Search NASA⌕ Search

SEARCH · Search NASA

Results for “performance verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Control structural interaction testbed: A model for multiple flexible body verification

Conventional end-to-end ground tests for verification of control system performance become increasingly complicated with the development of large, multiple flexible body spacecraft structures. The expense of accurately reproducing the on-orbit dynamic environment and the attendant difficulties in reducing and accounting for ground test effects limits the value of these tests. TRW has developed a building block approach whereby a combination of analysis, simulation, and test has replaced end-to-end performance verification by ground test. Tests are performed at the component, subsystem, and system level on engineering testbeds. These tests are aimed at authenticating models to be used in end-to-end performance verification simulations: component and subassembly engineering tests and analyses establish models and critical parameters, unit level engineering and acceptance tests refine models, and subsystem level tests confirm the models' overall behavior. The Precision Control of Agile Spacecraft (PCAS) project has developed a control structural interaction testbed with a multibody flexible structure to investigate new methods of precision control. This testbed is a model for TRW's approach to verifying control system performance. This approach has several advantages: (1) no allocation for test measurement errors is required, increasing flight hardware design allocations; (2) the approach permits greater latitude in investigating off-nominal conditions and parametric sensitivities; and (3) the simulation approach is cost effective, because the investment is in understanding the root behavior of the flight hardware and not in the ground test equipment and environment.

Chory, M. A.↗

Microthruster Propulsion for the Space Technology 7 (ST7) Technology Demonstration Mission

For future applications to precision formation flying missions, NASA's New Millennium Program is scheduled to test colloid micro-Newton thrusters (CMNTs) on the ST7 technology demonstration mission. These CMNTs are part of a disturbance reduction system (DRS) on the ESA SMART-2 Spacecraft or LISA Pathfinder. The goal of the ST7 DRS is to demonstrate technologies necessary to meet the nanometer precision positioning control requirements of the LISA mission. In order to achieve these goals, the CMNTs are required to demonstrate a thrust resolution of less than 0.1 micro-N and a thrust noise of less than 0.1 micro-N/[square root]Hz for thrust levels between 5 and 30 micro-N. Developed by Busek Co. with support from JPL in testing an design, the CMNT has been developed over the last four years into a flight-ready microthrust system. The development, validation testing, and flight unit production of the CMNTs are described. Development tests and analysis include preliminary wear tests, propellant loading process verification, flow testing, and performance verification. Validation and flight unit verification includes thermal and structural analysis, life testing, thermal and dynamic load testing, and performance verification. Final delivery of the units is planned in 2007 with and planned launch and flight demonstration 2009.

microthruster↗

Performance Increase Verification for a Bipropellant Rocket Engine

Component performance assessment testing for a, pressure-fed earth storable bipropellant rocket engine was successfully completed at Aerojet's Redmond test facility. The primary goal of the this development project is to increase the specific impulse of an apogee class bi-propellant engine to greater than 330 seconds with nitrogen tetroxide and monomethylhydrazine propellants and greater than 335 seconds with nitrogen tetroxide and hydrazine. The secondary goal of the project is to take greater advantage of the high temperature capabilities of iridium/rhenium chambers. In order to achieve these goals, the propellant feed pressures were increased to 400 psia, nominal, which in turn increased the chamber pressure and temperature, allowing for higher c*. The tests article used a 24-on-24 unlike doublet injector design coupled with a copper heat sink chamber to simulate a flight configuration combustion chamber. The injector is designed to produce a nominal 200 lbf of thrust with a specific impulse of 335 seconds (using hydrazine fuel). Effect of Chamber length on engine C* performance was evaluated with the use of modular, bolt-together test hardware and removable chamber inserts. Multiple short duration firings were performed to characterize injector performance across a range of thrust levels, 180 to 220 lbf, and mixture ratios, from 1.1 to 1.3. During firing, ignition transient, chamber pressure, and various temperatures were measured in order to evaluate the performance of the engine and characterize the thermal conditions. The tests successfully demonstrated the stable operation and performance potential of a full scale engine with a measured c* of XXXX ft/sec (XXXX m/s) under nominal operational conditions.

Alexander, Leslie↗

Verification of performance of the Mariner 9 television cameras.

The large volume of picture data produced by the Mariner 9 Television Experiment, in addition to providing a description of the planet Mars, emphasizes the need for in situ verification of camera performance. Such data provide the basis for initial quantitative image interpretation by confirmation of the relevance of preflight measurement. This information must be the result of planned calibration sequences rather than extraction from nominal mission photography. A lack of sufficient numbers of frames restricted Mariner camera verifications to only limited operational modes under optimal conditions and required significant extrapolation over the duration of the mission. The evidence does suggest that measurable photometric changes occurred, whereas agreement with preflight data is observed for other parameters.

