Search NASA⌕ Search

SEARCH · Search NASA

Results for “notification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Managing work flow and logistic at waste processing facilities using the waste compliance and tracking system - 15392

Work flow and logistics at a busy radioactive waste processing complex or permitted treatment, storage, and disposal facility (TSDF) can pose a monumental challenge. An efficient operation requires good communication between engineering, logistics, and waste operators. The Los Alamos National Laboratory (LANL) has implemented an application that facilitates seamless communication of work flow requirements, between engineering, logistics, and waste operations personnel in the field. The Waste Compliance and Tracking System (WCATS), a comprehensive waste management system designed at LANL, provides four key elements to support logistics: (a) the container work path, (b) directed unit operation requests, (c) notification of pending operations, and (d) real-time status tools for office and field workers. The combination of these elements allows everyone to function as a team, with a shared knowledge of what is needed to accomplish facility objectives. The first element is like a road map indicating which unit operations are needed and in what sequence they should be performed; this is referred to as a 'work path'. It automatically routes a waste item or container from operation to operation. For example, a given work path might indicate that waste items require radiological survey, radioassay, and a technical review, in that order. When the work path is assigned to a container, the system enforces the correct order of operations. Directed unit operation 'requests', the second element, fills a gap between pre-planned, formal 'work path' activities and the need for flexibility to direct preparatory operations or deal with unexpected issues, like staging or mining containers in preparation for a shipment or transferring containers from one storage unit to another to clear a path for building maintenance. Logistics engineers prepare these 'requests', and the system monitors the status and completion of the work. The third element, notifications, allows team members to subscribe to and receive notice that an operation is pending, initiated, or complete. This functionality supports a range of communication options, including e-mail, cell phone, pager, or application in-box messaging. Notifications allow waste operations personnel to multi-task, and remain in the loop on the status of facility-wide activities. Finally, the fourth element provides tools that communicate work path pending operations and directed requests to field workers on their mobile computer, allowing them to mine or pick containers from storage units, and leverage the capabilities of a bar-code scanner to avoid selection mistakes. Oversight and summary tools are provided, allowing logistics personnel to monitor work path and request task status, identify work-flow bottlenecks, and maximize the efficiency of waste operations. The Waste Compliance and Tracking System (WCATS) provides an innovative, comprehensive set of tools that allow large-scale radioactive waste processing facilities to manage logistics, maximize efficient use of the workforce, and create a team environment, where everyone from management to the waste handlers have an understanding of the work load and what needs to be accomplished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Event detection unit

An event detection unit (EDU) for detecting an explosive event is provided. The EDU includes different types of sensors for measuring characteristics of an explosive event. The EDU includes an event notification component. The EDU also includes a processor that receives a measurement from the sensors and generates a combined non-event probability and a combined event probability based on that measurement that indicates a likelihood that an explosive event has not occurred or has occurred. The processor determines whether an explosive event has occurred based on the non-event probabilities and event probabilities. When an explosive event has been determined to occur, the processor directs the event notification component to output a notification that an explosive event has occurred.

Candy, James Vincent↗

CIFTS : A coordinated infrastructure for fault-tolerant systems.

In the next few years SciDAC applications will utilize petascale systems with tens to hundreds of thousands of processors, hundreds of I/O nodes, and thousands of disks. This leap of two orders of magnitude in scale from today's typical systems is causing a critical gap in fault management of these systems. The fault management issues for these emerging systems are well beyond the scope of today's common infrastructure and practice. Currently, systems software components for large-scale machines remain largely independent in their fault awareness and notification strategies. Faults can arise not just from the hardware but also from the OS, middleware, libraries, and application levels. Petascale applications that are evolving to utilize these platforms face many new challenges. With the CIFTS initiative, we aim to provide a coordinated infrastructure that will enable Fault Tolerant Systems to adapt to faults occuring in the operating environment in a holistic manner. Our approach will be to design a reference implementation of a fault awareness and notification backplane to provide common uniform event handling and notification mechanisms for fault-aware libraries and middleware; create an interface specification that allows libraries, run- time systems, and applications to connect to and use the fault-tolerance backplane; and extend key libraries and applications to validate the interface choices and to form the critical mass necessary for adoption in the community.

