Search NASA⌕ Search

SEARCH · Search NASA

Results for “energy arbitrage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

90 records · Page 5

Effects of Deep Reductions in Energy Storage Costs on Highly Reliable Wind and Solar Electricity Systems.

We use 36 years (1980-2015) of hourly weather data over the contiguous United States (CONUS) to assess the impact of low-cost energy storage on highly reliable electricity systems that use only variable renewable energy (VRE; wind and solar photovoltaics). Even assuming perfect transmission of wind and solar generation aggregated over CONUS, energy storage costs would need to decrease several hundred-fold from current costs (to ~$1/kWh) in fully VRE electricity systems to yield highly reliable electricity without extensive curtailment of VRE generation. The role of energy storage changes from high-cost storage competing with curtailment to fill short-term gaps between VRE generation and hourly demand to near-free storage serving as seasonal storage for VRE resources. Energy storage faces "double penalties" in VRE/storage systems: with increasing capacity, (1) the additional storage is used less frequently and (2) hourly electricity costs would become less volatile, thus reducing price arbitrage opportunities for the additional storage.

14 SOLAR ENERGY↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant: Preprint

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

H-2-SALT: Storing Fossil Energy as Hydrogen in Salt Caverns

Hydrogen storage in subsurface caverns is known as perhaps largest and longest-term energy storage system. While few such systems are currently in service (e.g., Texas; Teesside, UK), they are envisioned as being a pillar of the current energy transition that will allow intermittent power production from renewable sources (e.g., wind, solar) to be balanced with demand at grid-scale. In addition, hydrogen energy storage can allow existing fossil power plants to run more economically either by minimizing startups/shutdowns or by allowing them to take advantage of arbitrage. Finally, stored hydrogen can feed a variety of non-power users such as pipeline gas, heating, transportation, and manufacturing. The H-2-SALT paper study assessed the feasibility of a power-to-hydrogen system utilizing salt cavern storage of hydrogen in bedded salt in central Kansas, where over 750 such caverns have been constructed to date, of which approximately 350 are still in service. Legacy well and salt cavern data were collected to develop a regional geological database for two sites in Central Kansas and adjacent areas for use in more detailed geological and geomechanical site characterization efforts. This study found commercial viability and competitiveness of large-scale, electrolytic H 2 production and storage ($1.78 per kg H 2 ) that can be used for both electrical power supply to the grid during high-priced electricity periods (including co-firing with NG and fuel cell power production) and sale of H 2 for various industries, such as petrochemicals or transportation. The commercial potential of the H-2-SALT system is also relatively high because each of its components operate commercially today. It is recommended that a stratigraphic test well be drilled to collect log data and core samples that can reduce uncertainty surrounding geological and geomechanical properties of the salt beds that will be required for further cavern and energy storage system design studies.

03 NATURAL GAS↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

This study explores tradeoffs between the use of home solar+storage systems for backup power versus day-to-day utility bill savings. The study focuses specifically on the “reserve setting” available with most home battery storage systems, which allow the customer to maintain some minimum level of storage in reserve in case of an unforeseen power interruption. The more capacity that is held in reserve, the greater the customer’s ability to ride-through possible power interruptions, but less capacity is then available to manage utility bills on a day-to-day basis. This study evaluates this operational tradeoff across a diverse set of locations and residential electricity tariff structures, relying on Berkeley Lab’s PRESTO model to stochastically simulate power interruption events, and exploring a range of sensitivities, including variations in customer value of lost load (VoLL), interruption frequency, and other key drivers. The results show that, in most circumstances, the opportunity cost of holding storage capacity in reserve, in terms of foregone bill saving, tends to outweigh any gains in reliability value associated with mitigated power interruptions. This finding is robust across tariff structures and across most of the sensitivities considered, including those related to rate level, customer load level, and storage sizing. There are a limited set of circumstances where raising the reserve setting improves the overall customer value (comprised of bill savings plus reliability value). Specifically, that exception occurs when all of the following conditions apply: (a) the customer resides in a location with exceptionally poor reliability, (b) the customer has exceptionally high VoLL; (c) the customer is on a net billing rate or on a TOU rate that allows grid discharging but not grid charging; and (d), depending on the location, the price arbitrage differential on that rate is relatively small. In all other circumstances analyzed, total customer value declines with reserve level.

