Search NASA⌕ Search

SEARCH · Search NASA

Results for “managing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

Brothers, Mary Ann↗

The Development of the Multi-Center Traffic Management Advisor (MCTMA): Traffic Flow Management Research in a Multi-Facility Environment

The Traffic Management Advisor (TMA) is a decision-support tool for traffic managers and air traffic controllers that provides traffic flow visualization and other flow management tools. TMA creates an efficiently sequenced and safely spaced schedule for arrival traffic that meets but does not exceed specified airspace system constraints. TMA is being deployed at selected facilities throughout the National Airspace System in the US as part of the FAA's Free Flight Phase 1 program. TMA development and testing, and its current deployment, focuses on managing the arrival capacity for single major airports within single terminal areas and single en route centers. The next phase of development for this technology is the expansion of the TMA capability to complex facilities in which a terminal area or airport is fed by multiple en route centers, thus creating a multicenter TMA functionality. The focus of the multi-center TMA (McTMA) development is on the busy facilities in the Northeast comdor of the US. This paper describes the planning and development of McTMA and the challenges associated with adapting a successful traffic flow management tool for a very complex airspace.

Lee, Katharine K.↗

Managing Fault Management Development

As the complexity of space missions grows, development of Fault Management (FM) capabilities is an increasingly common driver for significant cost overruns late in the development cycle. FM issues and the resulting cost overruns are rarely caused by a lack of technology, but rather by a lack of planning and emphasis by project management. A recent NASA FM Workshop brought together FM practitioners from a broad spectrum of institutions, mission types, and functional roles to identify the drivers underlying FM overruns and recommend solutions. They identified a number of areas in which increased program and project management focus can be used to control FM development cost growth. These include up-front planning for FM as a distinct engineering discipline; managing different, conflicting, and changing institutional goals and risk postures; ensuring the necessary resources for a disciplined, coordinated approach to end-to-end fault management engineering; and monitoring FM coordination across all mission systems.

McDougal, John M.↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASAs Space Launch System

The engineering development of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS) requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The nominal and off-nominal characteristics of SLS's elements and subsystems must be understood and matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex systems engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model-based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model-based algorithms and their development lifecycle from inception through FSW certification are an important focus of SLS's development effort to further ensure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. To test and validate these M&FM algorithms a dedicated test-bed was developed for full Vehicle Management End-to-End Testing (VMET). For addressing fault management (FM) early in the development lifecycle for the SLS program, NASA formed the M&FM team as part of the Integrated Systems Health Management and Automation Branch under the Spacecraft Vehicle Systems Department at the Marshall Space Flight Center (MSFC). To support the development of the FM algorithms, the VMET developed by the M&FM team provides the ability to integrate the algorithms, perform test cases, and integrate vendor-supplied physics-based launch vehicle (LV) subsystem models. Additionally, the team has developed processes for implementing and validating the M&FM algorithms for concept validation and risk reduction. The flexibility of the VMET capabilities enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the developed algorithms utilizing actual subsystem models such as MPS, GNC, and others. One of the principal functions of VMET is to validate the M&FM algorithms and substantiate them with performance baselines for each of the target vehicle subsystems in an independent platform exterior to the flight software test and validation processes. In any software development process there is inherent risk in the interpretation and implementation of concepts from requirements and test cases into flight software compounded with potential human errors throughout the development and regression testing lifecycle. Risk reduction is addressed by the M&FM group but in particular by the Analysis Team working with other organizations such as S&MA, Structures and Environments, GNC, Orion, Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission (LOM) and Loss of Crew (LOC) probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and associated detection and responses to be tested in VMET to ensure reliable failure detection, and confirm responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - the ARINC 6535-partitioned Operating System, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM such as telemetry packing and processing. The baseline plan for use of VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by FSW. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure their effectiveness and performance in the exterior FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Airborne Trajectory Management (ABTM): A Blueprint for Greater Autonomy in Air Traffic Management

