Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch lock”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Evaluation of GPS Coverage for the X-33 Michael-6 Trajectory

The onboard navigational system for the X-33 test flights will be based on the use of measurements collected from the Embedded Global Positioning System (GPS)/INS system. Some of the factors which will affect the quality of the GPS contribution to the navigational solution will be the number of pseudorange measurements collected at any instant in time, the distribution of the GPS satellites within the field of view, and the inherent noise level of the GPS receiver. The distribution of GPS satellites within the field of view of the receiver's antenna will depend on the receiver's position, the time of day, pointing direction of the antenna, and the effective cone angle of the antenna. The number of pseudorange measurements collected will depend upon these factors as well as the time required to lock onto a GPS satellite signal once the GPS satellite comes into the field of view of the antenna and the number of available receiver channels. The objective of this study is to evaluate the GPS coverage resulting from the proposed antenna pointing directions, the proposed antenna cone angles, and the effects due to the time of day for the X-33 Michael-6 trajectory from launch at Edwards AFB, California, to the start of the Terminal Area Energy Management (TAEM) phase on approach to Michael AAF, Utah.

Lundberg, John B.↗

A multipurpose satellite ejection system

A design is presented for a pneumatic ejection system capable of ejecting a spin stabilized satellite from the cargo bay of space vehicles. This system was orginally designed for use on the Spacelab 6 shuttle mission, but is now being considered for use with expendable rockets for launching satellites. The ejection system was designed to launch a 150 lb satellite at an initial ejection velocity of 32 ft/sec with a spin rate of 30 rev/min. The ejection system consists of a pneumatic cylinder, satellite retaining mechanism, and bearing assembly to allow the satellite to rotate during the spin up phase. As the cylinder is pressurized rapidly causing movement of the actuation piston, the mechanism automatically releases the spinning satellite by retracting a pneumatic locking pin and three spring loaded holddown pins. When the piston reaches the end of its stroke, it encounters a crushable aluminum honeycomb shock absorber which decelerates the piston and retaining mechanism. The assembly is designed for multiple uses except for the crushable shock absorber and pyrotechnic valves. The advantage of the design is discussed and patent no. and date given.

Moore, Michael B.↗

Trajectory design for the Mars Reconnaissance Orbiter Mission

This paper describes the analysis and design evolution of the Mars Reconnaissance Orbiter trajectory from launch to end-of-mission. The mission uses a combination of propulsive maneuvers and aerobraking techniques to deliver the orbiter to a low-altitude frozen orbit at Mars. The launch/arrival space for the 2005 Earth-Mars opportunity will be described as well as the particular launch strategy chosen for this mission. Details of the aerobraking profile will be provided. Finally, the Primary Science Orbit will be examined, and the trade-offs between science objectives and orbiter capability will be presented.

Mars↗

Potential campaign architectures and mission design challenges for near-term international Mars Sample Return mission concepts

Mars Sample Return (MSR) continues to be a high priority in the planetary science community and a decades-long goal of international planetary exploration programs. Options for architectures and mission concepts are currently under study by NASA and ESA to find potential partnership opportunities to achieve MSR in the 2020s. The major elements of a potential MSR campaign have significant architectural flexibility and mission launch, arrival, and return options. The decision criteria often depend on mission design and functional allocations across many elements. This paper outlines the reference architecture and key trades among the campaign elements.

Olikara, Zubin↗

Strategies to improve phase-stability of ultrafast swept source optical coherence tomography for single shot imaging of transient mechanical waves at 16 kHz frame rate

We present single-shot phase-sensitive imaging of propagating mechanical waves within tissue, enabled by an ultrafast optical coherence tomography (OCT) system powered by a 1.628 MHz Fourier domain mode-locked (FDML) swept laser source. We propose a practical strategy for phase-sensitive measurement by comparing the phases between adjacent OCT B-scans, where the B-scan contains a number of A-scans equaling an integer number of FDML buffers. With this approach, we show that micro-strain fields can be mapped with ∼3.0 nm sensitivity at ∼16 000 fps. The system's capabilities are demonstrated on porcine cornea by imaging mechanical wave propagation launched by a pulsed UV laser beam, promising non-contact, real-time, and high-resolution optical coherence elastography.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The ordnance transfer interrupter: A new type of S & A device