14 SOLAR ENERGY↗

Day-Ahead Bidding and Scheduling Method of a PV + Storage Plant

A Hybrid PV plant refers to the paradigm combining a PV farm with a battery energy storage system (BESS). Our study aims to answer the following questions. a) when the renewable penetration reaches 70%, a hybrid PV plant should bid as a thermal plant in the future electricity market. How should a hybrid PV plant bid in this market? b) the BESS can be used for arbitrage and/or capacity firming. How to schedule the BESS's operation in coordination with the bid decision?

Huang, Xiaoge↗

Opportunities for Industry to Provide Flexibility While Increasing Profitability

Supply and demand flexibility will both be needed to ensure the electricity system functions properly as the share from variable renewable generation continues to grow. Industrial manufacturing currently consumes about a third of primary energy worldwide, and electricity is projected to supply an increasing share of this demand as the global economy decarbonizes. Therefore, the ability for industry to flex demand poses an enticing opportunity to enable grid flexibility. However, large capital outlays prevent industry from voluntarily altering demand. Here we show that as battery costs continue to fall, industry will soon be able to profitably alter demand in accordance with electricity price variations. Focusing on two established industries– chlor-alkali and electric arc furnaces – and two industries with large future potential – methane pyrolysis and atmospheric CO 2 capture, we use a linear program (LP) optimization to assess the technoeconomic feasibility of flexible industrial demand across both historical and future-looking wholesale day-ahead marginal prices for the Electricity Reliability Council of Texas (ERCOT). We find positive net present values (NPV) from $\$$400K to $\$$50M using projected 2050 battery prices for industrial purchase of behind-the-meter batteries, using only arbitrage as a source of value. These results indicate that, with projected battery prices, profit-seeking industrial players could voluntarily play a future role in stabilizing a high-renewables grid where electricity prices act as accurate signals of grid needs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A comparison study on trading behavior and profit distribution in local energy transaction games

With the increasing integration of distributed energy resources, localized peer-to-peer energy transactions are receiving more attention since they could absorb more distributed renewables locally and stabilize the power grid. To better study the trading behavior and provide guidance for a viable local market design, different game-theoretical frameworks including cooperative and non-cooperative games are established and compared here. For the cooperative grand coalition, the maximum social welfare is guaranteed, the Shapley value and bargaining based approaches are implemented for further profit redistribution. It is shown that the asymmetrical bargaining power can be critical in the final payment clearing and it is equivalent to the Shapley value allocation if prosumers bargain based on their marginal contributions. Non-cooperative trading is formulated by using a Stackelberg bilevel model in which the upper level has the privilege in internal price setting. However, system optimum is not obtained due to competition, and the selfish leader could take away 89% of the collective benefit by price-gap based arbitraging. Aiming for a long-lasting trading market, a virtual benevolent leader and a uniform price structure in which purchase price equals selling price are tested. Experimental results indicate that maximum social welfare and a fairer profit allocation can be achieved with a uniform price structure, regardless of the selfish or benevolent attitude.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stand-Alone and Hybrid Electric Thermal Energy Storage in the System Advisor Model

This project developed stand-alone electric-thermal energy storage (ETES), stand-alone pumped thermal energy storage (PTES), and hybrid molten-salt power tower (MSPT)-ETES performance and dispatch optimization techno-economic models. The models are available to the public through the System Advisor Model (SAM) software, scripting, and as open-source code. We compared results of the dispatch model to PLEXOS dispatch of a similar generator using the same initial grid pricing signal and found our dispatch model performed well, but closer agreement between the models was limited by the inherent differences between price-taker and unit commitment models. Nevertheless, the price-taker models developed in this project are useful to analyze proposed ETES and PTES technologies because they provide more detailed system and component models, solve several orders of magnitude faster, and are available as free open-source software. The model results represent the most optimistic returns considering grid arbitrage from the input electricity pricing, so the financial results can be applied as a feasibility stage-gate. We also submitted a journal draft paper that describes the ETES dispatch model methodology and demonstrates model functionality. An accepted journal article will serve as peer-reviewed documentation for the models, along with the open-source code, SAM help-menu content, and eventually this final project report.