The aviation users of the National Airspace System (NAS) - the airlines, General Aviation (GA), the military and, most recently, operators of Unmanned Aircraft Systems (UAS) - are constrained in their operations by the design of the current paradigm for air traffic control (ATC). Some of these constraints include ATC preferred routes, departure fix restrictions and airspace ground delay programs. As a result, most flights cannot operate on their most efficient business trajectories and a great many flights are delayed even getting into the air, which imposes a significant challenge to maintaining efficient flight and network operations. Rather than accepting ever more sophisticated scheduling solutions to accommodate the existing constraints in the airspace, a series of increasingly capable airborne technologies, integrated with planned improvements in the ground system through the Federal Aviation Administration (FAA) Next Generation Air Traffic Management System (NextGen) programs, could produce much greater operational flexibility for flight path optimization by the aviation system users. These capabilities, described in research coming out of NASA's Aeronautics Research Mission Directorate, can maintain or improve operational safety while taking advantage of air and ground NextGen technologies in novel ways. The underlying premise is that the nation's physical airspace is still abundant and underused, and that the delays and inefficient flight operations resulting from artificial structure in airspace use and procedural constraints on those operations may not be necessary for safe and efficient flight. This article is not an indictment of today's NAS or the people who run it. Indeed, it is an exceptional achievement that Air Traffic Management (ATM) - the complex human/machine conglomeration of communications, navigation and surveillance equipment and the rules and procedures for controlling traffic in the airspace - has both the capacity and enables the degree of efficiency in air travel that it does. But it is also true that sixty years of the "radar religion" (i.e., reliance on radar-based command and control) has produced several generations of ATM system operators and researchers who believe that introducing automation within the existing functional structure of ATM is the only way to "modernize" the system. Even NextGen, which began as a proposal for "transformational" change in the way ATC is performed, has morphed over the last decade and a half to become just the inclusion of Global Positioning System (GPS) for navigation, Automatic Dependent Surveillance Broadcast (ADS-B) for surveillance, and Data Communications (Data Comm) for communications, while still operating in rigidly structured airspace with human controllers being responsible for separation and traffic flow management (TFM) within defined sectors of airspace, using the same horizontal separation standards that have been in use since raw primary radar was introduced in the 1950s. No system as massive as the current NAS ATM can be replaced with a better system while simultaneously meeting the transportation and other aviation needs of the nation. A new generation of more flexible operations must emerge and yet coexist in harmony with the current operation (i.e., share the same airspace without segregation), thereby enabling a long-term transformation to take place in the way increasing numbers of flights are handled. Market forces will be the ultimate driver of this transformation, and investment realities mandate that real benefits must accrue to the first operators to adopt these new capabilities. In fact, the kinds of missions envisioned in the emerging world of UAS operations, unachievable under conventional ATM, demand that this transformation take place. Airborne Trajectory Management (ABTM) is proposed as a series of transformational steps leading to vastly increased flexibility in flight operations and capacity in the airspace to accommodate many varied airspace uses while improving safety. As will be described, ABTM enables the gradual emergence of a new paradigm for user-based trajectory management in ATM that brings tangible benefits to equipped operators at every step while leveraging the air and ground investments of NextGen. There are five steps in this ABTM transformation.1 NASA has extensively studied the first and last of these steps, and a roadmap of increasing capabilities and benefits is proposed for bridging between these operational concepts.

Cotton, William B.↗

Human Interfaces and Management of Information (HIMI) Challenges for “In-time” Aviation Safety Management Systems (IASMS)

The envisioned transformation of the National Airspace System to integrate an In-time Aviation Safety Management System(IASMS)to assure safety in Advanced Air Mobility(AAM)brings unprecedented challenges to the design of human interfaces and management of safety information. Safety in design and operational safety assurance are critical factors for how humans will interact with increasingly autonomous systems. The IASMS Concept of Operations builds from traditional commercial operator safety management and scales in complexity to AAM. The transformative changes in future aviation systems pose potential new critical safety risks with novel types of aircraft and other vehicles having different performance capabilities, flying in increasingly complex airspace, and using adaptive contingencies to manage normal and non-normal operations. These changes compel development of new and emerging capabilities that enable innovative ways for humans to interact with data and manage information. In-creasing complexity of AAM corresponds with use of predictive modeling, data analytics, machine learning, and artificial intelligence to effectively address known hazards and emergent risks. The roles of humans will dynamically evolve in increments with this technological and operational evolution. The interfaces for how humans will interact with increasingly complex and assured systems designed to operate autonomously and how information will need to be presented are important challenges to be resolved.

