Search NASA⌕ Search

SEARCH · Search NASA

Results for “large office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Prioritization of engineering support requests and advanced technology projects using decision support and industrial engineering models

The evaluation and prioritization of Engineering Support Requests (ESR's) is a particularly difficult task at the Kennedy Space Center (KSC) -- Shuttle Project Engineering Office. This difficulty is due to the complexities inherent in the evaluation process and the lack of structured information. The evaluation process must consider a multitude of relevant pieces of information concerning Safety, Supportability, O&M Cost Savings, Process Enhancement, Reliability, and Implementation. Various analytical and normative models developed over the past have helped decision makers at KSC utilize large volumes of information in the evaluation of ESR's. The purpose of this project is to build on the existing methodologies and develop a multiple criteria decision support system that captures the decision maker's beliefs through a series of sequential, rational, and analytical processes. The model utilizes the Analytic Hierarchy Process (AHP), subjective probabilities, the entropy concept, and Maximize Agreement Heuristic (MAH) to enhance the decision maker's intuition in evaluating a set of ESR's.

Tavana, Madjid↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of WELL certification on occupant satisfaction and perceived health, well-being, and productivity: A multi-office pre- versus post-occupancy evaluation

The WELL Building Standard (WELL) is currently one of the most comprehensive building certification programs that aim to enhance the health and well-being of building occupants. However, there is a lack of systematic evaluation of the effectiveness of WELL in achieving its goal. This study investigates the impact of WELL certification on occupant satisfaction with the workplace and occupant perceived health, well-being, and productivity. More than 1300 pre- and post-occupancy survey responses provided by the nearly same cohort of occupants from six companies in North America were quantitatively analyzed. The results showed that transitioning to WELL certified offices from non-WELL certified offices had a positive impact on occupant satisfaction with the workplace and occupant perceived health, well-being, and productivity, with increases in means from pre-to post-occupancy being highly statistically significant. The majority of the studied occupant satisfaction parameters as well as occupant perceived mental health had large effect sizes. While they improved from pre-to post-occupancy, the analysis revealed small effect sizes for occupant perceived physical health and self-assessed productivity. The majority of the effect sizes for the perceived well-being parameters were large and medium. In addition to analyzing the survey responses in aggregate, the responses were examined at the individual company level to confirm the by-company and aggregate findings aligned.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NASA Funding Opportunities for Optical Fabrication and Testing Technology Development

Technologies to fabricate and test optical components are required for NASA to accomplish its highest priority science missions. For example, the NRC ASTRO2010 Decadal Survey states that an advanced large-aperture UVOIR telescope is required to enable the next generation of compelling astrophysics and exo-planet science; and that present technology is not mature enough to affordably build and launch any potential UVOIR mission concept. The NRC 2012 NASA Space Technology Roadmaps and Priorities report states that the highest priority technology in which NASA should invest to 'Expand our understanding of Earth and the universe' is a new generation of astronomical telescopes. And, each of the Astrophysics division Program Office Annual Technology Reports (PATR), identifies specific technology needs. NASA has a variety of programs to fund enabling technology development: SBIR (Small Business Innovative Research); the ROSES APRA and SAT programs (Research Opportunities in Space and Earth Science; Astrophysics Research and Analysis program; Strategic Astrophysics Technology program); and several Office of the Chief Technologist (OCT) technology development programs.

