Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight schedules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity (Pilot Egress Fitness)

As NASA prepares for exploration missions, it will be critical to understand and build upon known crew capabilities. Specifically, we need to know the functional capacities of crew at different stages of a mission and characterize these profiles so that the appropriate vehicle requirements and mission concepts of operations (ConOps) can be developed. One of the most complex phases of any missions is when there is a transition between gravity environments. For instance, both physiological adaptation to microgravity and subsequent re-entry into a gravity environment result in reduced functional capacity, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk tasks may have to be performed soon after gravity transitions: •Unassisted capsule egress task after return to Earth •Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study has been broken down into two phases. A pilot phase to assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing and the full Egress Fitness study, which will be part of the CIPHER complement. This study uses a functional task approach to characterize performance of these high-risk tasks in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and mobility to be able to complete the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth based emergency egress out of a functional capsule mockup, and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing can occur almost anytime pre-flight, but post-flight scheduling is much more critical with the capsule egress test occurring 1-4 hours after landing and the planetary EVA approximately 18-36 hours after landing. Data collected for both tasks includes task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed baseline pre-flight testing on 3 astronaut subjects. Post-flight testing of the first two subjects will be completed in November 2021 and the final subject around March 2022. Results and lessons learned from this pilot study will inform the full Egress Fitness study, which will incorporate additional pre-flight sessions, longer EVA tasks, and post-flight testing on R+1, 4, and 7 to characterize the timeframe of recovery

J R Norcross↗

NASA's Quesst Mission Status

Construction of NASA’s X-59 low-boom aircraft is nearing completion with its first flight scheduled within the next several months. The X-59 will be the low-boom noise source for a series of community noise surveys across the USA. The goal of NASA’s Quesst Mission is to collect and correlate noise and perceptual response data to low-loudness sonic booms so that the current prohibition on commercial supersonic aircraft flight overland can be reconsidered. This presentation describes the current state and future plans for the Quesst Mission and Commercial Supersonic Technology. Employment and internship opportunities for students and graduates are also outlined.

X-59↗

Scenario Complexity for Unmanned Aircraft System Traffic

This work introduces an approach to estimate the complexity of a low-altitude air traffic scenario involving multiple UASs using mathematical programming. Given a set of multi-point UAS flight trajectories, vehicle dynamics, and a conflict resolution algorithm, an abstract model is developed such that it can be solved quickly using a mathematical programming optimization software without running high-fidelity simulations that can be computationally expensive and may not suit real-time apA quick and accurate assessment of complexity for a given traffic scenario can help plan and schedule flights to alleviate traffic bottleneck and mitigate operation risks, especially for unmanned aerial system traffic management where high traffic density or complexity is expected. This work introduces a traffic scenario complexity metric that was constructed based on the number of potential conflicts weighted by the conflict resolution cost associated. The cost associated with a conflict is calculated based on the corresponding conflict resolution maneuvers. To obtain the conflict resolution maneuvers, a MILP-based optimization was formulated with the vehicle model and conflict management parameters incorporated. To evaluate the complexity metrics, an approach of using measurements from high-fidelity simulations was proposed. The scenario complexity measurements for 920 random-generated scenarios were obtained through high-fidelity simulations and treated as the ground truth. Two statistics methods: Pearson and Alternative Conditional Expectations were applied for analysis. The results showed that the number of flights has low correlation with the scenario complexity according to the correlation coefficients calculated by both methods. The Alternative Conditional Expectations method shows that the proposed scenario complexity metric has better correlation with the ground truth than the number of potential conflicts.plications. In the abstract model, each vehicle is represented by a time-varied vector associated with position, speed, and heading information. The total extra distance that aircraft need to divert from their original routes to avoid collisions is computed and used to setup a quadratic programming formula. The metrics including the number of conflicts and extra distances travelled by all vehicles are then utilized to estimate the complexity of a given UAS flight scenario. Results and verification against high-fidelity simulations will be provided in the final draft.