Thorpe, T. E.↗

Performance Measurement of Advanced Stirling Convertors (ASC-E3)

NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing data of the Advanced Stirling Convertor (ASC). The latest version of the ASC (ASC-E3, to represent the third cycle of engineering model test hardware) is of a design identical to the forthcoming flight convertors. For this generation of hardware, a joint Sunpower and GRC effort was initiated to improve and standardize the test support hardware. After this effort was completed, the first pair of ASC-E3 units was produced by Sunpower and then delivered to GRC in December 2012. GRC has begun operation of these units. This process included performance verification, which examined the data from various tests to validate the convertor performance to the product specification. Other tests included detailed performance mapping that encompassed the wide range of operating conditions that will exist during a mission. These convertors were then transferred to Lockheed Martin for controller checkout testing. The results of this latest convertor performance verification activity are summarized here.

Stirling Cycle↗

Simulation verification techniques study

Results are summarized of the simulation verification techniques study which consisted of two tasks: to develop techniques for simulator hardware checkout and to develop techniques for simulation performance verification (validation). The hardware verification task involved definition of simulation hardware (hardware units and integrated simulator configurations), survey of current hardware self-test techniques, and definition of hardware and software techniques for checkout of simulator subsystems. The performance verification task included definition of simulation performance parameters (and critical performance parameters), definition of methods for establishing standards of performance (sources of reference data or validation), and definition of methods for validating performance. Both major tasks included definition of verification software and assessment of verification data base impact. An annotated bibliography of all documents generated during this study is provided.

Schoonmaker, P. B.↗

Prototype solar power satellite options

The choice of options for the prototype solar power satellite is addressed relative to risk and cost. Emphasis is placed on the reduction of the risk of failure. Risk is the program cost multiplied by the reduction in probability of program success due to the risky action. Four classes of risk are identified. It is suggested that prototyping would reduce the technical risk as well as reduce the effects of the other three types of risk by allowing them to be quantified earlier. Prototype demonstration requirements addressed include electromagnetic power link feasibility demonstration, component integration verification, construction technology verification, and cost performance verification. Specific prototype requirements are listed and prototyping options are given in tabular form.

Sperber, B. R.↗

Performance Testing of Yardney Li-Ion Cells and Batteries in Support of JPL's 2009 Mars Science Laboratory Mission

In 2009, JPL is planning to launch an unmanned rover mission to the planet Mars. This mission, referred to as the Mars Science Laboratory (MSL), will involve the use of a rover that is much larger than the previously developed Spirit and Opportunity Rovers for the 2003 Mars Exploration Rover (MER) mission, that are currently still in operation on the surface of the planet after more than three years. Part of the reason that the MER rovers have operated so successfully, far exceeding the required mission duration of 90 sols, is that they possess robust Li-ion batteries, manufactured by Yardney Technical Products, which have demonstrated excellent life characteristics. Given the excellent performance characteristics displayed, similar lithium-ion batteries have been projected to successfully meet the mission requirements of the up-coming MSL mission. Although comparable in many facets, such as being required to operate over a wide temperature range (-20 to 40 C), the MSL mission has more demanding performance requirements compared to the MER mission, including much longer mission duration (approx. 687 sols vs. 90 sols), higher power capability, and the need to withstand higher temperature excursions. In addition, due to the larger rover size, the MSL mission necessitates the use of a much larger battery to meet the energy, life, and power requirements. In order to determine the viability of meeting these requirements, a number of performance verification tests were performed on 10 Ah Yardney lithium-ion cells (MER design) under MSL-relevant conditions, including mission surface operation simulation testing. In addition, the performance of on-going ground life testing of 10 Ah MER cells and 8-cell batteries will be discussed in the context of capacity loss and impedance growth predictions.

MSL Rover↗

Verification of performance of the Mariner 9 television cameras

Based on limited data, the Mariner 9 performance appears consistent throughout its mission. Several corrections have been provided by inflight verification sequences. A change in photometric response, which will impair precise photometric analysis, has been observed. Hence, only qualified photometric measurement appears feasible under limited conditions. Conversely, certain geometric and electronic parameters appear both measurable and congruent with preflight prediction. The role of inflight verification has been emphasized by these data to assess the in situ camera health and to promote efficient data analysis and interpretation.