Stahl, H. Philip↗

Factors Influencing Building Demand Flexibility

The U.S. Department of Energy’s National Roadmap for Grid-interactive Efficient Buildings (GEB) acknowledged that building demand flexibility (DF) is both an important strategy to decarbonizing the buildings sector and an important resource for meeting the changing needs of the electrical grid such as improving grid reliability. However, understanding the complexity and uncertainties in real building field performance of DF strategies is a large gap hindering stakeholders on both grid and buildings side to make investments on deploying such strategies. The research work in this report intended to advance understanding of the variability and influential factors in building demand flexibility. Adding such knowledge based on lab testing results and measured performance data from real buildings is an important contribution. The report uses standardized metrics and methods to quantify DF performance from field-measured DF datasets of two significant building groups of big-box retail and medium office buildings to present the challenge of building DF variability in multiple dimensions. The report presents findings related to how several key factors influence building demand flexibility from implementing a common, cost-effective DF control strategy (i.e., adjusting zone temperatures). The findings are supported by full-scale lab testing, field data analysis and simulation research. The authors also provided application-oriented recommendations to stakeholders such as building aggregators, utility program design professionals, sophisticated building portfolio owners, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA Funding Opportunities for Optical Fabrication and Testing Technology Development

NASA requires technologies to fabricate and test optical components to accomplish its highest priority science missions. The NRC ASTRO2010 Decadal Survey states that an advanced large-aperture UVOIR telescope is required to enable the next generation of compelling astrophysics and exo-planet science; and, that present technology is not mature enough to affordably build and launch any potential UVOIR mission concept. The NRC 2012 NASA Space Technology Roadmaps and Priorities Report states that the highest priority technology in which NASA should invest to 'Expand our understanding of Earth and the universe' is next generation X-ray and UVOIR telescopes. Each of the Astrophysics division Program Office Annual Technology Reports (PATR) identifies specific technology needs. NASA has a variety of programs to fund enabling technology development: SBIR (Small Business Innovative Research); the ROSES APRA and SAT programs (Research Opportunities in Space and Earth Science; Astrophysics Research and Analysis program; Strategic Astrophysics Technology program); and several Office of the Chief Technologist (OCT) programs

Stahl, H. Philip↗

Cybersecurity Lessons Learned from Vehicle to Grid Engagement

As the transportation industry continues to become electrified, introduction of additional digital devices within associated actions such as recharging bring additional potential for cybersecurity attacks. Devices that are designed, implemented, and operated with cybersecurity as a crucial consideration exacerbate these concerns by failing to provide strict boundaries on access to and use of the equipment. Emerging use cases such as Vehicle to Grid (V2G) charging may expand the potential physical effects of a cybersecurity attack by providing indirect access to electrical components of a building microgrid or portions of the larger power grid. This paper serves as an overview of findings and recommendations based on cybersecurity testing performed at a V2G implementation site operated by a member of the Memorandum of Understanding (MOU) to Establish the Vehicle-to-Everything (V2X) Collaboration [1]. The Department of Energy Office of Cybersecurity, Energy Security, and Emergency Response is a signatory of the MOU, and has funded this research paper and associated body of work regarding V2X cybersecurity. Sandia has a large background of previous research focused on Electric Vehicle (EV) cybersecurity, such as reference [2], which includes an overall survey of EV infrastructure cybersecurity and recommendations based on those findings. This report seeks to expand knowledge of EV cybersecurity status and needs by focusing on a specific implementation of V2G charging, and providing recommendations based on the relevant findings. This report serves as a publicly available, sanitized description of applied vulnerability testing on an operational V2G implementation. A more in-depth technical version of the report is provided to the MOU partner, but not available at the time of writing due to inclusion of proprietary information. V2G charging comes with many research problems that must be solved before the technology can securely implemented in sites with unrestricted public access or where cybersecurity attacks could have increased consequences, such as government offices. V2G charging requires many stakeholders such as end users, host sites, equipment vendors, and integrators, which all rely on operational safety and security as well as security and trustworthiness of any associated financial transactions.

