Search NASA⌕ Search

SEARCH · Search NASA

Results for “fire test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Considerations for Fire Service Response to Residential Battery Energy Storage System Incidents

Renewable energy sources (e.g., rooftop photovoltaics, wind turbines) are capable of addressing our grid-level energy challenges by reducing environmental impacts, increasing resiliency, and increasing the supply of input energy. However, renewable energy sources alone are not a complete solution. The generation of power from major renewable energy sources fluctuates with the weather, creating significant challenges in matching electrical power generation to electrical power consumption. The value of renewable power generation sources is multiplied when paired with battery energy storage systems (ESS), which can store excess power generated from renewable energy sources when it is not consumed and deliver that power later when demand exceeds base power generation. Residential ESS units are frequently installed to support renewable energy initiatives by storing energy from intermittent sources such as photovoltaic panels. Residential ESS units also offer an alternative to gas-powered generators or other backup power means. Lithium-ion batteries are the most common residential ESS technology due to their affordability and energy density. Though lithium-ion systems come with benefits, there is also a risk of thermal runaway within this technology which can result in flammable gas release, fire, and explosion. As the installations of these products increase, the frequency of response to fire incidents involving these products will increase. In response to this new and evolving hazard, UL Solutions (ULS) and UL Fire Safety Research Institute (FSRI) have partnered with the International Association of Fire Fighters (IAFF) to conduct a series of large-scale tests sponsored by the US Department of Energy to characterize the challenges for fire fighters responding to fires involving residential energy storage systems. The project focuses on developing size-up and tactical considerations to support the fire service in navigating the evolving modern fireground.

25 ENERGY STORAGE↗

CO2 Electrolyzer to Produce Formic Acid at Industry Relevant Current Density

Electrochemical CO2 reduction reaction (CO2RR) to produce formic acid has attracted great interest recently since formic acid can be used as a feedstock for biorefineries. Over the past decade, much effort has been devoted to the prospects of electrochemical CO2 conversion to formic acid. However, issues including low current density, low selectivity, low energy efficiency, poor long-term stability, and production of formate salts instead of formic acid remain as the great challenges for the development and commercialization of this technology. Recently, Dioxide Materials (DM) has developed an electrolyzer technology that can directly convert CO2 to pure formic acid with a three-compartment CO2 electrolyzer. In this work, DM will present our recent effort on improving the electrolyzer performance operating at industry relevant current density (200 mA/cm2). We have demonstrated 200 mA/cm² with 80% Faradaic efficiency for 1000 hours of operation. The effects of CO2 concentration and impurities in the flue gas on the electrolyzer performance will be discussed, as will ongoing efforts to test the device at a coal fired power plant. The long-term (1000 h) performance of the electrolyzer will also be presented.

Yang, Hongzhou↗

Radiation Hardened Foam Cold Test Plan – Phase-I: Foam Adhesion, Contamination Fixation, Moisture Stresses, Pipe Cutting, and Thermal Profile Testing

This document outlines the Phase-I test objectives and implementation plan for a down-selective foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of an intumescent, fire-retardant foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed in FIU’s Outdoor Test and Evaluation Facility using a mock-up that replicates the operational conditions at the proposed hot test location at F/H labs. Results from the cold test plan will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the site and transported to a proper disposal facility. Phase-I testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of foam fixative in piping, (2) evaluation of the adhesion of the foam fixative in piping under varying moisture conditions, (3) determination of the heat profile of the foam fixative during curing, (4) determination of the relationship between pipe diameter and foam fixative quantity, (5) determination of the internal pipe pressure after foam deployment and curing, (6) development of a leak test standard operating procedure to test for the effectiveness of the foam plug, (7) initiation of a literature review to determine if using a hot tap is a viable method to deliver foam into piping, and (8) initiation of a 10-foot mock up test that will be used in Phase-II cold testing. The cold test will be conducted at FIU and all testing activities will comply with SRNL Conduct of R&D Protocols (SRNL-IM-2020-00019).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Modeling of an 80 bar Oxy-Combustor for Direct Fired Supercritical CO2 Applications

As supercritical CO2 power cycles for fossil energy power generation continue to generate interest, there are significant issues and unanswered questions regarding injector design, flame stabilization, wall heat transfer, CO emissions, combustion dynamics and other combustion phenomenon. For natural gas, direct-fired cycles with carbon capture it is believed that Computational Fluid Dynamics (CFD) modeling will play an essential role in the combustor design process. To accurately model turbulent reacting flows at these unique conditions, experimental data is needed to validate CFD codes and sub-models and is currently lacking at conditions relevant for these cycles. This paper presents the conceptual design and CFD simulations of an experimental 80 bar oxy-combustion facility and test article currently under construction at NETL. The facility is targeted towards the testing of a single injector, direct-fired sCO2 combustor at the 100 kW thermal output level. While these conditions do not reflect the actual Allam cycle operating conditions (300 bar) they are viewed as a stepping stone in the model validation process at supercritical conditions. Reynolds Averaged Navier-Stokes as well as Large Eddy Simulation are used to model the turbulent combustion process and aid in the design of the combustor and injector. Process parameters including oxidizer preheat temperature and combustor flowrate are investigated.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Self-Assembly Supports Enabling Transformational Membrane Performance for Cost-Effective Carbon Capture