A discussion is given in this paper of a new approach to the Safing and Arming of aerospace ordnance systems interconnected by detonation transfer lines, in which the conventional type of S&A device normally used for this purpose is replaced by a relatively simple electro-mechanical switching device, referred to as an 'Interrupter.' In this approach the Interrupter, which is interposed in the transfer line between the system initiator and output device, is completely passive in that it contains no pyrotechnic devices or materials. Being passive (therefore, non-initiating), the Interrupter is much less hazardous to handle and install, as well as being significantly less complex and costly than conventional S&A devices containing EED's and explosive leads. Details are presented relative to the design, development and qualification, by PS/EDD, of an ordnance transfer Interrupter intended for use on a commercial launch missile. This device, which is capable of simultaneously 'switching' multiple detonation transfer lines, incorporates a rod-type rotary barrier with independent transverse apertures for each transfer line. Barrier actuation is bi-modal, i.e., the barrier can be driven from safe-to-arm or from arm-to-safe positions by independent electro-mechanical actuators. The Interrupter described also features visual and remote status monitoring provisions and, in common with range-approved conventional S&A devices, a pre-flight safety locking mechanism functioned by a removable safing key.

Greenslade, John T.↗

Olympus propagation studies in the US: Receiver development and the data acquisition system

Virginia Tech has developed two types of receivers to monitor the Olympus beacons, as well as a custom data acquisition system to store and display propagation data. Each of the receiver designs uses new hybrid analog/digital techniques. The data acquisition system uses a stand alone processor to collect and format the data for display and subsequent processing. The launch of the Olympus satellite with its coherent beacons offers new opportunities to study propagation effects at 12.5, 20, and 30 GHz. At Virginia Tech, the satellite is at 14 degrees in elevation, which allows us to measure low elevation angle effects. However, to make these measurements, a very accurate and stable measurement system is required. Virginia Tech has constructed a complex receiving system which monitors the Olympus beacons and all parameters associated with propagation research. In the current configuration, researchers have developed a receiver which frequency locks to the less fade susceptible 12.5 GHz beacon. Since all beacons on the satellite are driven from a single master oscillator, drift in the 12.5 GHz beacon implies corresponding drifts in the 20, and 30 GHz beacons. The receivers for the 20 and 30 GHz systems derive their frequency locking information from the 12.5 GHz system. This widens the dynamic range of the receivers and allows the receivers to maintain lock in severe fade conditions. In addition to monitoring the beacons, the sky noise is monitored with radiometers at each frequency. The radiometer output is used to set the clear air level for each beacon measurement. Researchers also measure the rain rate with several tipping bucket rain gauges placed along the propagation path.

Mckeeman, John C.↗

Foldable self-erecting joint

The invention relates to a foldable self erecting joint which may be used to deploy the tetratruss frame of the proposed shuttle launched triangular space station. The frame must be folded into the payload bay of the space shuttle orbiter. To deploy the frame the tubes are automatically unfolded and once in position should remain safely. A pair of hinged, tubular members in which the hinging is located at corresponding portions of the members are used. The opposite edge portions are connected by spring-based toggle links which in the unfolded position of the members are nested against one of the members in substantial alignment and over-center for securely locking the joint in the unfolded position.

Pelischek, T. E.↗

STS-114: Discovery Day 5 Post MMT Briefing

Wayne Hill, Space Shuttle Deputy Program Manager, and Chair of the Mission Management Team, reports the following: the testing of the thermal protection system in space, on orbit was successful; the MMT meeting formally approved the mission extension for one day; image analysis from the launch phase has been completed; tile and blankets had been formally cleared by the Engineering team; additional inspection of the reinforced carbon-carbon (RCC); gap filler, heat shield and small black spot phenomenon are carefully inspected and evaluated to prepare the safe return of the Discovery. Bill Gerstenmaier, ISS Program Manager reports on the extra vehicular activities (EVA): replaced the GPS antenna; prepared the airlock to attach the ESP2; re-powered CMG2; transfer of CWCs; and the MISSE packages were wrapped around thru at the end of the air lock. He mentioned the high currents problem seen on CMG3, which they will have to take off line to check and understand the problem. Consumables, engineering performance of the three sensors (LCS, LDRI, ITVC), CMG removal and replacement, EVA2 and EVA3, gap fillers, RCC, hydrogen tank pre-press cycles, thermal protection system, inspection, ISS supply maintenance, and projection of next flight are topics covered with the News Media.