33 ADVANCED PROPULSION SYSTEMS↗

Mitigation for roof alterations to building 06-cp-65 at the area 6 control point, nevada national security site, nye county, nevada

Building 06-CP-65 has been determined to be a contributing element to the Area 6 Control Point Historic District (O’Neill et al. 2021; Reed 2022). It contributes to the significance of the historic district under Criterion A as one of the principal buildings that supported timing and firing operations for nuclear testing on the NNSS from 1966 to 1992. As such, the building served as a major warehouse with office space within the district. It was used by both REECo, a long-time general contractor at the NNSS, as well as EG&G, which provided technical support to the national laboratories and the DOD. The building served as an important staging area and electrical power supply point for the NNSS diagnostic trailer fleet and its unique location immediately along Mercury Highway allowed easy accessibility to the forward areas of the NNSS. The building also contributes to the historic district under Criterion C as it is one of the large, unadorned, precast concrete buildings at the Control Point. These types of buildings were the prominent elements of the compound that convey the district’s overall utilitarian, military-industrial character. Building 06-CP-65 retains all aspects of integrity to a high degree and easily conveys its significance as a warehouse that supported Control Point operations. Building 06-CP-65 is not recommended eligible for listing in the NRHP as an individual resource. While it served an important support function as part of the Control Point Historic District, an archival and literature review did not reveal information linking it to any specific test, series of tests, programs, or for any specific role on the NNSS other than as a warehouse (Criterion A). It has no direct association with any important individual (Criterion B). It also is not architecturally significant in its own right beyond reflecting the overall aesthetic of the Control Point Historic District (Criterion C), and it does not have potential to yield information important to the history of nuclear testing beyond what can be learned from historic texts, drawings, and other documents (Criterion D).

54 ENVIRONMENTAL SCIENCES↗

Summary of NASA Lewis Research Center solar heating and cooling and wind energy programs

Plans for the construction and operation of a solar heating and cooling system in conjunction with a office building being constructed at Langley Research Center, are discussed. Supporting research and technology includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. The areas of a wind energy program that are being conducted include: design and operation of a 100-kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.

Vernon, R. W.↗

The Office of the Materials Division

I was assigned to the Materials Division, which consists of the following branches; the Advanced Metallics Branch/5120-RMM, Ceramics Branch/5130-RMC, Polymers Branch/5150-RMP, and the Durability and Protective Coatings Branch/5160-RMD. Mrs. Pamela Spinosi is my assigned mentor. She was assisted by Ms.Raysa Rodriguez/5100-RM and Mrs.Denise Prestien/5100-RM, who are both employed by InDyne, Inc. My primary assignment this past summer was working directly with Ms. Rodriguez, assisting her with setting up the Integrated Financial Management Program (IFMP) 5130-RMC/Branch procedures and logs. These duties consisted of creating various spreadsheets for each individual branch member, which were updated daily. It was not hard to familiarize myself with these duties since this is my second summer working with Ms Rodriguez at NASA Glenn Research Center. RMC ordering laboratory, supplies and equipment for the Basic Materials Laboratory (Building 106) using the IF'MP/Purchase Card (P-card), a NASA-wide software program. I entered into the IFMP/Travel and Requisitions System, new Travel Authorizations for the 5130-RMC Civil Servant Branch Members. I also entered and completed Travel Vouchers for the 5130-RMC Ceramics Branch. I assisted in the Division Office creating new Emergency Contact list for the Materials Division. I worked with Dr. Hugh Gray, the Division Chief, and Dr. Ajay Misra, the 5130-RMC Branch Chief, on priority action items, with a close deadline, for a large NASA Proposal. Another project was working closely with Ms. Rodriguez in organizing and preparing for Dr. Ajay K. Misra's SESCDP (two year detail). This consisted of organizing files, file folders, personal information, and recording all data material onto CD's and printing all presentations for display in binders. I attended numerous Branch meetings, and observed many changes in the Branch Management organization.

