Search NASA⌕ Search

SEARCH · Search NASA

Results for “packer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Triton: Environmental Monitoring Technology Development, Collision Risk Data Collection (Final Report)

In this project, we assembled a sensor suite that combines a scientific echosounder (sonar) system with video and acoustic cameras (secondary sensors). The sensor suite generates data that is amenable to automated target detection algorithms and can provide inputs to animal encounter models. We developed software (archiving software) to collect data simultaneously from all sensors in the suite, analyze the sonar data automatically in near real-time to identify time periods when targets of interest were present, and automatically archive data from the secondary sensors for these time periods. The product of the archiving software is a data set for the secondary sensors, containing data only for the times when targets of interest were determined to be present by the sonar. We performed controlled field testing to verify the operation of the sensor suite and the archiving software.

47 OTHER INSTRUMENTATION↗

Basic Data Report for Monitor Well AEC-7 (C-2742) Reconfiguration Activities

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic and mixed waste under the Hazardous Waste Facility Permit (Permit NM4890139088-TSDF, as amended) issued by the New Mexico Environment Department (NMED). WIPP is located approximately 26 miles east of Carlsbad, New Mexico, in eastern Eddy County (Figure 1-1). Disposal panels are being excavated in the Permian Salado Formation at a depth of approximately 2,150 feet below ground surface (bgs). Over the years a number of groundwater monitor wells have been installed for site characterization and to monitor temporal and spatial changes in groundwater elevation and chemistry at WIPP. Many of the wells used for this purpose were constructed of carbon steel casing that has deteriorated to varying degrees due to corrosion. For some wells, the deterioration has led to failure of the well integrity. In such cases, the well must either be reconfigured or completely plugged, according to regulatory requirements, to prevent commingling of groundwater from different formations. Other wells are nearing the end of their useful life and/or are duplicative of other wells that serve the same purpose. Because of these integrity issues, WIPP has begun a program to plug and abandon wells that are no longer useful for the monitoring program or are redundant, and to reconfigure other wells for future monitoring. One such well is known as AEC-7, which was reconfigured to monitor only the Culebra Member of the Rustler Formation. The New Mexico Office of the State Engineer (OSE) permitted well AEC-7 as C-2742. This well has been part of the far-field monitoring network since 1974. The well was used to obtain water level levations and hydraulic parameters from both the Bell Canyon Formation and the Culebra Member of the Rustler Formation. This basic data report provides a historical account of the well from the original installation to the current configuration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description Addendum

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) facility for fiscal year 2010. The addendum adds work scope to the previously developed program plan (DOE/WIPP 08-3376). Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico well drilling contractor holding a valid and current well driller license. The term "Contractor" refers to the licensed well driller and /or registered drill rig supervisor assigned by the well drilling contractor, who will be directed by the WIPP Subcontract Technical Representative (STR) or designee at the drilling site. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2008 Well Plugging and Abandonment and Reconfiguration Program (Rev. 0)

This work plan describes the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) for fiscal year 2008. Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico licensed drilling contractor. The term "Contractor" refers to the driller, who will be supervised by the Site Technical Representative (STR) or designee. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Piezometers PZ-13, PZ-14, and PZ-15 and Shallow Subsurface Water

The Site and Preliminary Design Validation (SPDV) pile is located in the southwest corner of Section 21, Township 22 South, Range 31 East in Eddy County, New Mexico, adjacent to the Waste Isolation Pilot Plant (WIPP) operational area. During August 2007, piezometers (PZ)-13, PZ-14, and PZ-15 were drilled around the SPDV pile to determine if shallow subsurface water (SSW) existed around the SPDV pile and, if so, provide a means to monitor. These piezometers were drilled with a combination of hollow-stem auger and air-assisted hollow-stem auger drilling. Below the surficial dunes and Berino soil, piezometers PZ-13 and PZ-14 encountered in order, from shallowest to deepest, the Mescalero caliche, Gatuña Formation, Santa Rosa Formation, and Dewey Lake Formation. Piezometer PZ-15 was completed in the Gatuña Formation, having not encountered the lower formations by the time SSW was detected. Water was encountered in all wells. Piezometers were constructed of 2-inch polyvinyl chloride casing and 15 feet of 0.020-inch slot screen. Water samples were obtained and analyzed for each well. Based on the results of the installation of the piezometers, analysis of water levels, and geological analysis, it is concluded that the water levels identified in PZ-13 and PZ-14 are the result of the SPDV pile runoff or infiltration prior to being lined. Water in PZ-15 is much shallower and chemically different that water in the other two wells, indicating another source, such as recharge and infiltration from the east of the SPDV pile.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Piezometers PZ-13, PZ-14, and PZ-15, and Shallow Subsurface Water (Rev. 1)