Lawrence J Prinzel↗

Drivers of Change in Managed Water Resources: Modeling the Impacts of Climate and Socioeconomic Changes Using the US Midwest as a Case Study

A global integrated assessment model including a water-demand model driven by socio-economics, is coupled in a one-way fashion with a land surface hydrology – routing – water resources management model. The integrated modeling framework is applied to the U.S. Upper Midwest (Missouri, Upper Mississippi, and Ohio) to advance understanding of the regional impacts of climate and socio-economic changes on integrated water resources. Implications for future flow regulation, water supply, and supply deficit are investigated using climate change projections with the B1 and A2 emission scenarios, which affect both natural flow and water demand. Changes in water demand are driven by socio-economic factors, energy and food demands, global markets and prices. The framework identifies the multiple spatial scales of interactions between the drivers of changes (natural flow and water demand) and the managed water resources (regulated flow, supply and supply deficit). The contribution of the different drivers of change are quantified regionally, and also evaluated locally, using covariances. The integrated framework shows that water supply deficit is more predictable over the Missouri than the other regions in the Midwest. The predictability of the supply deficit mostly comes from long term changes in water demand although changes in runoff has a greater contribution, comparable to the contribution of changes in demand, over shorter time periods. The integrated framework also shows that spatially, water demand drives local supply deficit. Using elasticity, the sensitivity of supply deficit to drivers of change is established. The supply deficit is found to be more sensitive to changes in runoff than to changes in demand regionally. It contrasts with the covariance analysis that shows that water demand is the dominant driver of supply deficit over the analysed periods. The elasticity indicates the level of mitigation needed to control the demand in order to reduce the vulnerability of the integrated system in future periods. The elasticity analyses also emphasize the need to address uncertainty with respect to changes in natural flow in integrated assessment.

climate change, water resources management, socio-↗

Incorporating Residential Smart Electric Vehicle Charging in Home Energy Management Systems

Electric vehicles (EVs) are expected to drastically increase residential electricity consumption and could provide a significant source of flexible demand. Aggregating smart EV charge controllers with other smart home devices through a home energy management system can lead to more optimal outcomes that benefit homeowners, utilities, and grid operators. Control strategies should consider occupant convenience by accounting for the need for fully charged EVs near the EV departure time. In this paper, we develop an EV charging framework that accounts for occupant convenience using OCHRE, a residential energy model, and foresee, a home energy management system. We simulate a community with high EV penetration and show that integrated, smart EV charging reduces peak demand and smooths night-time energy consumption. Simulation results show that the proposed control strategy nearly eliminates peak period EV charging and reduces the daily peak demand from EVs by 23%.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Thermal Management System for an Electric Machine with Additively Manufactured Hollow Conductors with Integrated Heat Pipes: Preprint

This paper discusses steps taken to size a thermal management system for an aircraft propulsion electric machine containing additively manufactured coils integrated with heat pipes aimed at boosting its specific power. Experimental setups are used to size and characterize heat pipes for the application and 3D thermal FEA is used to determine optimum heat transfer coefficient of convective boundaries. Geometric details of fin-based surface area enhancement required to reach target combined overall heat transfer coefficient (U) and surface area (A) performance (UA) in W/K, is worked out for relevant boundaries and the resulting UA is verified in 3D thermal FEA. Thermal management system's UA (by extension specific power) sensitivity to coolant temperature is explored and temperature distribution plots of optimized machine components are presented and discussed.

