Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended operators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Electrolyte Reservoir Would Lengthen Cell Life

Controlled-capillary sump supplies proper amount of electrolyte during cell operation. Releases electrolyte to compensate for electrolyte that empties from electrodes and separators: thus extending operating life of electrochemical cells that depend on recombination of gases in sealed condition without undue pressure buildup.

Thaller, L.↗

Technology Infusion in U.S. Spacesuits - A Comparative System Analysis

The National Aeronautics and Space Administration (NASA) has evolved multiple spacesuit systems for performing extravehicular activity (EVA) or space walks. These spacesuit systems include the Apollo Extravehicular Mobility Unit (EMU), Space Shuttle and International Space Station (ISS) EMU, and Exploration EMU (xEMU). Each spacesuit system is like the other for functionality. However, each spacesuit system is different in configuration based on the technology infused into the system associated with the purpose of the mission. Each spacesuit system is made up of many components and the integrate environment targeted for operations leads to an integrated system that is complex. Since Apollo, NASA has invested in multiple technologies that make up these spacesuit systems in different iterations. The Apollo EMU was designed in the 1960’s with a focus to facilitate the first human to walk on the moon. The Space Shuttle EMU was designed in the 1970’s for reusable microgravity operations that began in the early 1980’s. The Space Shuttle EMU was enhanced to facilitate extended operation on the ISS. Over the last 15 years, NASA has been designing, developing, and testing a new spacesuit system, the xEMU which is considered a design, verification, and test unit. NASA is planning to land the first woman and first person of color on the Moon. NASA recently engaged industry through a new contractual arrangement to provide EVA services needed to return to the Moon and to continue operations on the ISS. Spacesuit systems are complex. Understanding the requirements, operational environment, the necessary technologies, and the integrated spacesuit system are paramount. In addition, understanding the technology infusion process to meet the mission objectives is critical. This paper will review the spacesuit systems for EVA and several component functions within the spacesuits, along with a system comparison of those technologies from Apollo to xEMU.

Extravehicular Activity (EVA)↗

Preparing EMU for Space Station

An enhanced Extravehicular Mobility Unit (EMU) for the Space Shuttle Program is discussed which is capable of meeting new requirements for SSF support. It is concluded that current SSF documents contain meaningful requirements that should be imposed on the SSF EMU to support SSF assembly and maintenance operations. These requirements fall within three broad areas which encompass revised accommodation aboard Shuttle and SSF, including interior environments; extended operating life resulting from the EVA mission model for SSF assembly and support; and operating safely in Station external environments that differ from those of Shuttle.

Wilde, Richard C.↗

Smart-1 Moon Impact Operations

This paper describes the operations to control the Moon impact of the 3-axis stabilized spacecraft SMART-1 in September 2006. SMART-1 was launched on 27/09/2003. It was the first ESA mission to use an Electric Propulsion (EP) engine as the main motor to spiral out of the Earth gravity field and reach a scientific moon orbit [1]. During September 2005 the last EP maneuvers were performed using the remaining Xenon, in order to compensate for the 3rd body perturbations of the Sun and Earth. These operations extended the mission for an additional year. Afterwards the EP performance became unpredictable and low, so that no meaningful operation for the moon impact could be done. To move the predicted impact point on the 16/8/2006 into visibility from Earth an alternative Delta-V strategy was designed. Due to their alignment, the attitude thrusters could not be used directly to generate the Delta-V, so this strategy was based on controlled angular momentum biasing. Firing along the velocity vector around apolune, the remaining Hydrazine left from the attitude control budget was used, to shift the impact to the required coordinates.

Ayala, Andres↗

Life and Reliability Characteristics of TurboBrayton Coolers

Wear and internal contaminants are two of the primary factors that influence reliable, long-life operation of turbo-Brayton cryocoolers. This paper describes tests that have been conducted and methods that have been developed for turbo-Brayton components and systems to assure reliable operation. The turbomachines used in these coolers employ self-acting gas bearings to support the miniature high-speed shafts, thus providing vibration-free operation. Because the bearings are self-acting, rubbing contact occurs during initial start-up and shutdown of the machines. Bearings and shafts are designed to endure multiple stop/start cycles without producing particles or surface features that would impair the proper operation of the machines. Test results are presented for a variety of turbomachines used in these systems. The tests document extended operating life and start/stop cycling behavior for machines over a range of time and temperature scales. Contaminants such as moisture and other residual gas impurities can be a source of degraded operation if they freeze out in sufficient quantities to block flow passages or if they mechanically affect the operation of the machines. A post-fabrication bakeout procedure has been successfully used to reduce residual internal contamination to acceptable levels in a closed cycle system. The process was developed during space qualification tests on the NICMOS cryocooler. Moisture levels were sampled over a six-month time interval confirming the effectiveness of the technique. A description of the bakeout procedure is presented.