The Site and Preliminary Design Validation (SPDV) pile is located in the southwest corner of Section 21, Township 22 South, Range 31 East in Eddy County, New Mexico, adjacent to the Waste Isolation Pilot Plant (WIPP) operational area. During August 2007, piezometers (PZ)-13, PZ-14, and PZ-15 were drilled around the SPDV pile to determine if shallow subsurface water (SSW) existed around the SPDV pile and, if so, provide a means to monitor. These piezometers were drilled with a combination of hollow-stem auger and air-assisted hollow-stem auger drilling. Below the surficial dunes and Berino soil, piezometers PZ-13 and PZ-14 encountered in order, from shallowest to deepest, the Mescalero caliche, Gatuña Formation, Santa Rosa Formation, and Dewey Lake Formation. Piezometer PZ-15 was completed in the Gatuña Formation, having not encountered the lower formations by the time SSW was detected. Water was encountered in all wells. Piezometers were constructed of 2-inch polyvinyl chloride casing and 15 feet of 0.020-inch slot screen. Water samples were obtained and analyzed for each well. Based on the results of the installation of the piezometers, analysis of water levels, and geological analysis, it is concluded that the water levels identified in PZ-13 and PZ-14 are the result of the SPDV pile runoff or infiltration prior to being lined. Water in PZ-15 is much shallower and chemically different that water in the other two wells, indicating another source, such as recharge and infiltration from the east of the SPDV pile.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Piezometers PZ-13, PZ-14, and PZ-15, and Shallow Subsurface Water (Rev. 2)

The Site and Preliminary Design Validation (SPDV) pile is located in the southwest corner of Section 21, Township 22 South, Range 31 East in Eddy County, New Mexico, adjacent to the Waste Isolation Pilot Plant (WIPP) operational area. During August 2007, piezometers (PZ)-13, PZ-14, and PZ-15 were drilled around the SPDV pile to determine if shallow subsurface water (SSW) existed around the SPDV pile and, if so, provide a means to monitor. These piezometers were drilled with a combination of hollow-stem auger and air-assisted hollow-stem auger drilling. Below the surficial dunes and Berino soil, piezometers PZ-13 and PZ-14 encountered in order, from shallowest to deepest, the Mescalero caliche, Gatuña Formation, Santa Rosa Formation, and Dewey Lake Formation. Piezometer PZ-15 was completed in the Gatuña Formation, having not encountered the lower formations by the time SSW was detected. Water was encountered in all wells. Piezometers were constructed of 2-inch polyvinyl chloride casing and 15 feet of 0.020-inch slot screen. Water samples were obtained and analyzed for each well. Based on the results of the installation of the piezometers, analysis of water levels, and geological analysis, it is concluded that the water levels identified in PZ-13 and PZ-14 are the result of the SPDV pile runoff or infiltration prior to being lined. Water in PZ-15 is much shallower and chemically different that water in the other two wells, indicating another source, such as recharge and infiltration from the east of the SPDV pile.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Piezometers PZ-13, PZ-14, and PZ-15, and Shallow Subsurface Water (Rev. 3)