14 SOLAR ENERGY↗

GT Flex: A Coordinated Multi-Building Pilot Study

Buildings are a significant and untapped resource for providing utility electric grid services. Recent studies have estimated that buildings could reduce the peak demand on the electric grid in the U.S. by almost 25% through effective combinations of energy efficiency (EE) measures and load flexibility strategies (Langevin et al. 2021). The U.S. Department of Energy (DOE) has established a goal to triple energy efficiency and demand flexibility in both residential and commercial sections by 2030 compared to 2020 levels (Satchwell et al. 2021). Such findings place buildings alongside electric vehicles, photovoltaics, electric batteries, and other distributed energy resources (DERs) as primary technologies needed for supporting high renewable energy generation grids. Coordinating and optimizing multiple buildings and other DERs is more beneficial and valuable when compared with individual buildings and DERs operating as siloed resources, uncoordinated with others (Olgyay et al. 2020). A pilot study at the Georgia Institute of Technology (GIT) was conducted to evaluate value propositions of a multi-building scale project seeking carbon reduction, energy efficiency and grid-interactive capabilities, by demonstrating the means by which stakeholders can determine the technical and financial merits of grid-interactivity and energy efficiency technologies coordinated across multiple assets. The study focused on analyzing technical feasibility of deploying thermal load flexibility strategies at the multi-building scale, coordinated to not exceed existing infrastructure constraints at the pilot site. Results show that campus can provide 3-3.5 MW of potential load shed over a 4-hour event window through coordinated dispatch of thermal cooling load flexibility without exceeding existing infrastructure capacities. Under future high renewable scenarios, this thermal flexibility resource is also valuable when coordinated to reduce curtailment of intermittent renewables. Economic analyses were performed to effectively communicate various value propositions of grid-interactive and efficient building (GEB) thermal flexibility strategies. Load flexibility presents a financial value proposition to the campus today. By conducting rationalized, coordinated dispatch in response to real time price (RTP) fluctuations, the campus can benefit materially from daily price arbitrage. The RTP signal acts as an aggregating mechanism between the utility and customer to call on demand flexibility resources, with a large portion of the benefit deriving from a relatively small number of days. Realizing and maximizing this benefit with thermal load flexibility requires careful attention to the timing of pricing signals and parameterization of dispatch to overcome efficiency penalties. Grid value and signals are expected to evolve over time, and thermal load flexibility shows potential to adapt dispatch logic to support intermittent renewable generation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen underground storage for grid electricity storage: An optimization study on techno-economic analysis

Here, this study performs a techno-economic analysis of hydrogen underground storage systems for grid electricity storage, evaluating their economic viability at the plant scale using dynamic optimization. It explores the feasibility of various system configurations and revenue models in the context of volatile electricity prices and the necessity for multiple revenue streams. The hypothesis tested is that large-scale hydrogen storage, despite its low round-trip efficiency, can be economically viable with the right mix of revenue streams. This study uses scenario-based analysis to assess the impacts of different system configurations, including engaging in time-shifting arbitrage, ancillary service markets and blending hydrogen with natural gas. Results indicate potential annual net cash flows of up to $\$$1.5 million from ancillary services integration and $\$$5.2 million from natural gas blending, contingent on specific system sizes. The study concludes that hydrogen underground storage for grid electricity storage can be profitable, and emphasizes that proper system design and precise electricity price forecasting are crucial for optimizing system performance and economic returns. This research sets the stage for further investigations into the scalability of hydrogen storage systems and their broader implications for grid electricity storage and energy market dynamics.