Source record↗

Investigation of Atmospheric Boundary-Layer Effects on Launch-Vehicle Ground Wind Loads

A launch vehicle ground-wind-loads program is underway at the NASA Langley Transonic Dynamics Tunnel. The objectives are to quantify key aerodynamic and structural characteristics that impact the occurrence of large wind-induced oscillations of a launch vehicle when exposed to ground winds prior to launch. Of particular interest is the dynamic response of a launch vehicle when a von Kármán vortex street forms in the wake of the vehicle resulting in quasiperiodic lift and drag forces. Vehicle response to these quasiperiodic forces can become quite large when the frequency of vortex shedding nears that of a lowly-damped structural mode thereby exciting a resonant response. Wind approaching the vehicle can be characterized by a varying speed with height and turbulence content. The combination of both the varying speed and turbulence content is referred to herein as the atmospheric boundary-layer. The importance of the atmospheric boundary-layer upon launch vehicle wind-induced oscillation response has long been questioned, and its effects are not well understood. Although there are several facilities around the world dedicated to replicating atmospheric boundary layers, the development of such a boundary layer in a wind tunnel capable of producing flight-representative Reynolds numbers for aeroelastically-scaled launch vehicle models has only recently been accomplished. The NASA Langley Transonic Dynamics Tunnel is capable of simulating flight-representative Reynolds numbers of launch vehicles on the pad and is uniquely capable of replicating many fluid-structure scaling parameters typical of aeroelastic tests. Recent test efforts successfully developed representative atmospheric boundary-layers for three launch sites in the Transonic Dynamics Tunnel, thereby allowing all known aerodynamic and fluid-structure coupling parameters to be simultaneously simulated for those sites. Dynamic aeroelastically-scaled models representative of typical large launch vehicles were constructed for testing. Aeroelastic scaling includes matching geometry, mode shapes, reduced frequencies, damping, running mass ratios, and running stiffness ratios. The models were tested in smooth uniform flow and then immersed in the atmospheric boundary-layer for comparison of these effects. Dynamic data were acquired measuring unsteady pressure, acceleration, and base bending moment. It was discovered that peak dynamic loads resulting from resonant wind-induced oscillation response are similar when acquired in either smooth uniform flow or an atmospheric boundary-layer. This indicates that resonant lock-in events are minimally impacted by representative turbulence and/or wind profile. Alternately, nonresonant wind-induced oscillation response events are stronger when acquired in an atmospheric boundary-layer. This indicates that a lowly-damped structural response will increase when exposed to an increased magnitude of random excitation, which is consistent with historical comparisons. Loads created by the resonant response events were substantially stronger than those from the nonresonant response events. Therefore, if testing is done to simply identify worst-case conditions and load magnitude, then smooth uniform flow is likely an adequate test technique. However, if nonresonant response loads are of primary interest, then atmospheric boundary-layer simulation is required.

Thomas G Ivanco↗

Device for Locking a Control Knob

A simple, effective, easy-to-use device locks a control knob in a set position. In the initial application for which this device was conceived, the control knob to be locked is that of a needle valve. Previously, in that application, it was necessary for one technician to hold the knob to keep the valve at the desired flow setting while another technician secured the valve with safety wire -- a time-consuming procedure. After attachment of the wire, it was still possible to turn the knob somewhat. In contrast, a single technician using the present device can secure the knob in the desired position. in about 30 seconds, and the knob cannot thereafter be turned, even in the presence of harsh vibrations, which occur during space shuttle launch. The device includes a special-purpose clamp that fits around the control knob and its shaft and that can be tightened onto the knob, without turning the knob, by means of two thumbscrews. The end of the device opposite the clamp is a tang that contains a slot that, in turn, engages a bolt that protrudes from the panel on which the control knob and its shaft are mounted.

Grom, Dave↗

Analysis of architectures for the scientific exploration of Enceladus

In 2007, a JPL Rapid Mission Architecture (RMA) analysis team identified and evaluated a broad set of mission architecture options for a suite of scientific exploration objectives targeting the Saturnian moon Enceladus. Primary science objectives were largely focused on examination of the driving mechanisms and extent of interactions by the plumes of Enceladus recently discovered by Cassini. Investigation of the architectural trade space spanned a wide range of options, from high-energy flybys of Enceladus as a re-instrumented expansion on the Cassini mission, to more complex, multi-element combinations of Enceladus orbiters carrying multiple variants of in-situ deployable systems. Trajectory design emerged as a critical element of the mission concepts, enabling challenging missions on Atlas V and Delta IV-Heavy class launch vehicles. Various Enceladus Flagship-class mission concepts identified were analyzed and compared against several first-order figures of merit, including mass, cost, risk, mission timeline, and associated science value with respect to accomplishment of the full set of science objectives. Results are presented for these comparative analyses and the characterization of the explored trade space.