Ramsey, amanda J.↗

Field Performance of Commercial Building Load Flexibility Using Model Predictive Control

Model Predictive Control (MPC) applied to buildings is starting to see some commercial adoption by companies. However, it is hard to estimate if relative energy cost savings are enough to justify the cost of MPC implementation with few reported demonstrations. In small commercial and residential buildings, a one size-fits-all solution can help reduce implementation costs, while in very large buildings or districts the potential energy cost savings magnitude can cover more tailored solutions. This estimation becomes harder for medium to large commercial buildings, where a one-size-fits-all solution cannot be adopted and potential energy cost savings might not be sufficient to cover a tailored solution. Therefore, value propositions in addition to energy efficiency alone can make MPC technology more attractive through additional energy cost savings. One such value proposition is load shifting in response to dynamic electricity prices. On this aspect, MPC is a key technology to unlock building thermal mass for energy flexibility in response to electric grid conditions. This study shows the experimental results of MPC control of an office building in Berkeley, where different dynamic electricity price profiles were used in the MPC objective function to shift the building load and to calculate hypothetical electricity costs. Results show potential 50% cost savings with respect to the existing controller with the dynamic price scenario.

Zanetti, Ettore↗

IAC Abstract for Orbital Debris Phase II Report

Orbital debris poses a growing risk for spacecraft operations. This risk has most often been measured by proxies, like the number of debris or expected collisions, but few have attempted quantify the consequences of orbital debris or the costs and benefits of different methods to address the problem. This has made it difficult to assess the trade-offs and relative value among proposed actions for the mitigation, tracking, and remediation of debris. In March of 2023, the NASA Office of Technology, Policy, and Strategy (OTPS) took a step toward quantifying these relative values when we released Cost and Benefit Analysis of Orbital Debris Remediation. Since that time, OTPS has continued to build on this work. We have increased the fidelity of our risk model. For example, we added an ensemble of risk models that use varying assumptions of debris populations and lethality, included debris as small as 1mm, and incorporated atmospheric drag to naturally deorbit debris. We have also expanded our cost-benefit calculations to include action that mitigate and track debris, both large and small. The analysis has several important findings regarding the conditions under which debris remediation is more cost-effective than mitigation and tracking, the value of increased shielding of spacecraft and faster timelines for post-mission disposal, and how changes in the portfolio have interdependent effects. This presentation summarizes the body of work, with a particular focus on the risks and benefits to the global spacecraft population.

orbital debris↗

Methodology and analytical approach to investigate the impact of building temperature setpoint schedules

This work presents a method for generating a large set of stochastically varying temperature setpoint schedules for building performance simulations. It analyses tradeoffs resulting from specific changes to those schedules in terms of three quantities: total electricity consumption per day; maximum hourly electricity consumption per day and predicted percentage dissatisfied (occupant thermal comfort). The method for generating schedules requires a single base schedule as the starting point and, using a few clearly defined parameters, transforms it into a set of schedules that can be used for modelling an existing building stock or for performing parametric studies. Temperature setpoint schedules are generated and simulated for a small office building in a cool-dry climate in three different case studies pertaining to changing temperature setpoint schedules. Tradeoffs between the three output metrics are significant and vary based on the temperature setpoint schedules and the time of the year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Building Operating System Platform

The U.S General Services Administration's (GSA's) Green Proving Ground program, in partnership with the National Renewable Energy Laboratory. completed a large pilot study of an Energy Management Information Systems (EMIS) with Automated System Optimization (ASO). Four test bed facilities, each with different building characteristics and systems, were chosen for the implementation of cloud-based EMIS with ASO. Depending on functionality, this tool can be extremely effective in energy management and energy optimization in buildings. The capabilities evaluated in the pilot ranged from energy savings and energy consumption predictions to evaluations of user acceptance, operability, and ease of installation. This report presents the methodology, lessons learned and best practices, and deployment recommendations for the GSA's portfolio of commercial office space, comprising more than 8,500 properties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons Learned: Summary of Insights From the HERO WEC and Waves to Water Deployments Between 2022 and 2024

In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.