traffic complexity↗

Streamlining Payload Integration

Payload integration onto space transport vehicles and the International Space Station (ISS) is a complex process. Yet, cargo transport is the sole reason for any space mission, be it for ferrying humans, science, or hardware. As the largest such effort in history, the ISS offers a wide variety of payload experience. However, for any payload to reach the Space Station under the current process, Payload Developers face a list of daunting tasks that go well beyond just designing the payload to the constraints of the transport vehicle and its stowage topology. Payload customers are required to prove their payload s functionality, structural integrity, and safe integration - including under less than nominal situations. They must also plan for or provide training, procedures, hardware labeling, ground support, and communications. In addition, they must deal with negotiating shared consumables, integrating software, obtaining video, and coordinating the return of data and hardware. All the while, they must meet export laws, launch schedules, budget limits, and the consensus of more than 12 panel and board reviews. Despite the cost and infrastructure overhead, payload proposals have increased. Just in the span from FY08 to FY09, the NASA Payload Space Station Support Office budget rose from $78M to $96M in attempt to manage the growing manifest, but the potential number of payloads still exceeds available Payload Integration Management manpower. The growth has also increased management difficulties due to the fact that payloads are more frequently added to a flight schedule late in the flow. The current standard ISS template for payload integration from concept to payload turn-over is 36 months, or 18 months if the payload already has a preliminary design. Customers are increasingly requiring a turn-around of 3 to 6-months to meet market needs. The following paper suggests options for streamlining the current payload integration process in order to meet customer schedule needs and reduce costs for both the integration support teams and the developers, without reducing quality or compromising safety. Issues for the key integration areas of planning, training, verification, and safety are presented in a Root-Cause Analysis study, with plausible solutions provided that involve technology and tools already available to the ISS community. Although based upon the ISS process, the payload integration techniques outlined herein also offer an integration template for any space transport endeavor.

Lufkin, Susan N.↗

High Capacity Battery Cell Flight Qualified

The High Capacity Battery Cell project is an effort equally funded by the NASA Lewis Research Center and Hughes Space and Communications Company (a unit of Hughes Aircraft Company) to develop and flight qualify a higher capacity nickel hydrogen battery for continuing use on commercial spacecraft. The larger diameter, individual pressure vessel cell will provide approximately twice the power, while occupying the same volume, as the current state-of-the-art nickel hydrogen cell. These cells are also anticipated to reduce battery cost by 20 percent. The battery is currently booked for use on 26 spacecraft, with the first flight scheduled in 1997. A strong requirement for batteries with higher power levels (6 to 12 kW), long life, and reduced cost was identified in studies of the needs of commercial communications spacecraft. With the design developed in this effort, the higher power level was accommodated without having to modify the rest of the existing spacecraft bus. This design scaled-up the existing state-of-the-art nickel hydrogen battery cell from a 3.5-in., 50-Ahr cell to a 5.5-in., 350-Ahr cell. An improvement in cycle life was also achieved by the use of the 26-percent KOH electrolyte design developed by NASA Lewis. The cell design was completed, and flight batteries were built and flight qualified by Hughes Space and Communications Company with input from NASA Lewis. Two batteries were shipped in September 1996 to undergo life cycle testing under the purview of NASA Lewis.

McKissock, Barbara I.↗

Advances in Stereo Photogrammetry Capabilities for in-Situ Ejecta Measurements in Lunar Plume-Surface Interactions

Plume-surface interaction is a critical topic of interest as human spaceflight programs establish a renewed presence on the Moon and push onwards to Mars. The erosion of regolith and high-speed ejection of soil and rocks which occurs during a powered spacecraft landing on lunar or terrestrial bodies can pose serious risks to the vehicle during landing and to existing ground assets. Ground testing campaigns have provided data sets in relevant environments (e.g., low pressure) in tandem with predictive computational model validation. To-date, limited in-situ flight data exists to inform the study of the key phenomena of plume-surface interaction: plume-flow physics, soil erosion, and ejecta dynamics. In two upcoming lunar missions, erosion of the lunar regolith will be measured in-situ using the stereo photogrammetry technique as part of NASA’s Commercial Lunar Payload Services (CLPS) Program. The Stereo Cameras for Lunar Plume Surface Studies (SCALPSS) will use a multiple-camera system to measure the erosion of the lunar regolith due to the vehicles’ rocket engine plumes during descent and after landing. The application of stereo photogrammetry to accurately measure a realistic eroded shape has been validated in laboratory work ahead of the scheduled flights. In preparation for future CLPS, Artemis, or other lunar science missions, recent advancements have been made to measure the ejecta structure and particle dynamics in addition to the erosion of regolith using a SCALPSS-like photogrammetry system. The thickness and ejection angle of entrained soil and dust produced during plume-induced erosion can be used to determine how far debris will travel, and thus how it may impact nearby infrastructure or the landing vehicle itself. The present work highlights the development of this new flight instrumentation capability and its value to advancements in the plume-surface interaction measurement topic for lunar or planetary landings.

Olivia K. Tyrrell↗

Rolling Horizon with K-Position Search Method for Strategic Deconfliction of Package Delivery UAS

In this research, the strategic deconfliction of unmanned aircraft systems for an urban package delivery environment with two depots and multiple drop-off locations is studied. This research aims to formulate a mathematical model to compute both the departure sequence and scheduled time of departure for each unmanned aircraft system at a depot, considering temporal constraints at en-route crossing waypoints and depots for strategic deconfliction. However, the problem formulation results in an NP-hard mixed-integer nonlinear programming problem for the global optimal solution, so instead, a "rolling horizon with𝑘-position search"heuristic method is developed. The simulation studies show that an increase in the value of𝑘(the parameter used to determine the size of the local neighborhood) reduces the average ground delay at the cost of an increase in the computation time for a given problem size. The study also shows an order of magnitude increase in the maximum number of flights scheduled with the integration of rolling horizon (time decomposition) compared to those without the integration of rolling horizon in the heuristic algorithm for a given computation time cut off.