Strange, N.↗

Simulaneous optimization of spacecraft and trajectory design for interplanetary missions utilizing solar electric propulsion

A major challenge in formulating interplanetary mission concepts utilizing electric propulsion is the large number of trajectory variables that must be considered (thrust profile, flyby options, launch vehicle delivery), all of which are affected by spacecraft design variables (power, mass, thruster, payload, staging). This is significantly more complex than traditional ballistic/chemical mission design and early concepts are often suboptimal as a result, potentially missing valuable options. This paper presents a novel tool (MORT) for simultaneously optimizing the spacecraft design alongside the trajectory given mission constraints and objectives, including example results relevant to the exploration of Mars.

Lock, Rob↗

41-G Mission Report - Summary

Challenger's sixth flight launched from KSC at 6:03 CDT October 5, 1984. It returned to Kennedy eight days later, landing on October 13th. Since 41-G was a planned EVA flight, two prime EMUs and one backup short EMU were stowed in the Airlock. No MMUs were carried. Astronaut A and Astronaut B successfully accomplished their 3 l/2 hour EVA on October 11th, Flight Day 7 of the mission. This EVA took place the day after the EMU Checkout and Maintenance Recharge activities. During this time Astronaut A and Astronaut B completed the planned installation of the Orbital Refueling System Ball Valve mod kit as well as an unplanned activity of locking the gimbals on the Ku-Band antenna. They each performed quite well in their EMUs.

Source record↗

Management of Asymptomatic Renal Stones in Astronauts

Introduction: Management guidelines were created to screen and manage asymptomatic renal stones in U.S. astronauts. The risks for renal stone formation in astronauts due to bone loss and hypercalcuria are unknown. Astronauts have a stone risk which is about the same as commercial aviation pilots, which is about half that of the general population. However, proper management of this condition is still crucial to mitigate health and mission risks in the spaceflight environment. Methods: An extensive review of the literature and current aeromedical standards for the monitoring and management of renal stones was done. The NASA Flight Medicine Clinic's electronic medical record and Longitudinal Survey of Astronaut Health were also reviewed. Using this work, a screening and management algorithm was created that takes into consideration the unique operational environment of spaceflight. Results: Renal stone screening and management guidelines for astronauts were created based on accepted standards of care, with consideration to the environment of spaceflight. In the proposed algorithm, all astronauts will receive a yearly screening ultrasound for renal calcifications, or mineralized renal material (MRM). Any areas of MRM, 3 millimeters or larger, are considered a positive finding. Three millimeters approaches the detection limit of standard ultrasound, and several studies have shown that any stone that is 3 millimeters or less has an approximately 95 percent chance of spontaneous passage. For mission-assigned astronauts, any positive ultrasound study is followed by low-dose renal computed tomography (CT) scan, and flexible ureteroscopy if CT is positive. Other specific guidelines were also created. Discussion: The term "MRM" is used to account for small areas of calcification that may be outside the renal collecting system, and allows objectivity without otherwise constraining the diagnostic and treatment process for potentially very small calcifications of uncertain significance. However, a small asymptomatic MRM or stone within the renal collecting system may become symptomatic, and so affect launch and flight schedules, cause incapacitation during flight, and ultimately require medical evacuation. For exploration class missions, evacuation is unlikely. The new screening and management algorithm allows better management of mission risks, and will define the true incidence of renal stones in U.S. astronauts. This information will be used to refine future screening, countermeasures and treatment methods; and will also inform the needed capabilities to be flown on exploration-class missions.

