating at subcritical, supercritical (SC), and ultrasupercritical (USC) steam conditions, such as those examined in previous National Energy Technology Laboratory (NETL) reports. However, advanced materials are required for commercial operation under these AUSC steam conditions which impact plant economics. In 2001, the United States (U.S.) Department of Energy (DOE) with the Ohio Coal Development Office launched a research program carried out by a consortium of industry and research organizations (the AUSC Consortium) to develop the materials necessary to commercially demonstrate AUSC technology. The results contained in this report incorporate findings by the AUSC Consortium.

01 COAL, LIGNITE, AND PEAT↗

Hybrid Power Plant Bidding in Models of Future Electricity Systems

This paper proposes a stochastic model for hybrid power plants participation in day-ahead electricity markets, considering uncertainty in market prices and renewable generation. Additionally, it presents a methodology to incorporate this hybrid participation into existing production cost models (PCM), allowing the analysis and market design of future systems with high penetration of hybrids. These developments are illustrated using a wind-battery hybrid located in New York Independent System Operator (NYISO) footprint.

Kemp, Julie Mulvaney↗

Spokane Eco-District Campus Performance Under Alternative Electricity Rates: Benefits for virtual power plant participants and suppliers

Here, the respective benefits for virtual power plant participants and suppliers are revealed and compared under alternative electricity rate structures, including conventional large commercial electricity rates, large commercial electricity rates with special rates for demand-side generation, and dynamic hourly transactive prices. These three scenarios were explored using the capabilities of the Eco-District campus, a virtual power plant in Spokane, Washington, that is supplied electricity by Avista Utilities. The Eco-District Campus was modeled to host solar power generation, battery energy storage, and thermal energy resources that must be coordinated with building heating and cooling needs. First, the electricity supplier’s costs for energy, infrastructure, and energy losses were modeled. Then, the virtual power plant’s performance was modeled while presuming that its manager would minimize its costs under its electricity rate structure. The demand charges of conventional commercial electricity rates managed monthly peak, as would be expected, but hourly dynamic transactive pricing resulted in a striking alignment between the costs incurred by the supplier and the virtual power plant’s energy costs.

Electricity rates↗

Evaluation of solar thermal power plants using economic and performance simulations

An energy cost analysis is presented for central receiver power plants with thermal storage and point focusing power plants with electrical storage. The present approach is based on optimizing the size of the plant to give the minimum energy cost (in mills/kWe hr) of an annual plant energy production. The optimization is done by considering the trade-off between the collector field size and the storage capacity for a given engine size. The energy cost is determined by the plant cost and performance. The performance is estimated by simulating the behavior of the plant under typical weather conditions. Plant capital and operational costs are estimated based on the size and performance of different components. This methodology is translated into computer programs for automatic and consistent evaluation.

El-Gabawali, N.↗

Valuing Maintenance Strategies for Fusion Plants as Part of a Future Electricity Grid

Scheduled maintenance is likely to be lengthy and therefore consequential for the economics of fusion power plants. The maintenance strategy that maximizes the economic value of a plant depends on internal factors such as the cost and durability of the replaceable components, the frequency and duration of the maintenance blocks, and the external factors of the electricity system in which the plant operates. Here, this paper examines the value of fusion power plants with various maintenance properties in a decarbonized United States Eastern Interconnection circa 2050. Seasonal variations in electricity supply and demand mean that certain times of year, particularly spring to early summer, are best for scheduled maintenance. Seasonality has two important consequences. First, the value of a plant can be 15% higher than what one would naively expect if value were directly proportional to its availability. Second, in some cases, replacing fractions of a component in shorter maintenance blocks spread over multiple years is better than replacing it all at once during a longer outage, even through the overall availability of the plant is lower in the former scenario.

power plant, maintenance, seasonality, electricity↗