Search NASA⌕ Search

SEARCH · Search NASA

Results for “load allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

PC4CAST: A tool for DSN load forecasting and capacity planning

Effectively planning the use and evolution of the Deep Space Network (DSN) is a complex problem involving many parameters. The tool that models many of these complexities, yet requires simple structured inputs and provides concise easy-to-understand metrics to aid in the planning process is discussed. The tool, PC4CAST, is used for both load forecasting (predicting how well planned that DSN resources meet expected demand) and as a decision support tool in the capacity-planning process (determining the relative benefits of capacity expansion options). It is now in use in the TDA Planning Office, has been used in numerous studies, and is also being used by the JPL Multimission Operations System Office (MOSO) as an integral part of Resource Allocation Team activities. Experience using the tool has helped to identify additional requirements that will further improve the planning process, which can be met by future PC4CAST versions.

Loyola, S. J.↗

Structural Analysis of Components of the Students for the Exploration and Development of Space Satellite (SEDSAT) for the Small Expendable Deployer System (SEDS) Project Office

During the time frame allocated by the delivery order, members of the UAH Applied Research Program, with the cooperation of representatives from NASA investigated and conducted stress analysis of the SEDSAT1 satellite. The main area of concern was with the design of the deployable 10 m antennas. The placement of the holes for the antenna door hinge pin was too close to the edge of the antenna canister. Because of the load placed on the hinge pin, the stress analysis of this area suggested that more space would be needed between the holes and the edge of the material. Due to other conflicts, SEDSATI was removed from flying on the space shuttle and moved to the Delta Launch Vehicle. This changed many of the design requirements for the mounting and deployment of the satellite that forced a new design for the satellite. Once this happened, the stress analysis became obsolete, and the task was concluded.

Maddux, Gary A.↗

Interfacing with Legacy using Remote Method Invocation

The assignment described was enough to make a neophyte Java developer bolt for the door: provide a remote method for use by an applet which invokes a native method that wraps a function in an existing legacy library. The purpose of the remote method is to return an instance of a class object whose contents reflect the data structure returned by the legacy function. While embroiled in implementation, I would have spent the time wading through their JNI use group archive as well, but I couldn't seem to locate one. Subsequently, I made the decision to try to document my findings in order to assist others. Before we start on the class design, let's look at what the existing legacy code does. The C function to be called, Get-Legacy-Data, consists of two steps: an ASII file is read from the local disk and its contents are parsed into a Legacy_Type structure whose address is passed as an argument by the caller. The legacy code was compiled into a shared object library, legacy. so, using the IRIX 6.2 compiler and then loaded onto the Web server, a Silicon Graphics Indy station loaded with the IRIX 6.4 operating system. As far as the class design is concerned, the first thing required is a class to act as a template for the data structure returned by the legacy function. This class, JLegacy, declares a series of public instance variables which correspond to the members of Legacy_Type and provides a parameterless constructor. This constructor is never called, not even by the native method which allocates the object for return to the remote method. Next, the remote interface declaration for the remote object must be defined. In order for JLegacyRO to implement getJLegacy, JLegacyRO must interface with the existing legacy code through a native method, getn. getn is declared in the JLegacyRO class but implemented in C, just like the legacy code. getn returns a JLegacy instance and is declared static since its implementation is the same for all instances of the JLegacyRO class.

Howard, Scott M.↗

Pack Density Limitations of Hybrid Parachutes

The development and testing of the Orion crew capsule parachute system has provided a unique opportunity to study dense parachute packing techniques and limits, in order to establish a new baseline for future programs. The density of parachute packs has a significant influence on vibration loads, retention system stresses, and parachute mortar performance. Material compositions and pack densities of existing designs for space capsule recovery were compared, using the pack density of the Apollo main parachutes as the current baseline. The composition of parachutes has changed since Apollo, incorporating new materials such as Kevlar , Vectran , Teflon and Spectra . These materials have different specific densities than Nylon, so the densities of hybrid parachute packs cannot be directly compared to Nylon parachutes for determination of feasibility or volume allocation. Six parachute packs were evaluated in terms of weighted average solid density in order to achieve a non-dimensional comparison of packing density. Means of mitigating damage due to packing pressure and mortar firing were examined in light of the Capsule Parachute Assembly System (CPAS) and Apollo experience. Parachute design improvements including incorporation of modern materials and manufacturing processes serves to make CPAS the new knowledge base on which future spacecraft parachute systems will be built.