additive manufacturing↗

The Role of Interfacial Thermal Resistance in Li-Ion Battery Thermal Management: Preprint

Temperature critically affects the performance, life and safety of lithium-ion batteries. Therefore, it is essential to understand heat generation and dissipation within individual battery cells and battery packs to plan a proper thermal management strategy. One of the key challenges is that interfacial heat transfer of a battery unit is difficult to quantify. The steady-state absolute method and the transient laser-flash-diffusivity method were employed to measure heat conductivities of battery layer stacks and individual battery layer separately. Results show flash diffusivity method gives higher thermal conductivity at both cross-plane and in-plane directions. The difference is primarily caused by interfacial thermal resistance so that it can be estimated by steady-state and transient measurements. To investigate the effects of interfacial thermal transport beyond individual cell level, a multiphysics battery model is used. The model is built upon a multi-scale multi-domain modeling framework for battery packs that accounts for the interplay across multiple physical phenomena. Benefits of a battery module using thermal management materials are quantified through numerical experiments. During a thermal runaway event, it is found interfacial thermal resistance can mitigate thermal runaway in a battery module by significantly reducing heat transfer between cells.

33 ADVANCED PROPULSION SYSTEMS↗

Environmental Management Waste Management Facility Waste Lot Profile for the K-770 Scrap Yard Soils and Miscellaneous Debris, East Tennessee Technology Park, Oak Ridge, Tennessee - EMWMF Waste Lot 4.12

Waste Lot 4.12 consists of approximately 17,500 yd{sup 3} of low-level, radioactively contaminated soil, concrete, and incidental metal and debris generated from remedial actions at the K-770 Scrap Metal Yard and Contaminated Debris Site (the K-770 Scrap Yard) at the East Tennessee Technology Park (ETTP). The excavated soil will be transported by dump truck to the Environmental Management Waste Management Facility (EMWMF). This profile provides project-specific information to demonstrate compliance with Attainment Plan for Risk/Toxicity-based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee (DOE 2001). The K-770 Scrap Yard is an approximately 36-acre storage area located southwest of the main portion of ETTP, outside the security perimeter fence in the Powerhouse Area adjacent to the Clinch River. The K-770 area was used to store radioactively contaminated or suspected contaminated materials during and previous to the K-25 Site cascade upgrading program. The waste storage facility began operation in the 1960s and is estimated to at one time contain in excess of 40,000 tons of low-level, radioactively contaminated scrap metal. Scrap metal was taken to the site when it was found to contain alpha or beta/gamma activity on the surface or if the scrap metal originated from a process building. The segregated metal debris was removed from the site as part of the K-770 Scrap Removal Action (RA) Project that was completed in fiscal year (FY) 2007 by Bechtel Jacobs Company LLC (BJC). An area of approximately 10 acres is located in EUs 29 and 31 where the scrap was originally located in the 100-year floodplain. In the process of moving the materials around and establishing segregated waste piles above the 100-year floodplain, the footprint of the site was expanded by 10-15 acres in EUs 30 and 32. The area in EUs 29 and 31 that was cleared of metallic debris in the floodplain was sown with grass. The areas in EUs 30 and 32 have some scattered vegetation but are generally open and accessible. With limited exception, all materials contained in the scrap yard have been removed and disposed at the EMWMF. Soils that underlay the original waste storage area in EUs 29 and 31 as well as soils that underlay the scrap piles in EUs 30 and 32 show substantially elevated radioactivity. In addition to soils present at the site, remaining portions of foundations/floor slabs for Bldgs. K-725, K-726, and K-736 as well as the unnamed pad at the northeast corner of the site constructed to support the sort and segregation operations at the K-770 Scrap Removal Project in 2006 and several other small, unnamed concrete pads are included in this waste lot. While many of these foundations/floor slabs will be removed because they are contaminated, some of the smaller unamed concrete pads will be removed in order to access contaminated soils that are around and under the pads and regrade the site. Appendix E contains a map showing the areas of soil and concrete pads that are expected to be excavated. Soils in the areas indicated on this map will be removed to approximately one foot below the surface. (This corresponds to the soil interval sampled and analyzed to characterize this waste lot.) Contaminants present in the soils are directly derived from metallic debris and rubbish handled by the waste storage operations, are concentrated in the top few inches, and include the predominant constituents of concern associated with the metallic waste already disposed at EMWMF. Additionally, some residual metallic debris remains embedded in the shallow soils that underlay the former debris piles. This residual metallic debris is eligible for disposal in the EMWMF WAC criteria as defined in Waste Profile for: Disposal of the Scrap Removal Project Waste Lot 65.1 East Tennessee Technology Park, Oak Ridge, Tennessee (BJC 2004a). This waste, however, has been included in Waste Lot 4.12 to conform to the more rigorous profiling requirements currently contained in Waste Acceptance Criteria Attainment Team Project Execution Plan Environmental Management Waste Management Facility, Oak Ridge Reservation, Tennessee (BJC 2008a). It comprises approximately 5% of the total mass of material that will be generated under this RA. Incidental amounts of wood and other debris items and secondary waste generated during the RA are also included in this waste lot.