16 TIDAL AND WAVE POWER↗

Space Launch System Co-Manifested Payload Options for Habitation

The Space Launch System (SLS) has a co-manifested payload capability that will grow over time as the launch vehicle matures and planned upgrades are implemented. The final configuration is planned to be capable of inserting a payload greater than 10 metric tons (mt) into a trans-lunar injection trajectory along with the crew in the Orion capsule and its service module. The co-manifested payload is located below the Orion and its service module in a 10 m high fairing similar to the way the Saturn launch vehicle carried the lunar lander below the Apollo command and service modules. Various approaches that utilize this comanifested payload capability to build up infrastructure in deep space have been explored in support of future asteroid, lunar, and Mars mission scenarios. This paper reports on the findings of the Advanced Concepts Office study team at NASA Marshall Space Flight Center (MSFC) working with the Advanced Exploration Systems Program on the Exploration Augmentation Module Project. It includes some of the possible options for habitation in the co-manifested payload volume of the SLS. Findings include a set of module designs that can be developed in 10 mt increments to support these co-manifested payload missions along with a comparison of this approach to a large-module payload flight configuration for the SLS.

Smitherman, David↗

WPTO Navigator

Protecting hydroelectric plants from incidents that adversely impact their cyber-physical systems presents unique challenges due to the plants’ widely dispersed geographic locations and varied configurations as well as the relative nascent nature of the cyberattacks targeting these facilities. To help hydroelectric plants better respond to and mitigate cybersecurity incidents, this Department of Energy Water Power Technologies Office Navigator aligns the processes within the National Institute of Standards 800-61r2 Computer Security Incident Handling Guide with the emergency actions within the FEMA 64 Emergency Action Plan Framework. This work is to be used at a hydroelectric plant to quickly understand how the plant responds to a cyber incident in relationship to the actions involved in an emergency action plan involving a hydroelectric plant. In addition to this product, there are three other products meant to be distributed to a hydroelectric plant to assist in their cyber incident response and recovery. The first, a report on the processes of building a R&R flip book based on a large set of existing guidance. The second, a handy flip book meant to be distributed to hydroelectric plants to assist them during a cybersecurity incident occurring on a hydroelectic plant. And the third is a comprehensive set of resources to assist an operator in locating appropriate guidance during the recovery process.

13 HYDRO ENERGY↗

Modified Fittings Enhance Industrial Safety

Kennedy Space Center is not only home to one of the largest buildings in the world - the massive Vehicle Assembly Building - it also hosts a number of one-of-a-kind facilities. The more than 30-mile-long campus has witnessed every launch from the Space Shuttle Launch Pad, as well as many homecomings at the Shuttle Landing Facility. Just as important, the Space Station Processing Facility (SSPF) has seen each element of the International Space Station (ISS) that passes through Kennedy before it goes into orbit. The SSPF is where ISS components are checked, tested, and adjusted before being packed into the Space Shuttle for transport. In an environment like the SSPF - spanning 457,000 square feet of processing areas, operational control rooms, laboratories, logistics areas, and office space - large workstands and equipment used to support the processing of ISS components need to be moved around the facility. One of the devices employed for this task is an air pallet. An air pallet moves on cushions of air instead of wheels. Compressed air inflates the cushions underneath the pallet and is then expelled through exhaust holes. This forms a thin film of air between the cushions and the floor, lifting the platform off the floor and making it easy to move the heavy workstands, equipment, and ISS components. Concerned with the safety of the connections on the pressurized air hoses used for the air pallets, engineers at Kennedy modified an existing commercial cam and groove fitting to control the air supply hose in the event of an accidental release of a pressurized hose. This modification prevented the hose from detaching and, propelled by compressed air, striking workers or equipment. "At the time, these were not available on commercial coupling halves, so NASA made a modification and then put them into use. If a worker were to accidentally try to remove a pressurized hose from the pallet, it no longer rapidly separated, and it safely relieved the pressure," says Paul Schwindt, an engineer at Kennedy who together with Alan Littlefield, also an engineer at Kennedy, designed the modification.

Source record↗