UTM↗

Planning Space Shuttle's maiden voyage

NASA's first Space Shuttle, Columbia, whose technological advances include a space laboratory, navigational and communication satellites, and planetary explorers, is examined, and the first few flights, scheduled for 1980, are described. The Shuttle employs an all-digital, all-electronic, computer-operated avionics system. The onboard data processing and software subsystem, encompassing five computers (four online and one backup), a data-bus network, bus terminals, and software, is analyzed in detail. Attention is given to the basic structure of the Orbiter (37.19 m in length and 23.77 m wingspan), its main engines, and the payload and cargo capacities (29,500 kg). A two-step program that could increase the power and duration of spaceflights is presented. The first step is the creation of a power extension package, using solar arrays, generating electricity to extend the basic five-day flight to 20 days, while the second step uses the same design to create a 25-kW power model capable of providing energy for a 50-day flight. Plans for construction of a manned space construction base and a larger power platform of 250 kW are also presented.

Malkin, M. S.↗

HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler

HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.

Hua, Hook↗

O’Hare Airport Short-Term Ground Transportation Modal Demand Forecast Using Gaussian Processes

Here, the principal objective of this study is to analyze the spatial and temporal variation of ground transportation airport demand and provide demand forecast to inform planning capability and explore alternatives for investments to accommodate airport growth. Because of its good adaptability and strong generalization ability for dealing with high-dimensional input, small-sample, and nonlinear spatial data, Gaussian process (GP) regression is used to provide forecast estimates using data from transportation network company (TNC) trips and urban rail passengers at Chicago's O'Hare International Airport. TNC airport trips differ significantly, with three times more distance, more than twice the travel time, and half of the share requests compared with nonairport trips. This highlights the need for separate demand models. Hourly analysis of the rail service indicates that this is likely heavily used by airport workers, whereas TNC services focus on travelers because of variations in the peak demand hours. Heteroscedastic GP regression is implemented because of differences in trip variance between night and day hours. Estimates are given for weekdays and weekend trips, and the 95% confidence intervals are calculated. The introduction of flight schedule information into the models shows marginal improvements in their performance. However, fitting a GP regression becomes computationally expensive with increased sample size and the introduction of spatial components. Transportation planners and policymakers can use the results and methods implemented in this study to optimize transportation assets and provide long-range simulations of the current and future conditions in the area.

42 ENGINEERING↗

X-Ray and Particle Detection With the Si(Li) Tracker Module of the GAPS Experiment

Here, this work describes the architecture and the experimental results from the characterization of the lithium-drifted silicon (Si(Li)) detector module, which constitutes the building block of the tracker in the general antiparticle spectrometer (GAPS) experiment to search for dark matter. The instrument is designed for the identification of low-energy cosmic anti-nuclei (antiprotons, antideuterons, and antihelium) to be performed during an Antarctic long-duration balloon flight scheduled for late 2025. The GAPS Si(Li) tracker, that is the core of the instrument, is the assembly of 252 modules, each comprised of four Si(Li) detectors and a full custom-integrated circuit designed for detector readout and produced in a commercial 180-nm planar CMOS technology. A general overview of the detector module architecture and its components is provided, together with a description of the test setup and the experimental results obtained from the characterization of the low-noise analog readout channel. In order to verify the effective operation of the entire module, results concerning the detection of X-rays from a 241Am source and cosmic muons are also provided.

Manghisoni, Massimo [Università di Bergamo (Italy)↗

Lunar orbital mission plans.

Lunar orbital mission plans intended to optimize spacecraft procurement, flight schedules, science objectives and available funds

Allenby, R. J.↗

Impact of low cost refurbishable and standard spacecraft upon future NASA space programs. Payload effects follow-on study, appendix

Mission analysis is discussed, including the consolidation and expansion of mission equipment and experiment characteristics, and determination of simplified shuttle flight schedule. Parametric analysis of standard space hardware and preliminary shuttle/payload constraints analysis are evaluated, along with the cost impact of low cost standard hardware.

Source record↗

The space shuttle payload planning working groups. Volume 8: Earth and ocean physics

The findings and recommendations of the Earth and Ocean Physics working group of the space shuttle payload planning activity are presented. The requirements for the space shuttle mission are defined as: (1) precision measurement for earth and ocean physics experiments, (2) development and demonstration of new and improved sensors and analytical techniques, (3) acquisition of surface truth data for evaluation of new measurement techniques, (4) conduct of critical experiments to validate geophysical phenomena and instrumental results, and (5) development and validation of analytical/experimental models for global ocean dynamics and solid earth dynamics/earthquake prediction. Tables of data are presented to show the flight schedule estimated costs, and the mission model.

Source record↗