The Site and Preliminary Design Validation (SPDV) pile is located in the southwest corner of Section 21, Township 22 South, Range 31 East in Eddy County, New Mexico, adjacent to the Waste Isolation Pilot Plant (WIPP) operational area. During August 2007, piezometers (PZ)-13, PZ-14, and PZ-15 were drilled around the SPDV pile to determine if shallow subsurface water (SSW) existed around the SPDV pile and, if so, provide a means to monitor. These piezometers were drilled with a combination of hollow-stem auger and air-assisted hollow-stem auger drilling. Below the surficial dunes and Berino soil, piezometers PZ-13 and PZ-14 encountered in order, from shallowest to deepest, the Mescalero caliche, Gatuña Formation, Santa Rosa Formation, and Dewey Lake Formation. Piezometer PZ-15 was completed in the Gatuña Formation, having not encountered the lower formations by the time SSW was detected. Water was encountered in all wells. Piezometers were constructed of 2-inch polyvinyl chloride casing and 15 feet of 0.020-inch slot screen. Water samples were obtained and analyzed for each well. Based on the results of the installation of the piezometers, analysis of water levels, and geological analysis, it is concluded that the water levels identified in PZ-13 and PZ-14 are the result of the SPDV pile runoff or infiltration prior to being lined. Water in PZ-15 is much shallower and chemically different that water in the other two wells, indicating another source, such as recharge and infiltration from the east of the SPDV pile.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description for WIPP Wells 25 and H-4b

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) for fiscal year 2009. The addendum adds work scope to the previously developed program plan (DOE/WIPP-08-3376, Fiscal Year 2008 Well Plugging and Abandonment and Reconfiguration Program). Over the years, a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico licensed drilling contractor. The term "Contractor" refers to the driller, who will be supervised by the Site Technical Representative (STR) or designee. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modified fused silicide coatings for tantalum (Ta-10W) reentry heat shields

Results are presented of a program of research to develop a reliable, high performance, fused slurry silicide coating for the Ta-10W alloy. The effort was directed toward developing new and improved formulations for use at 2600 to 2800 F (1700 to 1811 K) in an atmospheric reentry thermal protection system with a 100-mission capability. Based on a thorough characterization of isothermal and cyclic oxidation behavior, bend transition temperatures, room- and elevated-temperature tensile properties, and creep behavior, a 2.5 Mn-33Ti-64.5Si coating (designated MTS) provides excellent protection for the Ta-10W alloy in simulated reentry environments. An extensive analysis of the oxidation behavior and characteristics of the MTS coating in terms of fundamental mechanisms also is presented.

Packer, C. M.↗

Paleomagnetism of the Mesozoic in Alaska

Over 400 oriented cores of Permian, Triassic, Jurassic, and Cretaceous sedimentary and igneous rocks were collected from 34 sites at 10 areas throughout southern Alaska. After magnetic cleaning in successively higher alternating fields 179 samples were considered to be stable and to give statistically consistent results within each site and age group. Due to the lack of a sufficient number of stable samples, the results from Permian, Triassic, and Cretaceous rocks were inconclusive. The nine remaining Jurassic sites represent 100 samples from three general areas in southern Alaska. The southern Alaskan Jurassic paleomagnetic pole is significantly different from the North American Jurassic pole. This suggests that since the Jurassic, southern Alaska must have moved approximately 18 degrees north and rotated 52 degrees clockwise to reach its present position. Tectonic interpretation of these results give a possible explanation for many of the geologic features observed in southern Alaska.

Packer, D. R.↗

Development of a fused slurry silicide coating for the protection of tantalum alloys

Results are reported of a research program to develop a reliable high-performance, fused slurry silicide protective coating for a tantalum-10 tungsten alloy for use at 1427 to 1538 C at 0.1 to 10 torr air pressure under cyclic temperature conditions. A review of silicide coating performance under these conditions indicated that the primary wear-out mode is associated with widening of hairline fissures in the coating. Consideration has been given to modifying the oxidation products that form on the coating surface to provide a seal for these fissures and to minimize their widening. On the basis of an analysis of the phase relationships between silica and various other oxides, a coating having the slurry composition 2.5Mn-33Ti-64.5Si was developed that is effective in the pressure range from 1 to 10 torr.

Packer, C. M.↗

Holding fixture for variable-contour parts

Array of vacuum cups on spindles holds parts for safe machining and other processings. Variable-contour part resting on fixture is held firmly enough for machining, coating, or other mechanical treatment.

Haynie, C. C.↗