25 ENERGY STORAGE↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

Market analysis for the integration of new power technologies: A case study of the deployment of hybrid fossil-based generator plus energy storage (ES-FE)

This study examines the national landscape of hybridized fossil energy (FE) power plants with energy storage (ES) technologies (“ES-FE”) and presents the compilation of an ES-FE dataset, which includes over 65 ES-FE projects and concepts in the United States, comprising approximately 500 MWh of co-located ES capacity with FE power plants. This study also estimates the economic feasibility of adding ES to existing FE power plants by characterizing the potential revenues that can be generated by the ES component through flexibility and capacity value. The analysis focuses on ES technologies with 2- to 10-h. durations located in four U.S. independent system operators (ISOs): Midcontinent ISO (MISO), Electric Reliability Council of Texas (ERCOT), PJM Interconnection (PJM), and California ISO (CAISO), which have +70,000 MW of combined FE power capacity that could add ES. Annual revenues are estimated for the ES component using a what-if-analysis approach, for capacity value, price arbitrage, or ancillary services provision. The results show that annual revenues depend on the end-use storage service, wholesale electricity and capacity market prices, and ES technology operation parameters such as discharging duration and cycling frequency. When performing a sensitivity analysis, ES accrues $7–178/kW-yr. via price arbitrage and ancillary services provision in the four ISOs, and $13–92/kW-yr. when providing capacity value only in MISO and PJM. A cash flow analysis is performed to estimate the net present value (NPV) of the ES addition using a range of ES costs. The study finds that for most ES technologies considered, these revenues alone are insufficient to achieve economic feasibility. In conclusion, of the 1645 total runs analyzed, 115 had positive NPVs (7%). Therefore, other revenue streams or monetizable benefits are necessary to achieve the break-even point.

20 FOSSIL-FUELED POWER PLANTS↗

A bilevel multistage stochastic self-scheduling model with indivisibilities for trading in the continuous intraday electricity market

In this paper, we study the profit maximization problem of a virtual power plant trading in the continuous intraday electricity market. Our virtual power plant model is compatible with renewable, and thermal assets, covering a range of virtual power plants currently participating in energy markets. We model the trading problem as a bilevel multistage stochastic program. The upper level of the problem accounts for the profit maximization of the virtual power plant with explicit modeling of the technical constraints of the operational status of the thermal power plant including minimum start-up and shut-down times, ramp-up and ramp-down rates, and minimum generation level. The upper level also decides which continuous and indivisible (fill-or-kill) orders are submitted to the market. The lower-level problem accounts for the clearing of the continuous intraday market, i.e., matching of buy and sell orders. Because of the presence of fill-or-kill orders, the lower-level problem is mixed-integer, which prevents its direct conversion to a single-level problem using duality. In order to solve this challenging problem, we develop a convex-hull extended formulation for the lower-level problem, apply duality theory to obtain a single-level stochastic equivalent formulation, and employ McCormick envelopes to turn the problem into a multistage stochastic mixed-integer linear problem, which we solve using the stochastic dual dynamic integer programming algorithm. We conduct numerical experiments and analyze the optimal trading behavior of a virtual power plant trading in an ideal continuous market without arbitrage.

Bilevel multistage stochastic programming problem↗

Long duration battery sizing, siting, and operation under wildfire risk using progressive hedging