Zwicker, Matthew L.↗

Error analysis in the measurement of average power with application to switching controllers

Power measurement errors due to the bandwidth of a power meter and the sampling of the input voltage and current of a power meter were investigated assuming sinusoidal excitation and periodic signals generated by a model of a simple chopper system. Errors incurred in measuring power using a microcomputer with limited data storage were also considered. The behavior of the power measurement error due to the frequency responses of first order transfer functions between the input sinusoidal voltage, input sinusoidal current, and the signal multiplier was studied. Results indicate that this power measurement error can be minimized if the frequency responses of the first order transfer functions are identical. The power error analysis was extended to include the power measurement error for a model of a simple chopper system with a power source and an ideal shunt motor acting as an electrical load for the chopper. The behavior of the power measurement error was determined as a function of the chopper's duty cycle and back EMF of the shunt motor. Results indicate that the error is large when the duty cycle or back EMF is small. Theoretical and experimental results indicate that the power measurement error due to sampling of sinusoidal voltages and currents becomes excessively large when the number of observation periods approaches one-half the size of the microcomputer data memory allocated to the storage of either the input sinusoidal voltage or current.

Maisel, J. E.↗

Traffic placement policies for a multi-band network

Recently protocols were introduced that enable the integration of synchronous traffic (voice or video) and asynchronous traffic (data) and extend the size of local area networks without loss in speed or capacity. One of these is DRAMA, a multiband protocol based on broadband technology. It provides dynamic allocation of bandwidth among clusters of nodes in the total network. A number of traffic placement policies for such networks are proposed and evaluated. Metrics used for performance evaluation include average network access delay, degree of fairness of access among the nodes, and network throughput. The feasibility of the DRAMA protocol is established through simulation studies. DRAMA provides effective integration of synchronous and asychronous traffic due to its ability to separate traffic types. Under the suggested traffic placement policies, the DRAMA protocol is shown to handle diverse loads, mixes of traffic types, and numbers of nodes, as well as modifications to the network structure and momentary traffic overloads.

Maly, Kurt J.↗

Environmental Measurements Session summaries

Emphasis was placed on data from payloads flown on the subject flights including results from the Induced Environment Contamination monitor (IECM). Brief summaries of the vibroacoustics, loads, electromagnetic and thermal aspects of the environment, as derived from Shuttle system measurements, were presented primarily to indicate where the environment was different than observed and, therefore, where specification changes may be forthcoming. In addition, brief summaries of two somewhat unexpected effects, the vehicle glow and interaction between the low Earth environment and Shuttle payload by materials were presented as an aid in interpreting other environmental data. Papers for each payload/experiment involved in Shuttle flights were presented essentially in flight related chronological order. A significant portion of time was allocated for presentation of IECM data since this payload was flown on STS-2, STS-3, and STS-4 and, therefore, represents the largest data base relative to the contamination environment. Summaries of papers are presented.

Lehmann, J.↗

Space processing applications payload equipment study. Volume 2B: Payload interface analysis (power/thermal/electromagnetic compatibility)

As a part of the task of performing preliminary engineering analysis of modular payload subelement/host vehicle interfaces, a subsystem interface analysis was performed to establish the integrity of the modular approach to the equipment design and integration. Salient areas that were selected for analysis were power and power conditioning, heat rejection and electromagnetic capability (EMC). The equipment and load profiles for twelve representative experiments were identified. Two of the twelve experiments were chosen as being representative of the group and have been described in greater detail to illustrate the evaluations used in the analysis. The shuttle orbiter will provide electrical power from its three fuel cells in support of the orbiter and the Spacelab operations. One of the three shuttle orbiter fuel cells will be dedicated to the Spacelab electrical power requirements during normal shuttle operation. This power supplies the Spacelab subsystems and the excess will be available to the payload. The current Spacelab sybsystem requirements result in a payload allocation of 4.0 to 4.8 kW average (24 hour/day) and 9.0 kW peak for 15 minutes.

Hammel, R. L.↗

DSN Resource Scheduling

TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

Wang, Yeou-Fang↗

Evaluation of Multiple Flow Constrained Area Capacity Setting Methods for Collaborative Trajectory Options Program