99 GENERAL AND MISCELLANEOUS↗

Avoiding thermal runaway in lithium-ion batteries using ultrasound detection of early failure mechanisms

Thermal runaway leading to catastrophic failure has slowed the adoption of lithium-ion batteries, highlighting the need for early warning systems. In this work, ultrasound is used to detect physical changes in 0.950 Ah Li-ion battery cells by inducing conditions associated with thermal runaway. Ultrasound signal features are extracted as the batteries are cycled under baseline conditions and subsequently subjected to constant current and voltage overcharges. Two conditions identifying failure are defined: a warning to detect the start of overcharge and an emergency stop (E-stop), to immediately take the battery out of service. Using changes in ultrasound signal features, consistent warning and stopping classifications are applied to all failure experiments. On average, a warning notification was issued after 15% of the overcharge time and an E-stop was triggered after 35% of total overcharge duration before failure. Further testing suggests that it is possible to avoid thermal runaway by reacting to intermediate, warning notifications prior to an immediate E-stop. In other words, not only can detection derived by ultrasound identify battery failure before a catastrophic event, but can also provide early, actionable warnings so that overcharges can be detected and corrected quickly enough so the battery does not need to be decommissioned.

25 ENERGY STORAGE↗

CIVET: Continuous Integration, Verification, Enhancement, and Testing

A Git server (GitHub, GitLab, BitBucket) sends event notifications to the Civet server. These are either a " Pull Request" or a "Push" notification. Civet then checks the database to determine what tests need to be run and marks them as ready to run. Civet clients, running on dedicated machines, query the server for available jobs that are ready to run. When a client gets a job it executes the scripts attached to the job and report back to the server the output and exit status. When the client updates the server, the server will also update the Git server with the result of the job, as well as updating the main web page.

Alger, Brian↗

Clearance Tracker

The manual process of managing security clearance was cumbersome and inefficient, involving the emailing of a fillable PDF from person to person. There was no visibility into the progress of a clearance submission. Clearance Tracker provides an automated workflow with data validation and notifications to manage the clearance process. The automated workflow routes notifications to individuals when their input is required. All participants can track the progress of clearance requests.

Short, RickyD↗

OVIS 3.2 user's guide.

This document describes how to obtain, install, use, and enjoy a better life with OVIS version 3.2. The OVIS project targets scalable, real-time analysis of very large data sets. We characterize the behaviors of elements and aggregations of elements (e.g., across space and time) in data sets in order to detect meaningful conditions and anomalous behaviors. We are particularly interested in determining anomalous behaviors that can be used as advance indicators of significant events of which notification can be made or upon which action can be taken or invoked. The OVIS open source tool (BSD license) is available for download at ovis.ca.sandia.gov. While we intend for it to support a variety of application domains, the OVIS tool was initially developed for, and continues to be primarily tuned for, the investigation of High Performance Compute (HPC) cluster system health. In this application it is intended to be both a system administrator tool for monitoring and a system engineer tool for exploring the system state in depth. OVIS 3.2 provides a variety of statistical tools for examining the behavior of elements in a cluster (e.g., nodes, racks) and associated resources (e.g., storage appliances and network switches). It provides an interactive 3-D physical view in which the cluster elements can be colored by raw or derived element values (e.g., temperatures, memory errors). The visual display allows the user to easily determine abnormal or outlier behaviors. Additionally, it provides search capabilities for certain scheduler logs. The OVIS capabilities were designed to be highly interactive - for example, the job search may drive an analysis which in turn may drive the user generation of a derived value which would then be examined on the physical display. The OVIS project envisions the capabilities of its tools applied to compute cluster monitoring. In the future, integration with the scheduler or resource manager will be included in a release to enable intelligent resource utilization. For example, nodes that are deemed less healthy (i.e., nodes that exhibit outlier behavior with respect to some set of variables shown to be correlated with future failure) can be discovered and assigned to shorter duration or less important jobs. Further, HPC applications with fault-tolerant capabilities would respond to changes in resource health and other OVIS notifications as needed, rather than undertaking preventative measures (e.g. checkpointing) at regular intervals unnecessarily.

97 MATHEMATICS AND COMPUTING↗

OVIS 2.0 user%3CU%2B2019%3Es guide.