Reyes, David↗

Management of Asymptomatic Renal Stones in Astronauts

Introduction: Management guidelines were created to screen and manage asymptomatic renal stones in U.S. astronauts. The risks for renal stone formation in astronauts due to bone loss and hypercalcuria are unknown. Astronauts have a stone risk which is about the same as commercial aviation pilots, which is about half that of the general population. However, proper management of this condition is still crucial to mitigate health and mission risks in the spaceflight environment. Methods: An extensive review of the literature and current aeromedical standards for the monitoring and management of renal stones was done. The NASA Flight Medicine Clinic's electronic medical record and Longitudinal Survey of Astronaut Health were also reviewed. Using this work, a screening and management algorithm was created that takes into consideration the unique operational environment of spaceflight. Results: Renal stone screening and management guidelines for astronauts were created based on accepted standards of care, with consideration to the environment of spaceflight. In the proposed algorithm, all astronauts will receive a yearly screening ultrasound for renal calcifications, or mineralized renal material (MRM). Any areas of MRM, 3 millimeters or larger, are considered a positive finding. Three millimeters approaches the detection limit of standard ultrasound, and several studies have shown that any stone that is 3 millimeters or less has an approximately 95 percent chance of spontaneous passage. For mission-assigned astronauts, any positive ultrasound study is followed by low-dose renal computed tomography (CT) scan, and flexible ureteroscopy if CT is positive. Other specific guidelines were also created. Discussion: The term "MRM" is used to account for small areas of calcification that may be outside the renal collecting system, and allows objectivity without otherwise constraining the diagnostic and treatment process for potentially very small calcifications of uncertain significance. However, a small asymptomatic MRM or stone within the renal collecting system may become symptomatic, and so affect launch and flight schedules, cause incapacitation during flight, and ultimately require medical evacuation. For exploration class missions, evacuation is unlikely. The new screening and management algorithm allows better management of mission risks, and will define the true incidence of renal stones in U.S. astronauts. This information will be used to refine future screening, countermeasures and treatment methods; and will also inform the needed capabilities to be flown on exploration-class missions.

Reyes, David↗

An Evaluation of a High Pressure Regulator for NASA's Robotic Lunar Lander Spacecraft

The Robotic Lunar Lander (RLL) development project office at NASA Marshall Space Flight Center is currently studying several lunar surface science mission concepts. The focus is on spacecraft carrying multiple science instruments and power systems that will allow extended operations on the lunar surface or other air-less bodies in the solar system. Initial trade studies of launch vehicle options indicate the spacecraft will be significantly mass and volume constrained. Because of the investment by the DOD in low mass, highly volume efficient components, NASA has investigated the potential integration of some of these technologies in space science applications. A 10,000 psig helium pressure regulator test activity has been conducted as part of the overall risk reduction testing for the RLL spacecraft. The regulator was subjected to typical NASA acceptance testing to assess the regulator response to the expected RLL mission requirements. The test results show the regulator can supply helium at a stable outlet pressure of 740 psig within a +/- 5% tolerance band and maintain a lock-up pressure less than the +5% above nominal outlet pressure for all tests conducted. Numerous leak tests demonstrated leakage less than 10-3 standard cubic centimeters per second (SCCS) for the internal seat leakage at lock-up and less than 10-5 SCCS for external leakage through the regulator body. The successful test has shown the potential for 10,000 psig helium systems in NASA spacecraft and has reduced risk associated with hardware availability and hardware ability to meet RLL mission requirements.

Burnside, Christopher G.↗

Providing a Turn for the Better

Engineers are tasked with designing new systems every day to meet changing or unexpected technical requirements. After the tragic explosion of the Space Shuttle Challenger on January 28, 1986, NASA engineers embarked on a complete overhaul of many of their long-standing quality systems and procedures. When the official cause of the accident was determined to be an O-ring failure in the right Solid Rocket Booster, NASA's Shuttle Program initiated a thorough redesign of the rocket boosters' clevis ends, which are the O-ring's mating surfaces. One of the unique systems that NASA engineers developed as a result of this effort included a heating assembly that is coupled to the outside of the rocket boosters. When the assembly is affixed to the external surface of the boosters, the very nature of its design allows for the warming of the O-rings prior to launch. After the engineers completed the assembly's design, however, they found that it was nearly impossible to tighten the spanner nuts required for attaching the system, given the minimum amount of clearance they had in the limited and confined space. Under these circumstances, the standard wrenches typically used for tightening these types of nuts did not work, and there were no other existing devices to solve the problem. NASA engineers embraced the challenge, developing a torque wrench tool adapter that allowed for a full rotation of spanner nuts in confined spaces. The tool, which is similar to an open-ended crowfoot wrench and a fixed-face spanner wrench, contains two dowel pins that center and lock the wrench onto the nut.

Source record↗