DOE OSTI2019
As Hanford celebrates its 75. anniversary, the challenge to complete the cleanup mission and simultaneously prepare for new nuclear operations puts increasing pressure on an infrastructure system that in some places is nearly the same age. While the cleanup mission began in earnest in 1989 and continues today, completing construction of the country's largest Waste Treatment and Immobilization Plant will put nuclear operations back into the Hanford footprint. Ensuring that the infrastructure originally built to support plutonium production as part of the Manhattan Project is the right size and reliable for the remaining missions is a delicate balance of funding priorities, strategy and a predictable project delivery. The DOE Richland Operations Office (DOE-RL) and other sites across the DOE complex have recognized the need for increased investment in site infrastructure. Combined with this increasing need is the funding reality of variable fiscal budgets that creates challenges for even the best strategists. The current Hanford infrastructure priority list has approximately 100 reliability projects with a combined value over $380 million dollars. At current funding levels, there is a 10 to 15-year backlog. To meet this challenge head on, DOE-RL and Mission Support Alliance (MSA) regularly evaluate project priorities and ongoing maintenance actions to ensure the highest risk systems are addressed. This is done by integrating historical and operational knowledge, system health reports, and maintenance records then coordinating with the Facility Information Management System (FIMS). Sometimes with decades old infrastructure, it can seem as if everything is a number one priority. Recently, in a random testing of approximately 20% of the wooden power poles on site, approximately 92% of the poles were found to be in satisfactory condition with 8% percent failing. MSA Electrical Utilities group immediately replaced one pole, found to have only 8% strength remaining. This type of severely degraded infrastructure is not conducive to reliable mission execution. Given the historical prioritization of funding for cleanup, then operations, followed by infrastructure, it is not surprising that the commitment of funds on infrastructure projects such as sewer collection systems or replacing old electrical transformers has been hard fought. The acknowledgement and re-prioritization of limited funds will work towards creating a more reliable and sustainable infrastructure portfolio that will support and even enhance the cleanup and operations missions. This paper/presentation will outline Hanford's approach to executing reliability projects that will serve the remaining missions on site for years to come. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