Battery sizing and siting problems are computationally challenging due to the need to make long-term planning decisions that are cognizant of short-term operational decisions. This paper considers sizing, siting, and operating batteries in a power grid to maximize their benefits, including price arbitrage and load shed mitigation, during both normal operations and periods with high wildfire ignition risk. Here we formulate a multi-scenario optimization problem for long duration battery storage while considering the possibility of load shedding during Public Safety Power Shutoff (PSPS) events that de-energize lines to mitigate severe wildfire ignition risk. To enable a computationally scalable solution of this problem with many scenarios of wildfire risk and power injection variability, we develop a customized temporal decomposition method based on a progressive hedging framework. Extending traditional progressive hedging techniques, we consider coupling in both placement variables across all scenarios and state-of-charge variables at temporal boundaries. This enforces consistency across scenarios while enabling parallel computations despite both spatial and temporal coupling. The proposed decomposition facilitates efficient and scalable modeling of a full year of hourly operational decisions to inform the sizing and siting of batteries. With this decomposition, we model a year of hourly operational decisions to inform optimal battery placement for a 240-bus WECC model in under 70 min of wall-clock time.

25 ENERGY STORAGE↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase I Conceptual Study)

The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and the proposed system is an improvement over alternate low carbon dispatchable power options. Our demonstration will include 54 MWh of hydrogen storage. CO 2 capture inherent to the CHG process can capture 90% of the CO 2 (with upgrades to >98%) in a commercial system (~300 MWth) for sequestration or other uses. The hydrogen will be utilized in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with the existing Southern Company fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load. However, H 2 production is relatively constant by storing H 2 , and revenues are improved by arbitrage between use of low-cost off-peak variable electricity generation or use of stored H 2 under peak demand. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via system requirements review with the whole team. These requirements were then incorporated into/iterated with our Heat & Mass Balance models and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Our system generates power at 17.4% lower cost than other low carbon approaches for the H 2 generation, H 2 compression and storage, carbon sequestration, and HRSG added electricity production for a large-scale duct-fired system. Our team recommends completing the Phase II Pre-FEED study for the proposed system as the next step for the project and its tasks will achieve the overall objective and be ready to launch the FEED. The Pre-FEED tasks include updating the requirements, Concept of Operations, plant scope/process description, component modeling, system modeling, performance estimates, emission estimates, block flow diagrams, fluid/process conditions (PFD), utility usage, and facility sizing/definition. The approach will be to complete these updates in a greater level of detail for the selected site. The approach for developing the EIV is to use the updated results, including model outputs, for carbon dioxide and waste streams.

03 NATURAL GAS↗

Techno-Economic Viability of Flexible Dispatch of Unconventional Geothermal Systems

Flexible geothermal operations could boost project returns through the allocation of improved power purchase agreements and/or exploitation of power price arbitrage opportunities. In this study, we investigated the techno-economic feasibility of variable flow rate control and time-of-day pricing in closed-loop geothermal systems. We considered U-shaped multilateral system configurations and modeled a variety of technical system parameters. These designs were simulated using a slender-body theory (SBT) model for transient heat transfer and fluid flow. This subsurface model was integrated into the flexible geothermal economic model (FGEM) tool to evaluate the overall flexible geothermal system techno-economics. Future hourly ambient temperature conditions were based on the Sup3rCC dataset. Published datasets were used for future hourly wholesale electricity prices. We analyzed four operating strategies: 1) baseload operation, 2) seasonal dispatch (high flow rate during summer and nominal flow rate during the rest of the year), 3) net generation maximization by varying flow rate to maximize net power output, and 4) revenue maximization by varying flow rate to maximize revenue. We ran all four scenarios for a multiloop configuration with 12 lateral passes, 7-km vertical depth and 87-km total drilling length. Furthermore, we assumed a 60 degrees C/km geothermal gradient and ambient temperature and wholesale electricity prices for New Mexico as a typical state location. The nominal flow rate was set to 80 kg/s. When considering drilling costs of $1,000/m and a discount rate of 7%, the generation maximization scenario resulted in the lowest levelized cost of electricity (LCOE) of ~$150/MWh. When considering project return on investment (ROI), defined as lifetime net income divided by upfront capital costs, all flexible operation scenarios performed better than the base case scenario. The highest ROI of 80% was obtained with the revenue maximization scenario. With drilling costs of $200/m and a discount rate of 5%, the generation maximization scenario resulted in LCOE of $49/MWh.

flexible geothermal↗