This final technical report describes work conducted by Membrane Technology and Research, Inc. (MTR) for the U.S. Department of Energy (DOE), National Energy Technology Lab (NETL) on the development of membranes with transformational performance for carbon capture under award number DE-FE0031596. The work was performed from June 1, 2018 through May 31, 2024. For more than a decade, MTR has worked in partnership with DOE to develop an innovative membrane-based CO 2 capture process. This effort has included the first test of membrane modules with coal-fired flue gas at the Arizona Public Services (APS) Cholla plant in 2010; the accumulation of >11,000 hours of flue gas operation for Polaris modules on a bench-scale 1 tonne/day (TPD) system at the National Carbon Capture Center (NCCC); scale-up of first-generation (Gen-1) Polaris to a 20 TPD small pilot system, and successful operation of this system on a flue gas slipstream at NCCC and in integrated boiler testing at Babcock & Wilcox (B&W). Through continued development efforts, a second-generation (Gen-2) version of the Polaris membrane has been scaled-up to pilot production. This membrane offers 70% higher CO 2 permeance with similar selectivity to the base case Polaris. MTR also developed planar modules designed specifically for the low-pressure, high-volumetric flow rate process conditions of flue gas operation. These new modules have significantly lower pressure-drop values compared to the type originally used (spiral-wound modules), which results in significant energy savings. The goal of the work described in this report was to improve on the Polaris Gen-2 membrane with the ultimate aim to reduce the cost of carbon capture. The majority of the effort was to develop improved support membranes for the multi-layer composite structure of MTR’s Polaris membrane. Earlier work at MTR had identified the support structure as limiting membrane permeances, not because the support itself represents a permeation resistance, but because the distribution of pores at the surface of the support imposes a geometric restriction to diffusion in the layers above it. Support membranes were prepared from a range of polymers, including commercially available block copolymers and a custom synthesized block copolymer alternative. The best support membranes developed in this project reduced the geometric restriction by a factor of two to three. These supports then were used to produce Polaris composite membranes with improved permeances. The second topic was to create a high-selectivity version of the Polaris membrane. The high-selectivity version uses a novel selective polymeric material and high selectivities were confirmed in experiments at MTR. The material is not easily made into very thin films. Consequently, the permeances are significantly lower than the Polaris Gen-2 membrane. The utility of this membrane is therefore limited to the carbon dioxide purification step that produces liquid CO 2 . A Technical and Economic Analysis (TEA) was performed for a carbon capture system that uses both advanced membrane types. The TEA shows the novel advanced membranes reduce the cost of capture by 10%, from $63.32/tonne CO 2 to $56.90/tonne CO 2 (2022 USD). Most of the development work was carried out with laboratory-scale casting and coating equipment. A number, but not all, of the improvements identified have been implemented on commercial-scale manufacturing equipment. The focus of future work at MTR is to incorporate the advancements made into the Polaris membrane manufacturing process.

01 COAL, LIGNITE, AND PEAT↗

Industry Level Integrated Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)

The software Fire Risk Investigation in 3D (FRI3D) has been developed over the last 2 years to integrate 3D spatial modeling with existing fire probabilistic risk assessment (PRA) models and fire simulation codes. The goal of this research and development is to automate many of the fire analysis manual tasks to reduce industry efforts in the initial fire modeling and operational costs for the model maintenance and evaluations required during normal plant operations. The tasks for Fiscal Year (FY) 2021 include first testing the FRI3D modeling capabilities by importing an industry fire model into FRI3D and making a 3D model of a complex/high-risk significant area. (For this work, the switchgear room was chosen.) Then, the second task of FY 2021 is to develop a dynamic fire PRA process that can help optimize traditional fire PRA models. The switchgear room model will be used for the dynamic fire PRA work. This report describes the work and insights learned when using FRI3D software to model both a Nuclear Regulatory Report (NUREG) example models and a full industry switchgear room.