This document describes how to obtain, install, use, and enjoy a better life with OVIS version 2.0. The OVIS project targets scalable, real-time analysis of very large data sets. We characterize the behaviors of elements and aggregations of elements (e.g., across space and time) in data sets in order to detect anomalous behaviors. We are particularly interested in determining anomalous behaviors that can be used as advance indicators of significant events of which notification can be made or upon which action can be taken or invoked. The OVIS open source tool (BSD license) is available for download at ovis.ca.sandia.gov. While we intend for it to support a variety of application domains, the OVIS tool was initially developed for, and continues to be primarily tuned for, the investigation of High Performance Compute (HPC) cluster system health. In this application it is intended to be both a system administrator tool for monitoring and a system engineer tool for exploring the system state in depth. OVIS 2.0 provides a variety of statistical tools for examining the behavior of elements in a cluster (e.g., nodes, racks) and associated resources (e.g., storage appliances and network switches). It calculates and reports model values and outliers relative to those models. Additionally, it provides an interactive 3D physical view in which the cluster elements can be colored by raw element values (e.g., temperatures, memory errors) or by the comparison of those values to a given model. The analysis tools and the visual display allow the user to easily determine abnormal or outlier behaviors. The OVIS project envisions the OVIS tool, when applied to compute cluster monitoring, to be used in conjunction with the scheduler or resource manager in order to enable intelligent resource utilization. For example, nodes that are deemed less healthy, that is, nodes that exhibit outlier behavior in some variable, or set of variables, that has shown to be correlated with future failure, can be discovered and assigned to shorter duration or less important jobs. Further, applications with fault-tolerant capabilities can invoke those mechanisms on demand, based upon notification of a node exhibiting impending failure conditions, rather than performing such mechanisms (e.g. checkpointing) at regular intervals unnecessarily.

99 GENERAL AND MISCELLANEOUS↗

Earthquake warning system for infrastructures : a scoping analysis.

This report provides the results of a scoping study evaluating the potential risk reduction value of a hypothetical, earthquake early-warning system. The study was based on an analysis of the actions that could be taken to reduce risks to population and infrastructures, how much time would be required to take each action and the potential consequences of false alarms given the nature of the action. The results of the scoping analysis indicate that risks could be reduced through improving existing event notification systems and individual responses to the notification; and production and utilization of more detailed risk maps for local planning. Detailed maps and training programs, based on existing knowledge of geologic conditions and processes, would reduce uncertainty in the consequence portion of the risk analysis. Uncertainties in the timing, magnitude and location of earthquakes and the potential impacts of false alarms will present major challenges to the value of an early-warning system.

99 GENERAL AND MISCELLANEOUS↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant’s existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transmittal of the Sandia National Laboratories/New Mexico Five-Day Report for the Accidental Slug Discharge at the Albuquerque Bernalillo County Water Utility Authority (ABCWUA) Industrial Wastewater Permit No. 2069 Outfall [Letter and Enclosure]

This letter represents the five-day written notification for elevated fluoride levels at the Building 858N, Acid Waste Neutralization (AWN) System in accordance with the ABCWUA Sewer Use and Wastewater Ordinance § 3-6-5(B), Reports of Potential Problems. This AWN System is covered under the ABCWUA Industrial Wastewater Permit No. 2069G. The immediate notification to the ABCWUA occurred at 21:42 on August 1, 2019.

54 ENVIRONMENTAL SCIENCES↗

Summer 2021 Internship Report

During this internship program, I was assigned with developing a Web application to robustify web resources referenced by links (URI-Rs) in PDFs. It was intended for use in LANL Research 2 Library systems such as RASSTI (Review and Approval System for Scientific and Technical Information), where users submit scholarly PDFs that may contain URI-Rs. For such PDFs, the application should, using Web Archives, create robust snapshots (i.e., Mementos) of the web resources referenced by URI-Rs, and notify this robustification to LANL Research Library systems. The Mementos were to be created using the Robust Links Service, and the notifications were to be sent using the Linked Data Notifications (LDN) Protocol.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Knowing the unknown: The underestimation of monkeypox cases. Insights and implications from an integrative review of the literature