Breedlove, Jeff J.↗

Indirect Magnetic Measurements on the Aerodynamic Heating Facility (AHF)

The arc jet complex at NASA Ames Research Center (ARC) investigates various thermal protection systems (TPS) and their performance in high enthalpy flow environments to improve heat shields used in atmospheric entry. The arc jet operates by inducing an arc between two electrodes and passing the heated gas through a supersonic nozzle. The arc plasma is typically a partially ionized air mixture at low temperature (< 2 eV) but operates for long periods of time (up to 30 min) at high power (< 60 MW). However, simulations using the in-house ARC Heater Simulator (ARCHeS) code predict that the arc is still unstable to MHD instabilities, primarily the kink instability, which limit the operational envelope of the facility [1]. Consequently, it is important to better characterize these instabilities to improve facility stability and extend operational ranges. Due to the high enthalpy and long timescales (i.e., minutes) arc diagnostics must be non-invasive (i.e., optical or magnetic). This work will cover the development of tri-axial magnetic hall sensors for arc jet instabilities and subsequent 3D characterization of arc motion. The latest results describing the kink instability amplitude, frequency and wavelength will be presented and represent the first measurements of this instability in a NASA arc jet facility. References: [1] Meurisse, J. (2018). 3D Unsteady Model of Arc Heater Plasma Flow Using the ARC Heater Simulator (ARCHeS), APS Gaseous Electronics Conference, 2018: APS.

Sebastian Vicente Colom↗

Potential Operating Orbits for Fission Electric Propulsion Systems Driven by the SAFE-400

Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially nonradioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.

Houts, Mike↗

Hubble Space Telescope First Servicing Mission Prelaunch Mission Operation Report

The Hubble Space Telescope (HST) is a high-performance astronomical telescope system designed to operate in low-Earth orbit. It is approximately 43 feet long, with a diameter of 10 feet at the forward end and 14 feet at the aft end. Weight at launch was approximately 25,000 pounds. In principle, it is no different than the reflecting telescopes in ground-based astronomical observatories. Like ground-based telescopes, the HST was designed as a general-purpose instrument, capable of using a wide variety of scientific instruments at its focal plane. This multi-purpose characteristic allows the HST to be used as a national facility, capable of supporting the astronomical needs of an international user community. The telescope s planned useful operational lifetime is 15 years, during which it will make observations in the ultraviolet, visible, and infrared portions of the spectrum. The extended operational life of the HST is possible by using the capabilities of the Space Transportation System to periodically visit the HST on-orbit to replace failed or degraded components, install instruments with improved capabilities, re-boost the HST to higher altitudes compensating for gravitational effects, and to bring the HST back to Earth when the mission is terminated. The largest ground-based observatories, such as the 200-inch aperture Hale telescope at Palomar Mountain, California, can recognize detail in individual galaxies several billion light years away. However, like all earthbound devices, the Hale telescope is limited because of the blurring effect of the Earth s atmosphere. Further, the wavelength region observable from the Earth s surface is limited by the atmosphere to the visible part of the spectrum. The very important ultraviolet portion of the spectrum is lost. The HST uses a 2.4-meter reflective optics system designed to capture data over a wavelength region that reaches far into the ultraviolet and infrared portions of the spectrum.

Source record↗

Potential Operating Orbits for the SAFE-400

Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp is greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.

Houts, Mike↗

Lunar Reconnaissance Orbiter (LRO): Observations for Lunar Exploration and Science

The Lunar Reconnaissance Orbiter (LRO) was implemented to facilitate scientific and engineering-driven mapping of the lunar surface at new spatial scales and with new remote sensing methods, identify safe landing sites, search for in situ resources, and measure the space radiation environment. After its successful launch on June 18,2009, the LRO spacecraft and instruments were activated and calibrated in an eccentric polar lunar orbit until September 15, when LRO was moved to a circular polar orbit with a mean altitude of 50 km. LRO will operate for at least one year to support the goals of NASA's Exploration Systems Mission Directorate (ESMD), and for at least two years of extended operations for additional lunar science measurements supported by NASA's Science Mission Directorate (SMD). LRO carries six instruments with associated science and exploration investigations, and a telecommunications/radar technology demonstration. The LRO instruments are: Cosmic Ray Telescope for the Effects of Radiation (CRaTER), Diviner Lunar Radiometer Experiment (DLRE), Lyman-Alpha Mapping Project (LAMP), Lunar Exploration Neutron Detector (LEND), Lunar Orbiter Laser Altimeter (LOLA), and Lunar Reconnaissance Orbiter Camera (LROC). The technology demonstration is a compact, dual-frequency, hybrid polarity synthetic aperture radar instrument (Mini-RF). LRO observations also support the Lunar Crater Observation and Sensing Satellite (LCROSS), the lunar impact mission that was co-manifested with LRO on the Atlas V (401) launch vehicle. This paper describes the LRO objectives and measurements that support exploration of the Moon and that address the science objectives outlined by the National Academy of Science's report on the Scientific Context for Exploration of the Moon (SCEM). We also describe data accessibility by the science and exploration community.