97 MATHEMATICS AND COMPUTING↗

Optimal Frequency-domain Analysis for Spacecraft Time Series: Introducing the Missing-data Multitaper Power Spectrum Estimator

While the Lomb–Scargle periodogram is foundational to astronomy, it has a significant shortcoming: the variance in the estimated power spectrum does not decrease as more data are acquired. Statisticians have a 60 yr history of developing variance-suppressing power spectrum estimators, but most are not used in astronomy because they are formulated for time series with uniform observing cadence and without seasonal or daily gaps. Here we demonstrate how to apply the missing-data multitaper power spectrum estimator to spacecraft data with uniform time intervals between observations but missing data during thruster fires or momentum dumps. The F-test for harmonic components may be applied to multitaper power spectrum estimates to identify statistically significant oscillations that would not rise above a white noise–based false alarm probability. Multitapering improves the dynamic range of the power spectrum estimate and suppresses spectral window artifacts. We show that the multitaper–F-test combination applied to Kepler observations of KIC 6102338 detects differential rotation without requiring iterative sinusoid fitting and subtraction. Significant signals reside at harmonics of both fundamental rotation frequencies and suggest an antisolar rotation profile. Next we use the missing-data multitaper power spectrum estimator to identify the oscillation modes responsible for the complex "scallop-shell" shape of the K2 light curve of EPIC 203354381. We argue that multitaper power spectrum estimators should be used for all time series with regular observing cadence.

79 ASTRONOMY AND ASTROPHYSICS↗

Update on the United States Advanced Ultra-Supercritical Program with Full Scale Component Fabrication to Develop Utility Scale Power Plants with 760°C Steam Temperature

Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in Phase 2 of a project which includes an advanced manufacturing effort to complete US-based supply chain development for full commercial scale (800-850 MWe) A-USC components made of nickel-based alloys, components operating at up to 760°C. The project, funded under U.S. Department of Energy Award No. DE-FE0025064, falls under the US DOE overall goal to Develop cost-effective, reliable technologies to improve the efficiency of new and existing coal-fired power plants. A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the specific goals of Phase 2 of the ComTest Project are to: validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions accelerate the development of a U.S.-based supply chain for the full complement of A-USC components close the remaining gaps and reduce the risks for manufacturing components from advanced materials for commercial demonstration fabricate full-scale versions of selected key components made of nickel-based alloys validate a qualified U.S. supply chain, to provide greater cost certainty for components obtain American Society of Mechanical Engineers (ASME) code approval for new materials, components and processes Additional benefit: Manufacturing technology will be applicable to other advanced fossil energy high temperature cycles, and can support increased flexibility of existing power plants The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. As stated earlier, the current phase of the effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides some of the technical details on the design of the ComTest components.

01 COAL, LIGNITE, AND PEAT↗

Update on the United States Advanced Ultra-Supercritical Program with Full Scale Component Fabrication to Develop Utility Scale Power Plants with 760°C Steam Temperature

Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in Phase 2 of a project which includes an advanced manufacturing effort to complete US-based supply chain development for full commercial scale (800-850 MWe) A-USC components made of nickel-based alloys, components operating at up to 760°C. The project, funded under U.S. Department of Energy Award No. DE-FE0025064, falls under the US DOE overall goal to Develop cost-effective, reliable technologies to improve the efficiency of new and existing coal-fired power plants. A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the specific goals of Phase 2 of the ComTest Project are to: validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions accelerate the development of a U.S.-based supply chain for the full complement of A-USC components close the remaining gaps and reduce the risks for manufacturing components from advanced materials for commercial demonstration fabricate full-scale versions of selected key components made of nickel-based alloys validate a qualified U.S. supply chain, to provide greater cost certainty for components obtain American Society of Mechanical Engineers (ASME) code approval for new materials, components and processes Additional benefit: Manufacturing technology will be applicable to other advanced fossil energy high temperature cycles, and can support increased flexibility of existing power plants The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. As stated earlier, the current phase of the effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides some of the technical details on the design of the ComTest components.

01 COAL, LIGNITE, AND PEAT↗

Long-term drought promotes invasive species by reducing wildfire severity

Anthropogenic climate change has increased the frequency of drought, wildfire, and invasions of non-native species. Although high-severity fires linked to drought can inhibit recovery of native vegetation in forested ecosystems, it remains unclear how drought impacts the recovery of other plant communities following wildfire. We leveraged an existing rainfall manipulation experiment to test the hypothesis that reduced precipitation, fuel load, and fire severity convert plant community composition from native shrubs to invasive grasses in a Southern California coastal sage scrub system. We measured community composition before and after the 2020 Silverado wildfire in plots with three rainfall treatments. Drought reduced fuel load and vegetation cover, which reduced fire severity. Native shrubs had greater prefire cover in added water plots compared to reduced water plots. Native cover was lower and invasive cover was higher in postfire reduced water plots compared to postfire added and ambient water plots. Our results demonstrate the importance of fuel load on fire severity and plant community composition on an ecosystem scale. Management should focus on reducing fire frequency and removing invasive species to maintain the resilience of coastal sage scrub communities facing drought. In these communities, controlled burns are not recommended as they promote invasive plants.

54 ENVIRONMENTAL SCIENCES↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