Monkeypox is an emerging zoonotic disease caused by the monkeypox virus, which is an infectious agent belonging to the genus Orthopoxvirus. Currently, commencing from the end of April 2022, an outbreak of monkeypox is ongoing, with more than 43,000 cases reported as of 23 August 2022, involving 99 countries and territories across all the six World Health Organization (WHO) regions. On 23 July 2022, the Director-General of the WHO declared monkeypox a global public health emergency of international concern (PHEIC), since the outbreak represents an extraordinary, unusual, and unexpected event that poses a significant risk for international spread, requiring an immediate, coordinated international response. However, the real magnitude of the burden of disease could be masked by failures in ascertainment and under-detection. As such, underestimation affects the efficiency and reliability of surveillance and notification systems and compromises the possibility of making informed and evidence-based policy decisions in terms of the adoption and implementation of ad hoc adequate preventive measures. In this review, synthesizing 53 papers, we summarize the determinants of the underestimation of sexually transmitted diseases, in general, and, in particular, monkeypox, in terms of all their various components and dimensions (under-ascertainment, underreporting, under-detection, under-diagnosis, misdiagnosis/misclassification, and under-notification).

59 BASIC BIOLOGICAL SCIENCES↗

NBIC Biofeeds: Deploying a New, Digital Tool for Open Source Biosurveillance across Federal Agencies

The National Biosurveillance Integration Center (NBIC) is deploying a scalable, flexible open source data collection, analysis, and dissemination tool to support biosurveillance operations by the U.S. Department of Homeland Security (DHS) and its federal interagency partners.IntroductionNBIC integrates, analyzes, and distributes key information about health and disease events to help ensure the nation’s responses are well-informed, save lives, and minimize economic impact. To meet its mission objectives, NBIC utilizes a variety of data sets, including open source information, to provide comprehensive coverage of biological events occurring across the globe. NBIC Biofeeds is a digital tool designed to improve the efficiency of analyzing large volumes of open source reporting and increase the number of relevant insights gleaned from this dataset. Moreover, the tool provides a mechanism to disseminate tailored, electronic message notifications in near-real time so that NBIC can share specific information of interest to its interagency partners in a timely manner. NBIC intends to implement operational use of the capability in FY 2018. The core components of the system are data collection, curation, and dissemination of information deemed important by NBIC subject matter experts. NBIC Biofeeds has captured information from more than 70,000 unique sources published from around the globe and presents, on average, 9,000 new biosurveillance-relevant articles to users each day. NBIC leverages a variety of data feeds, including third party aggregators like Google and subscription-based feeds such as HealthMap, as well as Really Simple Syndication (RSS) feeds and web-scraping of highly relevant sources. The NBIC biosurveillance taxonomy imbedded in the tool consists of more than 600 metadata targets that cover key information for understanding the significance of an active biological event, including etiologic agents, impact to humans and animals (e.g., infection severity, healthcare workers involved, type of host), social disruption, infrastructure strain, countermeasures engaged, and ‘red flag’ characteristics (e.g., pathogen appearance in a new geographic area, unusual clinical signs). This taxonomy serves as a foundation for data curation and can be tailored by NBIC partners to more directly meet their own mission objectives. At this time, metadata is predominately captured by NBIC analysts, who manually tag information, which triggers the population of three automatically-disseminated products from the tool: 1) the NBIC Daily Biosurveillance Review, 2) immediate and daily summary email notifications, and 3) custom-designed RSS feeds. These products are meant for individual recipients in the federal interagency and for consumption by other biosurveillance information technology systems, such as the Department of Defense, Defense Threat Reduction Agency (DTRA) Biosurveillance Ecosystem (BSVE). NBIC is working in partnership with DTRA to integrate NBIC Biofeeds as an application directly into the BSVE and further develop the BSVE as an all-in-one platform for biosurveillance data analytics. To improve the efficiency and effectiveness of gaining insights using NBIC Biofeeds, developers of the tool at the Pacific Northwest National Laboratory (PNNL) are researching and testing a variety of advanced analytics techniques focused on: 1) article relevancy ratings to improve the review of queried data, 2) significance ratings to elucidate the perceived severity of an event based on reported characteristics, 3) full-text article retrieval and storage for improved machine-tagging, and 4) anomaly detection for emerging threats. Testing and implementation of new analytic capabilities in NBIC Biofeeds is planned for this fiscal year. NBIC Biofeeds was developed to serve as a sophisticated and powerful open source biosurveillance technology of value to the federal government by providing information to stakeholders conducting open source biosurveillance as well as those consuming biosurveillance information. In FY 2018, NBIC Biofeeds will begin operational use by NBIC and an initial set of users in various federal agencies. User accounts for testing purposes will be available to other federal partners, and a broad scope of federal stakeholders can receive products directly from NBIC Biofeeds based on their interests. NBIC Biofeeds is expected to enable more rapid recognition and enhanced analysis of emerging biological events by NBIC analysts. NBIC anticipates other federal agencies with biosurveillance missions will find this technology of value and intends to offer use of the platform to those federal partners that can benefit from access to the tool and information generated from NBIC Biofeeds.