Thorpe, T. E.↗

J-2X Abort System Development

The J-2X is an expendable liquid hydrogen (LH2)/liquid oxygen (LOX) gas generator cycle rocket engine that is currently being designed as the primary upper stage propulsion element for the new NASA Ares vehicle family. The J-2X engine will contain abort logic that functions as an integral component of the Ares vehicle abort system. This system is responsible for detecting and responding to conditions indicative of impending Loss of Mission (LOM), Loss of Vehicle (LOV), and/or catastrophic Loss of Crew (LOC) failure events. As an earth orbit ascent phase engine, the J-2X is a high power density propulsion element with non-negligible risk of fast propagation rate failures that can quickly lead to LOM, LOV, and/or LOC events. Aggressive reliability requirements for manned Ares missions and the risk of fast propagating J-2X failures dictate the need for on-engine abort condition monitoring and autonomous response capability as well as traditional abort agents such as the vehicle computer, flight crew, and ground control not located on the engine. This paper describes the baseline J-2X abort subsystem concept of operations, as well as the development process for this subsystem. A strategy that leverages heritage system experience and responds to an evolving engine design as well as J-2X specific test data to support abort system development is described. The utilization of performance and failure simulation models to support abort system sensor selection, failure detectability and discrimination studies, decision threshold definition, and abort system performance verification and validation is outlined. The basis for abort false positive and false negative performance constraints is described. Development challenges associated with information shortfalls in the design cycle, abort condition coverage and response assessment, engine-vehicle interface definition, and abort system performance verification and validation are also discussed.

Santi, Louis M.↗

Verification and performance tests of HYCAR program

The HYCAR program simulates the network protocols of HYPERchannel and Fiber Optic Demonstration System (FODS) and other related protocols. Verification tests of the program were conducted using the FODS protocol. The tests validated the operation of the program through deterministic and analytical means. Extensive experimentation with the simulator produced a set of performance characteristics for the FODS protocol under varied loading conditions. These characteristics are consistent with those expected, and are documented with the validation tests.

Bhatia, Veena↗

Simulation verification techniques study. Task report 4: Simulation module performance parameters and performance standards

Shuttle simulation software modules in the environment, crew station, vehicle configuration and vehicle dynamics categories are discussed. For each software module covered, a description of the module functions and operational modes, its interfaces with other modules, its stored data, inputs, performance parameters and critical performance parameters is given. Reference data sources which provide standards of performance are identified for each module. Performance verification methods are also discussed briefly.

Source record↗

Ambient and Cryogenic Alignment Verification and Performance of the Infrared Multi-Object Spectrometer

The Infrared Multi-Object Spectrometer (IRMOS) is a facility instrument for the Kitt Peak National Observatory 4 and 2.1 meter telescopes. IRMOS is a near-IR (0.8 - 2.5 micron) spectrometer with low- to mid-resolving power (R = 300 - 3000). IRMOS produces simultaneous spectra of approximately 100 objects in its 2.8 x 2.0 arc-min field of view using a commercial Micro Electro-Mechanical Systems (MEMS) Digital Micro-mirror Device (DMD) from Texas Instruments. The IRMOS optical design consists of two imaging subsystems. The focal reducer images the focal plane of the telescope onto the DMD field stop, and the spectrograph images the DMD onto the detector. We describe ambient breadboard subsystem alignment and imaging performance of each stage independently, and the ambient and cryogenic imaging performance of the fully assembled instrument. Interferometric measurements of subsystem wavefront error serve to venfy alignment, and are accomplished using a commercial, modified Twyman-Green laser unequal path interferometer. Image testing provides further verification of the optomechanical alignment method and a measurement of near-angle scattered light due to mirror small-scale surface error. Image testing is performed at multiple field points. A mercury-argon pencil lamp provides spectral lines at 546.1 nm and 1550 nm, and a CCD camera and IR camera are used as detectors. We use commercial optical modeling software to predict the point-spread function and its effect on instrument slit transmission and resolution. Our breadboard test results validate this prediction. We conclude with an instrument performance prediction for first light.

Connelly, Joseph A.↗

The Design, Verification and Performance of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is NASA’s flagship mission successor to the highly successful Hubble Space Telescope. It is an infrared observatory featuring a cryogenic 6.6 m aperture, deployable Optical Telescope Element (OTE) with a payload of four science instruments (SIs) assembled into an Integrated Science Instrument Module (ISIM) that provide imagery and spectroscopy in the near-infrared band between 0.6 and 5 μm and in the mid-infrared band between 5 and 28.1 μm. JWST was successfully launched on 2021 December 25 aboard an Ariane 5 launch vehicle. All 50 major deployments were successfully completed on 2022 January 8. The observatory performed all midcourse correction maneuvers and achieved its operational mission orbit around the Sun–Earth second Lagrange point (L2). All commissioning and calibration activities have been completed, and JWST has begun its science mission. This paper will provide a description of the driving requirements and their technical challenges, the engineering processes involved in the design formulation, the resulting observatory design, the verification programs that proved it to be flightworthy, and the measured on-orbit performance of the observatory. Since companion papers will describe the details of the OTE and SIs, this paper will concentrate on describing the key features of the observatory architecture that accommodates these elements, particularly those features and capabilities associated with accommodating the radiometric and image-quality performance.