The purpose of this study was to compare flow constrained area (FCA) capacity setting methods for Collaborative Trajectory Options Program (CTOP) as they pertain to the Integrated Demand Management (IDM) concept. IDM uses flow balancing to manage air traffic across multiple FCAs with a common downstream constraint, as well as constraints at the respective FCA locations. FCA capacity rates can be set manually, but generating capacities for multiple, interdependent FCAs could potentially over-burden a user. A new enhancement to CTOP called the FCA Balance Algorithm (FBA) was developed at NASA Ames Research Center to improve the process of allocating capacity across multiple flow constrained segments in the airspace. The FBA evaluates the predicted demand and capacity across multiple FCAs and dynamically generates capacity settings for the FCAs that best meet capacity limits for all identified constraints. In a human-in-the-loop simulation study, both manual and automated capacity setting methods were evaluated in terms of their overall feasibility using measures of system performance, human performance, and qualitative feedback. Subject matter experts were asked to use three different methods to allocate capacity to three FCAs, either (1) by manually setting capacity for every 60-minute time window, (2) by manually setting capacity for every 15-minute time window, or (3) by using the FBA capability to automatically generate capacity settings. Results showed no significant differences in terms of overall system performance, indicated by similar ground delay and airport throughput numbers between methods. However, differences in individual strategies afforded by the manual methods allowed some participants to achieve system-wide delay that was much lower than the average. The FBA was the fastest method of capacity setting, and it received the lowest subjective rating scores on physical task load, mental task load, task difficulty and task complexity out of the three methods. Finally, participants explained through qualitative feedback that there were many benefits to using the FBA, such as ease of use, accuracy, and low risk of human input error. Participants did not experience the same limitations with the FBA that they did with the manual methods, such as reduced accuracy in the 60-minute manual condition, or high complexity in the 15-minute/manual condition. These results suggest that the FBA automation enhancement to CTOP maintains system performance while improving human performance. Therefore, the FBA could be introduced as a way to mitigate operator workload while planning a CTOP.

NextGen↗

Evaluation of Multiple Flow Constrained Area Capacity Setting Methods for Collaborative Trajectory Options Program

The purpose of this study was to compare flow constrained area (FCA) capacity setting methods for Collaborative Trajectory Options Program (CTOP) as they pertain to the Integrated Demand Management (IDM) concept. IDM uses flow balancing to manage air traffic across multiple FCAs with a common downstream constraint, as well as constraints at the respective FCA locations. FCA capacity rates can be set manually, but generating capacities for multiple, interdependent FCAs could potentially over-burden a user. A new enhancement to CTOP called the FCA Balance Algorithm (FBA) was developed at NASA Ames Research Center to improve the process of allocating capacity across multiple flow constrained segments in the airspace. The FBA evaluates the predicted demand and capacity across multiple FCAs and dynamically generates capacity settings for the FCAs that best meet capacity limits for all identified constraints. In a human-in-the-loop simulation study, both manual and automated capacity setting methods were evaluated in terms of their overall feasibility using measures of system performance, human performance, and qualitative feedback. Subject matter experts were asked to use three different methods to allocate capacity to three FCAs, either (1) by manually setting capacity for every 60-minute time window, (2) by manually setting capacity for every 15-minute time window, or (3) by using the FBA capability to automatically generate capacity settings. Results showed no significant differences in terms of overall system performance, indicated by similar ground delay and airport throughput numbers between methods. However, differences in individual strategies afforded by the manual methods allowed some participants to achieve system-wide delay that was much lower than the average. The FBA was the fastest method of capacity setting, and it received the lowest subjective rating scores on physical task load, mental task load, task difficulty and task complexity out of the three methods. Finally, participants explained through qualitative feedback that there were many benefits to using the FBA, such as ease of use, accuracy, and low risk of human input error. Participants did not experience the same limitations with the FBA that they did with the manual methods, such as reduced accuracy in the 60-minute manual condition, or high complexity in the 15-minute/manual condition. These results suggest that the FBA automation enhancement to CTOP maintains system performance while improving human performance. Therefore, the FBA could be introduced as a way to mitigate operator workload while planning a CTOP.

NextGen↗

DVB-S2 Demonstration Testing for Enhancing Data Rates for CubeSat/SmallSat Missions

