Search NASA⌕ Search

SEARCH · Search NASA

Results for “injection schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Optimized Trajectory Correction Burn Placement for the NASA Artemis II Mission

The NASA Artemis II mission represents the first time humans plan to return to the lunar vicinity in over 50 years with a crew traveling to the Moon in the Orion spacecraft on a free return trajectory. This first crewed mission of the Artemis program will evaluate human-rated elements of Orion in preparation to sending astronauts to the lunar surface. The selected free-return cislunar trajectory profile that is reminiscent of the Apollo 8 mission that nominally requires no additional translational burns following the trans-lunar injection (TLI) burn. Due to crew activity, maneuver execution errors, navigation uncertainty, orbit insertion errors, disturbance accelerations, and other system limitations; periodic trajectory corrections burns are necessary to ensure proper entry interface (EI) conditions are satisfied for a safe return to Earth. Robust trajectory optimization techniques are utilized to determine the optimized placements for the Artemis II trajectory correction burns that accounts for the crew schedule, both the primary and backup navigation systems, targeting strategies and burn plan configurations, spacecraft venting, thruster selection, and the integrated GN&C performance.

Linear Covariance Analysis↗

Analysis of a hydrocarbon scramjet with augmented preburning

This paper presents the results of a feasibility study of a hydrocarbon scramjet design utilizing an augmented preburner upstream of the main fuel injector locations. The combustor design evaluated here is for a small hypersonic research vehicle. It consists of a preburner into which a small amount of fuel is burned with on-board liquid oxygen and injected into the main airflow, upstream of the main fuel injector locations, thus ensuring that combustion is present and uninterrupted. Two degrees of analysis are presented including a one-dimensional cycle analysis and a complete computational fluid dynamic analysis with finite-rate chemistry and a two-equation turbulence model. Comparison of these analyses show good agreement when the CFD-predicted fuel consumption schedule is used in the cycle analysis.

Molvik, Gregory A.↗

Influence of Fuel Properties on Gasoline Direct Injection Particulate Matter Emissions Over First 200 s of World-Harmonized Light-Duty Test Procedure Using an Engine Dynamometer and Novel “Virtual Drivetrain” Software

Abstract The influence of fuel properties on particulate matter (PM) emissions from a catalytic gasoline particulate filter (GPF) equipped gasoline direct injection (GDI) engine was investigated using novel “virtual drivetrain” software and an engine mated to an engine dynamometer. The virtual drivetrain software was developed in labview to operate the engine on an engine dynamometer as if it were in a vehicle undergoing a driving cycle. The software uses a physics-based approach to determine vehicle acceleration and speed based on engine load and a programed “shift” schedule to control engine speed. The software uses a control algorithm to modulate engine load and braking to match a calculated vehicle speed with the prescribed speed trace of the driving cycle of choice. The first 200 s of the World-harmonized Light-duty Test Procedure (WLTP) driving cycle was tested using six different fuel formulations of varying volatility, aromaticity, and ethanol concentration. The first 200 s of the WLTP was chosen as the test condition because it is the most problematic section of the driving cycle for controlling PM emissions due to the cold start and cold drive off. It was found that there was a strong correlation between aromaticity of the fuel and the engine-out PM emissions, with the highest emitting fuel producing more than double the mass emissions of the low PM production fuel. However, the post-GPF PM emissions depended greatly on the soot loading state of the GPF. The fuel with the highest engine-out PM emissions produced comparable post-GPF emissions to the lowest PM producing fuel over the driving cycle when the GPF was loaded over three cycles with the respective fuels. These results demonstrate the importance of GPF loading state when aftertreatment systems are used for PM reduction. It also shows that GPF control may be more important than fuel properties, and that regulatory compliance for PM can be achieved with proper GPF control calibration irrespective of fuel type.

Energy & Fuels↗

Cryogenic Fuel Valve Testbed Development

The goal for this project is to update the cryogenic valve testbed program in LabVIEW to schedule and automate tests and experiments. By using an automated system, tens or hundreds of tests may be performed. This will ensure that accurate data is being collected for testing of the remaining useful life and end of life predictions. From the data obtained, new diagnostic and prognostic methods will be developed to manage or predict potential leaks which may occur in the future. The Cryogenic valve testbed injects controlled faults into the cryogenic fuel valve system in order to accurately determine failure behavior.

Prognostics↗

The Delta Launch Vehicle Model 2914 Series

The newest Delta launch vehicle configuration, Model 2914 is described for potential users together with recent flight results. A functional description of the vehicle, its performance, flight profile, flight environment, injection accuracy, spacecraft integration requirements, user organizational interfaces, launch operations, costs and reimbursable users payment plan are provided. The versatile, relatively low cost Delta has a flight demonstrated reliability record of 92 percent that has been established in 96 launches over twelve years while concurrently undergoing ten major upratings to keep pace with the ever increasing performance and reliability requirements of its users. At least 40 more launches are scheduled over the next three years from the Eastern and Western Test Ranges.

Gunn, C. R.↗

Dynamic cell culture system (7-IML-1)

This experiment is one of the Biorack experiments being flown on the International Microgravity Laboratory 1 (MIL-1) mission as part of an investigation studying cell proliferation and performance in space. One of the objectives of this investigation is to assess the potential benefits of bioprocessing in space with the ultimate goal of developing a bioreactor for continuous cell cultures in space. This experiment will test the operation of an automated culture chamber that was designed for use in a Bioreactor in space. The device to be tested is called the Dynamic Cell Culture System (DCCS). It is a simple device in which media are renewed or chemicals are injected automatically, by means of osmotic pumps. This experiment uses four Type I/O experiment containers. One DCCS unit, which contains a culture chamber with renewal of medium and a second chamber without a medium supply fits in each container. Two DCCS units are maintained under zero gravity conditions during the on-orbit period. The other two units are maintained under 1 gh conditions in a 1 g centrifuge. The schedule for incubator transfer is given.