Galaxy evolution↗

Verification and Validation Methodology of Real-Time Adaptive Neural Networks for Aerospace Applications

Recent research has shown that adaptive neural based control systems are very effective in restoring stability and control of an aircraft in the presence of damage or failures. The application of an adaptive neural network with a flight critical control system requires a thorough and proven process to ensure safe and proper flight operation. Unique testing tools have been developed as part of a process to perform verification and validation (V&V) of real time adaptive neural networks used in recent adaptive flight control system, to evaluate the performance of the on line trained neural networks. The tools will help in certification from FAA and will help in the successful deployment of neural network based adaptive controllers in safety-critical applications. The process to perform verification and validation is evaluated against a typical neural adaptive controller and the results are discussed.

Gupta, Pramod↗

Development and Testing of Automatically Generated ACS Flight Software for the MAP Spacecraft

By integrating the attitude determination and control system (ACS) analysis and design, flight software development, and flight software testing processes, it is possible to improve the overall spacecraft development cycle, as well as allow for more thorough software testing. One of the ways to achieve this integration is to use code-generation tools to automatically generate components of the ACS flight software directly from a high-fidelity (HiFi) simulation. In the development of the Microwave Anisotropy Probe (MAP) spacecraft, currently underway at the NASA Goddard Space Flight Center, approximately 1/3 of the ACS flight software was automatically generated. In this paper, we will examine each phase of the ACS subsystem and flight software design life cycle: analysis, design, and testing. In the analysis phase, we scoped how much software we would automatically generate and created the initial interface. The design phase included parallel development of the HiFi simulation and the hand-coded flight software components. Everything came together in the test phase, in which the flight software was tested, using results from the HiFi simulation as one of the bases of comparison for testing. Because parts of the spacecraft HiFi simulation were converted into flight software, more care needed to be put into its development and configuration control to support both the HiFi simulation and flight software. The components of the HiFi simulation from which code was generated needed to be designed based on the fact that they would become flight software. This process involved such considerations as protecting against mathematical exceptions, using acceptable module and parameter naming conventions, and using an input/output interface compatible with the rest of the flight software. Maintaining good configuration control was an issue for the HiFi simulation and the flight software, and a way to track the two systems was devised. Finally, an integrated test approach was devised to support flight software testing at both the unit- and build-test levels using the HiFi simulation to generate data for performance verification. Another benefit of the simulation and code-generation application used on the MAP project is that it supported bringing flight software and test data into the HiFi simulation environment. It was possible to integrate parts of the hand-coded flight software into the HiFi simulation, and also possible to import flight software test data for comparison and performance verification. This capability was used to incorporate the flight software Kalman filter into the HiFi simulation. This enabled us to greatly increase the amount of testing that could be done on the filter, because we could exert a greater degree of control over the software-only simulation than over the flight software test environment. Also, since the simulation could be used to run the Kalman filter faster than real time, our testing efficiency was greatly increased. We will conclude our discussion with a summary of the lessons learned thus far using automatically- generated code for the MAP project, and the spacecraft status as we work towards our scheduled launch in the year 2000.

ODonnell, James R., Jr.↗

Integrated heat pipe-thermal storage system performance evaluation

An integrated thermal energy storage (TES) system, developed as a part of an organic Rankine cycle solar dynamic power system is described, and the results of the performance verification tests of this TES system are presented. The integrated system consists of potassium heat-pipe elements that incorporate TES canisters within the vapor space, along with an organic fluid heater tube used as the condenser region of the heat pipe. The heat pipe assembly was operated through the range of design conditions from the nominal design input of 4.8 kW to a maximum of 5.7 kW. The performance verification tests show that the system meets the functional requirements of absorbing the solar energy reflected by the concentrator, transporting the energy to the organic Rankine heater, providing thermal storage for the eclipse phase, and allowing uniform discharge from the thermal storage to the heater.

Keddy, E.↗

Formalization of the Bellman-Ford Algorithm for Airspace Applications

This paper describes the formal verification of one of the most well-known algorithms for finding the shortest path between all vertices in a directed graph, namely the Bellman-Ford algorithm. This formal verification, performed in the Prototype Verification System (PVS), is motivated by two applications in the aerospace domain which use the algorithm for path planning. The first is a pre-flight calculation that uses an adapted version of Bellman-Ford to find a route intended to maximize GNSS availability throughout the flight. The second is a more traditional application intended to find the shortest path between an autonomous aircraft's current position and a goal waypoint, while avoiding regions of space specified by geofences. A novel aspect of this formal verification effort is the inclusion of two distinct models of computation for the algorithm, one being a traditional serial computation, and the other being an explicitly parallel computation. The ability to use parallel computation in the Bellman-Ford algorithm is in fact why it was chosen over other traditionally more performant algorithms, especially for the GNSS application, where the size of the graph makes a purely serial computation infeasible.

formal verification↗