54 ENVIRONMENTAL SCIENCES↗

Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Integrated Demand Management Looking into Strategic & Tactical Flow Management

The motivation behind Integrated Demand Management (IDM) research is to explore possible improvements to United States National Airspace System (NAS) performance that could be realized through procedural integration of strategic traffic flow management capabilities, such as the Collaborative Trajectory Options Program (CTOP), and tactical capabilities, such as Time Based Flow Management (TBFM). An initial IDM concept for clear weather operations was developed and evaluated for potential benefits, including efficiency, delay reduction, predictability and throughput, and to identify any major issues that might represent a showstopper for a fielded application. Newark Liberty International Airport (EWR) arrival operations provided a use case for concept development. EWR uses miles-in-trail (MIT) metering to regulate demand into TBFM during high volume operations, and short-haul flights are often penalized with excessive, last-minute ground delays when the overhead stream is saturated. IDM addresses this problem by replacing MIT conditioning with CTOP to better manage the demand delivery to the TBFM entry points. A quasi-real time high-fidelity simulation that would normally involve participants was conducted using heuristic-based procedures that mimicked operators behaviors instead. Five total conditions were compared: two baseline conditions with MIT delivery to TBFM entry points using two different TBFM settings; and three IDM conditions: one with airborne speed control using an Required Time of Arrival (RTA) capability, a second without RTA, and a third with no wind forecast errors. Results suggest that the IDM concept can deliver traffic more efficiently by shifting the delays from airborne to ground for both RTA and non-RTA conditions, while maintaining a target throughput rate. The results also suggest that with good predictability of airport capacity, excessive TBFM ground delay can be minimized by applying more strategic CTOP delay, increasing predictability for the airline operators. Overall, the results indicate that the implementation of an IDM concept under clear weather conditions can improve NAS system performance. Future IDM research aims to expand the concept to address demandcapacity imbalance d severe weather.

Time-Based Flow Management (TBFM)↗

How Management and Leadership Training Can Impact a Health System: Evaluation Findings From a Public Health Management Training Program in Cambodia

In 2017, the National Institute of Public Health in Cambodia collaborated with the U.S. Centers for Disease Control and Prevention to provide management and leadership training for 20 managers and senior staff from 10 health centers. We conducted a mixed methods evaluation of the program's outcomes and impact on the graduates and health centers. From June 2018 (baseline) to January 2019 (endpoint), we collected data from a competency assessment, observational visits, and interviews. From baseline to endpoint, all 20 participants reported increased competence in seven management areas. Comparing baseline and endpoint observational visits, we found improvements in leadership and governance, health workforce, water, sanitation, and hygiene, and health centers' use of medical products and technologies. When evaluating the improvements made by participants against the World Health Organization's key components of a well-functioning health system, the program positively contributed toward building four of the six components—leadership and governance, health information systems, human resources for health, and service delivery. While these findings are specific to the context of Cambodian health centers, we hope this evaluation adds to the growing body of research around the impact of skilled public health management on health systems.