Cogoli, Augusto↗

Skeletal muscle metabolism in hypokinetic rats

This grant focused on the mechanisms of metabolic changes associated with unweighting atrophy and reduced growth of hind limb muscles of juvenile rats. Metabolic studies included a number of different areas. Amino acid metabolic studies placed particular emphasis on glutamine and branched-chain amino acid metabolism. These studies were an outgrowth of understanding stress effects and the role of glucocorticoids in these animals. Investigations on protein metabolism were largely concerned with selective loss of myofibrillar proteins and the role of muscle proteolysis. These investigations lead to finding important differences from denervation and atrophy and to define the roles of cytosolic versus lysosomal proteolysis in these atrophy models. A major outgrowth of these studies was demonstrating an ability to prevent atrophy of the unweighted muscle for at least 24 hours. A large amount of work concentrated on carbohydrate metabolism and its regulation by insulin and catecholamines. Measurements focused on glucose transport, glycogen metabolism, and glucose oxidation. The grant was used to develop an important new in situ approach for studying protein metabolism, glucose transport, and hormonal effects which involves intramuscular injection of various agents for up to 24 hours. Another important consequence of this project was the development and flight of Physiological-Anatomical Rodent Experiment-1 (PARE-1), which was launched aboard Space Shuttle Discovery in September 1991. Detailed descriptions of these studies can be found in the 30 peer-reviewed publications, 15 non-reviewed publications, 4 reviews and 33 abstracts (total 82 publications) which were or are scheduled to be published as a result of this project. A listing of these publications grouped by area (i.e. amino acid metabolism, protein metabolism, carbohydrate metabolism, and space flight studies) are included.

Tischler, Marc E.↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Grand Tour missions to the outer solar system with Saturn /Intermediate 20/.

Discussion of the hazards, spacecraft features, time schedules, scientific objectives, and experiment packages which would probably characterize Grand Tour missions to the outer planets. The capabilities of the Saturn Intermediate 20 vehicle and supporting subsystems presently envisioned for such missions are outlined on the basis of comparison with other candidate launch vehicles. Hazard estimates are given for asteroid encounters, on-board and external radiation sources, trajectory perturbations, and operational reliability of equipment. Direct, swingby, and multiplanet missions are discussed in terms of launch opportunities, injection velocities, and flight durations. Measurements which should be carried out are evaluated for relevant contributions to knowledge of the outer planets.

Hale, D. P.↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗

Cartilage formation in the CELLS 'double bubble' hardware

The CELLS experiment scheduled to be flown on the first International Microgravity Laboratory is designed to study the effect of microgravity on the cartilage formation, by measuring parameters of growth in a differentiating cartilage cell culture. This paper investigates the conditions for this experiment by studying cartilage differentiation in the 'bubble exchange' hardware with the 'double bubble' design in which the bubbles are joined by a flange which also overlays the gasket. Four types of double bubbles (or double gas permeable membranes) were tested: injection-molded bubbles 0.01- and 0.005-in. thick, and compression molded bubbles 0.015- and 0.01-in. thick. It was found that double bubble membranes of 0.005- and 0.010-in. thickness supported cartilage differentiation, while the 0.015-in. bubbles did not. It was also found that nodule count, used in this study as a parameter, is not the best measure of the amount of cartilage differentiation.

Duke, P. J.↗

Austere Human Missions to Mars

This slide presentation reviews a possible mission architecture for a more austere Mars mission, than the one developed by NASA outlined in the Design Reference Architecture 5 (DRA 5). "Austere" architecture is scaled back from DRA 5 and might offer lower development cost, lower flight cost, and lower development risk. This approach will not meet all the DRA 5 mission requirements. Included in the presentation are the elements of an Austere mission, diagrams of the trans-Mars injection (TMI), cruise, and Mars Orbital Insertion for various phases of the mission, the entry descent landing (EDL) concept. The key features of the Transit Habitat (TransHab), the Earth Departure Stage (EDS), the landers, are reviewed. A chart shows the Mass in tons, of the conceptual types of Mars Landers. The EDL concept, EDL Phase diagrams for the Mars Lander are reviewed. New technologies that would be required are also reviewed. Flight test programs for the various parts of the architecture and a flight schedule are reviewed.

transit habitat (TransHab)↗

A hybrid architecture for volt-var control in active distribution grids

Modern active distribution grids are characterized by the increasing penetration of distributed energy resources (DERs). The proper coordination and scheduling of a large numbers of these small-scale and spatially distributed DERs is necessary, and warrants the use of novel distributed approaches. In this paper, we propose a hybrid volt-var control architecture for the distribution grid, which leverages existing centralized and local approaches to planning, decision making, and control, and augments it with distributed optimization and distributed control for DER management. First, we propose a convex model to describe the power physics of distribution grids of meshed topology and unbalanced structure, based on current injection and McCormick Envelopes. Second, we employ the distributed proximal atomic coordination (PAC) algorithm to coordinate DERs to provide voltage support. We implement volt-var optimization by optimally coordinating DERs including PV smart inverters and demand response. We present results using the IEEE-34 bus network, using real data from a distribution feeder in Hawaii, to model load and PV generation. Different levels of DER penetration and objective functions are simulated. Finally, our results show the need for the coordination of DERs to improve voltage profiles, even in networks with existing voltage control devices. Further, we show the need for flexible reactive power capabilities to achieve desired grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2023 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

58 GEOSCIENCES↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2024 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

15 GEOTHERMAL ENERGY↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