NBIC↗

Enabling Advanced Automation in Spacecraft Operations with the Spacecraft Emergency Response System

True autonomy is the Holy Grail of spacecraft mission operations. The goal of launching a satellite and letting it manage itself throughout its useful life is a worthy one. With true autonomy, the cost of mission operations would be reduced to a negligible amount. Under full autonomy, any problems (no matter the severity or type) that may arise with the spacecraft would be handled without any human intervention via some combination of smart sensors, on-board intelligence, and/or smart automated ground system. Until the day that complete autonomy is practical and affordable to deploy, incremental steps of deploying ever-increasing levels of automation (computerization of once manual tasks) on the ground and on the spacecraft are gradually decreasing the cost of mission operations. For example, NASA's Goddard Space Flight Center (NASA-GSFC) has been flying spacecraft with low cost operations for several years. NASA-GSFC's SMEX (Small Explorer) and MIDEX (Middle Explorer) missions have effectively deployed significant amounts of automation to enable the missions to fly predominately in 'light-out' mode. Under light-out operations the ground system is run without human intervention. Various tools perform many of the tasks previously performed by the human operators. One of the major issues in reducing human staff in favor of automation is the perceived increased in risk of losing data, or even losing a spacecraft, because of anomalous conditions that may occur when there is no one in the control center. When things go wrong, missions deploying advanced automation need to be sure that anomalous conditions are detected and that key personal are notified in a timely manner so that on-call team members can react to those conditions. To ensure the health and safety of its lights-out missions, NASA-GSFC's Advanced Automation and Autonomy branch (Code 588) developed the Spacecraft Emergency Response System (SERS). The SERS is a Web-based collaborative environment that enables secure distributed fault and resource management. The SERS incorporates the use of intelligent agents, threaded discussions, workflow, database connectivity, and links to a variety of communications devices (e.g., two-way paging, PDA's, and Internet phones) via commercial gateways. When the SERS detects a problem, it notifies on-call team members, who then can remotely take any necessary actions to resolve the anomalies.The SERS goes well beyond a simple '911' system that sends out an error code to everyone with a pager. Instead, SERS' software agents send detailed data (i.e., notifications) to the most appropriate team members based on the type and severity of the anomaly and the skills of the on-call team members. The SERS also allows the team members to respond to the notifications from their wireless devices. This unique capability ensures rapid response since the team members no longer have to go to a PC or the control center for every anomalous event. Most importantly, the SERS enables safe experimentation with various techniques for increasing levels of automation, leading to robust autonomy. For the MIDEX missions at NASA GSFC, the SERS is used to provide 'human-in-the-loop' automation. During lights-out operations, as greater control is given to the MIDEX automated systems, the SERS can be configured to page remote personnel and keep them informed regarding actions taking place in the control center. Remote off-duty operators can even be given the option of enabling or inhibiting a specific automated response in near real time via their two-way pagers. The SERS facilitates insertion of new technology to increase automation, while maintaining the safety and security of mission resources. This paper will focus on SERS' overall functionality and how SERS has been designed to handle the monitoring and emergency response for missions with varying levels of automation. The paper will also convey some of the key lessons learned from SERS' deployment across of variety of missions, highlighting this incremental approach to achieving 'robust autonomy'.

Breed, Julie↗

Delivering Faster Congestion Feedback with the Mark-Front Strategy

Computer networks use congestion feedback from the routers and destinations to control the transmission load. Delivering timely congestion feedback is essential to the performance of networks. Reaction to the congestion can be more effective if faster feedback is provided. Current TCP/IP networks use timeout, duplicate Acknowledgement Packets (ACKs) and explicit congestion notification (ECN) to deliver the congestion feedback, each provides a faster feedback than the previous method. In this paper, we propose a markfront strategy that delivers an even faster congestion feedback. With analytical and simulation results, we show that mark-front strategy reduces buffer size requirement, improves link efficiency and provides better fairness among users. Keywords: Explicit Congestion Notification, mark-front, congestion control, buffer size requirement, fairness.

Liu, Chunlei↗