60 APPLIED LIFE SCIENCES↗

Total Thermal Management of Battery Electric Vehicles (BEVs)

The key hurdles to achieving wide consumer acceptance of battery electric vehicles (BEVs) are weather-dependent drive range, higher cost, and limited battery life. These translate into a strong need to reduce a significant energy drain and resulting drive range loss due to auxiliary electrical loads the predominant of which is the cabin thermal management load. Studies have shown that thermal subsystem loads can reduce the drive range by as much as 45% under ambient temperatures below -10°C. Often, cabin heating relies purely on positive temperature coefficient (PTC) resistive heating, contributing to a significant range loss. Reducing this range loss may improve consumer acceptance of BEVs. The authors present a unified thermal management system (UTEMPRA) that satisfies diverse thermal and design needs of the auxiliary loads in BEVs. Demonstrated on a 2015 Fiat 500e BEV, this system integrates a semi-hermetic refrigeration loop with a coolant network and serves three functions: (1) heating and/or cooling vehicle traction components (battery, power electronics, and motor) (2) heating and cooling of the cabin, and (3) waste energy harvesting and re-use. The modes of operation allow a heat pump and air conditioning system to function without reversing the refrigeration cycle to improve thermal efficiency. The refrigeration loop consists of an electric compressor, a thermal expansion valve, a coolant-cooled condenser, and a chiller, the latter two exchanging heat with hot and cold coolant streams that may be directed to various components of the thermal system. The coolant-based heat distribution is adaptable and saves significant amounts of refrigerant per vehicle. Also, a coolant-based system reduces refrigerant emissions by requiring fewer refrigerant pipe joints. The authors present bench-level test data and simulation analysis and describe a preliminary control scheme for this system.

Chowdhury, Sourav↗

Simulations of Continuous Descent Operations with Arrival-management Automation and Mixed Flight-deck Interval Management Equipage

Air traffic management simulations conducted in the Airspace Operations Laboratory at NASA Ames Research Center have addressed the integration of trajectory-based arrival-management automation, controller tools, and Flight-Deck Interval Management avionics to enable Continuous Descent Operations (CDOs) during periods of sustained high traffic demand. The simulations are devoted to maturing the integrated system for field demonstration, and refining the controller tools, clearance phraseology, and procedures specified in the associated concept of operations. The results indicate a variety of factors impact the concept's safety and viability from a controller's perspective, including en-route preconditioning of arrival flows, useable clearance phraseology, and the characteristics of airspace, routes, and traffic-management methods in use at a particular site. Clear understanding of automation behavior and required shifts in roles and responsibilities is important for controller acceptance and realizing potential benefits. This paper discusses the simulations, drawing parallels with results from related European efforts. The most recent study found en-route controllers can effectively precondition arrival flows, which significantly improved route conformance during CDOs. Controllers found the tools acceptable, in line with previous studies.

arrival management↗

NGNP Risk Management Database: A Model for Managing Risk

The Next Generation Nuclear Plant (NGNP) Risk Management System (RMS) is a database used to maintain the project risk register. The RMS also maps risk reduction activities to specific identified risks. Further functionality of the RMS includes mapping reactor suppliers Design Data Needs (DDNs) to risk reduction tasks and mapping Phenomena Identification Ranking Table (PIRTs) to associated risks. This document outlines the basic instructions on how to use the RMS. This document constitutes Revision 1 of the NGNP Risk Management Database: A Model for Managing Risk. It incorporates the latest enhancements to the RMS. The enhancements include six new custom views of risk data - Impact/Consequence, Tasks by Project Phase, Tasks by Status, Tasks by Project Phase/Status, Tasks by Impact/WBS, and Tasks by Phase/Impact/WBS.

42 ENGINEERING↗