Search NASA⌕ Search

SEARCH · Search NASA

Results for “enabling science”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

The Advanced Concepts Office at NASA’s George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system’s heliopause, approximately 100 AU from the sun, within 10 years. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature Hall thruster, a solar sail and an electric sail. A second analysis was conducted to determine which solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming a characteristic energy capability provided by a Space Launch System Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist. Results indicated that if the Technology Readiness Level of an electric sail could be increased in time, this technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so in even less time.

Hopkins, Randall C.↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

As part of a larger effort led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA’s George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system’s heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025 to 2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/s(exp 2) and 0.664 mm/s(exp 2), were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s(exp 2) and 2 mm/s(exp 2), were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA’s Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 km(exp 2)/s(exp 2) for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

Led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system's heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025-2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/sq s and 0.664 mm/sq s were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s2 and 2 mm/sq s, were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA's Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 km2/sq s for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Building an Economical and Sustainable Lunar Infrastructure to Enable Lunar Science and Space Commerce

A new concept study was initiated to examine the framework needed to gradually develop an economical and sustainable lunar infrastructure using a public private partnerships approach. This approach would establish partnership agreements between NASA and industry teams to develop cis-lunar and surface capabilities for mutual benefit while sharing cost and risk in the development phase and then allowing for transfer of operation of these infrastructure services back to its industry owners in the execution phase. These infrastructure services may include but are not limited to the following: lunar cargo transportation, power stations, energy storage devices, communication relay satellites, local communication towers, and surface mobility operations.

Zuniga, Allison↗

CEOS Enabling Open Science via Science Data Systems

The Committee on Earth Observation Satellites (CEOS) strives to enhance international coordination and data exchange and to optimize societal benefit. CEOS contributes to NASA’s core mission and is critical to NASA’s Earth Science program and to the future of Earth observations community as a whole because it advances mission planning, interagency coordination and technical implementation. Within NASA, the CEOS Working Group on Information System and Services (WGISS) is a forum for the Earth Sciences Data Systems (ESDS) Program to collaborate with other international and domestic agencies in the development of Earth observation data systems and services. NASA leads the development and demonstration of multiple prototypes supporting CEOS and Group on Earth Observations (GEO) requirements. NASA’s participation in WGISS influences NASA’s Earth Observing System Data and Information System’s (EOSDIS) ability to make high-quality data products available to the broad science community both nationally and internationally. Combined with NASA’s free and open data policy, EOSDIS’s involvement in WGISS is essential to widespread use of research satellite measurements. This presentation focuses on an overview and recent status of NASA’s EOSDIS.

Diane Davies↗

Holistic and Pragmatic Standards Processes Enable Interdisciplinary Science

Open, interdisciplinary science inevitably relies heavily on standards. Standards are those often unseen agreements that we take for granted when systems and processes are working fine. Yet standards work is perpetual, laborious, and sometimes contentious, especially for standards to work across diverse disciplines. Standards development, maintenance, and implementation is a complex, ongoing socio-technical process. NASA has developed a progressively open science policy and strategy that calls for the establishment of a data standards process reaching across the five diverse divisions of the Science Mission Directorate. This is a delicate exercise. We, therefore, seek to apply a holistic yet pragmatic approach to developing and maintaining a standards process. We adopt an ecological philosophy that focuses on the interactions within the data ecosystem and how standards facilitate those interactions. We couple high-level analysis with on the ground experimentation. We began by 1) mapping information ecosystem components (e.g. data centers, missions, services, protocols, users), 2)establishing how the components interact (e.g. sharing (meta)data, funding, personnel exchange), and 3) modelling system dynamics (e.g. creation of products from multiple data centers, redundant processes, shared services). The goal is to apply understanding of the ecosystem to real world applications (e.g. planning a new mission, implementing new policy requirements, improving process efficiency, etc.). We have also conducted studies of historical standardization efforts, documenting lessons learned and cautionary tales. We then contrast this more abstract work with real examples. We reviewed and assessed multiple existing standards development processes both within and external to NASA. We now work to implement an initial test process which can be further optimized. We seek to define a consistent approach for assigning persistent identifiers for research objects, especially for the purposes of citation. The experience from this relatively ‘simple’ test case adds a pragmatic perspective on how researchers and engineers actually work. This presentation will review the details of this methodology, our initial findings, and how they might apply to other interdisciplinary standardization efforts.

Mark A Parsons↗