Vondrak, Richard↗

INS3D: An incompressible Navier-Stokes code in generalized three-dimensional coordinates

The operation of the INS3D code, which computes steady-state solutions to the incompressible Navier-Stokes equations, is described. The flow solver utilizes a pseudocompressibility approach combined with an approximate factorization scheme. This manual describes key operating features to orient new users. This includes the organization of the code, description of the input parameters, description of each subroutine, and sample problems. Details for more extended operations, including possible code modifications, are given in the appendix.

Rogers, S. E.↗

Cooperative Upper Class E Airspace: Concept of Operations and Simulation Development for Operational Feasibility Assessment

Upper Class E Traffic Management (ETM) is a novel community-based traffic management concept incorporating the FAA, NASA, and industry’s collaborative efforts to support safe, efficient, and scalable future operations in the airspace near and above 60,000 ft. The concept complements Air Traffic Control (ATC) infrastructure and Air Traffic Management (ATM) services by facilitating cooperative operations with ETM provided services. This paper presents an initial Cooperative Separation Management (CSM) concept for High Altitude Long Endurance (HALE) vehicles’ conflict detection and resolution during their extended operations. A prototype simulation platform has been developed to visualize and assess the concept during demonstrations to stakeholders. Further development plans for simulations and the CSM concept are discussed.

upper Class E airspace↗

Cooperative Upper Class E Airspace: Concept of Operations and Simulation Development for Operational Feasibility Assessment

Upper Class E Traffic Management (ETM) is a novel community-based traffic management concept incorporating the FAA, NASA, and industry’s collaborative efforts to support safe, efficient, and scalable future operations in the airspace near and above 60,000 ft. The concept complements Air Traffic Control (ATC) infrastructure and Air Traffic Management (ATM) services by facilitating cooperative operations with ETM provided services. This paper presents an initial Cooperative Separation Management (CSM) concept for High Altitude Long Endurance (HALE) vehicles’ conflict detection and resolution during their extended operations. A prototype simulation platform has been developed to visualize and assess the concept during demonstrations to stakeholders. Further development plans for simulations and the CSM concept are discussed.

upper Class E airspace↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Mary-Elizabeth Davis↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Water Processor Assembly↗

Performance of the FOS and GHRS Pt/(Cr)-Ne Hollow-cathode Lamps after their Return from Space and Comparison with Archival Data

The Space Telescope European Coordinating Facility (ST-ECF) and National Institute of Standards and Technology (NIST) are collaborating to study hollow cathode calibration lamps as used onboard the Hubble Space Telescope (HST). As part of the STIS Calibration Enhancement (STIS-CE) Project we are trying to improve our understanding of the performance of hollow cathode lamps and the physical processes involved in their long term operation. The original flight lamps from the Faint Object Spectrograph (FOS) and the Goddard High Resolution Spectrograph (GHRS) are the only lamps that have ever been returned to Earth after extended operation in space. We have taken spectra of all four lamps using NIST s 10.7-m normal-incidence spectrograph and Fourier transform spectrometer (FTS) optimized for use in the ultraviolet (UV). These spectra, together with spectra archived from six years of on-orbit operations and pre-launch spectra, provide a unique data set - covering a period of about 20 years - for studying aging effects in these lamps. Our findings represent important lessons for the choice and design of calibration sources and their operation in future UV and optical spectrographs in space.

Kerber, Florian↗

Lessons Learned in Extended-Extended Spitzer Space Telescope Operations

The Spitzer Space Telescope is executing the ninth year of extended operations beyond its 5.5-year prime mission. The project anticipated a maximum extended mission of about four years when the first mission extension was proposed. The robustness of the observatory hardware and the creativity of the project engineers and scientists in overcoming hurdles to operations has enabled a substantially longer mission lifetime. This has led to more challenges with an aging groundsystem due to resource reductions and decisions made early in the extended mission based on a shorter planned lifetime. We provide an overview of the extended mission phases, challenges met in maintaining and enhancing the science productivity, and what we would have done differently if the extended mission was planned from the start to be nearly twice as long as the prime mission.

Lowrance, Patrick↗

Stable and verifiable state estimation methods and systems with spacecraft applications

The stability of a recursive estimator process (e.g., a Kalman filter is assured for long time periods by periodically resetting an error covariance P(t.sub.n) of the system to a predetermined reset value P.sub.r. The recursive process is thus repetitively forced to start from a selected covariance and continue for a time period that is short compared to the system's total operational time period. The time period in which the process must maintain its numerical stability is significantly reduced as is the demand on the system's numerical stability. The process stability for an extended operational time period T.sub.o is verified by performing the resetting step at the end of at least one reset time period T.sub.r whose duration is less than the operational time period T.sub.o and then confirming stability of the process over the reset time period T.sub.r. Because the recursive process starts from a selected covariance at the beginning of each reset time period T.sub.r, confirming stability of the process over at least one reset time period substantially confirms stability over the longer operational time period T.sub.o.

Li, Rongsheng↗