The number of National Aeronautics and Space Administration (NASA) CubeSat/SmallSat missions is expected to grow rapidly in the next decade. High data rate is in increasing demanded for science missions, especially for mother/daughter CubeSat constellations. As the number of spacecraft on a ground network grows, loading could be reduced by limiting contact time per day, which is enabled by higher data rates. There is also a need to communicate direct to earth from space from longer distances than low earth orbit (LEO) with CubeSats. These challenges motivate the need for bandwidth and power efficient modulation and coding techniques. Today, DVB-S2 is an industry communications standard for larger satellites. DVB-S2 uses power and bandwidth efficient modulation and coding techniques to deliver performance approaching theoretical limits of RF channels. NASA Near Earth Network (NEN) is conducting demonstration testing at Wallops Flight Facility (WFF) in spring 2019 for CubeSat/SmallSat missions for enhancing data rate performance in NASAs allocated S-band 5 MHz channel. The ultimate goal is to upgrade NEN with DVB-S2 for increasing science data return, and enabling of greater numbers of CubeSats.This paper describes NEN DVB-S2 demonstration testing objectives and performance measurement results. DVB-S2 data rate performance in the NEN S-band 5 MHz channel is presented. Simulation analysis for the expected maximum data rate performance with the DVB-S2 signal family including multiple modulations and codes are presented. Link margin analysis for a typical CubeSat/SmallSat with a 1W/2W power amplifier/patch antenna using DVB-S2 for NEN S-band is discussed. The demonstration testing configurations at NEN Wallops station is described. Results of the demonstration testing are compared with other evolving radios for SmallSats and CubeSats in term of data rate and performance. There are a number of evolving S-band and X-band radios that are compatible with NEN. Some are integrated with commercial CubeSat/SmallSat busses. Some are flying for the first time with NEN in early 2019. The USRP B200mini transceiver S-band radio is one such radio. Results of streamlined compatibility testing with NEN in 2018, performance with the Technology Educational Satellite (TechEdSat-8) in flight in early 2019, potential to add DVB-S2 to the radio, and plans for a CubeSat using the radio for communication from 10 million kilometers from earth are discussed. Another evolving radio is the Syrlinks X-band radio. Results of compatibility testing with NEN in 2018, performance with the Sustained Ocean Color Observations using Nanosatellites (SOCON) in flight in early 2019, and potential for a future SOCON constellation are discussed.

Wong, Yen↗

Experimental evaluation of dynamic data allocation strategies in a distributed database with changing workloads

Traditionally, allocation of data in distributed database management systems has been determined by off-line analysis and optimization. This technique works well for static database access patterns, but is often inadequate for frequently changing workloads. In this paper we address how to dynamically reallocate data for partionable distributed databases with changing access patterns. Rather than complicated and expensive optimization algorithms, a simple heuristic is presented and shown, via an implementation study, to improve system throughput by 30 percent in a local area network based system. Based on artificial wide area network delays, we show that dynamic reallocation can improve system throughput by a factor of two and a half for wide area networks. We also show that individual site load must be taken into consideration when reallocating data, and provide a simple policy that incorporates load in the reallocation decision.

Brunstrom, Anna↗

Expression of heat shock protein 72 in atrophied rat skeletal muscles

Changes in the expression of heat shock protein 72 (HSP72) in response to atrophic-inducing perturbations of muscle involving chronic mechanical unloading and denervation were determined. Adult male Wistar rats were assigned randomly to a sedentary cage control (CON), hind limb unloading (HU, via tail suspension), HU plus tenotomy (HU + TEN), HU plus denervation (HU + DEN), or HU + TEN + DEN group. Tenotomy and DEN involved cutting the Achilles tendon and removing a segment of the sciatic nerve, respectively. After 5 days, HSP72 levels in the soleus of the HU + DEN and HU + TEN + DEN groups were 42 (P < 0.05) and 53% (P < 0.01) less than CON, respectively. Soleus weight decreased in both groups. Heat shock protein 72 levels in the plantaris of the HU + TEN, HU + DEN, and HU + TEN + DEN groups were 31, 25, and 30% lower than CON, respectively (P < 0.05). Plantaris weight decreased in the HU + DEN and HU + TEN + DEN, but not in the HU + TEN group. Hind limb unloading alone had little effect on the HSP72 level in either muscle. Reduced levels of HSP72 were associated with a decreased soleus (r=0.62, P < 0.01) and plantaris (r=0.78, P < 0.001) weight. These results indicate that the levels of HSP72 in both a slow and a fast rat plantarflexor are responsive to a chronic decrease in the levels of loading and/or activation and suggest that the neuromuscular activity level and the presence of innervation of a muscle are important factors that induce HSP72 expression.

NASA Discipline Musculoskeletal↗

PAAV Concept Document

The Pathfinding for Airspace with Autonomous Vehicles (PAAV) Concept Document, version 1.0, lays out the key challenges and potential solutions for the use of uncrewed aircraft (UA) technology for future regional air cargo operations. The challenges and solutions described in this document were informed by communications with the UA industry community (e.g., RTCA, the Federal Aviation Administration, and regional air cargo business operators), as well as the PAAV team’s research activities during the last two years including four tabletop exercises, a human-in-the-loop simulation study, a numerical simulation study, a functional allocation study, and flight data analysis (Appendix A). This document first describes the expected operational context of PAAV (Section 2), such as the flight mission, baseline UAS components, nominal operations, m:N operations (i.e., "m" remote pilots per "N" aircraft), and off-nominal operations. This context sets the scope for the PAAV concept development work. PAAV concept development assumes that UA operations will be increasingly autonomous. Thus, near- and far-term assumptions are defined (Section 3). PAAV identified seven key challenges for UA operations (Section 4): - Flight route planning - Separation and flow management - Traffic pattern integration - Contingency management - Taxi, takeoff, and landing - m:N operations - Communications operations The following 13 potential solutions to these challenges are then described (Section 5): - Scalable communications architecture - Data link - Designated UAS corridors - Crew planning for m:N operations - Flight route optimization - Traffic load-level control - Trajectory solutions with data link - Automated hazard avoidance for m:N operations - Traffic pattern integration (TPI) tool - Standard lost command and control (C2) link (LC2L) procedures - Automated hazard avoidance under LC2L - Auto-taxi, auto-takeoff, and auto-land - Ground control station (GCS) user interface for m:N operations The document attempts to link each of these solutions to one or more of the challenge areas. Novel solutions involving numerous automation technologies are needed to mitigate traffic and airspace management challenges, especially for realizing m:N operations and ensuring safety under LC2L conditions. The purpose of this document is to help understand alternatives and tradeoffs among potential solutions and provide a foundation for a cohesive PAAV concept that will be described and refined in subsequent concept versions.

Unmanned aircraft, uncrewed aircraft, regional air↗

Evidence for reduced cancellous bone mass in the spontaneously hypertensive rat

The histomorphometric changes in the proximal tibial metaphysis and epiphyseal growth plate and midtibial shaft of 26-week-old spontaneously hypertensive rats (SHR) compared with those of the corresponding normotensive Wistar-Kyoto (WKY) rats were studied. A decrease in body weight, growth plate thickness, and longitudinal growth rate of the proximal tibial epiphysis, trabecular bone volume, trabecular thickness and number, the number of osteoblasts and osteoprogenitor cells per millimeter square surface of the proximal tibial metaphysis, periosteal and endocortical apposition rate and bone formation rate of the tibial diaphysis were observed in the SHR. Additionally, systolic blood pressure, the number of osteoclasts per millimeter square surface and average number of nuclei per osteoclast of the proximal tibial metaphysis were significantly increased. Thus, osteoclastic activity is dominant over osteoblastic and chondroblastic activity in the SHR that results in a cancellous bone deficit in the skeleton. It will require additional work to ascertain the underlying cause for this condition as several factors in the SHR with a potential for causing this change are present, including elevated parathyroid hormone (PTH), depressed 1,25-(OH)2D3, low calcium absorption, reduced body weight (reduced loading) elevated blood pressure and possibly other direct cell differences in the mutant strain. At present elevated PTH and adaptation to underloading from reduced weight are postulated to be a likely cause, but additional studies are required to test this interpretation.

NASA Discipline Musculoskeletal↗

Vehicle Health Management Communications Requirements for AeroMACS

As the development of standards for the aeronautical mobile airport communications system (AeroMACS) progresses, the process of identifying and quantifying appropriate uses for the system is progressing. In addition to defining important elements of AeroMACS standards, indentifying the systems uses impacts AeroMACS bandwidth requirements. Although an initial 59 MHz spectrum allocation for AeroMACS was established in 2007, the allocation may be inadequate; studies have indicated that 100 MHz or more of spectrum may be required to support airport surface communications. Hence additional spectrum allocations have been proposed. Vehicle health management (VHM) systems, which can produce large volumes of vehicle health data, were not considered in the original bandwidth requirements analyses, and are therefore of interest in supporting proposals for additional AeroMACS spectrum. VHM systems are an emerging development in air vehicle safety, and preliminary estimates of the amount of data that will be produced and transmitted off an aircraft, both in flight and on the ground, have been prepared based on estimates of data produced by on-board vehicle health sensors and initial concepts of data processing approaches. This allowed an initial estimate of VHM data transmission requirements for the airport surface. More recently, vehicle-level systems designed to process and analyze VHM data and draw conclusions on the current state of vehicle health have been undergoing testing and evaluation. These systems make use of vehicle system data that is mostly different from VHM data considered previously for airport surface transmission, and produce processed system outputs that will be also need to be archived, thus generating additional data load for AeroMACS. This paper provides an analysis of airport surface data transmission requirements resulting from the vehicle level reasoning systems, within the context of overall VHM data requirements.

Kerczewski, Robert J.↗

NextSTEP Appendix A Modular ECLSS Effort Lessons Learned

NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.

NextSTEP↗